780N NUCLEAR POWER STATION

$ ANNUAL OCCUPATIONAL EXPOSURE REPORT i

a 4

/

! I i i 9903080289 990301 PDR ADOCK 05000295

.R PDR;f

.j

_, __._ -._._. - _ . _ . - . . _ . _. .. ._...._..m _ . . . . . _ . _. _ _ . . _

Zion Station '

Annual Os.:: 2:> .M Fvnnenre Ranart Personnel included in report are those with greater than 100 mrem per TLD readings. -

Dose assigments to various duty functions are based on electronic dot imeter data. .

Number of Personnel Person-REM

. Station Contractors / Utility Total Station Contractors / - Utility Total Work and Job Function Employess Others Employees Persons . Employess Others - Eni,,k,,ce; Person-REM Reactor Operatens and Surveillance Engineering 0 0 0 0 .0 0 0 0- >

Health Physics - 15 1 0 16 ' O.447 0.01 0- 0.457 Maintenance 0 0 0 0 0 0 0 0  ;

. Operations 4 0 0 4 0.011 0 0 0.011 .

Supervisory 1 0 0 1 0.003 0 0 0.003 20 1 0 21 0.461 0.01 0 0.471 i

Number of Personnel Person-REM Station Contractors / Utility Total Station Contractors / Utility - Total  ;

i Work and Job Function Employess Others Employees Persons Employess Others Employees Person-REM Routine Maintenance Engineering 0 0 0 0 0 0 0 0 Health Physics 15 0 0 15 1.177 0 0 1.177 Maintenance 14 1 0 15 0.309 0.088 0 0.397  !

Operations - 6 0 0 6 0.207 0 0 0.207 ,

Supervisory 2 0 0 2 0.013 0 0 0.013 i 37 1 0 38 1.706 0.088 0 1.794 Page 1 of 4 L _

w_ _ . . _ .

_- ms.--------- - - - - - - - - - - - - - - - --. - - . - - . - - - . ~ . .a W. .:

.i Zion Station Annual Operahonal Exposure Report r

Personnel included in report are those with greater than.100 mrem per TLD readings. .

Dose assigments to various duty functons are based on electronic dosimeter data. j t

i t

~ Number of Personnel Person-REM ,

StaSon. Contractors / Utility Total .. Stabon ~ .Cuid =,16 ./ -- Utility

. Total Wost and Job Funchon 0 4 ie;s Others Eii s ic;; Persons Employess Others Ei 4,;.; Person-REM f

' Refuelmg Engineenng 0' O O O- 0 0 0 0 Health Physics 11 0 0 11 0.26 0 0 0.26 i Mamtenance '14 0 0 14 1.663 0 0 1.663 ,

- Operations . 6 0 0 6- 0.409 0 0 0.409  ;

Superwsory 2 0 0 2 0.14 0 0 0.14 t 33 0 0 33 2.472 0 0 2.472 - l Number of Personnel Person-REM  !

. Station Contractors / Utility Total Station Contractors / Utility Total .s

-I

. Work and Job Funchon Employess Others Oi-@ ,;;; Persons Employess Others G Wice; Person-REM i

Weste Processmg .;

1 Engmeenng ' O O O O O O O O  ;

Health Physics 12 1 0 13 0.432 0.099 0 0.531 Mamtenance 5 1 0 6 0.214 0.11 0 0.324 Operabons 6: 0 0- 6 0.242 0 0 0.242

, Supervisory 2 0 0 2 0.045 0 0 0.045 j 25 2 0 27 0.933 0.209 0 1.142 l

i r.

s .

Page 2 of 4  !

- _. . . _ - , . __...n_..._..._--,..;_._,_._._~ . _ . _ _ - ._. _ _ _ -

_ . . ~ , _ _ . . . . _ , . . . _ . . _ . _ _ , . , . . _ . . .

n.. ... . . . . ~ . , . . . . . . . - . . ,- ..,, . . . ~ . . _ - . . , - . . .

. . . , ,. ~. ..

Zion Station .

hal Exposure Report f

-i Pe sonnel included in report are those with greater than 100 mrem per TLD readings. .

Dose assigments to various duty functions are based on electronic dosimeter data. j s

t, Number of Personnel Person-REM

- Station . Contractors / . Utility Total Staten Contractors /. . Utility Total :

' Work and Job Functon Employess Others . Ews,;;; Persons. Employess Others Ews,;;; Person-REM ,

inservice Inspection .f Engineering 0- 'O .0 0 0 0 0 .0 Health Physics. 0 0 0 -0. 0 0 0 0

. Maintenance 0 0 0 0 0 0 0 0 Operations 0 0 0 0 0 0 0 0 Supen/sory 0 ~0 0 0 0 0 0 0

.0 0 0 0 0 0 0' 0 r

Number of Personnel Person-REM -

Station Contractors / Utility Total Station Contractors / U'iiity Total Work and Job Function - Emp!oyess Ott'ers Employees Persons Employess Others Einpk,,;;; Person-REM ,

i Special Maintenance j Engineering 0 0 0 0 0 -0 0 0 . ,

Health Physics 0 0 0 0 0 0 0 0 .j Mamtenance 0 0 -0 0 0 0 0 0 Operations 0 0 0 0 0 0 0 0 i Supervisory 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i

Page 3 of 4 L

. s.

..r T

Zion Statica

  • Annual Oner=Hanal Fvmmre Ramrt Personnel included in report are those with greater than 100 mrem par TLD readings. .

Dose assigments to various duty functions are based on electronic dosimeter data.

Number of Personnel Person-REM Station Contractors / Utility Total Station Contractors / Utility Total Work and Job Function Employess - Others Employees : Persons Employess Others Employees Person-REM Total for All Catagones Engineering 0' O O O O O O O Health Phys.ics 15 1 0 16 2.316 0.109 0 2.425 Maintenance 14 1 0 15 2.186 0.198 0 2.384

. Operations 6 0 0 6 0.869 0 0 0.869 Supervisory 2 'O O 2 0.201 0 0 0.201 37 2 -0 39 5.572 0.307 0 5.879 Page 4 of 4 L - . . . _ _ _ - . __. - . _ _ _ - - _ _ . . . _ - - - _ - - . _ _ _ . _ _ _ _ _ _ _ _ _ _ - - _ ._ _ .-

ATTACHMENT B 0-LIST OF COMMITMENTS CONTAINED THIS LETTER  !

The following table identifies those actions committed to by Comed in this document. Any other actions discussed in this submittal represent intended or planned actions by Comed.

They are described to the NRC for the NRC's information and are not regulatory l commitments. Please notify Mr. Robert Godley, Zion Station Regulatory Assurance i Manager, of any questions regarding this document or any associated regulatory commitments. .

i i

Regulatory Commitments Committed Date None N/A 1

1 i

i  !

a i

1 l

l J