. . - _ _ _ _ __________ _ _ __

U -  ! '

.;. r -

TEXAS UTILITIES GENERATING CO. t TUGC0 INSTRUCTION O - CPSES -

QI-QP-11.10-1A Rev. 1 Page 1 of 37 SEP 211984 INSPECTION OF CLASS 1E CONDUIT RACEWAY SYSTEMS PREPARED BY: MMO 4 Is "A7/FV Date APPROVED BY: '

M ' '~

9"M-Date l

APPROVED BY:

/M I ~

8 ax 9-I'oYf t

rno nl: NRM MN OY.Y.

I un m

1.0 REFERENCES

1-A CP-Q P-11.10 " Inspection of Electrical Raceway Suppo rt Systems" 1-B 2323-52-910, "Gibbs and Hill Drawings" 1-C CP-CPM-7.1, " Package Flow Control" 1-0 2323-ES-100, " Electrical Erection" 1-E CP-CPM-6.3, " Preparation, Approval and Control of Operational Travelers" 1-F QI-QP-11.3-21, " Embedded Condui t and Sleeves" 1-G CP-ECP-19, " Exposed Conduit" 1-H ,

QI-Q P-11.4-2 2, "QC Verification of Protective Coatings Unique Identification Number Transfer" 1-I QI-QP-11.14-4, " Control of Matl. Traceabili ty fo r Site Fab. Struct./ Misc. Steel" 1-J QI-QP-11.21-1, "Vi sual Weld Inspection" = =

1-K QI-QP-11.2-1, " Installation of "Hilti" Drilled in Bolts" 1-L CCP-45 "Pe nnanent and Tempo rary Atta:hments t Embedded Weld Plates" hg61 g 6 860512 CARDE85-59 s lig PDR

-w- _ .-

- t> % ,, . ,

TEXAS tRILITIES GENERATING CO.

TUGCC INSTRUCTION P - CPSES - QI-QP-11.10-1A Rev. 1 N. Page 2 of 37 SEP 211934 1-M QI-QP-11.0-15, Verification of Base Pla tes for Grouting" 1-N 2323-El-1800, "%terial List" 1-0 2323-52-0910, " Sheet G-2A and Sheet CSD-7A" 1-P QI-QP-11.3-28, " Class 1E Cable Terminations" 1-Q 2323-El-1702-02, " Cable and Raceway Separation Details" 1-R 2323-E1/E2-1710. " Junction Box Schedule" 1-S CP-QP-18.0, " Inspection Report" 1-T CP-QP-16.0, "Nonconformances" 2.0 GENERAL 2.1 PURPOSE AND ICOPE ,

This Ins truction supplements Reference 1-A and provides the inspection criteria and the documentation requirements for perfonning ins pections on Cla ss 1- E Condui t Raceway and seismic supports for Class 1E and Train "C" Conduit Raceway Systens fabricated for and ins talled in Unit 2 Category 1 buildings (excluding electrical control building) and areas as required by Reference 1-B.

2.2 GENERAL INSTRUCTIONS The Unit 2 Interim Vault will issue work packages for each conduit run in accordance with Reference 1-C.

The work package shall include but not be 1imited to, a isometric

. drawing of the conduit run, Operation Travelers for the fabri-cation and installation of conduit supports and Conduit Raceway Inspection Reports.

The support (s) location, spacing, type, and attachment as shown on the isometric drawing have been designed by Engineering in accordance with Reference 1-B and 1-0. The isometric drawings present an isometric depiction of the conduit routing and includes applicable notes and references. Other drawings such as typical detail drawings, plan drawings, material lists, schedules, etc. ,

have been provided by Engineering to be used as applicable.

r %. -

TEXAS UTILITIES GENERATING CO. i TUGC0 INSTRUCTION h - CPSES - QI-QP-11.10-1A Rev. 1 Page 3 of 37

. SEP 211984 The inspection of condui t raceway shal l be docunented on Inspection Reports, Attachment 1, 2, 3, and 4.

The conduit run and supports shown on the isometric drawing will be inspected according to the operations listed on the Operations Traveler and the acceptance criteria specified in this Instruction.

Operations Travelers shall be processed and completed in accordance with Reference 1-E.

l Individual engineered supports ("IN") which have weld numbers assigned by engineering shall have specifically prepared operations travelers and/or inspection reports prepared by the .

Quality Engineer for inspection documentation. )1 Individual engineered supports ("IN") which do not have weld numbers assigned by engineering will utilize same operations "

- traveler fonnat as for any other type of conduit / junction box )

support. ]

1 Embedded conduit and electrical " stub ups" less than 24 inches in l length do not require supports and isometric drawings will not be '

issued for these installations. Embedded conduit and " stub ups" will be inspected in accordance with Reference 1-F.

I QC verification of support load and capacity, and. span per LS l Section of Reference 1-B are not within the scope of this I instruction.

Lighting supports and lighting conduit inspection criteria will be addressed in future revisions to this instruction.

2.3 SPECIAL INSTRUCTION

a. Quality Control Personnel who are certified in QI-QP-11.3-23 may perfonn the inspections required by paragraphs 3.1, 3.7, 3.8, 3.9 and 3.10 of this instruction.
b. Quality Control Personnel who are certified in QI-QP-11.10-1 may perfonn inspections required by paragraphs 3.2, 3.3, 3.4, 3.5 and 3.6 of this instruction.
c. All other paragraphs except paragraph 3.11, are applicable to both a and b above. _
d. Quality Control Personnel certified to this instruction may ,

perfonn inspections required by all paragraphs of this  !

ins truction.

1 j

ase n - "

r, ,

l

_ TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION

~

- CPSES -

QI- - 1.10-1A Rev. 1 Page 4 of 37 SEP 211984 .

, 3.0 INSTRUCTION 3.1 CONDUIT FABRICATION SURVEILLANCE Fabrication inspection (i.e., selection of material, threading and bending) of Class IE conduit, including lighting shall be perfomed on a random suneillance ba sis. The frequency of inspection shall be once per working shift when conduit fabrication activities are in progress or at the direction of the QC Supenisor.

Inspections will be documented on Attachment 1.

Inspections shall include the following:

a. Conduit shall be free of burrs, sharp edges, and foreign material which could cause cable damage during pulling and shall show no evidence of thread damage (i.e., flattening) which could cause irregularity in conduit shape.
b. To the extent possible, the QC Inspector shall examine conduit for internal and external " flaking" of the galvanize coating. If cracking of the galvanize surface is evident on the exterior of bends, flaking has probably occurred on the interior. The QC Inspector shall affix a

, hold tag to all conduit exhibiting " flaking" or thread damage and cause their removal to an isolated arca to prevent their use and possible vendor replacement.

c. Threads shall be standard U.S. conduit tapered threads (NPT) and shall not be irregular, jammed or undercut.
d. Dies being used shall be standard U.S. conduit tapered threads (NPT).
e. Cut threads shall be cleaned to bright metal and painted

- with Galvanox or similar approved product. l

f. Conduit bends shall not show kinking or excessive flattening or interruption of the smooth bore of the conduit. .

l NOTE: Excessive flattening is defined as reduction of the i outside diameter of the conduit by 257, or more,

g. Bends and off-sets will be made with benders.

m na 4 -me--- -

,, - +~ - , , - --,,,,r- ~ ~ -

' 4 r. .

TEXAS lKILITIES GENERATING CO. l

- TUGC0 INSTRUCTION l 1, - CPSES - QI-QP-11.10-1A Rev. 1 i Page 5 of 37 l SEP 211984 l l

3.2 SUPPORT FABRICATION 3.2.1 Transfer of "0P" Number and Material Traceability 3.2.1.1 Transfer of "QP" neber for coated bulk steel intended for use in the Reactor Building will be in accordance with Reference 1-H.

3.2.1.2 Material traceability for conduit supports, electrical equipment supports and components associated with these supports will be in accordance with Reference 1-I.

3.2.2 Welding Inspection All welding and stud welding inspections shall be perfonned in accordance with Reference 1-J.

The weld joint design shall be limited to those shown on the sketches appearing on qualified WPS's and/or applicable design docuent.

3.2.3 Identification of Conduit Supoorts Each support inspected on a raceway system shall be assigned a neber by Engineering as outlined in Reference 1-G and shown on the isometric drawing included in the conduit system work packages.

Supports with more than one conduit attached shall be assigned only one unique number with the exception of individually engineered ("IN") supports which allow attachment of conduit (s) other than those shown on the "IN" drawing. The additionally attached conduits will be assigned unique nebers and these numbers documented on the Operations Traveler for each supported conduit.

Supports shall be stamped / stenciled with the support neber, with the exception of unistrut hangers. Strut channel hangers shall be marked with an approved industrial marker in a manner that will not damage the supports. In cases where not enough roon is available to stencil the neber, (e.g., C91-2A type hangers) the number shall be marked on the conduit strap. .

NOTE: Pull box supports will be identified in the same manner as conduit supports, i ,

e g.

- - - - - , 9 er

TEXAS UTILITIES GENERATING CO.

m TUGC0 INSTRUCTION

- CPSES - QI-QP-11.10-1A Rev. 1 Page 6 of 37 SEP 211984 3.2.4 Identification of Junction Box Supports Junction box supports shall utilize the unique number of the 1 junction box, i.e., if the junction bo,, is identified JB2C-139G, the support number will be the sa;ne.

3.3 SUPPORT INSPECTIONS Package flow control group or craft personnel shall notify Quality Control when the support or Raceway is ready for inspection and supply the required Operational Traveler and support package. The Inspector will perfonn inspections per the provisions of this instruction and the operation traveler. Following cmpletion of required inspections, the Inspector will return the traveler to the package flow control group or craft.

NOTE: The QC Inspector will record all design change docu-mentation (DCA's, CMC's, etc..) and the revision thereof used fa.r inspection on the traveler for each applicable inspection operation completed.

Discrepancies found during inspection will be documented in accordance with Paragraph 3.13 of this instruction.

3.3.1 Support Assembly Inspection The QC Inspector shall verify the acceptability of the following in accordance with Reference 1-B, isometric drawing, and applicable procedures and instructions.

NOTE: General notes of Reference 1-B do not apply to design change documents (DCA's or CMC's) for specific hangers unless otherwise noted on the docunent.

The QC Inspector shall inspect the support for the following:

a. Member (s) shape (i.e., angle, channel, etc), size and dimensions
b. Conduit clamp gap ("t") tolerance
c. Configuration per Engineering drawing and related DCA.and/or ,

_ CMC, including bolt hole sizes

d. Unique identification number per paragraph 3.2.3 and 3.2.4 of

~ this instruction e

p 4

O * ,

. I TEXAS UTILITIES GENERATING CO. 1 i TUGC0 INSTRUCTION

- CPSES - QI-QP-11.10-1A Rev. 1 Page 7 of 37 SEP 211984

e. Shim plate provides full bearing to conduit prior to toque.
f. Welds per Reference 1-J.

3.3.2 Tolerances Hangers for electrical raceway systens shall be installed within the following tolerances. The cumulative effect of rolling (mill),

fabrication and erection tolerances shall not exceed those given below:

A hanger shall be considered plumb if the angle between the longitudinal axis of the main member (s) of the hanger is at right (90 ) angle to the supporting surface (ceiling or floor). A tolerance of 2* (unless noted otherwise) shall be acceptable provided the integrity of the supported raceway systen and its attachments to the hanger remains intact.

Hangers supported on vertical surfaces (4all, column, side of a beam, etc.), shall be considered level with maximum tolerance of 1/2" in 10 feet.

3.3.3 Support Attachment The QC Inspectt.e shall inspect the attachment of the support for the following:

a. Hilti bolt embedment and spacing
b. Bearing surface per paragraph 3.5 of this instruction
c. Attachment welds to embedded steel per paragraph 3.3.5.2 of this instruction
d. Attachment welds to the containment liner per Paragraph 3.2.2 of this instruction.

NOTE: Additionally any NDE for attachment welds to liner shall be completed per Operations Traveler provided by Civil Engineering. A copy of this Traveler shall be included in the support package,

e. Location per isometric drawing.

3.3.4 Bolting Inspection 3.3.4.1 General Bolting Requirenents For each support the QC Inspector shall:

~

- r

'~~~~

. ": . ;. . ~.. . .:..... _.

TEXAS UTILITIES GENERATING CO. .

TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 8 of 37 SEP 211924

a. Verify all bolted connections have been made with approved hardware and are completed and secure. In addition, bolt tensioning requirments for bolted connections as specified by Reference 1-B shall be verified. (See Attachment 5 for bolt tensioning requirments and Attachment 6 for bolt types and marking).

All strut channel and/or bolted Structural Supports that have been installed per Reference 1-B require bolt tensioning.

Electrical Raceway strut channel supports fabricated and assembled shall be inspected to verify that the bolt tensioning has been satisfactorily acceplished. One bolt /

nut combination per support shall be inspected for tension acceptabili ty. Addi tionally, if the support secures one (or more) vertical run of conduit, at least one bolt on one vertical conduit clamp shall be inspected to verify that proper tension has been reached. If this is not the case, all the reaining vertical clamp bolts will be inspected to assure satisfactory tension. Orange torque seal shall be applied to those bolts that are inspected.

b. The QC Inspector shall verify in accordance with Reference 1- K. Hilti bolt ebedment, spacing, torque acceptance, and Richmond Insert thread engagement (2d + 1/8") and snug tight verification. Hilti and Richmond Inspections shall be documented on the Inspection Report provided in Reference 1-K.

3.3.4.2 Structural Bolting The QC Inspector, when inspecting bolted connections, shall visually inspect for the following:

a. Bolts are the correct length as indicated by having the bolts flush with, or outside of, the face of the nut when completely

, installed .

b. Turning elements are on the correct face,
c. Washers are used when required.

NOTE: For long slotted holes, structural plate washers or a continuous bar not less than 5/16" thick are required to cover long slots that are in the outer plies of joints,

d. Bolt heads and nuts shall res't squarely against the metal or washer.

~

m TEXAS UTILITIES GENERATING CO.

TUGC0 INSTRUCTION

- CPSES - QI-QP-11.10-1A Rev. 1 Page 9 of 37 SEP 211984

. e. Where bolts are used on surfaces having slopes greater than 1-in-20 with a plane nonnal to the bolt axis, beveled washers shall be provided to give full bearing to the head or nut.

f. When " Turn-of-nut" method is used for bolt tightening, the impact wrench or other pneumatic device does not require calibration. However, the device shall be of adequate capacity and sufficiently supplied with air to perfonn the required tightening of each bolt in approximately ten seconds.

When this method is used, the following steps will be followed by construction:

1. All bolts in each joint shall first be brought to a

" snug tight" condition (snug tight is defined as the tightness attained by a few impacts of an impact wrench or the full effort of a man using an ordinary spud wrench or standard wrench).

2. All the nuts shall then be match-marked using an approved indus trial marker, i.e.: Nissen; which has certified contents.

> 3. All the bolts in the joint shall then be tightened by

- the applicable amount of nut rotation specified in Attachment 5.

4. Tightening shall progress systematically from the most rigid part of the joint to its freest edges.
5. There shall be no rotation during tightening of the part not turned by the wrench.
6. The end of all bolts shall be marked with the industrial marker when required nut rotation has been attained.
g. When several boltr are installed in a single joint, the QC Inspector shall assure bolts previously tightened which may have been loosened by the tightening of subsequent bolts are tightened to the prescribed amount.
h. When field connections are to be made by use of A325 or A490 bolts and tightened with a calibrated torque wrench, a hardened flat washer shall be used under the turned element and shall be tightened as follows:

- - ===. e TEXAS LITILITIES GENERATING CO. TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 10 of 37

. SEP 211984 AS1M A325 ASIM A490 Bolt Size Torque Torque (Inches) (Ft. Lbs.) (Ft. Lbs.)

