MONTHYEARML20217A5291999-10-0505 October 1999 Notification of 991026 Meeting with Vynpc in King of Prussia,Pa to Discuss Licensee Responses to Maint Rule Violation of 10CFR50.65(a)(3), Balancing Reliability with Unavailability ML20207M7641999-03-16016 March 1999 Forwards Monthly Rept of Status of 10CFR2.206 Petitions as of 990228.During Feb Director'S Decision DD-99-01,DD-99-02, DD-99-03 & DD-99-04,became Final Agency Actions & Closed. Attachment 3 Filed in Central Files ML20205J2731999-03-0909 March 1999 Forwards Request for Addl Info Transmitted on 990224 to T Silko of Vermont Yankee Nuclear Power Corp.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20202E4021999-01-28028 January 1999 Forwards Draft RAI Re Proposed Amend on SFP Assemblies Storage Expansion.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20196A9541998-11-19019 November 1998 Notification of 981217 Meeting with Util in Rockville,Md to Discuss Util Plans & Activities Related to long-term Spent Fuel Storage at Vermont Yankee Nuclear Power Station ML20239A2961998-09-0101 September 1998 Notification of Significant Licensee Meeting 98-078 W/Util on 980916 to Discuss NRC Systematic Assessment of Licensee Performance of Vermont Yankee Nuclear Power Station for Period 970119-980718 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20248H7531998-06-0303 June 1998 Notification of 980623 Meeting W/Vermont Yankee Nuclear Power Corp in Rockville,Md to Discuss Util Plans & Activities Related to Long Term Spent Fuel Storage at Plant ML20248L5181998-06-0202 June 1998 Forwards Document Developed by Cecil & R Croteau to Be Forwarded to V Dricks as Response to Mulligan ML20217F4151998-04-22022 April 1998 Forwards Facility Submittal of Initial/Operating Retake Exam Administered on 980209 ML20217B8571998-03-23023 March 1998 Notification of 980407 Meeting W/Util in Rockville,Md to Discuss Plant Plans & Activities Re Assurance of Adequate NPSH for Certain safety-related Pumps ML20216G1321998-03-13013 March 1998 Notification of 980324 Meeting W/Util to Discuss Licensee Plans & Activities Re Torus Strainer Replacement & Containment Issues.Meeting Will Take Place in Rockville,Md ML20217N4481998-03-10010 March 1998 Responds to 971110 Request for Assistance in Reviewing Technical Adequacy of Vermont Yankee Assessment & Repair of Structural Defects in Skid Mounted Piping for Edgs.Noted No Immediate Safety Concerns.Nrr Evaluation Encl ML20217N4721998-02-27027 February 1998 Forwards SER Re Structural Integrity of skid-mounted Piping Associated W/Edgs at Vermont Yankee.Based on Review,Staff Finds No Immediate Safety Concerns Re near-term Operability of EDGs ML20203H9091998-02-23023 February 1998 Notification of 980305 Meeting W/Utility in Rockville,Md to Discuss Vynpc Plans & Activities Re Containment Analysis, Bases for Maintaining Operations Related to Startup ML20203A9321998-02-17017 February 1998 Notification of Significant Licensee Meeting 98-17 W/Util on 980302 in King of Prussia,Pa to Discuss Apparent Violations in NRC Insp Rept 50-271/97-10 (EA-97-531) ML20198L2221998-01-0808 January 1998 Notification of 980112 Meeting W/Utility in Rockville,Md to Discuss Utility Plans & Activities Re Implementation of Torus Strainers at Vermont Yankee Nuclear Power Station. Meeting Cancelled ML20198G1441997-12-23023 December 1997 Notification of Meeting W/Vynpc on 980112 in Rockville,Md to Discuss Plans & Activities Re Implementation of Torus Strainers at Plant.Participants Listed.Agenda Encl ML20217J5131997-10-14014 October 1997 Notifies on 971103 Meeting W/Util in Rockville,Md to Discuss Util Plans & Activities Re Future Submittal on Imporved TSs for Plant ML20236N4551997-10-0606 October 1997 Submits Revised Response to Work Request Requesting Review of Region I Task Interface Agreement Re Interpretation of TSs at Vermont Yankee ML20236N3571997-09-0808 September 1997 Responds to Work Request Dtd 970804,requesting Review of Region I Task Interface Agreement Re