Category:REPORTS-TOPICAL (BY MANUFACTURERS-VENDORS ETC)
MONTHYEARML20212A6271999-09-30030 September 1999 Rev 0 to WCAP-15243, Anaylsis of Capsule V & Capsule Y Dosimeters from Duke Energy Catawba Unit 2 Reactor Vessel Radiation Surveillance Program ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20198D3641998-10-31031 October 1998 Analysis of Capsule V & Dosimeters from Capsules U & X from DPC Catawba Unit 1 Reactor Vessel Radiation Surveillance Program ML20236U1601998-07-31031 July 1998 Non-proprietary DPC-NE-2009, DPC W Fuel Transition Rept ML20202D1921997-12-31031 December 1997 Rev 2 to UFSAR Chapter 15 Transient Analysis Methodology ML20197J3011997-11-30030 November 1997 Non-proprietary TR DPC-NE-3004-A, Mass & Energy Release & Containment Response Methodology ML20248L2631997-02-20020 February 1997 Non-proprietary Version of DPC-NE-2004-A, Duke Power Co McGuire & Catawba Nuclear Stations Core Thermal-Hydraulic Methodology Using VIPRE-01 ML20108D2091996-04-30030 April 1996 Nonproprietary App C, Mcguire/Catawba Plant Specific Data Mark-BW Fuel BWU-Z CHF Correlation to DPC Thermal- Hydraulic Statistical Core Design Methodology ML20107M8931995-10-31031 October 1995 Nonproprietary DPC Fuel Reconstitution Analysis Methodology ML20073J9151994-09-19019 September 1994 Replacement Steam Generator Topical Rept ML20070K0711994-06-30030 June 1994 Rev 1 to FSAR Chapter 15 Sys Transient Analysis Methodology ML20064C8201994-02-28028 February 1994 Nonproprietary Evaluation of Pressurized Thermal Shock for Catawba Unit 2 ML20059F1571993-10-31031 October 1993 Nonproprietary Analysis to Determine Relative Tube/Tube Support Plate Displacements Under Steam Line Break Loads for Catawba Unit 1 Sgs ML20046D2361993-08-31031 August 1993 Nonproprietary Evaluation of PTS for Catawba Unit 1 ML20035H6791993-04-30030 April 1993 Nonproprietary Catawba Unit 1 SG Tube Interim Plugging Criteria Mid-Cycle Outage Assessment Presentation Matls ML20036A6961993-04-30030 April 1993 NRC Requested Catawba-1,S/G Leakage Evaluation ML20035E5031993-03-31031 March 1993 Technical Support for SG Interim Tube Plugging Criteria for Indications at Tube Support Plates ML20116N0531992-11-11011 November 1992 Rev 1 to Mark-BW Reload LOCA Analysis for McGuire & Catawba ML20106A2931992-09-30030 September 1992 Nonproprietary WCAP-13497, Catawba Unit 1 Steam Generator Tube Interim Plugging Criterion Presentation Matls ML20106A8271992-09-30030 September 1992 Nonproprietary WCAP-13495, Technical Support for SG Interim Tube Plugging Criteria for Indications at Tube Support Plates,Catawba Unit 1 ML20114A9771991-12-31031 December 1991 Nonproprietary McGuire & Catawba Nuclear Stations Core Thermal-Hydraulic Methodology Using VIPRE-01 ML20114A9711991-11-30030 November 1991 FSAR Chapter 15 Sys Transient Analysis Methodology ML20114A9911991-11-30030 November 1991 Nonproprietary Multidimensional Reactor Transients & Safety Analysis Physics Parameters Methodology ML20065M7381990-11-30030 November 1990 Mark-BW Reload LOCA Analysis for Catawba & McGuire Units ML20217A6621990-07-31031 July 1990 DPC Catawba,Unit 1,Reactor Vessel Radiation Surveillance Program ML20042F2381990-03-31031 March 1990 Nonproprietary Duke Power Co Nuclear Design Methodology for Core Operating Limits of Westinghouse Reactors ML20073H6281990-01-31031 January 1990 Nonproprietary Topical Rept DPC-NE-2001-A, Fuel Mechanical Reload Analysis Methodology for Mark-BW Fuel, Rev 1 ML19351A4191989-09-30030 September 1989 Mark-BW Reload LOCA Analysis for Catawba & McGuire Units ML20247H0431989-09-13013 September 1989 Revised Pages to Reactor Vessel Surveillance Capsule Z Analysis Rept ML20042F2321989-08-31031 August 1989 Nonproprietary DCHF-1 Correlation for Predicting Critical Heat Flux in Mixing Vane Grid Fuel Assemblies ML20235M9111989-02-20020 February 1989 Nonproprietary Catawba Unit 1 Evaluation for Tube Vibration Induced Fatigue ML20207L9261988-09-30030 September 1988 Nonproprietary Addendum 2 to COBRA-NC,Analysis for Main Steamline Break in Catawba Unit 1 Ice Condenser Containment (Response to NRC Questions) ML20154Q0941988-05-31031 May 1988 COBRA-NC,Analysis for Main Steamline Break in Catawba Unit 1 Ice Condenser Containment (Response to NRC Questions), WCAP-10989,Addendum 1 Dtd May 1988 ML20154J9831988-04-30030 April 1988 RCS Flow Anomaly Investigation Rept ML20235T9991987-09-30030 September 1987 Rev 2 to RTD Bypass Elimination Licensing Rept for Catawba Units 1 & 2 ML20235V4271987-08-31031 August 1987 Nonproprietary Tubesheet Region Plugging Criterion for Duke Power Co,Catawba 1,Nuclear Station Steam