1/2 093 5/8 228 3/4 387 500 1/8 518 650 1 725 1320 1 1/4 - 2620 1 1/2 - 4565

1. A490 and Galvanized A325 bolts shall not be reused. Other A325 bolts may be reused if approved by Engineering.

Retightening previously tightened bolts which may have been loosened by the tightening of adjacent bolts shall not be

, considered as a reuse.

j. ASTM A449 bolts may be substituted for A325 bolts.
k. ASTM A307 bolts shall be tightened. to a " snug tig h t" condition.
1. The QC Inspector shall apply torque seal to all satisfactory l tightened nuts / bolts.

3.3.5 Welding Inspection 3.3.5.1 All welding and stud welding inspections shall be perfonned in accordance with Reference 1-J.

The weld joint design shall be limited to those shown on the sketches appearing on qualified WPS/s and/or applicable design docunent.

3.3.5.2 Welded Attachments to Embedded Strips / Plates Welded attachments to embedded strip plates and large plates per Reference 1-L will be ins talled per the following and to the requirements of Reference 1-B.

w. .

TEXAS UTILITIES GENERATING CO.

TUGC0 INSTRUCTION CPSES - QI-QP-11.10-1A Rev. 1 Page 11 of 37 SEP 211984 3.3.5.2.1 Definitions

a. " Strip Plates" are those plates 3/4" thick, either 8"or 10" wide and of various lengths which are anchored to concrete surfaces by embedded Nelson Studs.
b. "Large Plates" are those plates 3/4" x 4'0" x 8'0" or 3/4" x 8 '0" x 12'0" which are anchored to concrete surfaces by

. embedded Nelson Studs. This includes plates of either of these nminal sizes which were modified to include cut-cuts or irregular outside shapes to confonn to building configurations.

3.3.5.2.2 Permanent Attachment Location Pennanent attachments shall be located in confonnance with design documents, but where the special situations described in the following paragraphs are encounted, the locations shall be subject to the provisions stated in this section.

Attachments to "large" plates in the cantilever region as defined on Figure 1 of Attachment 8 shall not be made except in those cases where: -

a. The design docment specifically states that investigation of the load being applied to the cantilever region has been acceplished by the designer, or,
b. The de. sign document provides for an additional member or members which serve to span the cantilever region, and are not attached to the plate within the cantilever region.

I When an attachment is made to a strip plate at a location not specifically shown on approved, controlled drawings, and the attachment whould be located more than 3/4" fra the center line of the plate, the location shall be approved by the on-site "CPPE" (Cmanche Peak Project Engineering Department) prior to doing the

. work (See Figure 2 on Attachment 8). Attachments to " strip" pla tes in the cantilever region as defined on Figure 2 of Attachment 8 shall not be made except in those cases where:

c. The design docment specifically shows that investigation of the load being applied to the cantilever region has been acceplished and that additional stiffeners are provided in the design to transfer the loads to the end set of studs, or,
d. The design docment provides for an additional member or members which serve to span the cantilever region.

[ 7 h

~ ~

.. :. -, . -.. ~ . -. -

- TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 12 of 37 SEP 211984 Welds for a hanger, and auxiliary steel where used for that hanger, shall be separated in minimum of 12" from an adjactent hanger and its auxiliary steel (see Figure 3 on Attachment 8), unless other-wise approved by the CPPE. Attachments to embedded weld plates which interface with installed expansion anchors shall provide the required clearances indicated in Reference 1-K, unless other-wise shown on an engineering drawing.

Strip plates which have separation violations with concrete expansion anchors may be rendered unuseable by CPPE Civil Depart-

- ment after an engineering evaluation has been made. Plate sections that are rendered unuseable will be so stated on a DCA.

This area of the plate will then be painted red in accordance with the appropriate architectural specification. No attachments shall be made to any portion of a strip plate which has been rendered unuseable and no portion of a strip plate shall be rendered unuseable if it has an attachment already made to it.

3.4 SUPPORTS IDENTIFIED WITH "E" NUMBERS Supports, or components identified with a unique "E" number 0001 thru 9000, need not be reinspected for welding. This support inspection shall be documented by the QC Inspector by writing opposite the support number listed on the Raceway Systen Operational Traveler the representative Inspection Report number '

or Traveler nunber for weld inspection. If no Inspection Report or Traveler exists, the welds shall be reinspected to re-quirements in Paragraph 3.3.5.

Supports numbered greater than E9000 shall require acceptance based on a satisfactory Inspection Report or Traveler.

3.5 INSPECTION OF BASEPLATES FOR GROUTING

, Inspection of baseplates for grouting shall be performed in accordance with Reference 1-M.

3.6 DESIGN CHANGE VERIFICATION Conduit supports, or miscellaneous welded electrical canponents modified as a result of Design Change Documents (DCA/ CMC) and included in the package for inspection not yet perfonned shall be inspected to verify incorporation of changes reflected on the Design Change Document. Verification and inspections will be accomplished utilizing applicable section of this instruction.

i

%.o . _ __ . . .-

TEXAS LITILITIES GENERATING CO.

TUGC0 INSTRUCTION

- CPSES - QI-QP-11.10-1A Rev. 1 Page 13 of 37 SEP 211984

. 3.7 CONDUIT INSTALLATION INSPECTIONS 3.7.1 Conduit Size and Fittings The QC Inspector's inspection of conduit size and fittings shall include the following:

a. The conduit size and fittings shall be as shown on the latest approved Engineering drawing.
b. Conduit of the next larger size (1/2", 3/4",1",1-1/2", 2, 3", 4", and 5") than shown on the electrical drawing may be substituted.
c. Where necessary, conduit fittings or pull boxes campatible with cable bending radius requirements may be used to minimize use of condulets.

NOTE: Crouse-Hinds condulets Series Fonn 7. Fonn 8 and Mark 9 are not acceptable and shall not be used.

d. The use of condulets is not pennitted in 6.9 KV conduit-systems. Where required, sheet metal boxes or 0.Z. Gedney

. type PBW pull box fittings shall be used to provide pull points. The minimum length of opening for cable pulling shall be as follows:

Conduit Size Pull Box Opening Length 5" 60"

, 4" 67' 3" 48"

e. Metallic anduits shall be made electrically continuous for

- the entire run by securely connecting conduits to boxes and enclosures by use of double locknut:1. All tenninal ends of conduits shall be provided with bushings-insulating type.

f. Where required by engineering drawings, watertight enclosures will be used. The conduit connections shall be made with liquid tight hub fittings. The hub fitting shall include a

. recessed neoprene "0" ring and a nylon insulated throat and shall be as specified on the Material List. Gasketed locknuts may be used where space limits the use of hub fittings.

_ _ :_ _ ___?___

I

~

. m ' ~

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION

-'^

CPSES -

QI-QP-11.10-1A Rev. 1 Page 14 of 37 SEP 211984

g. Conduit shall be made up into full threaded fittings with a minimum of five (5) threads engagement.

NOTE: Thread engagement shall be checked by verifying that the number of exposed threads does not exceed that shown below:

conduit maximum nunber nominal size' of exposed threads 1/2" 3 3/4" to 1-1/2" 4 2" to 2-1/2" 5 3" to 4" 6 5" 7

- 6" 8 3.7.2 Conduit Bends Not more than 3 - 90" bends or equivalent are pennitted in any conduit run between junction boxes or pull points unless approved by the Engineer.

3.7.3 Nuclear Instrumentation System Conduits Installation of NIS Conduit and NIS box functions 6R, W. B and Y shall have a maximum tolerance of 26 inches when design dimensions are given on drawings. l The QC Inspector shall verify that pull points are located at intervals less than or equal to as defined by A + B = 100; "A" is the total nunber of degrees of conduit bends between the pull points and "B" is the total number of running feet between pull points. Any deviation fran this criteria requires a Design Change Authorization.

All field bends for NIS conduit functions 6R, W B and Y shall have a bending radius of 20" minimum for 4" conduit and 15" minimum for 3" conduit.

Criteria requirenents apply to all condui ts li sted in the following Raceway Function Table:

9 4

a' (~[ ,

^ _" .

, TEXAS tKILITIES GENERATING CO. TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 15 of 37 ,

_ __ . . . - . SEP 211984 DWG RACEWAY CLASS SYMBOL CHANNEL FUNCTION 1E O I ea 1E h II 6W IE h III. 6B 1E h IV 6Y The QC Inspector is instructed that Engineering control points shall be utilized to detemine locations as well as floor, walls, etc., when shown on design drmjngs.

3.7.4 Flex Conduit Installation The installation of the flex conduit portion of raceways that teminate at equipment are not within the scope of this instruction. All other flexible conduit for all areas except the containment shall be Sealtite or Liquied-Tite unless shown other-wise on the drawings. Stainless steel flexible conduit as shown on material list shall be used in containment building. Flex conduit shall be ins talled in accordance with the applicable detail drawings.

3.7.5 Conduit Identification

3.7.5.1 Conduit identification shall be as shown on the latest approved drawing.

1 The following are the recommended and alternative methods in identifying conduit:

a. Recommended Method - Freehand marking of conduit wi th appropriate black ink marker or paint. Height of conduit nunber characters should be approximately 1/3 to 1/2 the conduit outside diameter and shall be visible where possible from floor level.

.l

?

. ._ . 7 TEXAS UTILITIES GENERATING CO.

TUGC0 INSTRUCTION

- CPSES . QI-QP-11.10-1A Rev. 1 Page 16 of 37 SEP 211984 i b. Alternative Method, No. 1 - Adhesive markers with factory pre-printed conduit numbers or conduit numbers field printed on marker before installation. Adhesive markers shall not be used inside containment or in manholes.

c. Alternative Method, No. 2 - Metal or plastic tags attached to conduit by various means, i.e., ty-raps, wire. This method is recommended for conduit stub-ups. However, for inside the containment metal tags attached with wire (preferable method) or Tef:el ty-raps or other approved method shall be used.

NOTE: Where groups of conduit pass through walls and floors Alternative Method, No. 2 is recommended

, for identifying conduits wi thin these groups.

Conduit shall be identified at both ends of each run; at all cable trays where conduit enters or leaves; on both sides of all walls, slabs and boxes through which conduit passes. The exception to this is a single conduit entering and leaving a pull box is not required to be identified. Exposed conduit ten (10) feet or less in length may be identified at either end or the middle of the run.

Groups of embedded conduits which are flush with the surface of

walls, floors and manholes shall be identified on the surface of the wall , floor, or manhole by attaching an identification tuplate near the conduit bank. Minimum height of markers shall be approximately two (2) inches where space permits. Marking shall be achieved by stenciling or adhesive markers. Adhesive markers shall not be used inside containment or in manholes.

TABLE 1 (Unit Number) 0 - Common to Both Units 1 - Unit 1 2 - Unit 2

--_--____-_-____--_-__-_________-__--_-________--a

,_ TEXAS UTILITIES GENERATING CO.

TUGC0 INSTRUCTION

- CPSES - QI-QP-11.10-1A Rev. 1 p,g, 37 of 37 SEP 21 food TABLE 2 (Raceway Function) 19, 1G, 1K -- 6.9kV ac 29, 2G, 2K -- 480 Vac & Heavy Power Feeders Under 480 Vac 30,3G,3K -- Control ac and de and Small Power Feeders Under 480V 40, 4G, 4K -- Low Level Signals 4R, 4W, 48, 4Y -- Reactor Protection Instrumentation Low Level Signals SK -- 480V ac & Heavy Power Feeders Under 480V (Local Control)

^

SR, SW, 58, SY -- Reactor Protection Instrtsnentation 120V Signal 6K -- Control ac & de and Small Power Feeders Under 480V (Local Control) 6R, 6W, 68, 6Y -- Nuclear . Instrumentation Systen 8K -- Telephone and Communication TABLE 3 (Safety Related Train)

"A" Train - Orange Associated "A" Train - Orange with white stripes "B" Train - Green - G -

. Associated "B" Train - Green with white stripes "C" Train - Black - K -

(Non-Q)

Inst. Channel 1 - Red - R -

Inst. Channel II White - W -

Inst. Channel III - Blue - B -

Inst. Channel IV - Yellow - Y -

  • . w . _ _ _ . -

c TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 18 of 37

- SEP 211984 3.7.5.2 A typical conduit identification number is depicted as follows:

C24R 16397 I I Il Denotesp Conduit i Unique conduit nuber This part of conduit 10 Designatg shall not be duplicated Unit 2 l

> Designates circuit train or Designates 4- channel . R1fer to Table 3 raceway function above.

Refer to Table 2 above.

Conduit identification shall be verified by the QC Inspector to comply with the latest approved drawing requirements at drawing changes / revisions are released which change a condui t's identification after QC acceptance of the conduit, the following actions shall be taken:

a. Changes to " Raceway Function", " Train / Channel Designation" or " Unique Number" shall require rework to reidentify the conduit and QC verification of proper identification. An IR, Attachment 2, shall be initiated to ' document the above verification. All Inspection attributes except "Ve rify Conduit Identification" shall be noted "N/A" and the drawing nunber and revision or DCA nunber that authorized the change shall be recorded in the " Remarks" section. The previous conduit identification shall also be referenced in the

" Remarks" section.

b. Changes to the " Unit Designation" shall not require reidenti-fication and reinspection of the affected conduits. The Interim Vault shall prepare a Pennanent Plant Records Vault Transmittal, to document these conditions and provide a cross reference record. The transmittals shall be sent to the Pennanent Plant Records Vault for filing with the respective conduit records.

3.7.5.3 The following are acceptable methods of color coding conduit containing safety related cables:

1

TEXAS (ITILITIES GENERATING CO. TUGC0 INSTRUCTION

- CPSES

  • QI-QP-11.10-1A Rev. 1 Page 19 of 37 SEP 21 19A4
a. Recommended Method - Paint exposed conduits with a full 360*

band at intervals not to exceed 15 feet and at points of entry to and exit from enclosed areas and on both sides of floor and wall penetrations. Paint color shall match as close as possible the appropriate cable jacket color of the safety related cables to be installed in a conduit. Paint band shall be at least one inch wide and shall be readily visible from floor level. It is recognized that for conduits in-stalled against walls and floors, it may be impossible to obtain a full 360' band for color coding requirements. In these cases, the maximum band possible shall be made,

b. Alternative Method - Use color coded adhesive markers with similar requirements as to color, width or marker.

Adhesive marking labels shall not be used inside containment or in manholes.

3.7.6 Verify Junction and Pull Box Size and Type Unless shown otherwise on material lists or drawings, junction boxes shall be type NEMA 12 enclosure (minimum).

Where the installation and corresponding drawing requires a Nema 4 junction box the QC Inspector shall verify that the junction box is a Nema 4.

The QC Inspector shall verify that rubber gaskets have been in-stalled on the mounting hardware (interior and exterior) and is of the type and size as specified on the drawing, Reference 1-N and 1-0.

Electrical " pull boxes" which are unscheduled on the Engineering drawings, may be installed to minimize conduit installation

. problems.

Where junction boxes are provided solely as cable pulling points in the conduit system and where space or support considerations make junction box installation impractical, pull box fittings, OZ/Gedney type "PBW" or approved equal, may be substituted for the junction box shown on the drawing.

