MONTHYEARML20248A6681989-09-26026 September 1989 Notice of Deviation from Insp on 890802-0905.Deviation Noted:Applicant Did Not Replace Nonqualified Class 1E Diesel Generator Wattmeters W/Qualified Components,Per Util 880325 Commitment ML20147G7121988-03-0202 March 1988 Notice of Deviation from Insp on 880105-0202.Deviation Noted:Nonconformance Rept NCR-87-A00491 & QC Hold Point Not Trended as Required by FSAR to Identify Any Trend Adverse to Quality ML20149J6591988-02-12012 February 1988 Notice of Deviation from Insp on 871202-880105.Deviation Noted:Calculation Package Incorrectly Dated & Isometrics for Conduit Runs Incorrectly Depicted & Measured IR 07100104/20120011987-12-18018 December 1987 Notice of Deviation from Insp on 871104-1201.Deviation Noted:Baseplate Reported to Be 8 Inches Long Found by NRC Inspector to Be 9 Inches Long ML20237D7291987-12-16016 December 1987 Notice of Deviation from Insp on 871104-1201.Deviation Noted:Checklist Attribute 20.2 Incorrectly Verified as 3/4 Inches Npt ML20236L9191987-11-0505 November 1987 Notice of Deviation from Insp on 870903-1006.Deviation Noted:Performance Guidelines for Conduit Support & Routing Walkdowns Not Followed ML20236C6101987-10-23023 October 1987 Notice of Deviation from Insp on 870805-0902.Deviation Noted:Administrative Controls Not Contained in Procedure to Ensure Adequate Retesting of Sys or Design Features Which Have Been Maintained or Modified Following Testing ML20237G3081987-08-0505 August 1987 Notice of Deviation from Insp on 870301-0430.Deviations Noted:Rev 24 to B&R Procedure QI-QAP-11.1.28 Not Revised to Require QC Inspector to Assign Weld Number to Each Weld Shown on Design Drawing & to Document Weld Size ML20216C1801987-06-22022 June 1987 Notice of Deviation from Insp on 870101-0228 ML20214R9351987-06-0101 June 1987 Notice of Deviation from Insp on 861101-1231 ML20206E7981987-04-0202 April 1987 Notice of Deviation from Insp on 860901-1031 ML20205L2351987-03-30030 March 1987 Notice of Deviation from Insp on 860401-0531 ML20205D1021987-03-18018 March 1987 Notice of Deviation from Insp on 860701-0831 ML20207E0131986-12-22022 December 1986 Notice of Deviation from Insp on 860601-30 ML20207E1081986-12-22022 December 1986 Notice of Deviation from Insp on 860401-0531 ML20215J8321986-10-17017 October 1986 Notice of Deviation from Insp on 860201-0331 ML20212P7611986-08-29029 August 1986 Notice of Deviation from Insp on 851101-860131 ML20198E8501986-05-12012 May 1986 Notice of Deviation from Insp During Dec 1985 ML20197E5501986-05-0707 May 1986 Notice of Deviation from Insp on 860201-0331 ML20199K9721986-04-0404 April 1986 Notice of Deviation from Insp on 851101-30 ML20141P0541986-03-0606 March 1986 Notice of Deviation from Insp on 851001-31 ML20133M7301985-10-11011 October 1985 Notice of Deviation from Insp on 850801-31 1989-09-26
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19993011999-07-16016 July 1999 Exam Repts 50-445/99-301 & 50-446/99-301 on 990618-24.Exam Results:Six Applicants for Senior Operator Licenses Passed Exams IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam ML20236G9321998-07-0202 July 1998 Notice of Violation from Insp on 980329-0509.Violation Noted:Four Examples Were Identified,Where Licensee Failed to Meet Requirement for Design of ECCS Switchover from Refueling Water Storage Tank to Containment Recirculation IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217F6051998-04-24024 April 1998 Notice of Violation from Insp on 980215-0328.Violations Noted:Corrective Actions Were Not Sufficient to Identify That Excessive Leakage in ECC Sys Check Valves During Unit 1 Cycle 6 Required Unit 1 Safety Injection Pumps Be Started ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20248L8831998-03-19019 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Licensee Failed to Document Heat Related Degredation of Unit 2,Train B Solid State Safeguards Sequencer IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 07100012/20110221998-01-16016 January 1998 Notice of Violation from Insp on 971012-1122.Violation Noted:Procedure IPO-005B,rev 2,not Appropriate to Circumstances in That Procedure Did Not Require