Interpretation of TSs at Vermont Yankee,Revised Response ML20216E9851997-09-0404 September 1997 Notification of 970917 Meeting W/Vynp in Rockville,Md to Discuss Submittals & 970815 Re Implementation of ASME Code Case N560 at Vermont Yankee Nuclear Power Station ML20236N2711997-08-11011 August 1997 Discusses Work Request Requesting Review of Region I TIA Re Interpretation of TS at Vermont Yankee ML20198K8521997-07-0303 July 1997 Informs That Enforcement Action Not Appropriate for OI Rept 1-96-005, Discrimination Against Senior Engineer for Raising Concerns Over Design Change to Advanced Off Gas Sys, Because OI Did Not Substantiate Allegation ML20198K8311997-06-23023 June 1997 Forwards OI Rept of Investigation Re Discrimination Against Senior Engineer for Raising Concerns Over Design Change to Advanced Off Gas Sys,Case 1-96-005 ML20248L9751997-05-19019 May 1997 Responds to 970519 Memo from H Eichenholtz.Informs That D Vito Also Spoke W/Alleger on 970516 Re Allegation 96-128/97-0066.Alleger Was Barely Coherent & Complained About Delays in NRC Followup.Encl Partially Deleted ML20248L9671997-05-16016 May 1997 Informs That Alleger Called on 970517 & Threatened to Talk to Public & Media Unless NRC Addressed All Issues in Favor of Alleger Re Allegation 96-128/97-0066 ML20138E2001997-04-22022 April 1997 Notification of 970515 (Revised Date) Meeting W/Myaps in King of Prussia,Pennsylvania to Discuss Performance Improvements in Engineering Area:Design Basis Project;Sys Engineering Function;Other Process & Organization Lessons ML20140D6181997-04-17017 April 1997 Notification of 970514 Meeting Mn 97-45 W/Util in King of Prussia,Pa to Discuss Performance Improvements in Engineering Area,Design Basis Project,Sys Engineering Function & Other Process/Organization Lessons Learned ML20198K6861997-04-10010 April 1997 Submits Conversation W/H Eichenholz ML20137P4011997-04-0707 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Analyses & Code Use Relative to Fuel Cycle 20 ML20137C1441997-03-20020 March 1997 Notification of Meeting on 970326 W/Util in Rockville,Md to Discuss Continuous Improvement Initiatives for Vermont Yankee Nuclear Power Station ML20135F7851997-03-11011 March 1997 Notification of 970331 Meeting W/Licensee in Rockville,Md to Discuss Licensing Activities & Schedules for Vermont Yankee Nuclear Power Station ML20136C6071997-03-0505 March 1997 Notification of Significant Licensee Meeting 97-22 W/Util on 970312 to Discuss SALP Mgt Meeting for Period of 950716 Through 970118 ML20247G4121997-01-10010 January 1997 Informs That on 970110,B Ruland & Reporting Agent Contacted J Massey So Ruland Could Inform of When NRC Planned to Complete Insp Activities of Concerns W/Plant ML20198K6771996-12-18018 December 1996 Submits Plants Workers Comp Files from 1989 to Current.Lists Three Incidents Where Shock Was Involved ML20149M4011996-12-11011 December 1996 Reissued Notification of 961223 Meeting W/Util in Rockville, MD to Discuss Plant Plans for Cycle 20 Core Reload Using GE-13 Rather than GE-9 Fuel ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20135C5541996-12-0404 December 1996 Notification of 961216 Meeting W/Util in Rockville,Md to Discuss Plans to Use Different Fuel Type for Cycle 20 Core Reload ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C3361996-10-18018 October 1996 Notification of 961021 Meeting W/Officials of Vynpc to Discuss Status of Licensees Activities to Restore Fire Protection Program at VT Yankee Nuclear Power Station to Full Compliance W/App R to 10CFR50 ML20198K6701996-07-10010 July 1996 Forwards 960619 Interview Rept & 960605 Deposition Providing Info from Ej Massey Re Case 1-96-005.W/o Encl ML20248L8471996-03-29029 March 1996 Informs That Vermont Yankee Engineer Called D Reid on 960329 & Reported That PE Appeared to Be Under Influence & Threatened to Go to NRC If Vermont Yankee Did Not Settle Early Retirement Package.Related Matls Encl ML20248L8441996-03-27027 March 1996 Discusses 960327 Telcon