Where junction boxes are used as terminal boxes the inspector shall visually inspect for those attributes previously stated herein for boxes and, in addition, verify the mounting hardware 1 for the tenninal block installed, j l

j

^ ~ b .'

. ..L.......'~

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 20 of 37 SEP 211984 NOTE: The tenninal block will be inspected by the inspector inspecting cable / wire tenninations in accordance with Reference 1-P.

3.8 JUNCTION AND PULL B0X INSTALLATION INSPECTIONS The QC Inspector shall ins pect the installation of electrical boxes in accordance with applicable approved Engineering drawings.

Inspections shall consist of, but are not limi ted to, the following items:

3.8.1 Verify Box Orientation All box covers and fittings shall face away fran walls and/or obstructions which would prohibit future maintenance.

3.8.2 Verify Box Identification All junction boxes shall be identified as noted on the drawings and in accordance with the following.

l Stencil characters in black on junction box covers. Height of junction box nurnber characters shall be a minimum of two inches

, except that characters may be smaller where size of box cover would require more than two lines to complete junction box number.

NOTE: Unscheduled pull boxes shall be identified by the letters "PB" or " pull box".

Free-hand marking of junction boxes is acceptable i for size 12 x 12 x 12 and smaller.

3.8.3 Verify Box Color Code

. Safety-related junction boxes containing safety rela ted cable shall be color coded prior to cable installation in accordance with the following.

Stencil an approximate 2" x 2" square on cover of junction box and also on one edge of junction box when the cover is not attached to the junction box by means of a sash chain.

NOTE: On smaller boxes, size of colored square may be reduced if there is not enough surfaco area for both.

TEXAS UTILITIES GENERATING CO.

c TUGC0 INSTRUCTION i - CPSES - QI-QP-11.10-1A Rev. 1 Page 21 of 37 SEP 211984 Paint color shall match as close as possible the appropriate cable jacket color of safety related cables to be pulled through ,

the junction box. Where possible, the colored squares shall be readily visible fran floor level.

NOTE: Where a Raceway or junction box contains only associated cable (s), at least one white horizontal stripe shall be applied over each applicable Train color coded marking and where possible, shall be visible fran floor level.

3.8.4 Verify Box Free of Damage All boxes shall be free fran burrs, rough edges, and foreign material which could cause cable damage during pulling.

Galvanize damage shall be repaired with Galvanox or an Engineering approved equal. -

3.8.5 Verify Mounting Strips Installed ,

Verify mounting strips installed in boxes. Mounting strips shall be in accordance with References 1-Q and 1-R. The QC Inspector shall inspect for the correct type and number of mounting strips and ensure the proper hardware is used.

3.8.6 Verify NIS Box location NIS box installations shall have a maximum tolerance of i six (6) inches when design dimensions are given on drawings.

3.9 VERIFY SEPARATION Conduit Raceway and supports shall be inspected in accordance with the requirements of Paragraph 3.9.1, and documented on the Inspection Report, Attachment 2.

The item (s) which violate separation requirements shall be 1dentified by affixing a " separation violation tag", Attachment 2A, and be reported on the Separation Deficiency Report, Attachment 2B,

. canpleted in accordance with the instructions given on Attachment 2C.

e e 8 e

~ ~ ~

~ .. ... -. . . .

e

,_ TEXAS UTILITIES GENERATING CO. ,

TUGC0 INSTRUCTION

- CPSES - QI-QP-11.10-1A Rev. 1 Page 22 of 37 '

SEP 211984 3.9.1 Condui t Conduit shall be installed in accordance with the typical detail drawings and as close as practical to the location shown on engineering plan drawings. Junction boxes, pull boxes, conduit fittings, etc., are part of the conduit systen and, therefore, are subject to the same separation criteria. .

NOTE: The minimum separation distance between Raceways shall be defined as the " clear air distance" between then.

a. Mininun separation between conduits having different trains or channels shall be one inch.
b. Minimum separation of six (6) feet shall be maintained between 6.9 kV raceway and Nuclear Instrumentation System (NIS) raceways.
c. A minimum separation of 6'-0" must be maintained between raceway functions 20, 2G, 2K, 30, 3G, 3K, SK, 6K, SR, SW, .58, SY and NIS cables not in condui t (e.g., near electrical penetrations).

NOTE: Refer to Attachment 7 for the voltage level designation.

d. A minimum separation of 2'-0" shall be maintained between parallel runs of "NIS" conduit systems (raceway functions) 6R, 6W, 6B, & 6Y & raceway systens 20, 2G, 2K; 30, 3G, & 3K; SK, 6K & SR, SW, 58, & SY. Minimum separation of non-parallel runs of "NIS" condui t and the above mentioned systems (i.e.', crossing each other at an angle greater than 15 degrees) should attain the above 2'-0" minimum when feasible; however, physical constraints may reduce such separation to 1".
e. " Minimum clearance between conduits containing power cables (raceway function 10, 20,1G, 2G,1K 2K, and SK) shall not be less than outside diameter of larger conduit except as defined below.

The clearance criteria as explained above may be waived; i a) At such points where exposed conduits enter or exit any equipment or box to a point of 4'-0" from such equipment or box.

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION l l

~ QI-QP-11.10-1A Rev. 1

- CPSES - Page 23 of 37 SEP 2154 b) In general plant areas where conduits have a minimum clearance of 1/4 0.D. of the larger conduit, but not less than 1" be keen di fferent train condui ts, fo r conduit runs rot exceeding 10 ft.

All other violations of the clearance criteria shall be reviewed by Engineering on case by case basis.

f. Minimum separation beween a conduit containing safety re-lated cables and associated cables and the top of a tray having different train or channels shall be two (2) feet in cable spreading room and three (3) feet in general plant area.

This separation may be reduced to one (1) inch when the tray has a solid cover. When the conduit above an open tray contains non-safety rela ted cable, the minimum separation is one inch and no covers are required.

g. Minimum separation between a conduit (safety or non-safety related) and a bottom or side of a tray (solid bottom or ladder) shall be one inch.
h. Cables routed in free air exiting or entering conduit raceway shall m41ntain:
1. A minimum of three feet horizontally and five feet

' vertically between redundant cable or conduit raceway in general plant areas.

2. A minimum of one foot horizontally and three feet vertically between redundant cable or conduit raceway in cable spreading area and control roon.
1. Raceways and supports shall not be located within six (6) inches of Class I or Class 11 piping welds or conponent welds (valves, gauges, e tc . ) , except conduit or conduit supports necessary for pipe mounted instrunentation.
j. Conduit and conduit supports shall be separated from piping (with operating tenperature of 200*F or greater) or piping insulation by one inch.
k. In no case shall any part of the raceway or raceway support systen come in direct contact with uninsulated equipment in the piping systen or with pipe restraints or anchors unless otherwise approved by the Engineer.

.' r ' .

TEXAS UTILITIES GENERATING CO.

. TUGC0 INSTRUCTION

- CPSES - QI-QP-11.10-1A Rev . 1 Page 24 of 37 SEP 211994 NOTE: Class I or Class II piping welds can be identified by the mechanical ID Tags. Typical spool piece tag ntsnber: 3"-S8-1-63-301 _5_ (last nume ral is class). If tag cannot be seen, go to pipe support typcial tag ntsnber: SFX-022-700-A550 (last ntsneral is class). Support will be the 'same as pipe it suppo rts.

1. Raceways and supports shall not be located closer than 1/8 inch from instrument sensing lines.

3.10 CONDUIT ACCEPTANCE All conduit and boxes which have been inspected and accepted shall be documented on Inspection Reports, Attachment 2 and/or 3 and included in the Raceway Package.

3.11 FINAL RACEWAY SYSTEM INSPECTION

~

3.11.1 The QC Inspector shall verify the conduit raceway systen has been installed in accordance with the requirements of the isometric drawing.

3.11.2 All final raceway systen inspections will be doctsnented on Attachment 4. .

3.12 DOCUMENTATION Inspection Reports shall be in accondance with Reference 1-S.

Documentation packages will be processed in accordance with Reference 1-C.

3.13 NONCONFORMANCES All unsatisfactory conditions shall be docisnented on an IR and/or a NCR, per References 1-S and 1-T respectively, as directed by the QC Supervisor.

1 l

l l

1

\

TEXAS UTILITIES GENERATING CO. -

TUGC0 INSTRUCTION QI-QP-ll.10-1A Rev. 1

- CPSES - Page 25:of 37 SEP 211984 ATTACHMENT 1

ua.%Cni essa $ 52:a L.L:Nc i f a r.cn st* =

- r -

INSPEC TICN REPCR7 y i, rem xscm*nca CLASS lE CON 0 ult l'u"ha 'd is'saw , srwoac as4=. m H 4 RACEWAY FABRICATION =( was ca rm sau.a oor=o vece ao au ac coc. s en a u.m io s

s e OI-0P-11.10-1A Rev.

C1" ",oipo', O P*ty g,tgnoa C las,r,ggpog [ q=,pncr,c, @f,esnEnea ,

.a57 *tsul.f s O ==eenoa ec ,urco . .u. me a irius sansr.cron O saaarevica co ,urco was riv cron ireme varro ecto. 'o INSPECTION ATTRl8u:E5  ; 3 oarg 3 ,," ,

1 a 5 *

(V) 1. I Conduit free of burrs , sharp edges and foreigi l l l 1 l ma terial -(Paragraoh 3.1 A) l i I l i l li I (V) 2. l Conduit free of internal and external flaking - 1I I l (Paragraoh 3.1B)

~~

ll l I II I (V) 3. I Conduit threads not irregular, jawied or undercut - l l l l (Paragraoh 3.1C) l l l

  • l l l l (V) 4. I Dies for conduit threads are standard U.S. conduit I i l l I tapered threads -( Paracraoh 3.10) l l l l i I Il l (V) 5. Conduit threads cleaned ard painted with Galvanox - l l l l

( Paragraph 3.lE) l l l l l l l I (V) 6. I Ccnduit bends free of kinking or excessive flattening l . I l l ! l l (Paracraoh 3.1F)

' I t e (y) l l 7 I Conduit bends and offsets made with accroval benders <

6 ( Paragraoh 3.1G)  ! ,

l i l il l  !

6 akLl t I dk NYl I I i .tugw . , t ,

I SU' !I I nm.a s towas.snes. cre s  %' ,,

W ito "C" 'o ' " "*V' iR CLOSED - oc =sete on ..

3 M1A/01 //84

... . .=- .-

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION QI-QP-11.10-1 A Rev. 1

'- - CPSES - Page 26 of 37 SEP 2119N ATTACHMENT 2 caua.icas a sicau z_z: aic s m:ca . , . ,,

INSPEC TION REPCRT jao aft = O($caspf ach 80DeTIFM.ar.ca 40. 3V5 TEM / 5TRucTb8E 25M'sMa fices CLASS 1E CONDUIT RACEWAY

=taa.at on r Eu couis acir. o.

spuc.no gasv gau.ac. occ. a esv a casar.c no if of O!-0P-11.10-1A Rev. r .

0 l"neancNc'n O Wic$%"*" 0?n'N$5 s"Notcrton A?non ,

sueP. SE3ul.73 0 is cena co tcreo. u. uca.cz irt=s san <actoav O imseccrian co=,terzo. uasanw.eton, irems usran esta=

INSPEC 10N ATTRIBUTES  ; 3 carg ,,,,[,y,g iz

  • 5 *
1. I Verify conduit sire and fittinat (Refer tn para 3.7.1 M I I l l I l
2. I Verify total conduit bends (Refer to Para. 3.7.2'). l I l I

l

,.)

3. l Verify NIS Conduit (Refer to Para. 3. 7. 3 t I
4. Verify flex conduit installation (Refer to Para. 3.7.4.1 l 1
5. Verify conduit identification (Refer to Para. 3. 7. 0 . l l l l
6. Verify pull box sire and tvoe (Refer to Para. 3.7.5 )- 1 I l ll l
7. Verify pull box installation (Refer to Para. 1.8). ll l
8. Verify raceway separation (Refer to Para. 3.9 & 3.9.1), I

! l

9. Verify NIS raceway seDaration (Refer to Para. 3.9 8 I I 3.9.11. I l l l i i i l  !

l

.  ; e l

l l l l

l 6I . LA I l ll O\M 3 I a n io ,s,ses, crei ,,pVA ; . -

5eceration Deficiency itein No.: ,Q ,#

D 80

  • N *C8 4 * *"' M 8
1. R CLOSED ~1 oc eseterom

- .e l ,,

MIA/02 7/84 .

t

=.--

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 27 of 37 SEP 211984

-'- ~

ATTACHMENT 2A

, YELLOW

. CSPS8S SEPARATION i VIOLATION  ;

o I.R. NO.

DEFICIENCY REPORTITEM #

O WANER APPROVED Q.C. INSPECTOR DATE DO NOT REMOVE THIS TAG WITHOUT Q.C. AUTHORITY

~

  • ~ ~ * * ' *

...--,..,--.,L_--.. ~*:--

. -?_':..-.~,.:L^..:._------. ~...--.-,* - - . . - - - . - - - - . . - . , - - . - - . - - - . . _ ..

l 9

a TEXAS IKILITIES GENERATING CO. '

TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 28 of 37 SEP 211984 ATTACHMENT 2B

]

w t=

dC W3 a=

o EI O

E 8ts s ..

c -

c. .

E 2 F 2 s ,3 5an 3 !,

m ,5 5.

g,5 0' -

g

=

y i G "

5

~ -

8 mm 5  : .. E

5 :5 t '

2.d E y -.

E e M E ..

- E =

< 3_5 =

! siw l 5 a a e 5 ,3 a

Et i 5"

~

~.

S 3 8 3 3 5 3 4 3 s '

u 3 m y ,  ?

m y y

u-g 5- '

t

. . O .:- 's. - .

2 ., . . - . - y ,<,.%.. _ ._y 9 4m _.___-.p. ,

~ '

+

TEXAS UTILITIES GENERATING CO. -

TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1 CPSES -

Page 29 of 37

. SEP 211984 ATTACHMENT 2C The following steps will be followed in processing of the Separation Deficiency Report (Attachment 2b) for Unit 2.

1 Step 1: QC will report the unsatisfactory as-found condition in the Block 2 Description Section and attach a " Separation Violation" Tag with the IR nunber and Deficiency Report iten number entered on the line provided (Attachment 2A). The tag shall be placed at the area where the violation occurs.

2: The Paper Flow Group will retain a copy of the Deficiency Report and fomard the original to Engineering fo r disposition in Block 3.

3: Upon conpletion of the Engineering Disposition Block 3, Engineering will assign the responsible craft in Block 4 and fomard the original Deficiency Report to the Paper Flow

' Group for distribution.

[ NOTE: When Block three (3) is dispositioned "Use as is" and the deficiency is not in accordance with ES-100, or the disposition is "Riwork" but the wort is not in the scope of CPP procedures, a NCR will be issued, and the deficient iten closed referencing the NCR.

EXCEPTION: When a traveler is issued for rework, it is not necessary that a procedure be issued. The traveler shall have detailed ins tructions.

4: For those unsatisfactory conditions which would restrain or impact ongoing construction activities, Engineering may re-quest authorization to proceed providing the following conditions are satisfied:

a. The deficiency di sposition includes suf ficient information and direction for accomplishing the work.
b. Engineering has stated the reason for waiver in Block 5.
c. Engineer Review / Approval shall be by the Engineering Discipline Engineer or his designee (Block 5).
d. Quality Assurance review / approval shall be by the Discipline Quali ty Engineers designated to review /

approve NCR dispositions (Block 5).

ea e

____.____________.____.am*_.m_____._______-______._________m_

- 2

~

l TEXAS lJTILITIES GENERATING CO.