Pressure Be Maintained Below Rc System Pressure & Temp Limits ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198R6571998-01-16016 January 1998 Notice of Violation from Insp on 970922-25.Violation Noted: on 961029,licensee Made Changes to Emergency Plan,W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) ML20198N2071998-01-14014 January 1998 Notice of Violation from Insp on 970608-0719 & Subsequent Inoffice Reviews Concluded on 971114.Violation Noted: Procedures OPT-102A & 102B Did Not Include Appropriate Quantitative Acceptance Criteria ML20199H0131997-11-21021 November 1997 Notice of Violation from Insp on 970831-1011.Violation Noted:Thermometer IC1473,was Used During Performance of Procedure PPT-SX-7505A on 970807 ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-IV-97-067, on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee1997-11-17017 November 1997 PNO-IV-97-067:on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee PNO-IV-97-066, on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed1997-11-17017 November 1997 PNO-IV-97-066:on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle PNO-IV-97-061, on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed1997-10-30030 October 1997 PNO-IV-97-061:on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20211A0691997-09-19019 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970507,while Performing Procedure OPT-457B,licensed Operator Failed to Close Valve 2-8812A Per Step 8.8 ML20198G1821997-09-12012 September 1997 Notice of Violation from Investigation on 970606.Violation Noted:Mn Shook Submitted Falsified Info to NRC Re Being Denied Access to Nuclear Power Plant as Result of fitness-for-duty Policy 1999-09-14
[Table view] |
Text
'
APPFNDIX B NOTICE OF DEVIATION Texas Utilities Electric Company Dockets: 50-445/85-16 50-446/85-13 Comanche Peak Steam Electric Permits: CPPR-126 Station, Units 1 and 2 CPPR-127 Based on the results of an NRC inspection conducted on November 1-30, 1985, of Comanche Peak Response Team (CPRT) activities, three deviations from commitments to the NRC were identified. The deviations involved failure to comply with approved instructions in performance of reinspections, inadequate quality instruction (QI) for liner measurements, and inadequate review of inspection documentation. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the deviations are listed below:
A. Section 4 in Revision 3 to CPRT Project Procedure CPP-009 for Issue -
Specific Action Plan VII.c states, in part, " Qualified QA/QC Review Team personnel perform field reinspections of specific hardware items and reviews of appropriate documents in accordance with approved instructions Contrary to the above, the following examples were noted where field reinspections of hardware items were not performed in accordance with approved instructions:
- 1. Attribute 4.5 in Section 5.0 of QI-055 Revision 0, states for spring nuts, " Verify that the serrated grooves align with the channel clamping ridge." For Verification Package No. I-S-INSP-033, Support No. 033A, the ERC inspector signed the checklist that this attribute was acceptable. However, an independent inspection showed that the spring nut serrated grooves did not align with the channel clamping ridge on this support (445/8516-D-50).
- 2. Section 5.1.A3c of QI-031, Revision 0, states, in part, with respect to reinspection of containment liner and tank stainless steel liner,
" Verify that the height of the reinforcement on each face of the seam does not exceed 3/32-inch." Section 5.1 addresses reinspection of the weld seam surface and states, "If the . . . weld seam surface does not meet the above criteria the checklist shall be marked reject and the weld and rejectable item shall be identified by a deviation report." However, the ERC inspector did not identify excessive reinforcement for containment liner weld joint PS2, Verification Package No. I-S-LINR-61. An independent reinspection of this weld identified excessive reinforcement for approximately 80% of the weld length with reinforcement up to 7/32 inch when measured from the liner plate to the center of the weld (446/8513-D-11).
