MONTHYEARIA-97-252, Packages Consisting of 19 Pages of Accession Numbers for South Texas Project1997-10-0707 October 1997 Packages Consisting of 19 Pages of Accession Numbers for South Texas Project ML20217F7671997-10-0707 October 1997 Packages Consisting of 19 Pages of Accession Numbers for South Texas Project ML20115E7131996-02-13013 February 1996 Rev 2 to Sub-Calculation MC-6441-101, Pressure Locking/ Thermal Binding Evaluation ML20198J5581995-06-0606 June 1995 Rev 0 to MC-6458, ECCS Isolation Valve Leak Analysis. W/ One Oversize Drawing ML20198J5521995-06-0606 June 1995 Rev 1 to MC-6313, ECCS Valve Leakage to RWST Analysis ML20059H3951993-11-0101 November 1993 Cold Ecw Chiller Analysis ML20058J5591993-10-14014 October 1993 Essential Chilled Water Load ML20059H3751993-10-0505 October 1993 Essential Chilled Water Load ML20059H3611993-09-28028 September 1993 Essential Chiller Performance Test ML20046A1421993-03-19019 March 1993 Package Consisting of 1993 Emergency Response Graded Exercise Objectives ML20092C7681992-01-0909 January 1992 Package Consisting of Objectives for 1992 Graded Emergency Preparedness Exercise on 920429 ML20197B1461991-11-20020 November 1991 Rev 1 to Calculation MC-6305, RHR Relief Valves as Coms/Ltop ML20079N3791991-11-11011 November 1991 Response to NUMARC Survey in Support of NRC License Renewal Rulemaking ML20055J4631990-05-0909 May 1990 Package Consisting of Director Highlights of Unusual Event Due to Required Shutdown by Tech Spec 3.4.6.1 for Pressure Boundary Leakage.Unit Entered Cold Shutdown to Make Repairs. Estimated Restart Date Is 900522 ML20055H8791990-05-0808 May 1990 Package of Info Re 900508 Shutdown Due to Pressure Boundary Leakage ML20247R3711989-09-18018 September 1989 Package of Three FOIA Requests ML20246P8441989-05-0505 May 1989 Errata to Annotated Rev to FSAR & Tech Specs Bases ST-HL-AE-3040, Proposed Revs to FSAR1989-04-18018 April 1989 Proposed Revs to FSAR ML20148C5971988-03-18018 March 1988 Slide Prsentation Entitled, Commission Briefing on Full Power Licensing of South Texas Project,Unit 1 ML20237D7901987-12-10010 December 1987 Package of Unrelated Documentation Re Listed Plants Concerning NRC Emergency Response Data Sys HL-3708, Record of 870819 Telcon W/A Singh,P Kadambi of Nrc,A Guidry of Bechtel Re Deviations Not Documented in Plant Ser.Nrc Concurred That Deviations Described in Attachment 2 to ST-HL-AE-2252 Acceptable1987-08-19019 August 1987 Record of 870819 Telcon W/A Singh,P Kadambi of Nrc,A Guidry of Bechtel Re Deviations Not Documented in Plant Ser.Nrc Concurred That Deviations Described in Attachment 2 to ST-HL-AE-2252 Acceptable HL-7514, Record of Telcon W/Ca Ayala,Ma Friedlander,Rl Perch,R Emch & C Moon on 870708 to Clarify Intent & Proper Interpretation of Encl marked-up Final Draft Tech Spec Table 3.3-31987-07-0808 July 1987 Record of Telcon W/Ca Ayala,Ma Friedlander,Rl Perch,R Emch & C Moon on 870708 to Clarify Intent & Proper Interpretation of Encl marked-up Final Draft Tech Spec Table 3.3-3 ML20209F5901987-03-13013 March 1987 Region IV Daily Rept on 870311 Steam/Water Hammer Event at Facility & Photographs of Facility Piping ML20209B0091987-02-0202 February 1987 Package of Supplemental Info Re Reg Guide 1.75 Testing Configurations ML20212G6831987-01-16016 January 1987 Package of Comments on Facility long-term Cooling Analysis ML20207N3951987-01-12012 January 1987 Package of Three Pages Providing Addl Clarification of Instrument Tubing ML20214A1831986-10-15015 October 1986 Nonproprietary Version of Slide Presentation Entitled, Presentation & Handout Matl Re Leak-Before-Break Calculations for South Texas Project 12-Inch Diameter Accumulator Line ML20211F0041986-09-30030 September 1986 Marked-up Notice of Violation from Insp on 791110-800207, Draft Investigation Rept & Proposed