TUGC0 INSTRUCTION

( - CPSES - QI-QP-11.10-1A Rev. 1 Page 30 Of 37 SEP 211984

^ ATTACHENT 2C (continued)

e. After approval of the waiver, the QC Inspector shall check the waiver approved block then sign and date the appropriate section of the " Separation Violation" Tag.

5: When the responsible craft empleted the itens listed on the Deficiency Report, by working the Engineering disposition and QC has signed all steps for acceptance, the QC Inspector shall remove the " Separation Violation" tag. The QC In-spector shall obtain the original IR, with the Deficiency Reports attached, sign and date the Deficiency Report, Block 6 for the iten just worked.

When all itens have been cmpleted on the Deficiency Report, the IR shall be closed and processed in accordance with Reference 1-T.

O i

9 I

i . _ '. . . .:. : 1

__ ... 1 .

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION

- CPSES -

QI-QP-ll .10-1 A Rev. 1 Page 31of 37 SEP 211984 ATTACHMENT 3 ,

i au.icn( *E;n s iEars i. I ; N.e  ; ra.cm i-et- :r INSPEC TION REPCRT  ;=o cc3nocar.c. w sim , srauc roat cu.ea nca

.rts otscm. aron CLASS lE 801 INSTALLATION we c=1 guv g au an occ. e uv s c,..=c.4 ,o lw s n a rm u,.a .ceir w d .I01-0P-11.10 1A Rev.

0 7. , 7, 55, O P*1;gitic',r'o=

, O la?,ry,'t,rl,; O qagye.,,, O P*,tsnErica ,

i 48 *E3wn.r 3 O --<crion co ,tzteo . .tu , uciatr ira sa w actcar O . sacerio ec=,urro, unsarir cron, irc= usrto octe. ,

? INSPECTION ATTRIBU TE S  ; k carg gg," g

.. .t=_5

1. I Verify box sire and tYDe (Para. 3.7.61. I II I

_ [V) i O Nema 12 I II l i O Nema 4 l l i I I Il1 l

/3 (V) 2. I Mountino easkets installed Nema 4 box (Para. 3.7.6T. lI l V i lI l

3. I Verify box installation (Para. 3.81. I l l l (V)

I a. Verify box orientation. I Il I l b. Verify alpha-numeric code (schedule boxes only). l l I l l c. Verify box color code. l l l l l d. Verify box free of damane. l I I I i e. Verify mountino strip installed. l l 1 l

' I f. Verify NIS box location. I ll I ll1 l l I i  : {

l . l l  !;! l l 1 'e i i l i I l  ! ; Ia i '

i l ' i M' i AK MF . -

I .tuW I i l (T W 'i I 1 1 1* I I I l no. s cewes,snes, tre i I

._*' q

\

-- ,asurto wn w 9 "'V' I. R Ct.CSED - oc asetcrca 4 l

M1A/03 7/84 i

4 l - - . . . . - - ~ . _ . . . . . . . . . .

...-_s.~. . . .

9 I e

.... ._ ...2- - . _.

I TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION QI-QP-il .10-1 A Rev.1

- CPSES - Page 320f 37 l SEP 211984 ATTACHMENT 4

cua.sc,,e *2. s: 2u 3 . u.c ima , ,

iNSPtC T1CN RLlCt. T y a

ittu otscairvion Liass a parr. car.c. ,0.

gsisrgw , sr=wcrw c ;gs.c ar.ca ,

Conduit Raceway System Insp. p y sPEcm1 sa tv nu at coc. e aav a c,.aass ,o t =<aut ca rur t avis .cor ,o

,l ., QI-QP-11.10-1A Rev. , ,

w( in

'"'n sp(c f70 '

gg?te1 Q P W'S TCM 9 MsPC CN alp *tsuLfs O .nexio ce=,teren . au. aciucaste ire =s sarisiactoav O =sncTion co-atstro. uasarisracronv irtis usruo actow ,,

6

.. e irtu go.

INSPECTION ATTRl8uTES =  ; garg l ,,Gn rung

,2 . 5 .

1. l Verify Conduit Raceway System is installed per the ll l Rev. l l l t i isometric drawing. Dwg. p I li i I(Para. 3.11.1).

I I l i l

ll l V l 1l l l . II I I

i l i i li i l l i1 I l l 1  !

I I I II I i l Ii i

! I li I l l l l l l

' i 1 l . i I

i I : i l

I I ! i l

' . l l l l

1 Im; i i  !

I Gl ,

i AE M9

  • l MUkMS I \

i 444' I i I .

I  %* II ' I  :

menaams pwes,seces, gTcj j 8

l l

l MLd 'ED *C S S "7

'" "' M 8 1

4. 4 CLOSED - oc =setcrce j

.s MIA/05 7/84 1


.----7.-- _ _

a 3 . .

- ~ ~ - . - - - -.-

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION 1

QI-QP-ll .10-1 A Rev. 1

- CPSES - Page33 of 37 i

SEP 211984 1

ATTACHMENT 5 I

NUT ROIATION' FROM SNUG TIGHT CONDITION 01sposition of Outer Faces of Solted Parts j i

i Soth faces normal to bolt axis, or one face Soth faces sloped not more I normal to axis and other face slooed not more than 1:20 from normal to bolt >

than 1:20 (bevel washer not used) axis (bevel. washers not used) l Solt length 5 not exceeding Bolt length b exceeding 8 diameters or 8 diameters or For all length of bolts 8 inches 8 inches 1/2 turn 2/3 turn 3/4 turn L ,

a. Mut rotation is rotation relative to bolt recardless of the element (nut or bolt) teing turned. Tolerance on rotation: 30

' For coarse thread heavy hex structural bolts of all sizes and length and

. heavy hex semi-finished nuts,

b. Solt length is measured from underside of head to extree end of point.  !

~

UNISTRUT (A-307) BOLTS -

BOLT SIZE TORQUE (INCHES) (FT.LSS.)

1/4 6 5/16 11 3/8 19 1/2 50 6

., .. e

. .- .- .. .:.e . . . . . .

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION

^

QI-QP-ll.10-1A Rev l'

- CPSES - Page 340f 37 SEP 211984

! ATTACHMENT 6 .

.sn. mo saa osmos asaammes roa sTest om Ts ao scaswa

  • **4 C.ame namese f SpeenGneses sag.Gemee t l Lee er hemma Casmen suse O

see maag Ast w a w , '

SAE.Csede 2 I'E I t Caes s s.s L8* *'sessme Carese seem nessem Caese Samus, gammanns ans Tamesses ASTu.A est

! C " s==L sAs-asses u L'q"ues"s'm'o's a "m'e'"T" emus"usse ASTW.A 323 asssme Caseme Sasst O'" Type 4 quemamme and famomuus ASTM.a 32s tourCaese mesumuss sesL a sas Tree 1 gesmeed ans femessee

() .

A31%.A 323

^

c (weemummet saast Tyge 3 gamm ase Tomsesus OW 8 ASTW-A 3$4 Lee Aasy $ asst f

. Geese De quemams ans famomuus ASTts-A 354 tse Ah sand.

OtC Osede DC

~.

gemens em Teesse

- -~

~..

  • AlmsbumCades AasylasmL exammes and Tw z

my RasThummens AAm ums ,.

.. ,* Thusumet assenma Osame Aasy Sase.

% g_. M'ame Temomme +

AsDe-s $14 Assy sammL Csede M Osmanas and Tamsesus

  1. ans femesses A Jet = te=Camme Sases Seeseems, and tw Teseesse Saamere tem A 3M.se.m seamen seen asse te, s _ ; seen % sesa e., s se.esmee omes s ce r'ma somme esamese a# A
  • F.
  • M ane fememes Se W Speg ame Sesa a abe= Gmemunes sus faamssee Aame Sese Sasse ens fases emme Susesame anweb

& Me h aus femunesammy Seus Game ses genmesee game Jasom sad Dusumet d est . -- ens e.amsy *--_ se 4scenene fasemme 8amenses s

g

  • ' ' * * *w
  • Oh 4 h.+@h. .us h h.-4 . ..a. ., ,

t---e- E ry* er 4 wg -'r y wwy w w* ww-T-W w w -vr7v-eev--s.eT--'---wey---yy r w-n-* r-,'m-y4--g-up e g - w i*' y-- r-v-awe w --y-w w w q yvm,w--wwy ywwu 9 -ww

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION

(' QI-QP-ll.10-1A Rev. 1

- CPSES - Page35 of 37 SEP 211984 ATTACHMENT 7 VOLTAGE LEVEL DESIGNATION TABLE 19, IG, 1K -- 6.9kV ac 29, 2G, 2K -- 480 Vac & Heavy Power Feeders Un-der 48U Vac 30, 3G, 3K -- Control ac and de and Small Power' Feeders Under 480V 49,4G, 4K -- Low Level Signals (N 4R, 4W, 48, 4Y -- Reactor Protection Instrtsnentation v' Low Level Signals SK -- 480V ac & Heavy Power Feeders Un-der 480V (Local Control)

SR, SW, SB, SY -- Reactor Pratection Instrtsnentation 120V Signal

~

6K -- Control ac & de and 'Small Power Feeders Under 480V (Local Control) 6R, 6W, 6B, 6Y -- Nuclear Instrumentation System 8K -- Telephone and Communication l

e

  • ' * 'e

' - uda eaaea., me og .m, g .g g, , _

,m ,v- v-- , - - - y y y y y

o

- = _ -- _ _ . . ,

"- N TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION f QI-QP-ll.10-1A Rev. 1

- CPSES - Page36 af 37 SEP 211984 ATTACHMENT 7 (Continued)

, m m e m o n E E E E E E E o o o o o o a 5

o 5

a 5v 5

v 5

v v

o v

CH. CH. CH. CH.

I II III IV Trair Train Train A B C*

  • Non-CLASS 1E (INCLUDES CONTROL CHANNELS 1, 2, 3 & 4 AS DEFINED BY W)

Item shown in each vertical column is separated from items in all other vertical columns by acceptable separation distance of 3'x 5', l'x 3', barrier, etc.

Relative arrangement within a vertical column is determined by voltage level.

i l

l

.--.b*..... -. . . . . - . _

TEXAS UTILITIES GENERATING CO. I TUGC0 INSTRUCTION QI-QP-ll .10-1 A Rev, 1

- CPSES _. -

Page37 of 37 SEP 211984

- ATTACHMENT 8 Figure 1 ,.

. " Cantilever Regions" are cross-hatched. No attach-

' ments are to be made in

" these areas unless the cri-

't 3 teria of paragraph 3.3.5.2.2 O , 7,QgpW/2W v

have been met.

O o s 3d- _

F 6" - Typical except where

" M marking indicates studs o

[ O to be nearer to edge 4< of plate.

FIGURE 2 4 Edgpf.-.concrete No attachments are to be made in " Cantilever Regions"

{unlesscriteriaafparagraph 3.3.5.2.2 have been met t' 'I f tTvnical except where marking 8" _Mf Cmum ide

. 6" 6" 6j edae indicates studs to be nearer of olate. ky"P{t n )

l

h. .

c -

c - . " . YV m, -&,;, .

F 4. Plate g -

, ) - -;

p g

.w -

y . ;;

g g - - .

l 0

= \t gttachneng g g g/,

3/4" Maximum l 3/4" Platej

. Typical either side of G plate unless detailed

.otherwise on design documents.

Figurg 3 , ,

T U- y g-

,12"Minimd .

I

\

4* 4 i

- 12" l Minimum j

.=r 4, 12" o Minimum , ,

l 3/4" Plate g ,

\ .; p l. - ( l 1

  • * - ~ ~ - - -

' ~_^ **___ ,~L % *

  • L*;__ _~-~~ .
  • t.

f[ .s . .L - t 'c %

J f o -]-8f l TEXAS UTILITIES GENERATING CO. 1 TUGC0 INSTRUCTION s - CPSES - s 9 QI-QP-11.14-4 Rev. 14 Page 1 of 5

~ 4A7d m SEP 211934 x _ _- ,

CONTROL OF MATERIAL TRACEABILITY FOR SITE FABRICATED STRUCTRUAL/MISCELLANE0US STEEL PREPARED BY: W/hJ Ja- Pda/W Date APPROVED BY: O.[lh ~

1//9/M Ddte APPROVED BY: //)l ~ N b k As24- Gbfl+d Da te e 1.0 REFEREfC ES 1-A QI-QP-11.14-1 " Inspection of Site Fabrication and Installation of Structural and Miscellaneous Steel" 1-B QI-Q P-11.4-2 2, "QC Surveillance of Protective Coatings unique Identification Number Transfer" 1-C CPM-6.3, " Preparation, Approval and Control of Operation Travelers" 1-0 CP-QP-18.0, " Inspection Reports" l 1-E CP-QP-16.0, "Nonconfonnances" 2.0 GENERAL 2.1 PURPOSE AND SCOPE 8 The purpose of this instruction is to describe material trace-ability requirements for seismic structural / miscellaneous steel fabrication per Reference 1-A.

i Ll -"

,- - e r. F0tA-85-89~"

j_ f . ;. r- 31 _'. td Y 3 'l 3 n . T. 9/ , s. . w , 35, ,

^~~ '

('

3.r( 0 b Ll c~ j ,' < f. :

. is -

~ ' 'l

~

(j' l

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION

- CPSES -

QI-QP-11.14-4 Rev. 14

( Page 2 of 5 SEP 211984 3.0 INSTRUCTION 3.1 ISSUANCE AND CONTROL OF MATERIALS The shop forenan will notify the QC Inspector when it is necessary to withdraw safety related materials from the storage area. In this case, a Material Requisition (MR) will be prepared by the craft. The MR shall provide the quantity, description, heat / mark nunbe r, and a general description of the intended use of the material (e.g., shims, etc.). This MR shall be presented to QC for material traceability verification. QC verification shall be documented by the Ins pector's signature and date on the MR.

NOTE: Conduit suppo rts, cable tray suppo rts, electrical l equipment supports, and attachments associated with these supports _do not reouire material identification or an MR for materials conforming to ASTM A-36 or ASTM A-500 Grade B specification.

The MR shall be presented to QC at the time of inspection to expedite material traceability verification.

3.2 SUBDIVISION OF MATERIALS The QC. inspector shall verify that if it is necessary to sub-divide material, that traceabili ty is transferred prior to cutting . QC verification shall be docunented on the MR, Operational Traveler, or IR as applicable.

NOTE: In the event that the steel is coated and has a Protective Coatings Unique Identification Number staaped on it (a QP nunber indicating use in Reactor Building), the QC inspector shall also verify transfer of this nunber in accordance with Reference 1-B. l 3.3 UNIQUE NUMBERING The QC Inspector shall maintain a material traceability log for safety related miscellaneous and structural steel items fabricated-in the shop requiring unique numbers as shown below.

Unique numbers may be applied to items in lieu of heat numbers when due to configuration, a unique number is more feasible.

NOTE: Catalog type items such as nuts, bolts, and washers that require only a Certificate of Compliance shall not be encompassed within the scope of this --instruction.

w "w -

      • e- - -
  • TEXAS lKILITIES GENERATING CO.

TUGC0 INSTRUCTION

^

CPSES - QI-QP-11.14-4 Rev. 14

\ Page 3 of 5 SEP 211984 The QC Inspector shall assign a consecutive unique I.D. control number beginning with "1001" to each unique item or group of itens being fabricated for field installation.

