MONTHYEARML20248A6681989-09-26026 September 1989 Notice of Deviation from Insp on 890802-0905.Deviation Noted:Applicant Did Not Replace Nonqualified Class 1E Diesel Generator Wattmeters W/Qualified Components,Per Util 880325 Commitment ML20147G7121988-03-0202 March 1988 Notice of Deviation from Insp on 880105-0202.Deviation Noted:Nonconformance Rept NCR-87-A00491 & QC Hold Point Not Trended as Required by FSAR to Identify Any Trend Adverse to Quality ML20149J6591988-02-12012 February 1988 Notice of Deviation from Insp on 871202-880105.Deviation Noted:Calculation Package Incorrectly Dated & Isometrics for Conduit Runs Incorrectly Depicted & Measured IR 07100104/20120011987-12-18018 December 1987 Notice of Deviation from Insp on 871104-1201.Deviation Noted:Baseplate Reported to Be 8 Inches Long Found by NRC Inspector to Be 9 Inches Long ML20237D7291987-12-16016 December 1987 Notice of Deviation from Insp on 871104-1201.Deviation Noted:Checklist Attribute 20.2 Incorrectly Verified as 3/4 Inches Npt ML20236L9191987-11-0505 November 1987 Notice of Deviation from Insp on 870903-1006.Deviation Noted:Performance Guidelines for Conduit Support & Routing Walkdowns Not Followed ML20236C6101987-10-23023 October 1987 Notice of Deviation from Insp on 870805-0902.Deviation Noted:Administrative Controls Not Contained in Procedure to Ensure Adequate Retesting of Sys or Design Features Which Have Been Maintained or Modified Following Testing ML20237G3081987-08-0505 August 1987 Notice of Deviation from Insp on 870301-0430.Deviations Noted:Rev 24 to B&R Procedure QI-QAP-11.1.28 Not Revised to Require QC Inspector to Assign Weld Number to Each Weld Shown on Design Drawing & to Document Weld Size ML20216C1801987-06-22022 June 1987 Notice of Deviation from Insp on 870101-0228 ML20214R9351987-06-0101 June 1987 Notice of Deviation from Insp on 861101-1231 ML20206E7981987-04-0202 April 1987 Notice of Deviation from Insp on 860901-1031 ML20205L2351987-03-30030 March 1987 Notice of Deviation from Insp on 860401-0531 ML20205D1021987-03-18018 March 1987 Notice of Deviation from Insp on 860701-0831 ML20207E0131986-12-22022 December 1986 Notice of Deviation from Insp on 860601-30 ML20207E1081986-12-22022 December 1986 Notice of Deviation from Insp on 860401-0531 ML20215J8321986-10-17017 October 1986 Notice of Deviation from Insp on 860201-0331 ML20212P7611986-08-29029 August 1986 Notice of Deviation from Insp on 851101-860131 ML20198E8501986-05-12012 May 1986 Notice of Deviation from Insp During Dec 1985 ML20197E5501986-05-0707 May 1986 Notice of Deviation from Insp on 860201-0331 ML20199K9721986-04-0404 April 1986 Notice of Deviation from Insp on 851101-30 ML20141P0541986-03-0606 March 1986 Notice of Deviation from Insp on 851001-31 ML20133M7301985-10-11011 October 1985 Notice of Deviation from Insp on 850801-31 1989-09-26
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19993011999-07-16016 July 1999 Exam Repts 50-445/99-301 & 50-446/99-301 on 990618-24.Exam Results:Six Applicants for Senior Operator Licenses Passed Exams IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam ML20236G9321998-07-0202 July 1998 Notice of Violation from Insp on 980329-0509.Violation Noted:Four Examples Were Identified,Where Licensee Failed to Meet Requirement for Design of ECCS Switchover from Refueling Water Storage Tank to Containment Recirculation IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217F6051998-04-24024 April 1998 Notice of Violation from Insp on 980215-0328.Violations Noted:Corrective Actions Were Not Sufficient to Identify That Excessive Leakage in ECC Sys Check Valves During Unit 1 Cycle 6 Required Unit 1 Safety Injection Pumps Be Started ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20248L8831998-03-19019 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Licensee Failed to Document Heat Related Degredation of Unit 2,Train B Solid State Safeguards Sequencer IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 07100012/20110221998-01-16016 January 1998 Notice of Violation from Insp on 971012-1122.Violation Noted:Procedure IPO-005B,rev 2,not Appropriate to Circumstances in That Procedure Did Not Require Pressure Be Maintained Below Rc System Pressure & Temp Limits ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198R6571998-01-16016 January 1998 Notice of Violation from Insp on 970922-25.Violation Noted: on 961029,licensee Made Changes to Emergency Plan,W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) ML20198N2071998-01-14014 January 1998 Notice of Violation from Insp on 970608-0719 & Subsequent Inoffice Reviews Concluded on 971114.Violation Noted: Procedures OPT-102A & 102B Did Not Include Appropriate Quantitative Acceptance Criteria ML20199H0131997-11-21021 November 1997 Notice of Violation from Insp on 970831-1011.Violation Noted:Thermometer IC1473,was Used During Performance of Procedure PPT-SX-7505A on 970807 ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-IV-97-067, on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee1997-11-17017 November 1997 PNO-IV-97-067:on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee PNO-IV-97-066, on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed1997-11-17017 November 1997 PNO-IV-97-066:on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle PNO-IV-97-061, on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed1997-10-30030 October 1997 PNO-IV-97-061:on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20211A0691997-09-19019 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970507,while Performing Procedure OPT-457B,licensed Operator Failed to Close Valve 2-8812A Per Step 8.8 ML20198G1821997-09-12012 September 1997 Notice of Violation from Investigation on 970606.Violation Noted:Mn Shook Submitted Falsified Info to NRC Re Being Denied Access to Nuclear Power Plant as Result of fitness-for-duty Policy 1999-09-14
[Table view] |
Text
p . . .