Enforcement Actions IA-86-784, Package Consisting of Request for Addl Info Re Alternative Pipe Break Criteria Attached to NRC to Util1986-07-10010 July 1986 Package Consisting of Request for Addl Info Re Alternative Pipe Break Criteria Attached to NRC to Util ML20214K2741986-07-10010 July 1986 Package Consisting of Request for Addl Info Re Alternative Pipe Break Criteria Attached to NRC to Util ML20207E1021986-07-0202 July 1986 Telcon W/Util,Nrc & Westinghouse to Discuss Bart Code Assessment ML20207F6921986-07-0202 July 1986 Telcon W/Sl Wu & P Kadambi of NRC to Discuss Util Providing Supplemental Info on Momentary Fuel Assembly Liftoff,Per SER Confirmatory Item 9 HL-3578, Record of 860630 Telcon W/R Goel & P Kadambi of NRC Re NRC Review of Fire Hazards/Safe Shutdown.Summary of Changes Incorporated Into Amend 4 to Fire Hazards Analysis Rept Encl1986-06-30030 June 1986 Record of 860630 Telcon W/R Goel & P Kadambi of NRC Re NRC Review of Fire Hazards/Safe Shutdown.Summary of Changes Incorporated Into Amend 4 to Fire Hazards Analysis Rept Encl HL-3576, Record of Telcon W/Mr Wisenburg,Pg Trudel,T Roberson,R Goel & P Kadambi Re NRC Review of Fire Hazards Analysis Rept & Safe Shutdown1986-06-25025 June 1986 Record of Telcon W/Mr Wisenburg,Pg Trudel,T Roberson,R Goel & P Kadambi Re NRC Review of Fire Hazards Analysis Rept & Safe Shutdown ML20199G0611986-06-18018 June 1986 Record of 860618 Telcon W/Nrc,Util,Bechtel & Westinghouse Re Deletion of Sump Additive Tank from Facility Design ML20204A0251986-04-22022 April 1986 Record of 860422 Telcon W/J Brammer,S Hou,S Long, T Robertson,M Powell,W Watson & P Kadambi Re Pipe Break Screening Criteria.Jet Load Calculations Will Not Be Performed w/NUREG/CR-2913 Methodology ML20207P2701986-01-14014 January 1986 Supplemental Info Received on Safe Shutdown Issue ML20010D9081981-08-26026 August 1981 Slide Presentation Re Soil Structure Interaction ML19350E1901981-05-26026 May 1981 Slide Presentation from 810526 Meeting Re Hafnium Control Rods 1997-10-07
[Table view] Category:TELEPHONE OR VERBAL CONVERSATION RECORD
MONTHYEARHL-3708, Record of 870819 Telcon W/A Singh,P Kadambi of Nrc,A Guidry of Bechtel Re Deviations Not Documented in Plant Ser.Nrc Concurred That Deviations Described in Attachment 2 to ST-HL-AE-2252 Acceptable1987-08-19019 August 1987 Record of 870819 Telcon W/A Singh,P Kadambi of Nrc,A Guidry of Bechtel Re Deviations Not Documented in Plant Ser.Nrc Concurred That Deviations Described in Attachment 2 to ST-HL-AE-2252 Acceptable HL-7514, Record of Telcon W/Ca Ayala,Ma Friedlander,Rl Perch,R Emch & C Moon on 870708 to Clarify Intent & Proper Interpretation of Encl marked-up Final Draft Tech Spec Table 3.3-31987-07-0808 July 1987 Record of Telcon W/Ca Ayala,Ma Friedlander,Rl Perch,R Emch & C Moon on 870708 to Clarify Intent & Proper Interpretation of Encl marked-up Final Draft Tech Spec Table 3.3-3 ML20207F6921986-07-0202 July 1986 Telcon W/Sl Wu & P Kadambi of NRC to Discuss Util Providing Supplemental Info on Momentary Fuel Assembly Liftoff,Per SER Confirmatory Item 9 ML20207E1021986-07-0202 July 1986 Telcon W/Util,Nrc & Westinghouse to Discuss Bart Code Assessment HL-3578, Record of 860630 Telcon W/R Goel & P Kadambi of NRC Re NRC Review of Fire Hazards/Safe Shutdown.Summary of Changes Incorporated Into Amend 4 to Fire Hazards Analysis Rept Encl1986-06-30030 June 1986 Record of 860630 Telcon W/R Goel & P Kadambi of NRC Re NRC Review of Fire Hazards/Safe Shutdown.Summary of Changes Incorporated Into Amend 4 to Fire Hazards Analysis Rept Encl HL-3576, Record of Telcon W/Mr Wisenburg,Pg Trudel,T Roberson,R Goel & P Kadambi Re NRC Review of Fire Hazards Analysis Rept & Safe Shutdown1986-06-25025 June 1986 Record of Telcon W/Mr Wisenburg,Pg Trudel,T Roberson,R Goel & P Kadambi Re NRC Review of Fire Hazards Analysis Rept & Safe Shutdown ML20199G0611986-06-18018 June 1986 Record of 860618 Telcon W/Nrc,Util,Bechtel & Westinghouse Re Deletion of Sump Additive Tank from Facility Design ML20204A0251986-04-22022 April 1986 Record of 860422 Telcon W/J Brammer,S Hou,S Long, T Robertson,M Powell,W Watson & P Kadambi Re Pipe Break Screening Criteria.Jet Load Calculations Will Not Be Performed w/NUREG/CR-2913 Methodology 1987-08-19