W/B Sherman Re Status of Insp & Investigation Efforts Re Allegations Raised by Daly of New England Coalition on Nuclear Pollution in Dec 1995 ML20248L8421996-03-19019 March 1996 Refers to 960319 Telcon W/D Gibson,Informing That Massey Would Not Be Willing to Talk to J Calvert.Informs That Matter Turned Over to Region I Counsel ML20248L8391996-03-18018 March 1996 Provides Documentation of Attempts by J Calvert to Interview E Massey of Vermont Yankee During Insp of Vermont Yankee Advanced Off-Gas Sys Conducted on 960303-08 ML20248L8371996-02-0909 February 1996 Refers to 960209 Telcon W/B Sherman Who Indicated That Vermont Dept of Public Safety May Soon Be Less than Satisfied W/Nrc Handling of Allegation of H&I Re Work to Be Performed on Vermont Yankee Aog Sys 1999-03-09
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217A5291999-10-0505 October 1999 Notification of 991026 Meeting with Vynpc in King of Prussia,Pa to Discuss Licensee Responses to Maint Rule Violation of 10CFR50.65(a)(3), Balancing Reliability with Unavailability ML20207M7641999-03-16016 March 1999 Forwards Monthly Rept of Status of 10CFR2.206 Petitions as of 990228.During Feb Director'S Decision DD-99-01,DD-99-02, DD-99-03 & DD-99-04,became Final Agency Actions & Closed. Attachment 3 Filed in Central Files ML20205J2731999-03-0909 March 1999 Forwards Request for Addl Info Transmitted on 990224 to T Silko of Vermont Yankee Nuclear Power Corp.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20202E4021999-01-28028 January 1999 Forwards Draft RAI Re Proposed Amend on SFP Assemblies Storage Expansion.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20196A9541998-11-19019 November 1998 Notification of 981217 Meeting with Util in Rockville,Md to Discuss Util Plans & Activities Related to long-term Spent Fuel Storage at Vermont Yankee Nuclear Power Station ML20239A2961998-09-0101 September 1998 Notification of Significant Licensee Meeting 98-078 W/Util on 980916 to Discuss NRC Systematic Assessment of Licensee Performance of Vermont Yankee Nuclear Power Station for Period 970119-980718 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20248H7531998-06-0303 June 1998 Notification of 980623 Meeting W/Vermont Yankee Nuclear Power Corp in Rockville,Md to Discuss Util Plans & Activities Related to Long Term Spent Fuel Storage at Plant ML20248L5181998-06-0202 June 1998 Forwards Document Developed by Cecil & R Croteau to Be Forwarded to V Dricks as Response to Mulligan ML20217F4151998-04-22022 April 1998 Forwards Facility Submittal of Initial/Operating Retake Exam Administered on 980209 ML20217B8571998-03-23023 March 1998 Notification of 980407 Meeting W/Util in Rockville,Md to Discuss Plant Plans & Activities Re Assurance of Adequate NPSH for Certain safety-related Pumps ML20216G1321998-03-13013 March 1998 Notification of 980324 Meeting W/Util to Discuss Licensee Plans & Activities Re Torus Strainer Replacement & Containment Issues.Meeting Will Take Place in Rockville,Md ML20217N4481998-03-10010 March 1998 Responds to 971110 Request for Assistance in Reviewing Technical Adequacy of Vermont Yankee Assessment & Repair of Structural Defects in Skid Mounted Piping for Edgs.Noted No Immediate Safety Concerns.Nrr Evaluation Encl ML20217N4721998-02-27027 February 1998 Forwards SER Re Structural Integrity of skid-mounted Piping Associated W/Edgs at Vermont Yankee.Based on Review,Staff Finds No Immediate Safety Concerns Re near-term Operability of EDGs ML20203H9091998-02-23023 February 1998 Notification of 980305 Meeting W/Utility in Rockville,Md to Discuss Vynpc Plans & Activities Re Containment Analysis, Bases for Maintaining Operations Related to Startup ML20203A9321998-02-17017 February 1998 Notification of Significant Licensee Meeting 98-17 W/Util on 980302 in King of Prussia,Pa to Discuss Apparent Violations in NRC Insp Rept 50-271/97-10 (EA-97-531) ML20198L2221998-01-0808 January 1998 Notification of 980112 Meeting W/Utility in Rockville,Md