Record of 860630 Telcon W/R Goel & P Kadambi of NRC Re NRC Review of Fire Hazards/Safe Shutdown.Summary of Changes Incorporated Into Amend 4 to Fire Hazards Analysis Rept EnclML20202F683 |
Person / Time |
---|
Site: |
South Texas |
---|
Issue date: |
06/30/1986 |
---|
From: |
Powell M HOUSTON LIGHTING & POWER CO. |
---|
To: |
|
---|
References |
---|
ST-HL-HL-35783, NUDOCS 8607150215 |
Download: ML20202F683 (5) |
|
|
---|
Category:ARCHIVE RECORDS
MONTHYEARIA-97-252, Packages Consisting of 19 Pages of Accession Numbers for South Texas Project1997-10-0707 October 1997 Packages Consisting of 19 Pages of Accession Numbers for South Texas Project ML20217F7671997-10-0707 October 1997 Packages Consisting of 19 Pages of Accession Numbers for South Texas Project ML20115E7131996-02-13013 February 1996 Rev 2 to Sub-Calculation MC-6441-101, Pressure Locking/ Thermal Binding Evaluation ML20198J5581995-06-0606 June 1995 Rev 0 to MC-6458, ECCS Isolation Valve Leak Analysis. W/ One Oversize Drawing ML20198J5521995-06-0606 June 1995 Rev 1 to MC-6313, ECCS Valve Leakage to RWST Analysis ML20059H3951993-11-0101 November 1993 Cold Ecw Chiller Analysis ML20058J5591993-10-14014 October 1993 Essential Chilled Water Load ML20059H3751993-10-0505 October 1993 Essential Chilled Water Load ML20059H3611993-09-28028 September 1993 Essential Chiller Performance Test ML20046A1421993-03-19019 March 1993 Package Consisting of 1993 Emergency Response Graded Exercise Objectives ML20092C7681992-01-0909 January 1992 Package Consisting of Objectives for 1992 Graded Emergency Preparedness Exercise on 920429 ML20197B1461991-11-20020 November 1991 Rev 1 to Calculation MC-6305, RHR Relief Valves as Coms/Ltop ML20079N3791991-11-11011 November 1991 Response to NUMARC Survey in Support of NRC License Renewal Rulemaking ML20055J4631990-05-0909 May 1990 Package Consisting of Director Highlights of Unusual Event Due to Required Shutdown by Tech Spec 3.4.6.1 for Pressure Boundary Leakage.Unit Entered Cold Shutdown to Make Repairs. Estimated Restart Date Is 900522 ML20055H8791990-05-0808 May 1990 Package of Info Re 900508 Shutdown Due to Pressure Boundary Leakage ML20247R3711989-09-18018 September 1989 Package of Three FOIA Requests ML20246P8441989-05-0505 May 1989 Errata to Annotated Rev to FSAR & Tech Specs Bases ST-HL-AE-3040, Proposed Revs to FSAR1989-04-18018 April 1989 Proposed Revs to FSAR ML20148C5971988-03-18018 March 1988 Slide Prsentation Entitled, Commission Briefing on Full Power Licensing of South Texas Project,Unit 1 ML20237D7901987-12-10010 December 1987 Package of Unrelated Documentation Re Listed Plants Concerning NRC Emergency Response Data Sys HL-3708, Record of 870819 Telcon W/A Singh,P Kadambi of Nrc,A Guidry of Bechtel Re Deviations Not Documented in Plant Ser.Nrc Concurred That Deviations Described in Attachment 2 to ST-HL-AE-2252 Acceptable1987-08-19019 August 1987 Record of 870819 Telcon W/A Singh,P Kadambi of Nrc,A Guidry of Bechtel Re Deviations Not Documented in Plant Ser.Nrc Concurred That Deviations Described in Attachment 2 to ST-HL-AE-2252 Acceptable HL-7514, Record of Telcon W/Ca Ayala,Ma Friedlander,Rl Perch,R Emch & C Moon on 870708 to Clarify Intent & Proper Interpretation of Encl marked-up Final Draft Tech Spec Table 3.3-31987-07-0808 July 1987 Record of Telcon W/Ca Ayala,Ma Friedlander,Rl Perch,R Emch & C Moon on 870708 to Clarify Intent & Proper Interpretation of Encl marked-up Final Draft Tech Spec Table 3.3-3 ML20209F5901987-03-13013 March 1987 Region IV Daily Rept on 870311 Steam/Water Hammer Event at Facility & Photographs of Facility Piping ML20209B0091987-02-0202 February 1987 Package of Supplemental Info Re Reg Guide 1.75 Testing Configurations ML20212G6831987-01-16016 January 1987 Package of Comments on Facility long-term Cooling Analysis