Upon assignment of a unique I.D. control number, the QC Inspector shall enter it on the Miscellaneous / Structural Steel Traceability Log, Attachment 1, along with the following information:

.a. Assembly Quantities - The total neber of unique assenblies or items being issued or fabricated.

b. Drawing No. - The B&R miscellaneous or structural steel fabrication drawing number.
c. Sheet - The B&R miscellaneous or structural steel fabrication drawing sheet number.
d. Revision - The B&R mi scellaneous or structu ral steel fabrication drawing revision number.
e. Date - The date that fabrication of the iten(s) is conpleted.
f. Assembly - The unique assembly title / number of the item being

. issued or fabricated as shown in the Bill of Materials on the drawing.

g. Sub-Assembly Itens - The size, type and grade of material y used for "Q" items to make the assembly.
h. Item Quantity - The total neber of each iten used to make the required number of assemblies.
i. Heat Number - The heat or lot number of each "Q" iten used to make the assembly.
j. P.O. Number - The purchase order number on which the material

was procured.

3.3.1 Change of Sequence

~

The following conditions or variables shall warrant the assignment '

of a new unique I.D. control number:

a. A change of P.O. , heat or lot neber
b. A change of material, size, type or grade
c. A change of assembly neber or assembly dimensions
d. A change of fabrication date
e. A change of drawing neber

.- - a 4 ya , ..

- ~

7, TEXAS UTILITIES GENERATING CO.

TUGC0 INSTRUCTION

^

- CPSES - QI-QP-11.14-4 Rev. 14

\

Page 4 of 5 SEP 211984 3.3.2 Field Fabricated Itens QC field ins pection/ verification shall be docur.ented and processed in accordance with References 1-C or 1-0 as applicable.

QC shall verify Heat Numbers applicable to material type being used and enter it in the comments section of the IR, or as directed by Operational Traveler.

3.4 DOCUMENTATION The maintenance of operation travelers shall be in accordance with Reference 1-C.

The QC Inspector shall fo rward Miscellaneous /JtructuJal Steel Traceabili Vault ty). Log (PPRV (MTL) sheets Inspection to theas Repo rts, Permanetn applicable, Platnshall Records be processed per Reference 1-D.

3.5 DISCREPANCIES Discrepancies found during inspection shall be docunented on the IR and/or a NCR per Reference 1-D and 1-E respectively, as directed by the QA/QC Supervisor.

, .-.__.- . - _ . . _ , _ . . . - _ _ m - _- . _ _ . .

r -.,_m _ _ _ . _ _ - . . _ . , -

~

i . _-

^

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION k'

)

- CPSES -

QI-QP-ll.14-4 Rev. 14 Page 5 of 5

_ _ _ SEP 211984 ATTACHMENT 1 e -

a 8

G7 et 9%

~ 8.

J.

&~

>b

$I a

.g" .

s sa

>= we

>= E 5 i-

=

d 5 2=

a 5"

,E s=

M m

s d

v w

= = .

M 8

x ,

me g

v 5e CE =

,_s Eg s= ~

e e u _

, '. i.

u i xn ' ,a ;.- -

+:1 - 5 t ,.- t 7

/ ), /

f. to ,g. g, sj.( <N.x i+; ,=

7 n - > i o o,- is1 >:c e c .i. ossa u'p e ,;

i

~

Q  ? -IQj" p*- ' AlUIs /D ],/ - A;.t'c' # 'i' ~i' U b s j ', ' r 5

j. y_ g y 3 cf ,

/O G-5-S2 cJl ? G,id' # };,' lf $[, ,,, ,,

.'f.~,.,

.'_ i.

,, , si

(/~4 f-f'-)l).'r'/* l k

'l 6 - z ? -6y f. w s.e ? . .r . cdc.

b : '? ' " d :

(.p,,  : ,1 ( w . , 'Ki:.-

,c a ; ic - ic - <> .n ' r

/ Z- 't ' 7 - 33 ( .-w: > sy p y ,. ,  : . , , - - :., ,< 'u - - -c

' ll Iz 2 .C 2 n n .,,r c G) 7 :' .: _/

/"I ~1-7i-8V C k ynj, i -/a /, v, 3 , / , T. t , 5. 3 4

s

,)

i

_ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ . _ _ _ _ . _ _ _ _ . _ _ _ _ . _ _ . _ . _ _ . -[______._________ _ _ _ . _ _ . _ . _ _ _ _ . - _ _ .

L.,.f. r:..

g TEXAS UTILITIES GENERATING CO. '

TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 1 of 37 SEP 211934

~

INSPECTION OF CLASS 1E CONDUIT RACEWAY SYSTEMS PREPARED BY: MMb 8/ Ns "A7/*V 4 Date APPROVED BY: /5 M" 9' M-Date APPROVED BY:

/Ied_ M M

~

. .s A -

.  ?- Ee ->/

Date

1.0 REFERENCES

1-A CP-Q P- 11.10 " Inspection of Electrical Raceway Suppo rt Systems" 1-B 2323-52-910, "Gibbs and Hill Drawings" 1-C CP-CPM-7.1, " Package Flow Control"

]"m'E0LOM 1-D 2323-ES-100, " Electrical Erection" 1-E CP-CPM-6.3, " Preparation, Approval and Control of Operational Travele rs" 1-F QI-QP-11.3-21 " Embedded Condui t and Sleeves" .

1-G CP-ECP-19, " Exposed Conduit" 1-H ,

QI-QP-11.4-22, "QC Verification of Protective Coatings Unique Identification Number Transfer" 1-I QI-Q P-11.14-4, " Control of Matl. Traceabili ty for 'Sile?

Fab. Struct./ Misc. Steel" 1-J QI-QP-11.21-1, "Vi sual Weld Inspection" ai ==

1-K QI-QP-11.2-1, " Installation of "Hilti" Drilled in it "

1-L -5,, "Pemanent and Tempo rary Attachme Em d M 3, 7. / -

/ & t' M -

'O '?

4.)39Sh

. --~e .

e' TEXAS UTILITIES GENERATING Co. -

TUGC0 INSTRUCTION l - CPSES - QI-QP-11.10-1A Rev. 1 Page 2 of 37 SEP 21 ES4 1-M QI-QP-11.0-15, Verification of Base Plates for Grouting" 1-N 2323-El-1800, " Material List" 1-0 2323-S2-0910, " Sheet G-2A and Sheet CSD-7A" 1-P QI-QP-11.3-28, " Class 1E Cable Terminations" 1-Q 2323-El-1702-02, " Cable and Raceway Separation Details" 1-R 2323-E1/E2-1710. " Junction Box Schedule" 1-S CP-QP-18.0, " Ins pection Report" 1-T CP-QP-16.0, "Nonconformances" 2.0 GE NERM.

2.1 PURPOSE AND SCOPE This Ins truction supplements Reference 1-A and provides the inspection criteria and the documentation requirements for perfonning ins pections on Cla ss 1- E Conduit Raceway and seismic supports for Class 1E and Train "C" Conduit Raceway Sys tens fabricated for and ins talled in Unit 2 Catego ry 1 buildings (excluding electrical control building) and areas as required by Reference 1-B.

2.2 GENERAL INSTRUCTIONS The Unit 2 Interim Vault will issue work packages for each '

conduit run in accordance with Reference 1-C.

The work package shall include but not be 1imited to, a isometric

. drawing of the conduit run, Operation Travelers for the fabri-cation and installation of conduit supports and Conduit Raceway Inspection Reports.

The support (s) location, spacing, type, and attachment as shown on the isometric drawing have been designed by Engineering in accordance with Reference 1-B and 1-0. The isometric drawings present an isometric depiction of the conduit routing and includes applicable notes and references. Other drawings such as typical

- detail drawings, plan drawings, material lists, schedules, etc. ,

have been provided by Engineering to be used as applicable.

s_ _ _ _ . _ _ _ _ . _ _ _ _ _ . _ - _ . - . . . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ . _ . . _ _ _ - - _ _ _ _ _ . _ - _ _ _ = . _ - . _ _ . _ .

TEXAS UTILITIES GENERATING C0. i TUGC0 INSTRUCTION

' - CPSES - QI-QP-11.10-1A Rev. 1 Page 3 of 37 SEP 211984 The inspection of condui t raceway shal 1 be doctmented on Inspection. Reports, Attachment 1, 2, 3, and 4.

The conduit run and supports shown on the isometric drming will be inspected according to the ' operations listed on the Operations Traveler and the acceptance criteria specified in this Instruction.

Operations Travelers shall be processed and completed in accordance wi th Reference 1-E.

Individual engineered supports ("IN") which have weld numbers assigned by engineering shall have specifically prepared operations travelers and/or inspection reports prepared by the Quality Engineer for inspection documentation.

Individual engineered supports ("IN") which do not have weld numbers assigned by engineering will utilize same operations

- traveler fonnat as for any other type of conduit / junction box support.

Embedded conduit and electrical " stub ups" less than 24 inches in length do not require supports and isometric drawings will not be issued for these installations. Embedded conduit and " stub ups" will be inspected in accordance with Reference 1-F.

QC verification of support load and capacity, and. span per LS Section of Reference 1-B are not within the scope of this instruction.

Lignting supports ,and lighting conduit inspection criteria will be addressed in future revisions to this instruction.

2.3 SPECIAL INSTRUCTION

a. Quality Control Personnel who are certified in QI-QP-11.3-23 may perform the inspections required by paragraphs 3.1, 3.7, 3.8, 3.9 and 3.10 of this instruction.
b. Quality Control Personnel who are certified in QI-QF-11.10-1 may perfonn inspections required by paragraphs 3.2, 3.3, 3.4, 3.5 and 3.6 of this instruction.
c. All other paragraphs except paragraph 3.11, are applicable to both a and b above.
d. Quality Control Personnel certified to this instruction may perfonn inspections required by all paragraphs of this instruction.

W ,

ea e

TEXAS UTILITIES GENERATING CO.

c TUGC0 INSTRUCTION

- QI-QP-11.10-1A Rev. 1

- CPSES - Page 4 of 37 SEP 211984 3.0 INSTRUCTION 3.1 CONDUIT FABRICATION SURVEILLANCE Fabrication inspection (i.e., selection of material, threading and bending) of Class 1E conduit, including lighting shall be perfonned on a random su neillance ba sis. The frequency of inspection shall be once per working shift when conduit fabrication activities are in progress or at the direction of the QC Supervisor.

Inspections will be documented on Attachment 1.

Inspections shall include the following:

a. Conduit shall be free of burrs, sharp edges, and foreign material which could cause cable damage during pulling and shall show no evidence of thread damage (i.e., flattening) which could cause irregularity in conduit shape.
b. To the extent possible, the QC Inspector shall examine conduit fo r internal and external " flaking" of the galvanize coating. If cracking of the galvanize surface is evident on the exterior of bends , flaking has probably occurred on the interior. The QC Inspector shall affix a hol'd tag to all conduit exhibiting " flaking" or thread damage and cause their removal to an isolated area to prevent their use and possible vendor replacement.
c. Threads shall be standard U.S. conduit tapered threads (NPT) and shall not be irregular, , jammed or undercut.
d. Dies being used shall be standard U.S. conduit tapered threads (NPT).
e. Cut threads shall be' cleaned to bright metal and painted

. with Galvanox or similar approved product.

f. Conduit bends shall not show kinking or excessive flattening or interruption of the smooth bore of the conduit.

NOTE: Excessive flattening is defined as reduction of the outside diameter of the conduit by 257, or more. ,

g. Bends and of f-sets will be made with benders, l

1

TEXAS UTILITIES GENERATING CO. t TUGC0 INSTRUCTION O v - CPSES - QI-QP-11.10-1A Rev. 1 Page 5 of 37 SEP 211994 3.2 SUPPORT FABRICATION 3.2.1 Transfer of "0P" Number and Material Traceability 3.2.1.1 Transfer of "QP" neber for coated bulk steel intended for use in the Reactor Building will be in accordance with Reference 1-H.

3.2.1.2 Material traceability for conduit supports, electrical equipment supports and cmponents associated with these supports will be in accordance with Reference 1-I.

! 3.2.2 Welding Inspection All welding and stud welding inspections shall be perfont.ed in accordance with Reference 1-J.

The weld joint design shall be limited to those shown on the sketches appearing on qualified WPS's and/or applicable design docment.

3.2.3 Identification of Conduit Supports Each support inspected on a raceway system shall be assigned a neber by Engineering as outlined in Reference 1-G and shown on the isometric drawing included in the conduit system work packages.

Supports with more than one conduit attached shall be assigned only one unique number with the exception of individually engineered ("IN") supports which allow attachment of conduit (s) other than those shown on the "IN" drawing. The additionally attached condui ts will be assigned unique nebers and these numbers documented on the Operations Traveler for each supported condui t.

Supports shall be stamped / stenciled with the support neber, with the exception of unistrut hangers. Strut channel hangers shall be marked with an approved industrial marker in a manner that will not damage the supports. In cases where not enough rom is available to stencil the number, (e.g., CSM-2A type hangers) the number shall be marked on the conduit strap.

NOTE: Pull box supports will be identified in the same manner as conduit supports.

i L

I l .

+

TEXAS UTILITIES GENERATING C0. i p' TUGC0 INSTRUCTION v - CPSES - QI-QP-11.10-1A Rev. 1 Page 6 of 37 SEP 211984 3.2.4 Identification of Junction Box Supports Junction box supports shall utilize the unique number of the junction box, i.e. , if the junction box is identified JB2C-139G, the support number will be the same.

3.3 SUPPORT INSPECTIONS Package flow control group or craft personnel shall notify Quality Control when the support or Raceway is ready for inspection and supply the required Operational Traveler and support package. The Inspector will perfonn inspections per the provisions of this instruction and the operation traveler. Following conpletion of required inspections, the Inspector will return the traveler to the package flow control group or craft.

NOTE: The QC Inspector will record all design change docu-mentation (DCA's, CMC's, etc..) and the revision thereof used for inspection on the traveler for each applicable inspection operation completed.

Discrepancies found during inspection will be documented in accordance with Paragraph 3.13 of this instruction.

3.3.1 Support Assembly Inspection The QC Inspector shall verify the acceptability of the following in accordance with Reference 1-B, isometric drawing, and applicable procedures and instructions.

NOTE: General notes of Reference 1-B do not apply to design change documents (DCA's or CMC's) for specific hangers unless otherwise noted on the doctraent.

The QC Inspector shall inspect the support for the following:

a. Member (s) shape (i.e., angle, channel , etc ) , size and dimensions
b. Conduit clamp gap ("t") tolerance
c. Configuration per Engineering drawing and related DCA and/or CMC, including bolt hole sizes
d. Unique identification number per paragraph 3.2.3 and 3.2.4 of this instruction j l

. m -

TEXAS tiriilTIES GENERATING CO.

m TUGC0 INSTRUCTION

(. ! - CPSES - QI-QP-11.10-1A Rev. 1 Page 7 of 37 SEP 211994

e. Shim plate provides full bearing to conduit prior to toque.
f. Welds per Reference 1-J.

, 3.3.2 Tolerances riangers for electrical raceway systens shall be installed within the following tolerances. The cumulative effect of rolling (mill),

fabrication and erection tolerances shall not exceed those given below:

A hanger shall be considered plumb if the angle between the longitudinal axis of the main member (s) of the hanger is at right (90*) angle to the supporting surface (ceiling or floor). A tolerance of 22* (unless noted otherwise) shall be acceptable provided the integrity of the supported raceway systen and its attachments to the hanger remains intact.