to Discuss Utility Plans & Activities Re Implementation of Torus Strainers at Vermont Yankee Nuclear Power Station. Meeting Cancelled ML20198G1441997-12-23023 December 1997 Notification of Meeting W/Vynpc on 980112 in Rockville,Md to Discuss Plans & Activities Re Implementation of Torus Strainers at Plant.Participants Listed.Agenda Encl ML20217J5131997-10-14014 October 1997 Notifies on 971103 Meeting W/Util in Rockville,Md to Discuss Util Plans & Activities Re Future Submittal on Imporved TSs for Plant ML20236N4551997-10-0606 October 1997 Submits Revised Response to Work Request Requesting Review of Region I Task Interface Agreement Re Interpretation of TSs at Vermont Yankee ML20236N3571997-09-0808 September 1997 Responds to Work Request Dtd 970804,requesting Review of Region I Task Interface Agreement Re Interpretation of TSs at Vermont Yankee,Revised Response ML20216E9851997-09-0404 September 1997 Notification of 970917 Meeting W/Vynp in Rockville,Md to Discuss Submittals & 970815 Re Implementation of ASME Code Case N560 at Vermont Yankee Nuclear Power Station ML20236N2711997-08-11011 August 1997 Discusses Work Request Requesting Review of Region I TIA Re Interpretation of TS at Vermont Yankee ML20198K8521997-07-0303 July 1997 Informs That Enforcement Action Not Appropriate for OI Rept 1-96-005, Discrimination Against Senior Engineer for Raising Concerns Over Design Change to Advanced Off Gas Sys, Because OI Did Not Substantiate Allegation ML20198K8311997-06-23023 June 1997 Forwards OI Rept of Investigation Re Discrimination Against Senior Engineer for Raising Concerns Over Design Change to Advanced Off Gas Sys,Case 1-96-005 ML20248L9751997-05-19019 May 1997 Responds to 970519 Memo from H Eichenholtz.Informs That D Vito Also Spoke W/Alleger on 970516 Re Allegation 96-128/97-0066.Alleger Was Barely Coherent & Complained About Delays in NRC Followup.Encl Partially Deleted ML20248L9671997-05-16016 May 1997 Informs That Alleger Called on 970517 & Threatened to Talk to Public & Media Unless NRC Addressed All Issues in Favor of Alleger Re Allegation 96-128/97-0066 ML20138E2001997-04-22022 April 1997 Notification of 970515 (Revised Date) Meeting W/Myaps in King of Prussia,Pennsylvania to Discuss Performance Improvements in Engineering Area:Design Basis Project;Sys Engineering Function;Other Process & Organization Lessons ML20140D6181997-04-17017 April 1997 Notification of 970514 Meeting Mn 97-45 W/Util in King of Prussia,Pa to Discuss Performance Improvements in Engineering Area,Design Basis Project,Sys Engineering Function & Other Process/Organization Lessons Learned ML20198K6861997-04-10010 April 1997 Submits Conversation W/H Eichenholz ML20137P4011997-04-0707 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Analyses & Code Use Relative to Fuel Cycle 20 ML20137C1441997-03-20020 March 1997 Notification of Meeting on 970326 W/Util in Rockville,Md to Discuss Continuous Improvement Initiatives for Vermont Yankee Nuclear Power Station ML20135F7851997-03-11011 March 1997 Notification of 970331 Meeting W/Licensee in Rockville,Md to Discuss Licensing Activities & Schedules for Vermont Yankee Nuclear Power Station ML20136C6071997-03-0505 March 1997 Notification of Significant Licensee Meeting 97-22 W/Util on 970312 to Discuss SALP Mgt Meeting for Period of 950716 Through 970118 ML20247G4121997-01-10010 January 1997 Informs That on 970110,B Ruland & Reporting Agent Contacted J Massey So Ruland Could Inform of When NRC Planned to Complete Insp Activities of Concerns W/Plant ML20198K6771996-12-18018 December 1996 Submits Plants Workers Comp Files from 1989 to Current.Lists Three Incidents Where Shock Was Involved ML20149M4011996-12-11011 December 1996 Reissued Notification of 961223 Meeting W/Util in Rockville, MD to Discuss Plant Plans for Cycle 20 Core Reload Using GE-13 Rather than GE-9 Fuel ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20135C5541996-12-0404 December 1996 Notification of 961216 Meeting W/Util