PNO-III-88-001, on 871231,reactor Scrammed from 75% Power as Result of High Water Level in Reactor,Caused by Personnel Error During Installation of Auxiliary Computer Intended to Monitor Feedwater Heater Temp

From kanterella
(Redirected from ML20198M862)
Jump to navigation Jump to search
PNO-III-88-001:on 871231,reactor Scrammed from 75% Power as Result of High Water Level in Reactor,Caused by Personnel Error During Installation of Auxiliary Computer Intended to Monitor Feedwater Heater Temp
ML20198M862
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/04/1988
From: Greenman E, Patricia Pelke
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-88-001, PNO-III-88-1, NUDOCS 9710300074
Download: ML20198M862 (1)


l ,

ffYYhhb A y

PRELININARYNOTIFICATION0FEVENTORUNUSL'COCCURRENCE--PNO-III-88-01$6ateJanuary4,1988 b This reliminary notification constitutes EARLY notice of _ events of POSSIGLE safety

-or pu lic interest significance, s The~1nformation is as' initially received without (b vertfication or evaluation, and is basically all- that is known by the Region III staff on this date.

Facility: Detroit Edison Company Licensee Emergency Classification:

Forst 2 . Notification of an Unusual Event 6450 N. Dixie Highway- Alert Newport, MI 48166 Site Area Emergency General Emergency C Not Applicable

Subject:

REACTOR SCRAM DUE TO INCREASED FEEDWATER FLOW At6:52p.m.(EST)onDecember 31, 1987, the reactor scranned from 75; percent power as a result of. high water level in the reactor. The increased water level was caused by a personnel error during the installation of an auxiliary computerA ntended to monitor feedwater heater temperature.- While the computer was being connected to'the main process computer, a lead carrying the feedwater flow data'to the main process

  • computer was-inadvertently grounded (shorted). Although feedwater flow' remained :normai r the control system " sensed" a 50 percent reduction in the flow and increased the) flow' rate into the reactor vessel.

The high reactor water level signal caused a trip of the feedwaterhurbines, followed by a main turbine-generator trip, and the reactor scram. The unit's safety systems functioned normally during the scram, although a post-accident recorder did not switch to high speed, '

-as required, and leakage was observed from a feedwater heater pump seal.-

N The reactor remains shut down for maintenance and routine surveillSece; testing. The m licenseeexpectstorestarttheplantonJanuary5,1988.~,{TheMicensee_iscurrently On December 30, 1987, the;11censee'" requested. Region III,

'v) llinited to 75 percent power.(Chicago) authorization to increase to full power. The request-is under The State of Michigan will be infonned.

'There has been local news media interest in the reactor shutdown.

The Headquarters Operations Center was notified of- the reactor scram'a't%8:12_ p.m. (EST) on December 31, 1987. This information is current as of 12 Noon (EST);' January 4,1988.

CONTACT: P. Pelke FTS 388-5560 E. Greenman FTS 388-5518 DISTRIBUTION: . O/

H. St. NM88 Phillips E/W .Willste ,

LTiTrman Zech- XEUU NRR UIK. . NM55 -

Cosa Roberts-Conn. Bernthal ARM EDO AirRights O!

Mail To: ,

hk Conn. Carr PA 5LITP DC5(Original)

Cosa. Rogers OGC -00T(Trans.Only)

SECY OGC-H FAX TO: Nicholson Lane Regions CA F RE5 Region I GPA NSAC Region II ACRS Licensee Region IV

,PDR Resident inspector Region V HQS. Operations Officer .

( g ,. Region !!!

Rev. November 1987

{'

9710 g n 900 W , C/R Distribution: Chm, Cmr  ;

htII-88-001.# GC, CA, W . Historian {