ML20214A183

From kanterella
Jump to navigation Jump to search
Nonproprietary Version of Slide Presentation Entitled, Presentation & Handout Matl Re Leak-Before-Break Calculations for South Texas Project 12-Inch Diameter Accumulator Line
ML20214A183
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/15/1986
From:
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
Shared Package
ML19292G273 List:
References
ST-HL-AE-1784, NUDOCS 8611190286
Download: ML20214A183 (12)


Text

---

ATTACHMENT A ST-HL-AE- #984

.PAGE : OF i A l

Westinghouse Non-Proprietary Class 3 4

~

FRESENTATION AND MANDOUT MATERIAL REIATIVE TO LB5 CAlcVIATIoss FOR SOUTM TEXA8 PROJECT 12 INCE DIAMETER ACCUMULATOR LINE OCT0EER 15. 1986 uzETING WITH THE anc l

2 l

W137INGHOUSE E.ECTRIC CORPORATION l

NUCLEAR ENERGT SYSTDG l

P.O. Box 7T28 Pittsburgh, Pennsylvania 15230

$$h $Dbb

[

A

ATTACHMENT 2.

ST-HL AE-I'784 PAGE a OFit FIGURE I SOUTH TEXAS PROJECT 12 INCH ACCUMULATOR LINE F

or 8

b 10 RCS COLD LEG

/ BRANCH NDZZLE

/%

x A

3 12"

, h,

  1. 2" h

k C

=

m

=

ACCUMULATOR LINE OPERATING PRESSURE = 2304 psi

'(TYPICAL FOR LOOPS 1,2 and 3) i 1

l l

ATTACHMENT l -

ST HL AE-IWI.L i

PAGE A 0F1:L.

l ACCtM1 ATOR L1E TEAK-BFFORE-BREAK EVALtRTIDN FDR THE SOLITH TEXA5 PROJET STEP 1:

CALCtLATE THE CRACK SIZE YlELDING 18 F M LEAK RATE.

USE NORML OPERATING LOADS

~

i

~

c, e t I

t*-*t T.

___.L________

2" I

~ ~ ~

p q

k

- - ~ _ _ _ __._ _ _ _._ _ _ _ _.

h12.7

{

RESti TS:

~~

~

NORMAL DPERATING tDAOS:

FORCE, F = 197 KIPS BENDING >0 MENT, M = 619.5 IN-KIPS l

(a.c.e>

CRACK S'12E YlELDING LEAK RATE OF 18 F M IS LONG.

ATTACHMENT A ST-HL-AE-17tv PAGE 4 OF1.1.

I ACCtM1ATOR 1 IW 1EAK BEFORF RREAK FVA! t& TION,

FOR THF EDUTH TFYAS PROSCT APPLY W (NORMAL + SSE) LOADS TO TH STEP 2:

A)

THE LEAKAGE SIZE CRACK FROM STEP 1.

E EEN N B)

CALClLATE 'JAPPLlED tmet t i

M f

8 N.0" 1

-m

_._______.L_______.

,f,

e

<%9

.e L

6 i

H 2.75" I

{

RFRII TS:

I Il

% (NORMAL + SSE) LOADS ARE:

FORCE, F = 282.8 KIPS BENDING ElENT, M = 13i8.7 IN-KIPS (8,Cie)

~

THUS, A PARGIN ON LOAD OF%

IS DEMONSTRATED FOR THE LEAK SIZE

... a ATTACHMENT ST-H L-AE- /W.2_

PAGE 6 OF/2 ACCLMJLATOR LIF t FAK-BEFORE-BREAK EVAltR

OR THE SOUTH TEXAS PRO FCT F

USECRACK51ZEi2(LEAKAGESIZECRACK)

I STEP 3:

A)

L = 2 (J)

DEPONSTRATE CRACK BF. APPLY (NORMAL + SSE) LOADS.

STABILITY.

i

=

Crack L, I

1.00"

_ _ _ _ _ _ _ J. _ _ _ _ _ _ _ _

a o

p Y

p,

(

h m

M2.75H

(

t REStLTS: (1)

J-T APPROACH

(..c.e>

IF IWB3640 APPROACH IS USED AND CONSERVA (2)

ASStWTION 15 MADE THAT THE MAX 16UM LOA LOCATION, THEN THE " CRITICAL

  • FLAW SIZE WOULD BE AB

^

-HL Yh 1:1

__ PAGE G OF /s.

l ACCUMULATOR LINE RAK-BEFORE-EREAK EVALUATION FOR ~~

THE SOUTH TEXAS PRDJECT CONCLUSIONS o

FATIGUE' CRACK GROWTH WOULD BE INSIGNIFICANT (BASED ON TYPICAL RESULTS) i o

NO MECHANISM IS KNOWN THAT CAN CAUSE THE LARGE SIZE OF FLAWS ASSUMED IN THE EVALUAT10N P'STULATED THROUGH-WALL FLAW WOULD YlELD A DETECTABLE j

O o

LEAKAGE l

o AMPLE MARGINS ARE DEMONSTRATED WITH RESPECT TO LEAK DETECTION, MAXIMUM APPLIED LOADS AND FLAW SIZE THUS, MECHANISTIC CONSIDERATIONS SHOW THAT DOUBLE ENDED l

GUILLOTINE BREAKS ARE NOT POSSIBLE FOR THE SOUTH TEXAS l

PROJECT ACCUMULATOR LINES I

l

l ATTACHMEiMT &

ST-HL-AE 17tv PAGEj O_F/ L e

South Texas Loop C Safety Injection Wozzle.'

(,,c,,)

I i

m h

e 0

l I

I

__. u,--

v-e ATTACHMENT 2 ST-HL-AE l?N PAGE g OF $9-t fME MATERT ALS AND Ff M olt THE 2 Put\\TS (a,c e) l i

\\

l

~

l}

l-6 n

b

=

ATTACHM ENT.2.

ST HL-AE /7N PAGE 9 0F/.2 TYPICAL ROCH TEMPERATURE PECHANICAL PROPERTES OF THE ACCUMULATOR Livr NATERTALM ANS Wf DM & THE 50tml Tmt PRMFCT UMITS 1 1ND 2 PUtg Continued (a.c.e) 4 I

l l

e e

3

-.2..

3 (o,c.e)

ATTACHMENT J.

ST-HL-AE /7tv PAGE /0 OF /s

?

E eia l

t l

l l

True htress-True Strain Curve for SA376 TP316 Stainless Steel at 560 F 0

~

I ATTACHMENT 1 ST HL A

,_PAGE llE- /7sp Oftz (a,c,e) l 5

1 l

l Variation of the applied J as a f tion 4f applied moment up to the normal plus SSE load for a Sng through-wall (8.c *)

t

}

circumferential crack - South Texa Projeit Accumulator Lines e

(a,c,e)

D)

'i

\\.

72 e

PRELIMINARY S

1

_a ATTACHMENT,L ST HL AE-/7/V PAGE /a_OF />

(a c.e) l

{-

l l

VariationoftheappliedJasafunctionof.,3pplidmomentupto i

4 times the nomal plus SSE loading for al long through-wall (a,c.e) circumferential crack - South Texas Project Accuiiiulator Lines I

(a,c.e)

DRAFT PRELIMINARY

.