in Rockville,Md to Discuss Plans to Use Different Fuel Type for Cycle 20 Core Reload ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C3361996-10-18018 October 1996 Notification of 961021 Meeting W/Officials of Vynpc to Discuss Status of Licensees Activities to Restore Fire Protection Program at VT Yankee Nuclear Power Station to Full Compliance W/App R to 10CFR50 ML20198K6701996-07-10010 July 1996 Forwards 960619 Interview Rept & 960605 Deposition Providing Info from Ej Massey Re Case 1-96-005.W/o Encl ML20248L8471996-03-29029 March 1996 Informs That Vermont Yankee Engineer Called D Reid on 960329 & Reported That PE Appeared to Be Under Influence & Threatened to Go to NRC If Vermont Yankee Did Not Settle Early Retirement Package.Related Matls Encl ML20248L8441996-03-27027 March 1996 Discusses 960327 Telcon W/B Sherman Re Status of Insp & Investigation Efforts Re Allegations Raised by Daly of New England Coalition on Nuclear Pollution in Dec 1995 ML20248L8421996-03-19019 March 1996 Refers to 960319 Telcon W/D Gibson,Informing That Massey Would Not Be Willing to Talk to J Calvert.Informs That Matter Turned Over to Region I Counsel ML20248L8391996-03-18018 March 1996 Provides Documentation of Attempts by J Calvert to Interview E Massey of Vermont Yankee During Insp of Vermont Yankee Advanced Off-Gas Sys Conducted on 960303-08 ML20248L8371996-02-0909 February 1996 Refers to 960209 Telcon W/B Sherman Who Indicated That Vermont Dept of Public Safety May Soon Be Less than Satisfied W/Nrc Handling of Allegation of H&I Re Work to Be Performed on Vermont Yankee Aog Sys 1999-03-09
[Table view] |
Text
- _ _ _ _ _ _ _ _ _ _ _ _ _
o
. January 20, 1987 Docket No. 50-271 MEMORANDUM FOR: William Kane, Director Division of Reactor Projects Region I THRU: Robert M. Bernero, Director Division of BWR Licensing THRU: Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing l FROM: Vernon L. Rooney, Project Manager BWR Project Directorate #2 Division of BWR Licensing
SUBJECT:
NRR SALP INPUT - VERMONT YANKEE NUCLEAR POWER STATION Enclosed is NRR's input for the February 1987 SALP Board meeting for the Vermont Yankee facility. As discussed in the enclosure, our evaluation was conducted according to NRR Office Letter No. 44, Revision 1, dated December 22, 1986 and NRC Manual Chapter 0516, Systematic Assessment of Licensee Performance. The overall performance rating in the functional area of Licensing Activities is Category 1.
i OriginalSignedbi l Vernon L. Rooney, Project Manager BWR Project Directorate #2 Division of BWR Licensing
Enclosure:
l As stated f
l cc w/ enclosure:
l W. Raymond, Resident Inspector DISTRIBUTION I Docket-Filer NRC PDR Local PDR PD#2 Reading File PDf2 Plant File RBernero 8701270098 870120 VRooney PDR ADOCK 05000271 DMuller G PDR SNorris 0FFICIAL R CORD COPY DByff3 DB OM DBL:PD#f B f SNorris V ey:cb DH)/fer gRBernero' 1//f/87 1/d787 1//f/87 1/fz)/87
Docket No. 50-271 FACILITY: Vermont Yankee Nuclear Power Station LICENSEE: Vermont Yankee Nuclear Power Corporation (VYNPC)
EVALUATION PERIOD: October 19, 1985 to December 31, 1986 PROJECT MANAGER: Vernon L. Rooney
1.0 INTRODUCTION
This report contains NRR's input to the SALP review for the Vermont Yankee Nuclear Power Station. The assessment of the licensee's performance was conducted according to NRR Office Letter No. 44, Revision 1, NRR inputs to SALP Process, dated December 22, 1986. Office Letter No. 44 incorporates NRC Manual Chapter 0516, Systematic Assessment of Licensee Performance.
2.0
SUMMARY
NRC Manual Chapter 0516 specifies that each functional area evaluated will be assigned a performance category (Category 1, 2 or 3) based on a composite of a number of attributes. The performance of VYNPC in the functional area of Licensing Activities is rated Category 1.
3.0 CRITERIA The evaluation criteria used in this assessment are given in NRC Manual Chapter 0516 Appendix, Table 1, Evaluation Criteria with Attributes for Assessment of Licensee Performance.
