B APPENDIX B NOTICE OF DEVIATION TU Electric Dockets:
50-445/89-64 50-446/89-64
-Comanche Peak Steam Electric Station, Permits:
CPPR-126 Units 1 and 2, Glen Rose, Texas CPPR-127 The following deviation was identified during an NRC inspection conducted on August 2 through September 5, 1989.
As stated in TU Electric's letter TXX-88294 dated March 25, 1988, the applicant committed to the replacement of the nonqualified Class 1E, Unit 1 diesel generator wattmeters with qualified components prior to Unit 1 hot functional testing.
Contrary to the above, the subject wattmeters were installed after Unit 1 hot functional testing.
This failure to adequately implement the corrective actions specified in the reference letter is identified as a deviation (50-445/8964-D-02).
Please provide to the U.
S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC, 20555, with a copy to the Assistant Director for Inspection Programs, Comanche Peak Project Division, Office of Nuclear Reactor Regulation, in writing within 30 days of the date of this Notice, the reason for the deviation, the corrective steps which have been taken and the results achieved, the corrective steps which will be taken to avoid further deviations, and the date when your corrective action will be completed.
Where good cause is shown, consideration will be given to extending the response time.