ML20207N3951987-01-12012 January 1987 Package of Three Pages Providing Addl Clarification of Instrument Tubing ML20214A1831986-10-15015 October 1986 Nonproprietary Version of Slide Presentation Entitled, Presentation & Handout Matl Re Leak-Before-Break Calculations for South Texas Project 12-Inch Diameter Accumulator Line ML20211F0041986-09-30030 September 1986 Marked-up Notice of Violation from Insp on 791110-800207, Draft Investigation Rept & Proposed Enforcement Actions IA-86-784, Package Consisting of Request for Addl Info Re Alternative Pipe Break Criteria Attached to NRC to Util1986-07-10010 July 1986 Package Consisting of Request for Addl Info Re Alternative Pipe Break Criteria Attached to NRC to Util ML20214K2741986-07-10010 July 1986 Package Consisting of Request for Addl Info Re Alternative Pipe Break Criteria Attached to NRC to Util ML20207E1021986-07-0202 July 1986 Telcon W/Util,Nrc & Westinghouse to Discuss Bart Code Assessment ML20207F6921986-07-0202 July 1986 Telcon W/Sl Wu & P Kadambi of NRC to Discuss Util Providing Supplemental Info on Momentary Fuel Assembly Liftoff,Per SER Confirmatory Item 9 HL-3578, Record of 860630 Telcon W/R Goel & P Kadambi of NRC Re NRC Review of Fire Hazards/Safe Shutdown.Summary of Changes Incorporated Into Amend 4 to Fire Hazards Analysis Rept Encl1986-06-30030 June 1986 Record of 860630 Telcon W/R Goel & P Kadambi of NRC Re NRC Review of Fire Hazards/Safe Shutdown.Summary of Changes Incorporated Into Amend 4 to Fire Hazards Analysis Rept Encl HL-3576, Record of Telcon W/Mr Wisenburg,Pg Trudel,T Roberson,R Goel & P Kadambi Re NRC Review of Fire Hazards Analysis Rept & Safe Shutdown1986-06-25025 June 1986 Record of Telcon W/Mr Wisenburg,Pg Trudel,T Roberson,R Goel & P Kadambi Re NRC Review of Fire Hazards Analysis Rept & Safe Shutdown ML20199G0611986-06-18018 June 1986 Record of 860618 Telcon W/Nrc,Util,Bechtel & Westinghouse Re Deletion of Sump Additive Tank from Facility Design ML20204A0251986-04-22022 April 1986 Record of 860422 Telcon W/J Brammer,S Hou,S Long, T Robertson,M Powell,W Watson & P Kadambi Re Pipe Break Screening Criteria.Jet Load Calculations Will Not Be Performed w/NUREG/CR-2913 Methodology ML20207P2701986-01-14014 January 1986 Supplemental Info Received on Safe Shutdown Issue ML20010D9081981-08-26026 August 1981 Slide Presentation Re Soil Structure Interaction ML19350E1901981-05-26026 May 1981 Slide Presentation from 810526 Meeting Re Hafnium Control Rods 1997-10-07
[Table view] Category:TELEPHONE OR VERBAL CONVERSATION RECORD
MONTHYEARHL-3708, Record of 870819 Telcon W/A Singh,P Kadambi of Nrc,A Guidry of Bechtel Re Deviations Not Documented in Plant Ser.Nrc Concurred That Deviations Described in Attachment 2 to ST-HL-AE-2252 Acceptable1987-08-19019 August 1987 Record of 870819 Telcon W/A Singh,P Kadambi of Nrc,A Guidry of Bechtel Re Deviations Not Documented in Plant Ser.Nrc Concurred That Deviations Described in Attachment 2 to ST-HL-AE-2252 Acceptable HL-7514, Record of Telcon W/Ca Ayala,Ma Friedlander,Rl Perch,R Emch & C Moon on 870708 to Clarify Intent & Proper Interpretation of Encl marked-up Final Draft Tech Spec Table 3.3-31987-07-0808 July 1987 Record of Telcon W/Ca Ayala,Ma Friedlander,Rl Perch,R Emch & C Moon on 870708 to Clarify Intent & Proper Interpretation of Encl marked-up Final Draft Tech Spec Table 3.3-3 ML20207F6921986-07-0202 July 1986 Telcon W/Sl Wu & P Kadambi of NRC to Discuss Util Providing Supplemental Info on Momentary Fuel Assembly Liftoff,Per SER Confirmatory Item 9 ML20207E1021986-07-0202 July 1986 Telcon W/Util,Nrc & Westinghouse to Discuss Bart Code Assessment HL-3578, Record of 860630 Telcon W/R Goel & P Kadambi of NRC Re NRC Review of Fire Hazards/Safe Shutdown.Summary of Changes Incorporated Into Amend 4 to Fire Hazards Analysis Rept Encl1986-06-30030 