[Table view] |
Text
g HOUSTON LIGHTING & POWER COMPANY (
q SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION TELEPHONE MINUTES f#* 4i' 4'7 M. R. Wisenburg CORRESPONDENCE SERI AL NUMBER TO: , 4 ST-HL-HL-35769 M. E. Powell f/
FROM: SUBJECT FILE NUMBERS June 23, 1986 G9.4 DATE OF CALL: PRIMARY: SECONDARY-NRC Review of Fire Hazards / Safe Shutdown
SUBJECT:
TELECON PARTICIPANTS:
M. E. Powell (HL&P) R. Goel (USNRC)
(INCLUDE NAME AND P. G. Trudel (BEC) P. Kadambi (UShTC)
ORGANIZATION OF EACH)
T. Roberson (HL&P) PAGE 1 OF 2 The above participants participated in a conference call on June 25, 1986 regarding the NRC review of the Fire Hazards Analysis Report (FHAR) and safe shutdown. Mr. Goel (USNRC - Plant Systems Branch) had the following comments / questions:
(1) He would like a copy of the report No. SA019MFP001 titled, " Post Fire Operator Actions and Equipment Protection Requirements" made available in the Bethesda Licensing Office as soon as possible.
(2) He questioned if repairs are required to achieve cold shutdown?
(3) He questioned if there were any scenarios (other than a control room fire) where you need to use the Auxiliary Shutdown Panel (ASP)?
(4) He questioned if we can achieve cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />?
(5) He would lika us to identify all high/ low pressure interfaces in the FHAR.
(6) He questioned if the transfer switches have alternate fuses?
(7) He would like a typical circuit drawing for both power and control circuits for a typical transfer switch.
(8) He questioned if there are any electrical " interties" between trains such that a failure of a breaker could loose more than one (1) train. He indicated that he was primarily concerned about an 'N' circuit being tied between 'A', 'B' or 'C' circuit or if a spurious actuation could propagate from an a- circuic co a o- circult chrougn an 'm circutc.
8607100271 860625 PDR ADOCK 05000498 p PDR Ll/TELMIN/E STP-103 (6-79)
HOUSTON LIGHTING & POWER COMPANY
,b SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION TELEPHONE MINUTES CORRESPONDENCE SERIAL NUMBER TO: ST-HL-HL-35769 FROM: SUBJECT FILE NUMBERS June 25, 1986 C9.4 DATE OF CALL: PRIMARY: SECONDARY-NRC Review of Fire Hazards / Safe Shutdown
SUBJECT:
TELECON PARTICIPANTS:
(INCLUDE NAME AND M. E. Powell (HL&P) R. Goel (USNRC)
P. G. Trudel (BEC) P..Kadambi (USNRC),
ORGANIZATION OF EACH)
(9) He requested that more detailed information on the ASP and transfer switch panels be placed in the FHAR. I stated that based on previous conversations between Prasad, C. Turner & I, we have agreed to incorporate a reference in the FHAR to the FSAR Sections where the subject information is already discussed in detail. Mr. Goel stated that he would review the FSAR to see if it provided the necessary detail.
I stated that we would review his comments / questions and get back with him during the week of Junt 30, 1986.
Mr. Goel questioned if the above could be incorporated into amendment 4 to the FHAR. I committed to get back to him with an answer. He then requested a breakdown af the changes being incorporated in amendment 4. I committed to have the breakdown available by June 30, 1986.
4EP/yd
- c: A. W. Harrison C. M. Turner C. Wren M. A. McBurnett S. Eldridge A. Guidry (BEC)
F. G. Trudel (BEG)
- 1. Koberson (Detnesca Licensing VII1ce)
R. 5weeney (Bechesda Liceusiu6 Office) 5IF FJi3 (2)