8604100264 860404
{DR ADOCK 05000445 unn
i 2
- 3. Section 5.3.A of QI-043, Revision 1, states with respect to concrete surface inspection, " Inspect all accessible surfaces for honeycombing and voids (Inaccessible surfaces are those cast against earth, backfilled, or coated)."
Review of Verification Package No.1-S-CONC-057 revealed that the ERC inspector entered "N/A" (for not applicable) on the checklist for attribute 3.A (surface inspection of walls, etc.), and " coated" in the remarks column. However, an independent inspection revealed that the surface was not coated. In addition, the NRC inspector identified a void with a depth of at least 11/2 inch and dirt in the construction 4 joint. These conditions were not identified by ERC (445/8516-D-47).
- 4. Section 5.1.Al of QI-031, Revision 0, states, in part, with respect to attribute A.I.a. "The following local contour deviations are to be verified: A maximum of 1-inch gap between the cylindrical liner or dome shell plate and a six feet long template curved to the required radius . . . ." This attribute applies to both the cylindrical and dome liners. McwcVer, the ERC inspector w.ered "N/A" for not applicable on the checklists and "(dome only)" in the remarks column for attribute A.I.a for Verification Package Nos. I-S-LINR-08 I-S-LINR-12, and I-S-LINR-61. These verification packages involved the cylindrical liner and attribute A.I.a did, in fact, apply (445/8516-D-42).
- 5. Section 1.3 of QI-012, Revision 0, states, in part, " Verify that the tubing is correctly routed . . . check tag numbers of instruments and proper hook-up of high/ low pressure connections . . . ." Section 1.5 states, in part, " Verify that there is proper air gap. The minimum gap spacing shall always be 1/8 inch (between) . . . adjacent sensing lines, other equipment, concrete or steel building members."
Section 1.7 states, in part, " Verify that bends have a minimum of four (4) times the nominal tube size by using a template or the following procedure: . . . Enter measured and calculated values on Attachment 6.1. Initial and date each entry." Section 2.3 states, in part, ". . . For differential pressure type instruments, verify the proper hook-up of high/ low pressure connections . . . ."
Contrary to the above, the following conditions were identified:
- a. The installation identification tag showing the low pressure root valve numbers and instrument number for equipment in Verification Package No. 1-E-ININ-049 was incorrectly marked as follows:
o The tag on Valve No. 1-RC-8061B, which was associated with Instrument No.1-FT-425, was identified with Instrument No. 1-FT-424.
d
3
- b. Less than the required minimum 1/8-inch air gap spacing was identified at the following locations:
o Verification Package No. I-E-ININ-049 - Between the high pressure sensing line and a steel member adjacent to the isolation valve location.
o Verification Package No. I-E-ININ-059 - Between the tubing and header pipe routed through the same wall penetration at the inside face of the excess letdown heat exchanger orifice room. The swagelock fitting near Support No. C-24-04-51 was also touching the wall.
- c. Verification of minimum bend radii for tubing was not performed on the following:
o Bend No. 5 in Verification Package No. 1-E-ININ-051, which was accessible, was neither identified nor inspected by the ERC inspector.
o Bend No. 6 in verification Package No. 1 + ININ-041, which was accessible, was identified by the ERC inspector as being inaccessible and was thus not inspected,
- d. An improper hook-up (i.e. , loose bolt) was identified between the low pressure sensing line flange attachment and the differential pressure type instrument in Verification Package No. 1-E-ININ-049 (445/8516-D-30).
- 6. Section 5.6.1.A of QI-027, Revision 0, states, " Verify welds are located as shown on design drawings. Record any welds that are in addition to those specified on the drawings. (Attachment 6.6)."
Contrary to the above, the ERC inspector failed to record the presence of existing additional welds to those specified on the drawing for Verification Package No. I-1-LBSR-041. Independent review of the original installation documentation package, Mark No. CC-1-126-702-F43R, '
established from examination of " Vendor Supplied Component Records" .
that field welds, which were not identified on the drawings, had been I performed on the two sway struts (445/8516-D-35).