Generators ML20235Z5841987-05-31031 May 1987 Nonproprietary Rev 1 to WCAP-11309, Resistance Temp Detector Bypass Elimination Rept for Catawba Units 1 & 2. RCS Nozzle & Thermowell Locations Encl ML20217A6701985-11-30030 November 1985 DPC Catawba,Unit 2,Reactor Vessel Radiation Surveillance Program ML20137Z5391985-11-30030 November 1985 Nonproprietary COBRA-NC,Analysis for Main Steamline Break in Catawba Unit 1 Ice Condenser Containment ML20127K1381985-06-30030 June 1985 Nuclear Physics Methodology for Reload Design ML20093N0811984-10-19019 October 1984 App a to Topical Rept DPC-NF-2010, Code Summary ML20092N5761984-06-30030 June 1984 Nonproprietary Technical Basis for Eliminating RHR Line Rupture as Structural Design Basis for Catawba Units 1 & 2 & McGuire Units 1 & 2 ML20094D1701984-06-30030 June 1984 Nonproprietary Westinghouse Setpoint Methodology for Protection Sys,Catawba Station. Two Oversize Tables Encl. Aperture Cards Available in PDR ML20092H6911984-04-30030 April 1984 Technical Basis for Eliminating Class 1 Accumulator Line Rupture as Structural Design Basis for Catawba Units 1 & 2 ML20084N9291984-04-30030 April 1984 Nonproprietary Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Catawba Units 1 & 2 ML20087G3351984-02-10010 February 1984 Nonproprietary Technical Basis for Eliminating Pressurizer Surge Line Ruptures as Structural Design Basis for Catawba Units 1 & 2 ML20083F2761983-11-30030 November 1983 Nonproprietary Technical Bases for Eliminating Large Primary Loop Pipe Ruptures as Structural Design for Catawba Units 1 & 2 ML20031F2281981-07-31031 July 1981 Reliability Analysis of Auxiliary Feedwater Sys for Catawba Nuclear Station Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212J1891999-10-0101 October 1999 Safety Evaluation Supporting Exemption from 10CFR54.17(c)re Schedule to Apply for Renewed Operating Licenses ML20212A6271999-09-30030 September 1999 Rev 0 to WCAP-15243, Anaylsis of Capsule V & Capsule Y Dosimeters from Duke Energy Catawba Unit 2 Reactor Vessel Radiation Surveillance Program ML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 05000414/LER-1999-004-01, :on 980906,error During Tagout Caused de-energization of Vital Bus & Actuation of Ltop.Caused by Inadequate Work Practices.Individuals Involved Were Counseled1999-09-27027 September 1999
- on 980906,error During Tagout Caused de-energization of Vital Bus & Actuation of Ltop.Caused by Inadequate Work Practices.Individuals Involved Were Counseled
05000413/LER-1999-015, :on 990616,discovered That Auxiliary Bldg Filtered Ventilation Exhaust Sys Was Inoperable.Caused by Improperly Positioned Vortex Damper.Damper Was Repositioned Correctly & Sys Was Retested Successfully1999-09-27027 September 1999
- on 990616,discovered That Auxiliary Bldg Filtered Ventilation Exhaust Sys Was Inoperable.Caused by Improperly Positioned Vortex Damper.Damper Was Repositioned Correctly & Sys Was Retested Successfully
ML20212G2511999-09-22022 September 1999 Safety Evaluation Supporting Amends 180 & 172 to Licenses NPF-35 & NPF-52,respectively 05000413/LER-1999-008, :on 990610,operations Prohibited by TS 3.5.2, Was Violated.Caused by Inoperable Centrifugal Charging Pump. Operators Swapped to CCP 1A & Sys Parameters Were Returned to Normal.With1999-09-21021 September 1999
- on 990610,operations Prohibited by TS 3.5.2, Was Violated.Caused by Inoperable Centrifugal Charging Pump. Operators Swapped to CCP 1A & Sys Parameters Were Returned to Normal.With
05000414/LER-1999-005-02, :on 990727,missed Emergency DG TS Surveillance Concerning Verification of Availability of Offsite Power Sources,Was Declared.Caused by Defective Procedure.Revised Affected Procedure1999-09-20020 September 1999
- on 990727,missed Emergency DG TS Surveillance Concerning Verification of Availability of Offsite Power Sources,Was Declared.Caused by Defective Procedure.Revised Affected Procedure
05000413/LER-1999-009, :on 990518,inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits Was Noted. Caused by Inadequate Retest Following Surveillance Test Failure.Valve Was Retested & Returned to Service1999-09-15015 September 1999
- on 990518,inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits Was Noted. Caused by Inadequate Retest Following Surveillance Test Failure.Valve Was Retested & Returned to Service
ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 05000413/LER-1999-014, :on 990816,missed Surveillances & Operation Prohibited by TS Was Noted.Caused by Defective Procedures or Programs Inappropriate TS Requirements.Affected Procedures/ Programs Were Revised & Testing Was Performed1999-09-0101 September 1999