phn ,
a.
,1 x _
.4 p,
APPENDIX A
, NOTICE OF DEVIATION TU Electric--
- Dockets: 50-445'/87-02 L
50-446/87-02 h* Comanche Peak Steam Electric Station, Permits: CPPR-126
. Units 1 and 2 CPPR-127 J Base'd on the results of an NRC inspection conducted on January 1 through H
February 28, 1987, two deviations from commitments were identified. The..
-deviations consisted of several concrete pours'not being identified on the' Population Items List and documents missing from the Issue-Specific Action Plan (ISAP)LVII.c project files. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2,. Appendix C (1986), the deviations. are listed below:
A .' ERC document QA/QC-RT-1628, Revision 1, " Population Items List Concrete Placement," states, in part, that the list ". . . includes all safety-related concrete pours in Unit 1, 2 and areas common to both units." Attachment 6.3 of ERC Procedure CPP-005, Revision 3,' states, in L part, "The'ResponsibleLQA/QC Discipline Engineer . . . Provides the. basis
.for accepting the list as valid." In addition, "The QA/QC Lead Discipline Engineer and the QA/QC Engineering Supervisor review Population Items Lists _ to ensure: that they are complete, accurate, and consistent with the requirements of this procedure."'
In deviation from the above, NRC inspection of the Population Items List for concrete placement revealed the following discrepancies:
- 1. Pour Nos. 205-9810-039 through 205-9810-056 are shown as block-out type pours-in the east diesel generator foundation, Unit 2, on Drawing SSB-20655, Sheet 1, Revision 5. -Pour Nos. 205-9810-040 and 205-9810-048 through 205-9810-056 were not on the Population. Items-List and no corresponding pour cards could be obtained in the TU Electric Records Center. Pour Nos.'205-9810-039 and 205-9810-041 through 205-9810-047 were on the Population ItemsLList but were i assigned on drawings at least twice and are shown, for example, on Drawings SSB-20605, Sheet 1, Revision 7, and SSB-20618, Sheet 1, Revision 2, to be concrete curbs, removable slabs, etc.; not bl oc k-outs.
- 2. Pour No. 205-4822-003 is shown as a shielding wall for the Primary Sampling room on Drawings SSB-20605, Sheet 4A, Revision 0, and SSB-20605, Sheet 4, Revision 0. This pour number was not on the Population Items List.
.The above discrepancies indicate that the Population Items List is not entirely complete and accurate and does not include all safety-related concrete pours. The ERC review of the Population Items List to ensure accuracy and completeness was inadequate (445/8702-0-03; 446/8702-D-03).
8706300233 B70622 . 5 PDR ADOCK 0500
, o ;
3 2
B.- - Section 5.3.1 of Revision 2 to ERC Procedure CPP-004, " Project Working Files," dated December-17, 1985, for ISAP VII.c states, in part, "The Records' Administrator.shall review each document. received for filing for
. physical quality.(e.g'., reproducibility, legibility, condition) and
. completeness. (e.g. .. number, file location, sequence of attachments, etc.)."
In deviation from the above, NRC inspection of the Population Items List for electrical cable, revealed that the records administrator failed to
- identify that pages 813 and 814 of.the Electrical' Management System cable i
population listing and the list 'of. Essential and Emergency Lighting circuits were missing from the cable population. listing (445/8702-D-04; 446/8702-D-04).
TU Electric is hereby requested to submit to this office within 30 days of the date of the-letter transmitting this. Notice, a written statement or explanation in reply, including'for each deviation: (1) the reasons for the deviations if
. admitted,(2)thecorrectivestepswhichhavebeentakenandtheresults achieved (3) corrective steps which will.be taken to avoid further deviations, and (4) the date when full compliance will be^ achieved. Where good cause-is shown. consideration will be given to extending the response time.
, ' Dated at. ' Arlington, Texas this 22nd day.nf June 1987 s