4.0 METHODOLOGY This evaluation represents the integrated inputs of the Project Manager (PM) and those technical reviewers who ex; ended significant amounts of effort and/or prepared a Safety Evaluation for the Vermont Yankee Nuclear Power Station licensing actions during the current rating period. Using the guidelines of NRC Manual Chapter 0516, the PM and each reviewer applied specific evaluation criteria to the relevant licensee performance attributes, as delineated in Chapter 0516, and assigned an overall rating category (1, 2 or 3) to each attribute. The reviewers included this information as part of each Safety Evaluation transmitted to the PM. The PM, after reviewing the inputs of the technical reviewers, combined this information with his own assessment of licensee performance and arrived at a composite rating for the licensee. This rating also reflects the comments of the NRR Senior Executive assigned to the Vennont Yankee SALP assessment.
The basis for this appraisal was the licensee's performance in support of licensing actions that had a significant level of activity during the current rating period. These actions, consisting of amendment requests, exemption requests, code relief requests, responses to generic letters, TMI and Salem ATWS items, and other actions, are listed below:
Multiplant Actions A-18 Technical Specifications Affected by 50.72 and 50.73 (Generic Letter 83-43)*
B-23 Degraded Grid Voltage Equipment
D-20 Mark I Drywell Vacuum Breakers
- F-48 ADS Actuation Study (II.K.3.18)*
F-63 Technical Support Center (III.A.1.2)*
F-71 Detailed Control Room Design Review Plant Specific Actions Exemption: Appendix R (separation and suppression)*
Exemption: Appendix R (alternatt- safe shutdown)*
Technical Specification Change: RHR Wear Ring Replacement
- Technical Specification Change: Single Loop
- Technical Specification Change: Iodine Spike Limit
- Technical Specification Change: New Recirculation Piping
- Technical Specification Change: Nil Ductility Transition Temperature
- Review of Control Room Carpet
- Review of Alternate Inspection of Feedwater Nozzles
- Review of~ Use of PVRC Damping Analysis
- Technical Specification Change: Inservice Inspection Technical Specification Change: Inservice Testing 4
Technical Specification Change: Spent Fuel Pool Expansion
~
Review of Containment Safety Study Review of Analysis Using RELAP SY-A 5.0 ASSESSMENT OF PERFORMANCE ATTRIBUTES This evaluation of the licensee's performance was based on consideration of five of the six attributes specified in NRC Manual Chapter 0516. These are:
- Management Involvement and Control in Assuring Quality
- Approach to Resoluation of Technical Issues from a Safety Standpoint
- Responsiveness to NRC Initiatives
- Reporting and Analysis of Reportable Events
-Staffing (includingManagement)
For the remaining attribute, Enforcement History, there is no basis for a rating by NRR.
In addition, this evaluation includes an assessment of the licensee's housekeeping practices and the conduct of control room personnel.
- Indicates action completed I
5.1 Management Involvement and Control in Assuring Quality Vermont Yankee Nuclear Power Corporation and Yankee Atomic Electric Company -
management have an awareness of the various licensing issues by virtue of 3
extensive experience in the industry, technical expertise, and active participation in industry and professional organization activities. Management takes actions in a timely manner to ensure safety issues are properly addressed. The successful and timely completion of recirculation piping replacement with minimal unforseen problems during this reporting period is due
- in part to management involvement and control in assuring quality throughout the pipe replacement outage, as well as the extensive planning and preparation noted in the SALP for the previous reporting period.
i The fact that no emergency technical specification changes have been requested during the report period evidences consistent planning by management to take into account license requirements. The recent request (12/30/86) for cask lifting device approval within a month of planned use is an exception to usual practice.
In mid-1986 Vermont Yankee at the urging of the Governor of Vermont undertook a Containment Safety Study addressing concerns related to the capability of 4
Vermont Yankee's Mark I containment to withstand severe accidents. The conduct of this study was, in part, guided by the staff's initiative to improve the severe accident performance of BWR Mark I containments; but also has been 4 coordinated with the State of Vermont through'the state's Vermont State Nuclear l Advisory Panel (VSNAP). On several occasions Vermont Yankee met with and' i formally responded to questions on the study from the staff and VSNAP. The
, initiative displayed in undertaking this study and the follow-up activities related to it, as well as the quality and timeliness of the effort, evidences management sensitivity to, and involvement in, safety concerns.
Candid discussions between the Project Manager and licensee management have
- satisfactorily served to integrate safety and operational interests from the licensing point of view. Integrated scheduling is an option that is available, if the present less formal process becomes unsatisfactory. Since the last SALP the licensee has initiated a practice of regularly informing the Project
- Manager of the licensee's prioritization of pending licensing actions. At the j same time there has been some effort to withdraw from the "pending" list requested actions that no longer are required, or that require revision in .
order to be acted upon.