Hangers supported on vertical surfaces (wall, column, side of a

^

bem, etc.), shall be considered level with maximum tolerance of 1/2" in 10 feet.

3.3.3 Support Attachment The QC Inspector shall inspect the attachment of the support for the following:

a. Hilti bolt embedment and spacing
b. Bearing surface per paragraph 3.5 of this instruction
c. Attachment welds to embedded steel per paragraph 3.3.5.2 of this instruction i
d. Attachment welds to the containment liner per Paragraph 3.2.2 of this instruction.

NOTE: Additionally any NDE for attachment welds to liner shall be completed per Operations Traveler provided by Civil Engineering. A copy of this Traveler shall be included in the support package.

e. Location per isometric drawing.

3.3.4 Bolting Inspection 3.3.4.1 General Bolting Requirenents For each support the QC Inspector shall:

TEXAS UTILITIES GENERATING CO.

_ TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 8 of 37 SEP 211924

a. Verify all bolted connections have been made with approved hardware and are completed and secure. In addition, bolt tensioning requirenents for bolted connections as specified by Reference 1-B shall be verified. (See Attachment 5 for bolt tensioning requirenents and Attachment 6 for bolt types and marking).

All strut channel and/or bolted Structural Supports that have been installed per Reference 1-B require bolt tensioning.

Electrical Raceway strut channel supports fabricated and assembled shall be inspected to verify that the bolt tensioning has been satisfactorily accomplished. One bolt /

nut combination per support shall be inspected for tension acceptabili ty. Addi tional ly, if the support secures one (or more) vertical run of conduit, at least one bolt on one vertical conduit clamp shall be inspected to verify that proper tension has been reached. If this is not the case, all the renaining vertical clamp bolts will be inspected to assure satisfactory tension. Orange torque seal shall be I applied to those bolts that are inspected.

b. The QC Inspector shall verify in accordance with Reference 1- K . Hilti bolt enbedment, spacing, torque acceptance, and Richmond Insert thread engagement (2d + 1/8") and snug tight Hilti and Richmond Inspections shall be verification.

documented on the Inspection Report provided in Reference 1-K.

3.3.4.2 Structural Bolting The QC Ins pector, when inspecting bolted connections, shall visually inspect for the following:

a. Bolts are the correct length as indicated by having the bolts flush with, or outside of, the face of the nut when completely instal led .
b. Turning elements are on the correct face.
c. Washers are used when required.

NOTE: For long slotted holes, structural plate washers or a continuous bar not less than 5/16" thick are required to cover long slots that are in the outer l plies of joints. ,

1

d. Bolt heads and nuts shall rest squarely against the metal or l washer. l I

l

\

.- l l

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION

- CPSES - QI-QP-11.10-1A Rev. 1 Page 9 of 37 SEP 211984 i l

. e. Where bolts are used on surfaces having slopes greater than 1-in-20 with a plane nonnal to the bolt axis, beveled washers shall be provided to give full bearing to the head or nut.

f. When " Turn-of-nut" method is used for bolt tightening, the impact wrench or other pneumatic device does not require calibration. However, the device shall be of adequate capacity and sufficiently supplied with air to perfonn the required tightening of each bolt in approximately ten seconds.

When this method is used, the following steps will be followed by construction:

1. All bolts in each joint shall first be brought to a

" snug tight" condition (snug tight is defined as the tightness attained by a few impacts of an impact wrench or the full effort of a man using an ordinary spud wrench or standard wrench).

2. All the nuts shall then be ma tch-ma rked using an approved industrial marker, i.e.: Nissen; which has certified contents.
3. All the bolts in the joint shall then be tightened by the applicable amount of nut rotation specified in Attachment 5.
4. Tightening shall progress systematically fran the most rigid part of the joint to its freest edges.
5. There shall be no rotation during tightening of the part not turned by the wrench.
6. The end of all bolts shall be marked with the industrial marker when required nut rotation has been attained.
g. When several bolts are installed in a single joint, the OC Inspector shall assure bolts previously tightened which may have been loosened by the tightening of subsequent bolts are tightened to the prescribed amount.
h. When field connections are to be made by use of A325 or A490 bolts and tightened with a calibrated torque wrench, a hardened flat washer shall be used under the turned element and shall be tightened as follows:

.- TEXAS UTILITIES GENERATING CO. i TUGC0' INSTRUCTION w' .QI-QP-11.10-1A Rev. 1

- CPSES - Page 10 of 37 SEP 21 iM.;

ASTM A325 ASTM A490 Bolt Size Torque Torque (Inches) _(Ft. Lbs.) (Ft. Lbs.)

1/2 093 5/8 228 3/4 387 500 7/8 518 650 1 725 1320 1 1/4 - 2620 1 1/2 - 4565

1. A490 and Galvanized A325 bolts shall not be reused. Other A325 bolts may be reused if approved by Engineering.

Retightening previously tightened bolts which may have been loosened by the tightening of adjacent bolts shall not be considered as a reuse.

j. ASTM A449 bolts may be substituted for A325 bolts.
k. ASTM A307 bolts shall be tightened , to a " snug tigh t" condition.
1. The QC Inspector shall apply tortiue seal to all satisfactory l tightened nuts / bolts.

3.3.5 Welding Inspection 3.3.5.1 All welding and stud welding inspections shall be perfonned in accordance with Reference 1-J. .

The weld joint design shall be limited to those shown on the sketches appearing on qualified WPS/s and/or applicable design docunent.

3.3.5.2 Welded Attachments to Embedded Strips / Plates Welded attachments to embedded strip plates and large plates per Reference 1-L will be installed per the following and to the requirements of Reference 1-B.

I a

TEXAS lRILITIES GENERATING C0. i TUGC0 INSTRUCTION

- CPSES - QI-QP-11.10-1A Rev. 1 Page 11 of 37 SEP 211984 3.3.5.2.1 Definitions

a. " Strip Plates" are those plates 3/4" thick, either 8"or 10" wide and of various lengths which are anchored to concrete surfaces by embedded Nelson Studs,
b. "Large Plates" are those plates 3/4" x 4'0" x 8'0" or 3/4" x 8'0" x 12'0" which are anchored to concrete surfaces by embedded Nelson Studs. This includes plates of either of these ncminal sizes which were modified to include cut-outs or irregular outside shapes to conform to building configurations.

3.3.5.2.2 Permanent Attachment Location Pennanent attachments shall be located in confonnance with design documents, but where the special situations described in the following paragraphs are encounted, the locations shall be subject to the provisions stated in this section.

Attachments to "large" plates in the cantilever region as defined on Figure 1 of Attachment 8 shall not be made except in those cases where:

a. The design doceent specifically states that investigation of the load being applied to the cantilever region has been accanplished by the designer, or,
b. The de. sign document provides for an additional member or members which serve to span the cantilever region, and are not attached to the plate within the cantilever region.

I When an attachment is nade to a strip plate at a location not specifically shown on approved, controlled drawings, and the attachment whould be located more than 3/4" from the center line of the plate, the location shall be approved by the on-site "CPPE" (Comanche Peak Project Engineering Department) prior to doing the work (See Figure 2 on Attachnent 8). Attachments to " strip" plates in the cantilever region as defined on Figure 2 of Attachment 8 shall not be made except in those cases where:

c. The design docuent specifically shows that investigation of the load being applied to the cantilever region has been  ;

acceplished and that additional stiffeners are provided in 1 l

the design to transfer the loads to the end set of studs, or,

d. The design docment provides for an additional member or members which serve to span the cantilever region.

E e - - . . -.

c TEXAS UTILITIES GENERATING CO. '

TUGC0 INSTRUCTION QI-QP-11.10-1A Rev . 1

- CPSES - Page 12 of 37 i SEP 211984 Welds for a hanger, and auxiliary steel where used for that hanger, shall be separated in minimum of 12" from an adjactent hanger and its auxiliary steel (see Figure 3 on Attachment 8), unless other-wise approved by the CPPE. Attachments to embedded weld plates which interface with installed expansion anchors shall provide the required clearances indicated in Reference 1-K, unless other-wise shown on an engineering drawing.

Strip plates which have separation violations with concrete expansion anchors may be rendered unuseable by CPPE Civil Depart-ment after an engineering evaluation has been made. Plate sections that are rendered unuseable will be so stated on a DCA.

This area of the plate will then be painted red in accordance with the appropriate architectural specification. No attachments shall be made to any portion of a strip plate which has been rendered unuseable and no portion of a strip pla te shall be rendered unuseable if it has an attachment already made to it.

3.4 SUPPORTS IDENTIFIED WITH "E" NUMBERS Supports, or components identified with a unique "E" number 0001 thru 9000, need not be reinspected for welding. This support

' inspection shall be documented by the QC Inspector by writing opposite the support number li sted on the Raceway Sys tem Operational Traveler the representative Inspection Report number or Traveler nunber fo r weld inspection. If no Ins pection Report or Traveler exists, the welds shall be reinspected to re-quirements in Paragraph 3.3.5.

Supports numbered greater than E9000 shall require acceptance based on a satisfactory Inspection Report or Traveler.

3.5 INSPECTION OF BASEPLATES FOR GROUTING .

- Inspection of baseplates for grouting shall be performed in i

accordance with Reference 1-M.

3.6 DESIGN CHANGE VERIFICATION Conduit supports, or miscellaneous welded electrical camponents I modified as a result of Design Change Documents (DCA/ CMC). and included in the package for inspection not yet perfonned shall be inspected to verify incorporation of changes reflected on the Design Change Document. Verification and inspections will be accomplished utilizing applicable section of this instruction.

TEXAS lRILITIES GENERATING CO. '

TUGC0 INSTRUCTION

- CPSES -

QI-QP-11.10-1A Rev. 1 Page 13 of 37 SEP 211934

. 3.7 CONDUIT INSTALLATION INSPECTIONS 3.7.1 Conduit Size and Fittings The QC Inspector's inspection of conduit size and fittings shall include the following:

a. The conduit size and fittings shall be as shown on the latest approved Engineering drawing.
b. Conduit of the next larger size (1/2", 3/4",1",1-1/2", 2, 3", 4", and 5") than shown on the electrical drawing may be i I

substituted.

c. Where necessary, conduit fittings or pull boxes compatible with cable bending radius requirements may be used to minimize use of condulets.

NOTE: Crouse-Hinds condulets Series Fonn 7, Fonn 8 and Mark 9 are not acceptable and shall not be used.

d. The use of condulets is not pennitted in 6.9 KV conduit-systems. Where required, sheet metal boxes or 0.Z. Gedney type PBW pull box fittings shall be used to provide pull points. The minimum length of opening for cable pulling shall be as follows:

Conduit Size Pull Box Opening Length 5" 60" 4" '

60" 3" 48"

e. Metallic conduits shall be made electrically continuous for

- the entire run by securely connecting conduits to boxes and enclosures by use of double locknuts. All tenninal ends of conduits shall be provided with bushings-insulating type.

f. Where required by engineering drawings, watertight enclosures will be used. The conduit connections shall be made with liquid tight hub fittings. The hub fitting shall include a recessed neoprene "0" ring and a nylon insulated throat and shall be as specified on the Material List. Gasketed locknuts may be used where space limits the use of hub fittings.

l . .-

l TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION

^

- CPSES -

QI-QP-11.10-1A Rev. 1 l

Page 14 of 37 SEP 211984

g. Conduit shall be made up into full threaded fittings with a minimum of five (5) threads engagement.

NOTE: Thread engagement shall be checked by verifying that the number of exposed threads does not exceed that shown below:

condui t maximum number nominal size' of exposed threag 1/2" 3 3/4" to 1-1/2" 4 2" to 2-1/2" 5 3" to 4" 6 5" 7 6" 8 3.7.2 Conduit Bends Not more than 3 - 90* bends or equivalent are pennitted in any conduit run between junction boxes or pull points unless approved by the Engineer.

3.7.3 Nuclear Instrumentation System Conduits Installation of MIS Conduit and NIS box functions 6R, W B and Y shall have a maximum tolerance of t6 inches when design dimensions are given on drawings. l The QC Inspector shall verify that pull points are located at intervals less than or eqJal to as defined by A + B = 100; "A" is the total number of degrees of conduit bends between the pull points and "B" is the total number of running feet between pull ,

points. Any deviation fran this criteria requires a Design Change l Authorization . j All field bends for NIS conduit functions 6R, W, B and Y shall have a bending radius of 20" minimum for 4" conduit and 15" minimum for 3" conduit.

Criteria requirenents apply to all conduits li sted in the following Raceway Function Table:

,s TEXAS UTILITIES GENERATING CO. ' -

TUGC0 INSTRUCTION s QI-QP-11.10-1A Rev. 1

- CPSES - Page 15 of 37 SEP 211984 DWG RACEWAY CLASS SYMBOL CHANNEL FUNCTION 1E O I ea 1E h II 6W IE h III. 6B IE h IV 6Y The QC Inspector is instructed that Engineering control points shall be utilized to' determine locations as well as floor, walls, etc., when shown on design drawings.

3.7.4 Flex Conduit Installation The installation of the flex conduit portion of ractways that tenninate at equipment are not within the scope of this instruction. All other flexible conduit for all areas except the containment shall be Sealtite or 1.:quied-Tite unless shown other-wise on the drawings. Stainless steel flexible conduit as shown on material list shall be used in containment building. Flex conduit shall be installed in accordance with the applicable detail drawings.

I 3.7.5 Conduit Identification 3.7.5.1 Conduit identification shall be as shown on the latest approved drawing.

The following are the recommended and alternative methods in ,

identifying conduit:

a. Recommended Method - Freehand marking of conduit wi th appropriate black ink marker or paint. Height of conduit ntsnber characters should be approximately 1/3 to .1/2 the conduit outside diameter and shall be visible where possible from floor level .

,m_

r

~

TEXAS UTILITIES GENERATING CO.

f. .

TUGC0 INSTRUCTION

- CPSES . QI-QP-11.10-1A Rev. 1 Page 16 of 37 SEP 211984

. b. Alternative Method, No. 1 - Adhesive marke'rs with factory pre-printed conduit numbers or conduit numbers field printed on marker before installation. Adhesive markers shall not be used inside, containment or in manholes.

.c. Alternative Method, No. 2 - Metal or plastic tags attached to conduit by various means, i.e., ty-raps, wire. This method is recommended for ccnduit stub-ups. Howeve r, fo r inside the containment metal tags attached with wire (preferable method) or Tefzel ty-raps or other approved method shall be used.

NOTE: Where groups of conduit pass through walls and floors Alternative Method, No. 2 is recommended for identifying condui ts wi thin these groups.

Conduit shall be identified at both ends of each run; at all cable trays where conduit enters or leaves; on both sides of all walls, slabs and boxes through which conduit passes. The exception to this is a single conduit entering and leaving a pull box is not required to be identified. Exposed conduit ten.(10) feet or less in length may be identified at either end or the middle of the run.

- Groups of embedded conduits which are flush with the surface of walls, floors and manholes shall be identified on the surface of the wall , floor, or manhole by attaching an identification tenplate near the conduit bank. Minimum height of markers shall be apvoximately two (2) inches where space pennits. Marking shall be achieved by stenciling or adhesive markers. Adhesive markers shall not be used inside containment or in manholes.

TABLE 1 (Unit Number) 0 - Common to Both Units 1 - Unit 1 2 - Lhit 2 S. [' .

