Notice of Deviation from Insp on 871202-880105.Deviation Noted:Calculation Package Incorrectly Dated & Isometrics for Conduit Runs Incorrectly Depicted & Measured
ML20149J659
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/12/1988
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To:
Shared Package
ML20149J607 List:
References
50-445-87-35, 50-446-87-26, NUDOCS 8802230165
Download: ML20149J659 (3)


Text

m s

APPEND Q B NOTICE OF DEVIATION TU Electric Dockets: 50-445/87-35 50-446/87-26 Comanche Peak Steam Electric Station, Permits: CPPR-126

?] nits 1 and 2, Glelt Rose, Texas CPPR-12'i The following deviraions were identified during inspections conducted on December 2, 1987, through January 5, 1988.

A. Appendix A to Project Instructjon (PI) PI-0210'053a001, Revision 6, "Checking Procedures," states, in part, "Tne ,

purpose of an engineering check is to provide assurance that a '

tasx is performed and documented thoroughly and that the ,

results are correct and reasonable . . . .

Further, Section F of this appendix to the PI, states, in part, "Once an item has beca checked and approved, it should 1 not be altered without issuing a revision of the item.".

Cont'eary to the above,
1. In the calculati_n package for the Level 5 support evaluation A02454, on pages 15 end 16 of 39, the person checking the calculations dated them March 10, 1987, prior to the date of the calculations (March 11, 1987).

The support load calculations in this package were

' performed on March 20, 1987, aCd checked on March 23, l 1987. The summary Of loads on page 19 or 39 was dated March 9, 1987, and checked on March 10, 1987, which is 1 before the date indicating when the calculations were  :

performed.

l

2. Cn page la of 63, of Calculation A-02151 for Room 148B,
entitled "Open Items", the checker indicated that his work was completed on January 6, 1987; however, the preparer signed and dated this document on January 7, 1987.

I These two examples comprise a deviation (445/8735-D-01).

D, Section 4.1, "Walkdown Guidelines," to Project Instruction PI 0210-052-004 provides checklists for documentation, tolerances for dimensions, and guidelines for performing the' i conduit routing valkdowns. The instruction requires an.,

l 88022301e3 ApocK 880212 05000445 l PDR '

,,0 DCD v,

e -

y 4 e

g-. . _ . , .y . ._ -, .. . , . .. _ -. . . _

. g. . , j  ;.

^

pl >

2! .

..g**'

em' h' . 4 s ,

as-built sketch be drawn, lengths ~and sites _of structural i members be identijled, and' supports be identified, j i i contrary to the,above, i 1 1. In Roog 76, RFI-35-1-0118, Appendix'ATto cal'eulation, ,

A-00628,.page 4'ofE4 of this areendix lLs the.as-built

drawing which forms the banis ' t this calculation. on: ,

this drawing, the.engincur Vho ptrformed the walkdown v

. reported that the Unistrut:bclte being used to secure the

! junction box to the Unistrut araber were 3/8" in i I diameter ; however, the NRC inspector found 'these bolts to

be 1/2' in diameter, Also, on dm came drawing, the . '

walkdown enginoer_-reported that the HKB cn the. north side ,

of the junction box was located 171/ 2" away from the  !

junction box. The NRC inspecter measured this distance. t to be 1 1/8".

.I i 2. In Room 148E on the isometric drawn tG depict the conduit [

runs being evaluated as part of calculation A-02151,-and j

chown on page 24 of 43 of this calculation, the=

i dimensional data and orientation for conduits C-1PA-CR2'

'j "

d and C-lFD-A180, south of the Type 6 support tagged >

NQ-19688/A-02156 hava been reversed, thedefore,'the isometrics for both conduit rets are incorrectly .

}

j depicted. The dimension north of the Type.6 support ';

tagged NQ-06005/A-02157 to the change in elevation.is not i shown on the isometric for'the Conduit Run C-1PA-A265. ,

l

3. In Room 148E, the dittance from the Type 6 support tagged .

NQ-06004/A-02168 to the rise in elevation of the condui?.  !

to the bolted junction box tagged NQ-08650 snus documented

~

by the walkdown engineer to be 22". The NRC inspector l measured this length to be 13".

J ]

4. In Room 148B, the overall lergth of the P1001 Unistrut l i member of the Type 7 support tagged NQ-06002/A-02160,  :

L shown on page 26 of 43 for calculation A-02151 was

, documented by the walkdown engineer to be 10". This  ;

1 length was measured to be 8" by the NRC inspector.  ;

These four examples ccmprise a deviation (445/8735-D-03).  !

Please provide to the U. S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555, with a copy to the  !

) Assistant Director for Inspection Programs, Comanche Peak Project  !

j Division, Office of Special Projects, in writing within 30 days of  :

the date of this Notice, the reason for the deviation, the l corrective steps which have been taken and the results achieved, l ~

1  !

1 ,

7 .Q. '. . . . ,. ., 6'.,,-,.-.--.<, r +4 -

1., [ -- - --+v-=* v - *SI - * '*8 ** ***+'**~~**~"i*~+F

. to

. 3 the. corrective stcps which will be taken to avoid further deviations, and the date when your corrective action will be -

completed. Where good cause is shown, consideration will be given to extending the response time. -

FOR THE NUCLEAR REGULATORY COMMISSION 0 5 !O O Dated this_12th day of February 1988 1

at Comanche Peak Site 2-I i

I i

i a

e 5 4 f +

e l

  • t i

t p

)

1 3