In summary, for the last reporting period there was consistent evidence of l, prior planning, and assignment of priorities that demonstrates close management involvement and control.
Based on the above considerations, this attribute is rated Category 1.
5.2 Approach to Resolution of Technical Issues from a Safety Standpoint Favorable evaluations from the technical reviewers are indicative of the licensee's technical understanding of most issues and that Vermont Yankee's engineering staff, in concert with support from the Yankee Atomic Electric Company, assures that most engineering work, either done inhouse or performed under its direction by contractors, has adequately addressed complex technical issues. An example of the licensee's initiative and technical capability is the Containment Safety Study referred to in Section 5.1. Thus multi-discipline activity was reviewed both by the NRC staff and by an independent consultant hired by the State of Vermont. Vermont Yankee also has under review a unique technical effort in the qualification of the RELAP-5YA code for BWR analysis.
The licensee frequently forms technical judgements independently from the industry. These judgements are well-thought out with adequate technical bases.
For example, the exemptions granted on December 1,1986 to Vermont Yankee for Appendix R are the result of the licensee's persistence in convincing the staff of the validity of certain special technical considerations pertaining to Vermont Yankee.
Safety evaluations submitted by the licensee in support of proposed technical specification changes, or to resolve technical issues, have been clear and substantive. The licensee has demonstrated a e.. ear understanding of the issues, and its approach in resolving issues has been technically sound and thorough in almost all cases.
Based on the above c1nsiderations, the rating for this attribute is Category 1.
5.3 Responsiveness to NRC Initiatives Open and effective communication channels exist between the NRC and Vermont Yankee licensing staff in Framingham with involvement of nanagement in Brattleboro as appropriate. The effectiveness of this communication has improved since the last SALP period. The licensee meets established commitment dates or provides a written submittal explaining the circumstances and establishing a new firm date. Conference calls with the staff are i promptly established and include appropriate engineering and plant personnel.
An example of licensee responsiveness to NRC initiatives is the recent resolution of TMI Action Plan Item II.K.3.18 pertaining to the ADS logic.
Based on the above considerations, the rating for this attribute is Category 1.
5.4 REPORTING AND ANALYSIS OF REPORTABLE EVENTS During this rating period, the licensee submitted 24 non-security reportable events in accordance with 10 CFR 50.72 and the Licensee Event Reports (LER) in accordance with 10 CFR 50.73. During this period, events or problems specific to Vermont Yankee were discussed at four NRR Operating Reactor Events Briefings. These four events were each of a different nature (i.e.,
recirculation flow instability, problems with scram solenoid valves, failure of
standby liquid control system and pipe support problems.) A study of reported events shows no pattern of repetition, indicating that corrective actions are effective. Events were generally identified and analyzed properly and there were few subsequent revisions of the LERs. The licensee has been diligent in submitting LERs within the prescribed time limit.
Occupational Dose The Vermont Yankee Nuclear Power Plant is a 504 Mwe BWR which started commercial operation in November 1972. Since 1973, the plant's average total yearly dose has been approximately 622 person-rem, which is lower than the corresponding average for other operating BWR's. More recently, for the period from January 1983 to October 1986, the plant's average yearly dose has been approximately 1137 person-rem, which is significantly higher than it's overall average and higher than most operating BWRs for the same time period.
The principal contributor to this worker dose is the plant pipe replacement project recently completed in June 1986 (approximately 1800 person-rem in the 1985-1986 time interval). On the basis of Vermont Yankee's dose history since the beginning of commercial operation in 1972, and for the year 1986, the staff concludes that the licensee occupational doses are lower than for most currently operating BWR's, but has been increasing slightly in recent years.
Conclusion Based on the above considerations, the rating for this attribute is Category 1.
5.5 STAFFING No changes in Vermont Yankee licensing staff have occurred during this rating period. The Licensing Engineer in Framingham has gained licensing experience thereby increasing effectiveness. Both the Framingham and Brattleboro offices have supported licensing discussions in a professional manner. The involvement of Brattleboro staff in licensing discussions have been somewhat greater than in the previous reporting period.
The rating for this attribute is Category 1.