June 1986 Record of 860630 Telcon W/R Goel & P Kadambi of NRC Re NRC Review of Fire Hazards/Safe Shutdown.Summary of Changes Incorporated Into Amend 4 to Fire Hazards Analysis Rept Encl HL-3576, Record of Telcon W/Mr Wisenburg,Pg Trudel,T Roberson,R Goel & P Kadambi Re NRC Review of Fire Hazards Analysis Rept & Safe Shutdown1986-06-25025 June 1986 Record of Telcon W/Mr Wisenburg,Pg Trudel,T Roberson,R Goel & P Kadambi Re NRC Review of Fire Hazards Analysis Rept & Safe Shutdown ML20199G0611986-06-18018 June 1986 Record of 860618 Telcon W/Nrc,Util,Bechtel & Westinghouse Re Deletion of Sump Additive Tank from Facility Design ML20204A0251986-04-22022 April 1986 Record of 860422 Telcon W/J Brammer,S Hou,S Long, T Robertson,M Powell,W Watson & P Kadambi Re Pipe Break Screening Criteria.Jet Load Calculations Will Not Be Performed w/NUREG/CR-2913 Methodology 1987-08-19
[Table view] |
Text
So-4is
' HOUSTON UGHTING & POWER COMPANY '
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Y TELEPHONE MINUTES M. R. Wisenburg COR RESPONDENCE SERI AL NUMBE R TO: . .
ST-HL-HL-35783 FROM: SUBJECT FILE NUMBERS June 30', 1986 C9.4 DATE OF CALL: PRIMARY: SECONDARY-NRC Review of Fire Hazards / Safe Shutdown
SUBJECT:
TELECON PARTICIPANTS:
M. E. Powell (HL&P) R. Goel (USNRC)
G AN ZAT ON OF EACH)
A. Guidry (BEC) PAGE 1 OF 4 The above participants participated in a conference call on June 30, 1986 regarding the NRC review of the Fire Hazards Analysis Report (FHAR) and safe shutdown . The purpose of the call was to provide responses to comments / questions that the NRC had in a previous conference call (reference ST-HL-HL-35769) . A summary of the questions and responses is as follows:
1 Question (1):
Mr. Goel requested that a copy of the report No. 5A019MFP001 titled, " Post Fire .
Operator Actions and Equipment Protection Requirements" be made available in the Bethesda Licensing Office as soon as possible.
Response: We have provided Mr. Goel with an informational copy of the subject report through the Bethesda Licensing Office..
Question (2):
Mr. Goel questioned if repairs are required to achieve cold shutdown?
~
Response: Section 4.1, Pg. 4.1-36, Item III.L.5 states that " Repair procedures for systems necessary to achieve and maintain cold shutdown using the " Appendix R Required" single safe shutdown pathway will be. generated as required". To date, there are no requirements for repairs.
Mr. Goel stated that eventually be would need confirmation as to whether or not cepairs are required to achieve cold shutdown since this is one of the areas that he nas to sign-off on. Mr. Goel also stated that if repairs are required, then we need to make sure that the material that is required for any repair is available and dedicated for that purpose.
Ll/Telmin/ee 8607150215 860630 PDR ADOCK 05000498 g I F PDR STP-1C3(6-79)
' HOUSTON UGHTING G POWER COMPANY SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION TELEPHONE MINUTES M. R. Wisenburg CORRESPONDENCE SERI AL NUMBER TO: ST-HL-HL-35783 M. E. Powell FROM: SUBJECT FILE NUMBERS June 30, 1986 G9.4 DATE OF CALL: PRIMARY: SECONDARY-NRC Review of Fire Hazards / Safe Shutdown
SUBJECT:
TELECON PARTICIPANTS:
M. E. Powell (HL&P) R. Goel (USNRC)
="A~a'a" face c n Tur=er catsr> P x a =bt (usnac)
A. Guidry (BEC) PAGE 2 OF 4 Question (3):
Mr. Goel questioned if there were any scenarios (other than a control room fire) where you need to use the Auxiliary Shutdown Panel (ASP)?
Response: There are currently no other scenarios, other than a control room fire, where you need to use the ASP. The only instance currently in the FHAR where
- 4. requirement to use the ASP exists is for Fire Area (FA) 1 (reference Section 3.2 of the FHAR).
Question (4):
Mr. Goel questioned if we can achieve cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />?