- on 990816,missed Surveillances & Operation Prohibited by TS Was Noted.Caused by Defective Procedures or Programs Inappropriate TS Requirements.Affected Procedures/ Programs Were Revised & Testing Was Performed
05000414/LER-1999-004, :on 990616,CIV 2NM-221A Was Returned to Svc Without Testing,As Required by TS 3.6.3.Caused by Programmatic Deficiency.Test Procedure Has Been Revised & Subject Valve Was Successfully Tested & Returned to Svc1999-09-0101 September 1999
- on 990616,CIV 2NM-221A Was Returned to Svc Without Testing,As Required by TS 3.6.3.Caused by Programmatic Deficiency.Test Procedure Has Been Revised & Subject Valve Was Successfully Tested & Returned to Svc
ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 05000414/LER-1999-003, :on 990612,unplanned Actuation of ESFAS Occurred Due to a SG High Level.Caused by Inadequate Procedural Guidance.Msiv 2SM-7 Was Closed & SG 2A Level Was Returned to Normal1999-08-31031 August 1999
- on 990612,unplanned Actuation of ESFAS Occurred Due to a SG High Level.Caused by Inadequate Procedural Guidance.Msiv 2SM-7 Was Closed & SG 2A Level Was Returned to Normal
ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 05000413/LER-1999-012, :on 990727,adverse Sys Interaction Between Annulus Ventilation Sys & Auxiliary Building Ventilation Sys Was Discovered.Caused by Inadequate Design.Compensatory Actions Developed & Implemented.With1999-08-26026 August 1999
- on 990727,adverse Sys Interaction Between Annulus Ventilation Sys & Auxiliary Building Ventilation Sys Was Discovered.Caused by Inadequate Design.Compensatory Actions Developed & Implemented.With
ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210U8341999-08-13013 August 1999 Safety Evaluation Supporting Amends 179 & 171 to Licenses NPF-35 & NPF-52,respectively ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 05000413/LER-1999-009, :on 990518,inoperability of Containment Valve Injection Water Sys Valve Was Noted in Excess of TS Limits. Caused by Inadequate Testing Following Surveillance Test Failure.Valve Was Retested & Restored to Service1999-07-19019 July 1999
- on 990518,inoperability of Containment Valve Injection Water Sys Valve Was Noted in Excess of TS Limits. Caused by Inadequate Testing Following Surveillance Test Failure.Valve Was Retested & Restored to Service
05000414/LER-1999-004-02, :on 990610,violation of TS 3.6.3 Was Noted Due to CIV 2NM-221A Being Returned to Service Without Testing. Caused by Procedure Deficiency.Civ 2NM-221A Was Tested & Returned to Operable Status1999-07-15015 July 1999
- on 990610,violation of TS 3.6.3 Was Noted Due to CIV 2NM-221A Being Returned to Service Without Testing. Caused by Procedure Deficiency.Civ 2NM-221A Was Tested & Returned to Operable Status
ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation 05000414/LER-1999-003-02, :on 990612,unplanned Actuation of Esfa Sys Due to a SG High Level Was Noted.Caused by Inadequate Procedural Guidance.Long Term Corrective Actions to Prevent Recurrence of Event Are Being Developed1999-07-0808 July 1999
- on 990612,unplanned Actuation of Esfa Sys Due to a SG High Level Was Noted.Caused by Inadequate Procedural Guidance.Long Term Corrective Actions to Prevent Recurrence of Event Are Being Developed
ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 05000414/LER-1999-002-03, :on 990504,plant Was Forced to Shutdown as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Affected Piping Was Cleaned & Flow Tested1999-06-0303 June 1999
- on 990504,plant Was Forced to Shutdown as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Affected Piping Was Cleaned & Flow Tested
ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions 05000413/LER-1999-004, :on 990310,operation Prohibited by TSs Was Noted.Caused by Incorrect TS Requirements for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation.Submitted Lar.With1999-04-12012 April 1999
- on 990310,operation Prohibited by TSs Was Noted.Caused by Incorrect TS Requirements for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation.Submitted Lar.With
ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML20205N2381999-04-0909 April 1999 Safety Evaluation Supporting Amends 178 & 170 to Licenses NPF-35 & NPF-52,respectively ML20205N2121999-04-0808 April 1999 Safety Evaluation Supporting Amends 177 & 169 to Licenses NPF-35 & NPF-52,respectively ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205B3101999-03-26026 March 1999 Safety Evaluation Supporting Amends 176 & 168 to Licenses NPF-35 & NPF-52,respectively 1999-09-07
[Table view] |