ML20205P878

From kanterella
Jump to navigation Jump to search
Affidavit of Am Callendrello (SAPL-8A).* Resume Encl
ML20205P878
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 03/25/1987
From: Callendrello A
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
Shared Package
ML20205L804 List: ... further results
References
OL, NUDOCS 8704030397
Download: ML20205P878 (7)


Text

-

(,3

}

i-Dated: March 25,.1987 UNITED STATES OF' AMERICA NUCLEAR REGULATORY COMMISSION before the ATOMIC SAFETY AND LICENSING BOARD

)-

In the Matter of )

)

PUBLIC SERVICE COMPANY OF -) Docket Nos. 50-443-OL NEW HAMPSHIRE, et al. ) 50-444-OL

) Off-site' Emergency (Seabrook Station, Units 1 and 2)-) Planning Issues

) .,

)

AFFIDAVIT OF ANTHONY M. CALLENDRELLO (SAPL-8A)

I, Anthony M. Callendrello, being on oath, hereby depose and say as follows:

1. I am the Manager of Emergency Planning for New Hampshire Yankee.
2. A statement of my professional qualifications is attached hereto and marked "A".
3. An ongoing personnel resource assessment program to determine specific State and local municipality needs and availabilities of personnel resources.necessary.to fully implement the New Hampshire ~ Radiological ~ Emergency Response Plan (RERP) has been established.

6704030397 870325 PDR ADOCK 05000443 G PDR a

s i

s:

4. One result of this program was the determination -

that if~the assigned State agency could not support the implementation of assigned tasks, adequate personnel resources are available to supplement that State agency.

5. Based upon the aforementioned personnel resource assessment program, there are sufficient numbers of personnel available to the State as State employees, members of support-organizations, or emergency response volunteers to perform the tasks contemplated in the New Hampshire RERP.
6. As a result of the. aforementioned personnel resources assessment program, emergency response positions can be filled from the identified resource pools.

,s' .

/"Anth'ony M. Callendrello COMMONWEALTH OF MASSACHUSETTS Suffolk, ss. March {d,'~1987 The above-subscribed Anthony M. Callendrello appeared before me and made oath that he had read'the foregoing affidavit and that the statements set forth therein are true to the best of his knowledge.

Before me, l cs' l

'~

Notar? Public My Commission. Expires:

zg;',,a . .; . .'n M < ?

m e.r aus.c

-g p r',AgwM M M M M' 1

1 I

.g.

CALLENDRELLO. ANTHONY M.

EDUCATION Stevens Institute of Technology - Bachelor of Engineering 1973 Stevens Institute of Technology - Master of Mechanical Engineering 1980 Harvard School of Public Health - Planning for Nuclear Emergencies 1983 LICENSES AND REGISTRATION Professional Engineer - New Jersey Professional Engineer - New Hampshire EXPERIENCE

SUMMARY

Mr. Callendrello has a wide variety of experience in all aspects of onsite and offsite radiological emergency planning. Currently, he is responsibie, for all Seabrook Station offsite radiological emergency response planning work involving state and local plan development and implementation. In prior positions at Seabre.ok Station he has been responsible for prompt notification system procurement and installation, onsite procedure develop-ment and scenario development. .

Prior to his current employment. he was with Stone & Webster Engineering Corporation. There nis unsite planning experience included leading the radiological emergency planning effort for a boiling water reactor generating station. There he was responsible for directing the revision of the station's emergency plan, implementing procedures, and emergency action levels in response to Nuclear Regulatory Commission emergency preparedness appraisal findings. He also has prepared a comprehensive audit of onsite emergency preparedness for a boiling water reactor generating station currently under construction. Based on the audit results, he worked with the utility's management to develop a comprehensive emergency planning strategy to support the licensing of the station.

Mr. Callendrello's offsite experience involves all aspects of radiological emergency planning. He had lead an effort to prepare an emergency plan and implementing procedures for a utility-implemented offsite emergency plan.

In addition, he has provided technical support of the ASLB licensing hearing for this same station through the preparation of discovery respon-ses as well as written testimony.

Prior to this effort, he has led five offsite emergency planning projects.

These projects have involved the preparation of 35 State and local radiolo-gical emergency response plans and associated implementing and standard operating procedures.

II o

R 1

D Of these projects. three have involved the preparatior, of exercise scen-arios and support for practice and federally witnessed exercises. Three projects have also involved the training of offsite emergency response per-sonnel. This required the preparation of all training and drill materials.

One of these efforts involved an intensive training program for all person-nel in four counties prior to their successful performance in a federally witnessed exercise.

Mr. Callendrello has served as an observer in nineteen full-scale practice and federally-witnessed exercises. He also has been involved in the pre-paration of ALSB hearing support material, the design of prompt notifica-tion systems, and the preparation of evacuation time estimates.

Before joining Stone & Webster Engineering Corporation. Mr. Callendrello i provided acoustical consulting services regarding the noise impact of pro-posed nuclear generating facilities. interior and exterior noise analysts, and control of fossil fuel generating stations as well as a variety of pro-cess industries.

PROFESSIONAL AFFILIATIONS ..

American Nuclear Society I

l

- 2-

s DETAILED EXPERIENCE RECORD CALLENDRELLO. ANTHONY M.

NEW HAMPSHIRE YANKEE OtVISION.