- 7. The cable tray configuration acceptance criteria containe3 in Section 5.3.6 of QI-016, Revision 1, requires the inspector to verify l that all bolts have a nut and a locking device. Independent j inspection of Verification Package No. I-E-CATY-077 revealed that the ERC inspector did not identify a missing bolt and locking device on the splice plate joining tray section T148 REC 28 to T148 REC 27 (445/8516-0-18).
- 8. Section 5.6 of QI-014, Revision 0, requires verification that the cable routing agrees with References 3.2 and 3.3; i.e., 2323-EI-1700, 1 Cable and Raceway Schedule. Independent reinspection of Verification l l
l i
i
4 Package No. I-E-CABL-102 (Cable EG139517) revealed that ERC inspectors had failed to identify that the cable routing was not in agreement with Cable and Raceway Schedule 2323-EI-1700, issue 334, page 720.354 dated November 21, 1984. The cable was noted to be physically routed into tray T13GCCP80 and then tray T13GCCP81. The cable schedule routed the cable into T13GCCP81 and then T13GCCP80 (445/8516-D-17).
B. Section 5.1 of ERC Procedure CPP-001, Revision 1, states, in part,
. . . Each Quality Instruction (QI) shall specify what is to be inspected or reviewed and the associated accept / reject criteria based on appropriate 4 specification, drawings, codes, procedures, etc . . . ." This procedure also indicates with respect to QI format that Section 5.0 of a QI provides comprehensive instructions of what is to be done to fulfill the purpose of the document.
l Contrary to the above:
l l 1. The ERC Description Memorandum QA/QC-RT-293 lists Gibbs & Hill (G&H)
Containment Liner Specification 2323-5S-14, Revision 4, as the
- reference for developing QI-031, Revision 0. Paragraph 8.2.2.1.2.b of the abon G&ii specification states, in p ut, "The following i deviations are acceptable
- . . . A 1 1/2 inch gap when the template ,
l . . . (the 6 foot long curved template) is placed across one or more '
4 welded seams." This applies to both the cylindrical liner and the
! dome liner. However, Section 5.1. A.1.of QI-031, Revision 0, states, in part, with respect to surface contour attribute A.1.b, "The following local contour deviations are to be verified: . . . A maximum 1 1/2 inch gap when the six foot long template is placed across the 2
dome weld seams when measuring horizontally or vertically." This applies only to the dome liner and does not include the cylindrical i liner measurement requirement of the G&H specification.
- 2. Section 5.0 in Revision 0 to QI-031 does not provide comprehensive instructions of what is to be done with respect to reinspection of the containment liner. It states, in part, "The following local contour deviations are to be verified: . . . A maximum of 3/4 inch deviation from a 10 foot straight edge placed in the vertical direction between the horizontal weld seams." Deviation values measured using this instruction can vary by as much as a factor of two depending on the method used to hold the straight edge against the cylindrical liner, i
If the surface is convex, for example, the deviation could be measured with the straight edge touching at either the center of the liner plate or at one of the edges resulting in differing measurements.
Section 5.0 of QI-031, Revision 0, does not clarify this situation *
- (445/8516-D-41).
C. Paragraph 5.2.4 of ERC Procedure CPP-009, Revision 1, requires the lead inspector (Level III) and lead discipline engineer to ". . . ensure that reinspection / documentation review results are clear, accurate, and complete."
1 5
l
- Contrary to the above, attribute 3.A of the completed checklist for i Verification Package No. I-S-CONC-015 was neither accepted nor rejected (i.e., not signed off), and thus actual reinspection for this attribute could not be verified. The checklist was approved and signed b
' lead inspector and the lead discipline engineer (445/8516-D-47)y both the i
l Texas Utilities Electric Company is hereby requested to submit to this office, within 30 days of the date of this Notice of Deviation a written statement or j explanation in reply, including for each deviation: (1)thereasonsforthe deviations if admitted, (2) the corrective steps which have been taken and the l results achieved; (3) corrective steps which will be taken to avoid further 4 deviation from commitments made to the Commission; and (4) the date when full i compliance will be achieved. Consideration may be given to extending your response time for good cause shown.
l
! Dated at Arlington, Texas j this 4th day of April,1986 I