5.6 HOUSEKEEPING AND CONTROL ROOM CONDUCT Observations made by the NRR project manager while visiting the site on several occasions during this rating period indicate that the licensee's housekeeping practices are good. The cleanliness and orderliness which prevailed during a major plant modification outage was adequate. The expansion of office facilities following the pipe replacement outage should reduce congestion and enhance housekeeping. In all observed instances control room personnel appeared to conduct themselves in a professional manner.
The rating for this attribute is Category 2.
~6-
6.0 CONCLUSION
An overall performance rating of Category 1 has been assigned in the licensing area.
Section 043 of the Manual Chapter 0516 defines the meaning of rating the licensee's performance Category 1 as follows:
" Reduced NRC attention may be appropriate. Licensee management attention and involvement are aggressive and oriented toward nuclear safety; licensee resources are ample and effectively used so that a high level of performance with respect to operational safety and construction quality is being achieved."
Even though the Vermont Yankee Nuclear Power Corporation is rated Category 1
, no less management effort on the part of the licensee or NRC attention in the licensing category can be accommodated.
l 1
1 I
t n
i 1
f
Information to be Added to Section 5 of SALP Report
" Supporting Date and Sumary"
- 1. NRC/ Licensee Meetings / Site Visits Site Visits: November 7-8, 1985, January 9-10, July 28 - August 11 September 29-30, and October 9-10, 1986 Meetings: January 10, 1985 SALP Management Meeting April 10, 1986 Licensing Counterparts Meeting September 11, 1986 Discussed Containment Safety Study Progress July 29, 1986 Discussed RELAP SYA Code Review November 17, 1986 Discussed Responses to Containment Safety Study Questions
- 2. Commission Briefings None
- 3. Schedular Extensions Granted None
- 4. Relief Granted December 19, 1986; Certain inservice inspection requirements
- 5. Exemptions Granted December 1,1986; Certain requirements of Appendix R
- 6. License Amendments Issued Amendment No. 91, issued October 24, 1985; revises TS regarding iodine spiking Amendment No. 92, issued March 27, 1986; revises TS to reflect changes in recirculation system piping Amendment No. 93, issued June 24, 1986; revises TS regarding Nil Ductility Transition Temperature Amendment No. 94, issued August 8, 1986; revises TS regarding Single Loop Operation Amendment 95, issued August 11, 1986; revises TS concerning reporting (50.72and50.73) i Amendment 96, issued August 11, 1986; revises TS pertaining to NUREG-0737 modifications (G.L.83-36)
- 2-Amendment No. 97, issued December 3, 1986; revises TS to permit RHR wear ring replacement during fuel Cycle 13.
- 7. Emergency / Exigent Technical Specifications
! None
- 8. Orders Issued None
- 9. NRR/ Licensee Management Conferences None i
1 i
J f
1 d
I a
+sm- -~ -
g m -w - - - - - - -m,e-,s.n ew m yg.~,-v~-wa--~- - -- g =
Enclosure 2 B. Facility Performance Functional Category Category Recent Area Last Period This Period Trend (5/1783 - 10/31/84) 11/1/84 - 10/18/85)
A. Plant Operations 1 1 Consistent B. Radiological 2 2 Consistent Controls C. Maintenance 2 1 Consistent D. Surveillance 1 1 Consistent Fire Protection / 2 N/A* N/A Housekeeping E. Emergency 1 2 Improving Preparedness F. Security and Safeguards 1 2 Declining G. Outages 1 1 Consistent H. Training and N/A** N/A** No Basis Qualification Effectiveness I. Licensing Activities 1 1 Consistent J. Assurance of Quality 2 2 N/A Notes:
- Not assessed as a distinct functional area this period.
Assessments are incorporated within other functio .21 areas as appropriate.
- Not assessed as distinct functional area last period.
B. Facility Performance Functional Category Category Recent Area Last Period This Period Trend (5/1/83 - 10/31/84) 11/1/84 - 10/18/85)
A. Plant _0perations 1 1 Consistent B. Radiological 2 2 Consistent Controls C. Maintenance 2 1 Consistent D. Surveillance 1 1 Consistent Fire Protection / 2 N/A* N/A Housekeeping E. Emergency 1 2 Improving Preparedness F. Security and Safeguards 1 2 Declining G. Outages 1 1 Consistent H. Training and N/A** N/A** No Basis Qualification Effectiveness I. Licensing Activities 1 1 Consistent J. Assurance of Quality 2 2 N/A Notes:
- Not assessed as a distinct functional area this period.
Assessments are incorporated within other functional areas as appropriate.
- Not assessed as distinct functional area last period.