Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
HL-3708, Record of 870819 Telcon W/A Singh,P Kadambi of Nrc,A Guidry of Bechtel Re Deviations Not Documented in Plant Ser.Nrc Concurred That Deviations Described in Attachment 2 to ST-HL-AE-2252 Acceptable | 19 August 1987 | Record of 870819 Telcon W/A Singh,P Kadambi of Nrc,A Guidry of Bechtel Re Deviations Not Documented in Plant Ser.Nrc Concurred That Deviations Described in Attachment 2 to ST-HL-AE-2252 Acceptable | |
HL-7514, Record of Telcon W/Ca Ayala,Ma Friedlander,Rl Perch,R Emch & C Moon on 870708 to Clarify Intent & Proper Interpretation of Encl marked-up Final Draft Tech Spec Table 3.3-3 | 8 July 1987 | Record of Telcon W/Ca Ayala,Ma Friedlander,Rl Perch,R Emch & C Moon on 870708 to Clarify Intent & Proper Interpretation of Encl marked-up Final Draft Tech Spec Table 3.3-3 | |
ML20207F692 | 2 July 1986 | Telcon W/Sl Wu & P Kadambi of NRC to Discuss Util Providing Supplemental Info on Momentary Fuel Assembly Liftoff,Per SER Confirmatory Item 9 | |
ML20207E102 | 2 July 1986 | Telcon W/Util,Nrc & Westinghouse to Discuss Bart Code Assessment | |
HL-3578, Record of 860630 Telcon W/R Goel & P Kadambi of NRC Re NRC Review of Fire Hazards/Safe Shutdown.Summary of Changes Incorporated Into Amend 4 to Fire Hazards Analysis Rept Encl | 30 June 1986 | Record of 860630 Telcon W/R Goel & P Kadambi of NRC Re NRC Review of Fire Hazards/Safe Shutdown.Summary of Changes Incorporated Into Amend 4 to Fire Hazards Analysis Rept Encl | Safe Shutdown |
HL-3576, Record of Telcon W/Mr Wisenburg,Pg Trudel,T Roberson,R Goel & P Kadambi Re NRC Review of Fire Hazards Analysis Rept & Safe Shutdown | 25 June 1986 | Record of Telcon W/Mr Wisenburg,Pg Trudel,T Roberson,R Goel & P Kadambi Re NRC Review of Fire Hazards Analysis Rept & Safe Shutdown | Safe Shutdown |
ML20199G061 | 18 June 1986 | Record of 860618 Telcon W/Nrc,Util,Bechtel & Westinghouse Re Deletion of Sump Additive Tank from Facility Design | |
ML20204A025 | 22 April 1986 | Record of 860422 Telcon W/J Brammer,S Hou,S Long, T Robertson,M Powell,W Watson & P Kadambi Re Pipe Break Screening Criteria.Jet Load Calculations Will Not Be Performed w/NUREG/CR-2913 Methodology | Safe Shutdown |