PUBLIC SERVICF OF NEW HAMPSHIRE (Jan. 1984 - Present)

Appointments; Emergency Planning Manager - 1986 Emergency Preparedness Supervisor - September 1985 Senior Emergenc,y Planner - January 1984 Mr. Callendrello is currently supervising the offsite emergency prepared-ness efforts for Seabrock Station. He has direct responsibility for the direction of Massachusetts. New Hampshire and Maine state and local planning and training.

Prior, he was responsible fur the development of onsite emergency respon'se procedures and prompt' notification system procurement and installation and scenario preparation.

STONE & WEBSTER ENGINEERING CORPORATION. NEW YORK, NY (Apr. 1980 to Dec. 1983)

Shoreham Nuclear Power Station. Long Island Lighting Company (Mar. 1983 to Dec. 19831 Mr. Callendrello supervised a group of planners providing technical support for offsite radiological emergency planning. Principally this involved the preparation of an emergency response plan and implementing procedures for the first utility implemented offsite plan developed in the country. His responsibilities also include the support of the ASLB licensing hearings througn the preparation of discovery responses and written testimony Oyster Craek Nuclear Generating station. General Public l'tilities (Oct. 1980 to June 1983)

Mr. Callendrello supervised the development of Radiological Emergency Plans (REPS) for the county and municipalities within the Emergency Planning Zone of the Oyster Creek Nuclear Generating Station. This involved the following principal efforts: the preparation of individual REPS for the county and twenty municipalities; the preparation of implementing and stan-dard operating procedures; the preparation of the scenario for the FEMA witnessed exercise: the training of offsite emergency response personnel in the specifics of radiological duties: and the direct support of FEMA exer-cise activities through the provtsion of field radiological data and field team referees / evaluators l

1

(

e a

AMC This planning process involved extensive interviews and meetings with various officials of the State, county, and municipalities, utility manage-ment and site operating personnel, the FEMA regional representative. and local news media.

James A. FitzPatrick Nuclear Power Plant. Power Authority of the State of New York (Mar. 1982 to July 1982)

Mr. Callendrello supervised the onsite radiological emergency planning effort for the J.A. Fitzpatrick Nuclear Power Plant. This effort involves the modification of the emergency plan. implementing procedures, and Emergency Action Levels (EALs) in accordance with the latest Federal-guidance. The preparation of these documents was in support of the 1982 NRC/ FEMA graded exercise and the NRC appraisal.

Indian Point Nuclear Power Station - Unit 3, Power Authority of the State of N*ew York (Jan. 1982 to Mar. 1982)

Mr. Callendrello supervised the support of offsite radiological emergency response planning for the four counties within the Emergency Planning Zone of Indian Point Unit 3. This support involved the training of county exe-cutives and agency heads in their role in a radiological emergency response, and the training of personnel responsible for decontamination center operation, dose assessment. field monitoring, reception center operations. and emergency operations center activation and operations.

In addition, support material for this effort was prepared including an emergency worker's training manual: standard operating procedures for field monitoring and dose assessment personnel; and materials and suggested layouts for emergency operations centers.

Finally, he supervised the support of the successful 1982 FEMA witnessed exercise. This included the preparation of the offsite scenario: the pro-vision of observers / evaluators at offsite locations: and the collection.

evaluation, and provision of evaluator critique comments. I Salem Generating Station, Public Service Electric and Gas Company l (Aug. 1980 to May 1981)

Mr. Callendrello directed the development of Radiological Emergency Plans (REPS) for the State of New Jersey and the counties and municipalities in the Emergency Planning Zone of the Salen Generating Station. This work included the preparation of REPS for the State, two counties, and six munt-cipalities: the development of implementing and standard operating proce-dures; the development of training materials; and support in the staging of the 1982 FEMA observed exercise.

4 .

i

t 9 .

/

AMC Wm. H. Zimmer Nuclear Power Station. Cincinnati Gas and Electric Comoany (May 1960 to Aug. 1980)  !

Mr. Callendrello was responsible for the coordination and technical review of efforts to design an integrated prompt public warning system for the area near the Zimmer Station to support radiological emergency planning.

During this period, he participated in the preparation of evacuation time estimates for the area near the Zimmer Station'in response to NRC require-ments. He has assisted in the preparation of th'e Radiological Emergency Plans for the Commonwealth of Kentucky and the counties within the Emergency Planning zone. Also, he has assisted in the preparation of writ-ten testimony for the Atomic Safety Licensing Board licensing hearings.

CONLEY. MILLER & NOWIKAS, INCORPORATED (1976[to1980)

He was responsible for industrial and environa' ental noise control project's*.

Industrial projects etquired compliance with OSHA noise standards for many industries including power generating stations, papermaking, food pro-cessing and metal fabricating. Environmental projects dealt with the J' control of noise from large rotating equipment in order to congly with 4:

State and local codes.

LEWIS S. GOODFRIEND & ASSOCIATES (1973 to 1976)

Mr Callendrello directeo projects involving industrial noise control god the prediction, assessment, and control of environmental noise. . Typical in-plant equipment analyzed including fans pumps crushing and mixing mills, and power station equipment. Environmental projects on which he worked dealt with a variety of power station equipment, highways, and com-munity annoyance studies. In particular, he assessed tha environmental impact of the noise from four 1000 MW nuclear,.ginerating plants on a single site for the New York State Atomic and Space Cevelopment Authority.

s i

I, 9

i t

-$- 't