/

r

/

/

~ ~ ' ' " ~

. - - TEXAS UTILITIES GENERATING CO. '

TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 17 of 37 SEP M i:0J TABLE 2 (Raceway Function) 10, 1G, 1K -- 6.9kV ac 20, 2G, 2K -- 480 Vac & Heavy Power Feeders Under 480 Vac 39, 3G, 3K --

Control ac and dc and Small Power Feeders Under 480V 40, 4G, 4K -- Low Level Signals 4R, 4W, 4B, 4Y -- Reactor Protection Instrumentation Low Level Signals SK -- 480V ac & Heavy Power Feeders Under 480V (Local Control)

SR,SW,SB,SY -- Reactor Protection Instrumentation 120V Signal 6K -- Control ac & de and Small Power Feeders Under 480V (Local Control)

Nuclear Instrumentation Systen 6R, 6W, 6B, 6Y --

8K -- Telephone and Communication TABLE 3 (Safety Related Train)

"A" Train - Orange -

D -

Associated "A" Train - Orange with white stripes "B" Train -

Green -

G -

, Associated "B" Train - Green with white stripes "C" Train - Black -

K -

(Non-Q)

Inst. Channel I -

Red - R -

Inst. Channel II -

White - W -

Inst. Channel III -

Blue - B -

Inst. Channel IV -

Yellow -

Y -

l l

l l

1 l

- TEXAS UTILITIES GENERATING CO. i TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1 Page 18 of 37

- CPSES -

SEP 21 E4 3.7.5.2 A typical conduit ident;fication number is depicted as follows:

C24R 16397 I ii I l Denotesp Conduit > Unique conduit number This part of conduit ID Designatg shall not be duplicated Unit 2

> Designates circui t train or Designates 4- channel . Refer to Table 3 raceway function above.

Refer to Table 2 above.

Conduit identification shall be verified by the QC Inspector to comply with the latest approved drawing requirements at drawing changes / revisions are released which change a condui t's identification after QC acceptance of the conduit, the following actions shall be taken:

a. Changes to " Raceway Function", " Train / Channel Designation" or " Unique Number" shall require rework to reidentify the conduit and QC verification of proper identification. An IR, Attachment 2, shall be initiated to ' document the above verification. All Inspection attributes except "Ve rify Conduit Identification" shall be noted "N/A" and the drawing nunber and revision or DCA number that authorized the change shall be recorded in the " Remarks" section. The previous conduit identification shall also be referenced in the

" Remarks" section.

b. Changes to the " Unit Designation" shall not require reidenti-fication and reinspection of the affected conduits. The Interim Vault shall prepare a Pennanent Plant Records Vault

. Transmittal, to document these conditions and provide a cross reference record. The transmittals shall be sent to the

- Pennanent Plant Records Vault for filing with the respective conduit records.

. 3.7.5.3 The following are acceptable methods of color coding. conduit containing safety related cables:

E _ _

m TEXAS UTILITIES GENERATING CO. i TUGC0 INSTRUCTION

,q QI-QP-11.10-1A Rev. 1

- CPSES - Page 19 of 37 SEP 21 F94

a. Recommended Method - Paint exposed conduits with a full 360*

band at intervals not to exceed 15 feet and at points of entry to and exit from enclosed areas and on both sides of floor and wall penetrations. Paint color shall match as close as possible the appropriate cable jacket color of the safety related cables to be installed in a conduit. Paint band shall be at least one inch wide and shall be readily visible fran floor l evel . It is recognized that for conduits in-stalled against walls and floors, it may be impossible to obtain a full 360 band for color coding requirements. In these cases, the maximum band possible shall be made,

b. Alternative Method - Usq color coded adhesive markers with similar requirements as to color, widtn or marker.

Adhesive marking labels shall not be used inside containment or in manholes. -

3.7.6 Verify Junction and Pull Box Size and Type Unless shown otherwise on material lists or drawings, junction boxes shall be type NEMA 12 enclosure (minimum).

Where the installation and corresponding drawing requires a Nema 4 junction box the QC Inspector shall verify that the junction box is a Nema 4.

The QC Inspector shall verify that rubber gaskets have been in-stalled on the mounting hardware (interior and exterior) and is of the type and size as specified on the drawing, Reference 1-N and 1-0.

Electrical " pull boxes" which are unscheduled on the Engineering drawings, may be installed to minimize conduit installation

, problems.

Where junction boxes are provided solely as cable pulling points in the conduit system and where space or support considerations make -junction box installation impractical, pull box fittings, 0Z/Gedney type "PBW" or approved equal, may be substituted for the junction box shown on the drawing.

Where junction boxes are used as terminal boxes the inspector shall vi sually inspect for those attributes previously stated herein for boxes and, in addition, verify the mounting hardware

() for the tenninal block installed.

TEXAS UTILITIES GENERATING CO. '

TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 20 of 37 SEP 21 GG4 NOTE: The tenninal block will be inspected by the inspector inspecting cable / wire terminations in accordance with Reference 1-P.

3.8 JUNCTION AND PULL B0X INSTALLATION INSPECTIONS The QC Inspector shall inspect the installation of electrical boxes in accordance with applicable approved Engineering drawings.

Inspections shall consist of, but are not limi ted to, the following items:

3.8.1 Verify Box Orientation All box covers and fittings shall face away from walls and/or obstructions which would prohibit future maintenance.

3.8.2 Verify Box Identification All junction boxes shall be identified as noted on the drawings and in accordance with the following.

Stencil characters in black on junction box covers. Height of junction box number characters shall be a minimum of two inches except that characters may be smaller where size of box cover would require more than two lines to complete junction box number.

NOTE: Unscheduled pull boxes shall be identified by the letters "PB" or " pull box".

Free-hand marking of junction boxes is acceptable  :

for size 12 x 12 x 12 and smaller. 1 3.8.3 Verify Box Color Code Safety-rela ted junction boxes containing safety rela ted cable shall be color coded prior to cable installation in accordance with the following.

Stencil an approximate 2" x 2" square on cover of junction box and also on one edge of junction box when the cover is not '

attached to the junction box by means of a sash chain.

NOTE: On smaller boxes, size of colored square may be reduced if there is not enough surface area for both.

I l

7 TEXAS UTILITIES GENERATING CO.

TUGC0 INSTRUCTION

/3

- CPSES - QI-QP-11.10-1A Rev. 1 Page 21 of 37 SEP 21 E34 Paint colo r shall ma tch as close as possible the appropriate cable jacket color of safety related cables to be pulled through the junction box. Where possible, the colored squares shall be readily visible from floor level.

NOTE: Where a Raceway or junction box contains only associated cable (s), at least one white horizontal stripe shall be applied over each applicable Train color coded marking and where possible, shall be visible from floor level.

3.8.4 Verify Box Free of Damage All boxes shall be free fram burrs, rough edges, and foreign material which could cause cable damage during pulling.

Galvanize damage shall be repaired with Galvanox or an Engineering approved equal . -

3.8.5 Verify Mounting Strips Installed Verify mounting strips installed in boxes. Mounting strips shall be in accordance with References 1-Q and 1-R. The QC Inspector shall inspect for the correct type and number of mounting strips and ensure the proper hardware is used.

3.8.6 Verify NIS Box location NIS box installations shall have a maximum tolerance of t six (6) inches when design dimensions are given on drawings.

3.9 VERIFY SEPARATION Conduit Raceway and supports shall be inspected in accordance with the requirements of Paragraph 3.9.1, and documented on the Inspection Report, Attachment 2.

The item (s) which violate separation requirements shall be identified by affixing a " separation violation tag", Attachment 2A, and be reported on the Separation Deficiency Report, Attachment 2B,

' . conpleted in accordance with the instructions given on Attachment 2C.

l

\

.~

c TEXAS UTILITIES GENERATING CO.

TUGC0 INSTRUCTION

- CPSES - QI-QP-11.10-1A Rev. 1 Page 22 of 37

' SEP 211984 3.9.1 Condui t Conduit shall be installed in accordance with the typical detail drawings and as close as practical to the location shown on engineering plan drawings. Junction boxes, pull boxes, conduit fittings, etc., are part of the conduit system and, therefore, are subject to the same separation criteria.

NOTE: The minimum separation distance between Raceways shall be defined as the " clear air distance" between them.

a. Minimum separation between conduits having different trains or channels shall be one inch,
b. Minimum separation of six (6) feet shall be maintained between 6.9 kV raceway and Nuclear Instrumentation System (NIS) raceways.
c. A minimum separation of 6'-0" must be maintained between raceway functions 20, 2G, 2K, 30, 3G, 3K, SK, 6K, SR, SW, 58, SY and NIS cables not in conduit (e.g. , near electrical penetrations) .

NOTE: Refer to Attachment 7 for the voltage level designation.

d. A minimum separation of 2'-0" shall be maintained between parallel runs of "NIS" conduit systems (raceway functions) 6R, 6W, 6B & 6Y & raceway systems 20, 2G, 2K; 30, 3G, & 3K; SK, 6K & SR, SW, SB, & SY. Minimum separation of non-parallel runs of "NIS" condui t and the above mentioned systems (i.e., crossing each other at an angle greater than 15 degrees) should attain the above 2'-0" minimum when feasible; however, physical constraints may reduce such separation to 1".
e. " Minimum clearance between conduits containing power cables

- (raceway function 10, 20,1G, 2G,1K, 2K, and SK) shall not be less than outside diameter of larger conduit except as defined below.

The clearance criteria as explained above may be waived; a) At such points where exposed conduits enter or exit any

', equipment or box to a point of 4'-0" from such equipment or box.

, TEXAS UTILITIES GENERATING CO. 1 TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 23 of 37 SEP 211984 b) In general plant areas where conduits have a minimum clearance of 1/4 0.D. of the larger conduit, but not less than 1" be tween di fferent train conduits, fo r conduit runs not exceeding 10 ft.

All other violations of the clearance criteria shall be reviewed by Engineering on case by case basis,

f. Minimum separation between a conduit containing safety re-lated cables and associated cables and the top of a tray having different train or channels shall be two (2) feet in cable spreading room and three (3) feet in general plant area.

This separation may be reduced to one (1) inch when the tray has a solid cover. When the conduit above an open tray contains non-safety rela ted cable, the minimum separation is one inch and no covers are required.

g. Minimum separation between a conduit (safety or non-safety related) and a bottom or side of a tray (solid bottom or ladder) shall be one inch.
h. Cables routed in free air exiting or entering conduit raceway shall maintain:
1. A minimum of three feet horizontally and five feet vertically between redundant cable or conduit raceway in general plant areas.
2. A minimum of one foot horizontally and three feet vertically between redundant cable or conduit raceway in cable spreading area and control roan.
1. Raceways and supports shall not be located within six (6) inches of Class I or Class II piping welds or conponent welds (valves, gauges, e tc . ) , except conduit or conduit supports necessary for pipe mounted instrunentation.
j. Conduit and conduit supports shall be separated from piping (with operating tenperature of 200*F or greater) or piping insulation by one inch.
k. In no case shall any part of the raceway or raceway support system come in direct contact with uninsulated equipment in the piping systen or with pipe restraints or anchors unless otherwise approved by the Engineer.

(-

TEXAS UTILITIES GENERATING C0.

TUGC0 INSTRUCTION

- CPSES - QI-QP-11.10-1A Rev. 1 Page 24 of 37 SEP 21 $54 NOTE: Class I or Class II piping welds can be identified by the mechanical ID Tags. Typical spool piece tag nmber: 3"-58-1-63-301-5. (last nee ral is class). If tag cannot be seen, go to pipe support typcial tag neber: SFX-022-700-A550 (last nmeral is class). Support will be the same as pipe it sup po rts.

1. Raceways and supports shall not be located closer than 1/8 inch from instrument sensing lines.

3.10 CONDUIT ACCEPTANCE All conduit and boxes which have been inspected and accepted shall be documented on Inspection Reports, Attachment 2 and/or 3 and included in the Raceway Package.

3.11 FINAL RACEWAY SYSTEM INSPECTION 3.11.1 The QC Inspector shall verify the conduit raceway systen has been installed in accordance with the requirements of the isometric drawing .

3.11.2 All final raceway systen inspections will be docmented on Attachment 4.

3.12 DOCUMENTATION Inspection Reports shall be in acconiance with Reference 1-S.

Documentation packages will be processed in accordance with Reference 1-C.

3.13 NONCONFORMANCES All unsatisfactory conditions shall be docmented on an IR and/or a NCR, per References 1-5 and 1-T respectively, as directed by the QC Supervisor.

8

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION QI-qP-il .10-1 A Rev.1 CPSES - Page 25:of 37 SEP 211984 ATTACHMENT 1

uescnd M aa 5 Eate .'M i S NN IN SPEC T1CN REPCRT .*
  • isesaw, srever at m . m.

1.rtw :tsc*are CLASS lE CGN0Uli d t"Wh* 4 .

%ACEWAY FABRICATION c,a usr um., .om o sac ao. ;ao jau ac coc. e atv a c,.aau w j ewat si el Ot-OP-11.10-1A Rev.

ms t'; 10 (CDCm m NCm ,

eisPt hc'm wks hYm .

asp #E3ut.f 3 C msPEC3cm CouMito ALL APNCastg eftus $AnsFACfo#9 C'asMCTION CowMTtc. unsAT!sFACTCAT ITEMS u*fto SEL3w NSPCCTION ATTRieuTE5

[mIrt,g

.t a fls cart  ! .

1.1 Conduit free of burrs , sharp edges and foreton I lI I (V) l I l I I material -(Paracraoh 3.1A) l I i I i

2. I Londuit tree of internai and e uernei e ini 9 - f!  ! >

(V) ~

l i I I l (Paracraoh 3.1B) l 1 I i l

I (V) 3. I Conduit threads not irregular, jartned or undercut - l l 1 l

l (Paragraoh 3.lC) l l l

. I I II I I ll l l (V) 4. I Dies for conduit threads are standard U.S. conduit l l I l l tacered threads -( Paraoraoh 3.1D) l l l l l (V) 5. I Conduit threads cleaned and painted with Galvanox - l l l 1 i

8

( Pa ragraph 3.lE) l l t i

l I i l l (V) 6. l Conduit bends free of kinking or excessive flattening-l . l I I ! l l ( Pa ragraoh 3.lF)

I ! e I

l l (V) 7. I Conduit bends and offsets made with accroval benders --

i i l ( Paragraph 3.1G) .

l il l I 4M_I  !

l akk NTI I l i

_.t m w,ii i .

I SU' l l i I

a. . .. mos,sncs. m g- .,

PC' A fl3 9Ce W "

  • V 8 g

IR CLOSCO "-

- QC msPS.C*G4 .g MIA/01 //84

~

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION QI-QP-ll .10-1 A Rev. 1

- CPSES - Page 26 of 37 SEP 21 PN ATTACHMENT 2 CCM a.4 CnE dead $ ~ Du E.f : ~ 4sc $ *J ?".CN wr- er ~

INSPEC TICN REPCRT jw i.ot.Jertricar.cn % svSTEM / 3rmucr6mt 25.Ga nca trth OEscJiiffen .

CLASS 1E CONDUIT RACEWAY 13 s a m at on rm me .ceir. no.

srscan gas, g=u oc occ. a esv a cnw so il el O!-0P-11.10-1A Rev. , ,

o C la ,",,ch$,5, O Pa,{pyho,rio- c a

0 8"$,'#tig C F,",0,ene, O *. W r.. ,

iase etsutra O =s -enon ce=,utto au. uci.L irt=s 34rts,actoav O =sneno= ca ures. uasansr.croav irtue unrra ee.o. ,,

INSPCTION aTTRteuTES cart sua c,

1. l Verify conduit sire and fittinm (Refer en para 3. 7.1 i l I i i li I
2. I Verify total conduit bends f oe fer to para. 3.7.2'). 1 i l l l 1 Verify NIS Conduit (Refer to Para. 3.7.11 I

~

3.