~
Response: As stated in Section 4.1 of the FHAR (Page 4.1-33, STP does have the capacity to achieve cold shutdown conditions within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and maintain cold I shutdown conditions thereafter.
Questions (5):
Mr. Goel questioned if we could identify all high/ low pressure interfaces in the FHAR?
Response: A commitment was made to include the subject information in tabular form in Amendment 4 to the FHAR. Mr. Goel then requested that the table include a remarks column in which one could determine how the high/ low pressure interfaces were resolved. A commitment was made to include the requested information.
L1/Telmin/ee STP-103(6-79)
l
, HOUSTON UGHTING & POWER COMPANY l SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION l I
TELEPHONE MINUTES M. R. Wisenburg CORRESPONDENCE SERI AL NUMBER j TO: ST-HL-HL-35783 1 M. E. Powell FROM: SUBJECT FILE NUMBERS June 30, 1986 G9.4 DATE OF CALL: PRIMARY: SECONDARY-NRC Review of Fire Hazards / Safe Shutdown 1
SUBJECT:
I TELECON PARTICIPANTS:
M. E. Powell (HL&P) R. Goel (USNRC)
GAN ZAT ON OF EACH) l A. Guidry (BEC) PAGE 3 OF 4 Question (6):
Mr. Goel questioned if transfer switches have alternate fuses?
Response: The transfer switches in use at STP have alternate fuses.
Question (7):
Mr. Goel questioned if a copy of circuit drawings for both power and control ,
I circuits for typical transfer switches could be made available? )
Response: A commitment was made to provide Mr. Goel with copies of the requested J I
drawings. In addition it was noted that only control circuits have alternate fuses, ;
i not power circuits.
Question (8):
Mr. Goel questioned if there are any electrical " interties" between trains such that a failure of a breaker could loose more than one (1) train. He indicated that he was primarily concerned about an
~
'N' circuit being tied between 'A', 'B' or 'C' circuit or if a spurious actuation could propagate from an 'A' circuit to a 'B' circuit through an 'N' circuit.
Response: There are no " interties" between trains. ,
1 Question (9):
Mr. Goel requested that more detailed information on the ASP and transfer switch l
panels be placed in the FHAR.
L1/Telmin/ee STP-103(6-79)
i
HOUSTON LIGHTING G POWER COMPANY j SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION TELEPHONE MINUTES M. R. Wisenburg CORRESPONDENCE SERI AL NUMBE R TO: 1 M. E. Powell FROM: SUBJECT FILE NUMBERS June 30, 1986 G9.4 DATE OF CALL: PRIMARY: SECONDARY-NRC Review of Fire Hazards / Safe Shutdown TELECON PARTICIPANTS:
M. E. Powell (HL&P) R. Goel (USNRC)
IINCLUDE NAME AND ORGANIZATION OF EACH)
C. M. Turner (HIAP) P. Kadambi (USNRC)
A. Guidry (BEC) PAGE 4 OF 4 Response: Per previous conversations between Prasad, C. Turner & I, we have egreed to incorporate a reference in the FHAR to the FSAR Sections where the subject information is already discussed in detail. Mr. Goel indicated that this was acceptable.
l In Addition, Mr. Goel had previously requested a breakdown of the changes being incori.arated in FHAR amendment 4. The attached list was telecopied to him on June 20, 1986. ;
l nrrfyc ;
cc: A. W. Harrison C. M. Turner C. Wren M. A. McBurnett S. Eldridge A. Guidry (BEC)
P. G. Trudel (BEC)
I. Roberson (Bethesda Licensing Office)
R. Sweeney (Bethesda Licensing Office) dirims u)
L1/Telmin/ee STP-103(6-79)
4 Attachment ST-HL-HL-35783 File No.: G9.4 Page 1 of 1 Summary of Amendment 4 Revision
- 1. Update " Redundant Safe Shutdown Assessment" section for each area to reflect latest evaluation results.
- 2. Adds evaluation of Spurious - Operation of Equipment (SOE) components to Redundant Safe Shutdown Section Assessment.
- 3. Adds evolution of high/ low pressure interface components to Redundant Safe Shutdown Ascessment sections.
- 4. Revise applicable fire area drawings to reflect addition of 16 sprinkler systems in MEAB.
- 5. Revise applicable fire area drawings to identify those systems which are property protection only.
- 6. Delete Lewis Barbe's resume.
- 7. Revise Table 2-2 and 2-3 and associated zone tables to incorporate HL&P and Impell comments.
- 8. Add section 3.1.4 to clarify the STP Redundant Safe Shutdown philosophy.
- 9. Clarify wording on page 4.2 - 44a and 4.2-44b to reflect walkdown results.
Ll/Telmin/ee