I

4. Verify flex conduit installation (Refer to Para. 3.7.4 ) l I i Verify conduit identification (Refer to Para. 3.7. 0 . ll- l 5.

I l l

6. I Verify pull box sire and tyce (Refer to Para. 3.7.61 I I I
7. Verify pull box installation (Refer to Para. 3.81 i 1
8. Verify raceway separation (Refer to Para. 3.9 8 3.9.11, I
  • i I
9. Verify N!$ raceway seDaration (Refer to Para. 3.9 & I l I 3.9.11. I Ii l !

{

I i I l l

l i  !  !

g i i f i t i l

I L. \ I i

i l

l 1 @ l 'l '

== s io.as,snes, cre :

e \.

Separation Deficiency Item No.: [ v'

' *"'N' MLarto cnw I. R Ct.0SE0 9 ,e

- oc aseteroa MIA/02 1/84 ,

)

{

l i l TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION QI-QP-ll.10-1A Rev. 1

- CPSES - Page 27 of 37 SEP 211984 ATTACHMENT 2A YELLOW CSPS8S SEPARATlON VIOLATION l.R. NO.

. DEFICIENCY REPORT ITEM #

O WAIVER APPROVED Q.C. INSPECTOR DATE DO NOT REMOVE THIS TAG WTTHOUT Q.C. AUTHORITY l

- _ . - , , , _ . , . _ _ _ _ - . _ . _ . , . . ~ - _ . - , , . - . - _ _ _ _ _ _ _ . - , , _ _ _ - . ~ . _ _ . , . _ . _ . _ - . _ . _ . _ . , , . - . - ~ . _ _ _ _ , _ , _ . . _ . , _ ~ . _ . _ . _ . - _ . - . _ , , _ _ , _ . , ,

TEXAS UTILITIES GENERATING CO. I TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1

- CPSES - Page 28 of 37 1 1

SEP 211984 i ATTACHMENT 28 l

~

e. l w

rw UB W3 x=

o EI si .

E $ l' sii c , e n

5 g F 2 s -

! 3 5 3 !n $5 aa3a 5

- 3 aaEa E -

w g

5 o

. e .

2 w

- l

%M 5 *: .. E

2:; 5 .

2d5 y E =

M E g <

..l E

< g5

_ =i 3' g --

w-

=

v . -

. g usg I E a a 8 i

EE 5"

em e.

m g ,

l =

~

3 [3

=, ,

$5 an m

[ Y y ..

t 5" W =

__ _ _ _ _ _ _ _ . _ _ -w-mm-__-__.s_

TEXAS (frILITIES GENERATING C0. I TUGC0 INSTRUCTION QI-QP-11.10-1A Rev. 1 C -

CPSES - Page 29 of 37 m

SEP 21 G34 ATTACHMENT 2C The following steps will be followed in processing of the Separation Deficiency Report (Attachment 2b) for Unit 2.

Step 1: QC will report the unsatisfactory as-found condition in the Block 2 Description Section and attach a " Separation Violation" Tag with the IR nunber and Deficiency Report iten number entered on the line provided ( Attachment 2A). The tag shall be placed at the area where the violation occurs.

2: The Paper Flow Group will retain a copy of the Deficiency Report and forward the original to Engineering fo r disposition in Block 3.

3: Upon conpletion of the Engineering Disposition Block 3, Engineering will assign the responsible craft in Block 4 and forwa rd the original Deficiency Report to the Paper Flow Group for distribution.

NOTE: When Block three (3) is dispositioned "Use as is" and the deficiency is not in accordance with ES-100, or the disposition is " Rework" but the wort is not in the scope of CPP procedures, a NCR will be issued, and the deficient iten closed referencing the NCR.

EXCEPTION: When a traveler is issued for rewort, it is ilot necessary that a procedure be issued. The traveler shall have detailed ins tructions, i

4: For those unsatisfactory conditions which would restrain or impact ongoing construction activities, Engineering may re-quest authorization to proceed providing the following conditions are satisfied:

a. The deficiency di sposi tion includes suf ficient information and direction for accomplishing the work,
b. Engineering has stated the reason for waiver in Block 5.
c. Engineer Review / Approval shall be by the Engineering Discipline Engineer or his designee (Block 5).
d. Quality Assurance review /appr oval shall be by the m Discipline Quali ty Engineers designated to review / l approve NCR dispositions (Block 5). l t

1

- TEXAS UTILITIES GENERATING CO.

TUGC0 INSTRUCTION

. CPSES . QI-QP-11.10-1A Rev. 1 Page 30 of 37 SEP 211984 ATTACHMENT 2C (continued)

e. After approval of the waiver, the QC Inspector shall check the waiver approved block then sign and date the appropriate section of the " Separation Violation" Tag.

5: When the responsible craft completed the itens listed on the Deficiency Report, by working the Engineering disposition and QC has signed all steps for acceptance, the QC Inspector shall remove the " Separation Violation" tag. The QC In-spector shall obtain the original IR, with the Deficiency Reports attached, sign and date the Deficiency Report, Block 6 for the iten just worked.

When all itens have been completed on the Deficiency Report, the IR shall be closed and processed in accordance with Reference 1-T.

9 i

)

l

TEXAS lITILITIES GENERATING CO.  ; TUGC0 INSTRUCTION 3 ,

QI-QP-ll.10-1A Rev. 1

- CPSES - Page 31of 37 SEP 21 G84 ATTACHMENT 3 m a.uc a sean s :ta:a : . *.: a *~- u .,,,,. .,

REPCRT =c INSPEC T10N

.co.r.rcar.c, wo s,srew / sraucr o n ass.ru irew a sca ,re. .,i ,

CLASS IE BOX INSTALLATION srt: a juv a g u a c coc e u, a canau *o j=<43 4 c.a rest tw ceir *o

,1 .iO!-0P-11.10-1A Rev. ~

O Paf,;",5ghgt'oa C ia,5,"sWiflot -- S n.c3c, C P;'snike.

Clayj;;5,5, ,

ase assi.,Lis C mnenom coustarts , aLL appucAatt irtus sarissacroat 0,asse:rica ec- ttres. uasarisr.cton, irtss usito setow .c.

' " " "  ; oart INSP("Il0N ATTRIBU TC $ g,g, py,g

.r a is f ..

1 #

(V) 1. l Verify box site an1 tvee (Para. 3.7.6). I i O Nema 12 I II I I l ' I

' C Nema 4 l lI I (V) 2. I Mountino caskets insts11ed Nema 4 box (Para. 3.7.6T. !I I I

II I (V) 3. I Verify bor installation (Pars. 3.91. III l l l l l l a. Verify box orientation.

I b. Verify alpha-numeric code (schedule bores only), 1II l l C. Verify box color code, i ll l I

i d. Verify box free of damane. I l I l e. Verify nounting strip installed. I lI I

f. Verify NIS bor locatien. I II I l l l l 1 t I  :  !

I I l i i l i

i ' I i i

l I I l

i

i l2 3 l 'ihk '

i at RF .

I .n3W" l 8 6 4N%3 I i 1' l i I samaans (owes,sptes, s'c J

~ n. ..a ,e ca,,, -, mi ...~. oc = set *

  • c = i.

)

MIA/03 1/u4

' TUGC0 INSTRUCTION

- TEXAS tfTILITIES GENERATING CO.

QI-QP-11.10-1A Rev. 1

- CPSES - Page 32of 37 SEP 21 E34 ATTACHMENT 4

-E aa $ tata  :.:;'*6 '"JN

p Ju a.s c as i REDCRT

. et'

c INSPEC T1CN

=o ,sesitw , sreuc ro a t as4 ar:ca artw atscmerca Liass it, .

Conduit Raceway System Insp. r;cor+carsa - d i=(aei.at ca rgst g aw.s .onr ,o sitc ao a mte g au a t acc e et, a caa=u wo ,

,l ,; QI-QP-11.10-1A Rev.

  • 1 SDeeries C PI/sdE*tica ,

OI"asTetcm C P'!$7elhc".*" C l'sINEc$

  • se etsA rs O a,<c= co tcres . .u. u.uciets irios sirisi.crea. "'

O snenoa co=,terto. wasarisr.ctea, ircus ustro act:. ,e

.I artw 40. INSPC T;os ATTAiSu fE 5

  • doarglsion at .

I Verify Conduit Ra h ay System is installed cer the i II t 1.

i isome**ic drawing. Owg. # Rev._ liI i I I l

! (Para .' 3.11.1) .

I i 1 x l Ii 3

II I i

ii i i

II I f

II I i

, I i i i I

i l  !

i I l

' I i

i t li  ;

i '

l , i I '

I  : I l

I 6 i t f

! l i l I -

L; I i I

I

,Mi '

  • AK M9 I

alMWi i I i e

Mu' e i i ,

I

%* II I o - s iewas.ines, ce i

8 Tf GN d f t,4 4 C gg ggggg 9 oc = set t'c a ..

MIA/05 1/84 4

-- . . . . - . ~ . . . - . ,

73 TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION

!._ QI-QP-11.10-1 A Rev. 1

- CPSES - Page33 of 37 SEP 211984

' ~

ATTACHtiENT 5 NUT ROTATION' FROM SNUG TIGHT CONDITION Oiscosition of Outer Faces of Solted Parts Soth faces normal to bolt axis, or one face 20th faces sloced not more normal to axis and other face slooed not more than 1:20 from normal to telt than 1:ZO (bevel washer not used) ,

axis (bevel. washers not used)

Solt lengthb not exceeding Bolt length b exceeding a diameters or 8 diameters or Fcr all length of bolts 8 inches 8 inches .

~

1/2 turn 2/3 turn 3/4 turn

' l y.

a. Nut rotstion is rotation relative to bolt recardless of the element (nut or bolt) teing turned. Tolerance on rotation: 30
  • For coarse thread heavy hex structural bolts of all si:ss and length and

- heavy hex semi-finished nuts.

b. Soit length is measured from underside of head to extreme end of point.

UNISTRUT(A-307) BOLTS ~

BOLT SIZE TORQUE (INCHES) (FT.LBS.)

1/4 6 5/16 11 3/8 19 1/2 50

_ _ . _ . . _ - . _ _ - - - . - _ _ _ . . - _ - .- _ . , . . - . . _ . .. -.m._ _

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION

- QI-QP-11.10-1A Rev. 1

- CPSES - Page 340f 37 SEP 211984 ATTACHMENT 6 Agtte Asse SAE CAA04 seamates43 POA 3786L 80473 ANO SCR6vut 1

ee meen

-s e.,

l la8-Geese t l Le* es M**"" C*e*e see O

memaar asthe 147 j Lee Casase Sasse lat-4,eee 2 IA E *O'*** I L8* es mesme Cmeen seems usemum (meme Sasus, gemeenes mes fas, pes A4The-4 s*9 9

gg% y Ls= Casass esensassa Sesak Qemannse and foerusse e

astm.a 813 neuemme C,a,mme,tsest,,,,,

g,,

Oaase 7,,, g q,,, , ,,

d

- _, . . - - Ame.a Its Law Csess asereseems smet a see Tree I Queemase and Tesense asw.4 31' cessues sweesasumes samat free 3 Ommmame ame feesmes OM es A8The 314 Ls= asse ses=L e Geese De Qusmems aus femaeus A8The 114 (se Aese Sammt '

OSC osene DC Omummaus sua fameused baussen Comme Aam,1 sun. ,

W "8 T~

SAS=4sede f Sa4ftmummeAne Nee., l

...

  • Tsunamme

-g g .t Mmesma h A h $ 4

. N'eus famosus * .

Asha $14 Aasy fama, l c ees an Ommmmes and Temeesse and fenessus

. _ =

_ . faseesse Sesmere Fasom 4 JEr = tee Caeus team t seresse one :

A 3."S e es.e geungus seem esen to twesense 3== m seenes.g 3. me amen ame some meep., svapen e# #=8 .mse ene fumanos se o emes e=e temsk 4 ate = benunus see few aame Gese See mas f use m tumease so.m a sESe h ses fmaseme Seam tese ses tenseure Gese m ,

Mh J e#9

  • ese shmense aumusumumme se G . fenemme 8ammesse l

l l

[

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION

  • QI-QP-11.10-1A Rev. 1

- CPSES - Page35 of 37 SEP 211984 ATTACHMENT 7 VOLTAGE LEVEL DESIGNATION TABLE 19,1G , 1K -- 6.9kV ac 29, 2G, 2K -- 480 Vac & Heavy Power Feeders Un-der 480 Vac 39, 3G, 3K -- Control ac and de and Small Power

  • Feeders Under 480V 49,4G, 4K -- Low Level Signals

/

4R 4W, 48, 4Y -- Reactor Protection Instrunentation Low Level Signals 5K -- 480V ac & Heavy Power Feeders Un-der 480V (Local Control)

SR, SW, 5B, SY -- Reactor Protection Instrumentation 120V Signal 6K -- Control ac & de and 'Small Powe r Feeders Under 480V (Local Control) 6R, 6W. 68, 6Y -- Nuclear Instrumentation Systen 8K -- Telephone and Communicatign

,o e

e

TEXAS UTILITIES GENERATING CO. TUGC0 INSTRUCTION (q .

QI-QP-ll.10-1A Rev. 1

- CPSES - Page36 of 37 SEP 211934 ATTACHMENT 7 (Continued) e4 N M 4 @ @ N E E E E E E E 3 3 3 3 3 3 3 8 8 8 8 8 8 8 CH. CH. CH. CH.

I II III IV Train Train Train A B C*

  • Non-CLASS 1E (INCLUDES CONTROL CHANNELS 1, 2, 3 & 4 AS DEFINED BY W)

Item shown in each vertical column is separated from items in all other vertical columns by acceptable separation distance of 3'x 5', l'x 3', barrier, etc.

Relative arrangement within a vertical column is determined by voltage level.

e 1

s e

- er h

TEXAS UTILITIES GENERATING CO.

TUGC0 INSTRUCTION C- .- QI-QP-ll.10-1A Rev'. 1 Page37 of 37

- CPSES _ -

SEP 211934

- ATTACHMENT 8 Figure 1

' " Cantilever Regions" are cross-hatched. No attach-

/Jgg/ - * .ments are to be made in

" these areas unless the cri-t 2!

O 7}).% 9 M,#9///PN f O teria og paragraph 3,3,s,2,2

.2 - .

~

have been met.

'3 O O .

E'- ..

6" - Typical except where i's@ i marking indicates studs NW-du, o to be nearer to edge

[

O of plate.

S. .

FIGURE 2 .

_.af_ Edg p f._ concrete No attachments are to be made in " Cantilever Regions" niess criteria of paragraph 3.3.5.2.2 have Dee'n met "

n mum I -l t Tveical except where marking ner sMe 6" 6" o plate) 6"l edae of olate. indicates studs to be nearer

"; F#

-h. /

O - 3 -  ; . .

.- ,/M P 4. Plate g , ) p g g

.w y - .. ,

=

. 4 gttachmenb o O d,,)

3/4" Plate) 3/4" Maximum l Typical either side of G plate unless detailed othemise on design documents.

Figureg 3 , ,

Y l' y I-

_12"Minimd .  ;

. t ,

4p.

4 12" J g Minimum j

=r

\

12" e, 5

3/4" Plate g

+ s  :: e i