August 12, 1998 Mr. Michael B. Sellman Chief Nuclear Officer Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 5320.
SUBJECT:
1 OlNT BEACH NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INi ORMATION RE: GENERIC LETTER 97-05 " STEAM GENERATOR TUBE INSPECTION TECHNIQUES" (TAC NO. MA0484)
Dear Mr. Sellman:
On March 17,1998, Wisconsin Electric (WE) Power Company submitted its response to GL 97-05. During review of WE's response to GL 97-05, the staff identified one area that required additional clarification in order to assess the adequacy of steam generator inspection techniques employed at Point Beach Nuclear Plant, Unit 1. The staff's request for additional information (RAI)is enclosed.
Please provide your response to the staffs RAI within 30 days of receipt of this letter in order to support the staffs review schedule, if you have any questions regarding the content of the RAI, please contact me at (301) 415-1355.
Sincerely, ORIGINAL SIGNED BY:
Beth A. Wetzel, Senior Project Manager Project Directorate ill-l Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-266 DISTRIBUTION:
Enclosure:
RAI Docket Fdes PUBLIC PD3-1 r/f EGA1 cc w/ encl: See next page CCarpenter CJamerson BWetzel OGC ACRS PRush i
DOCUMENT NAME:PTBA0484.RAI l
Ta receive a copy of this document, Indicate in the box: "C" = Copy without enclosuras "E" = Copy with enclosures "N" = No copy 31 FICE PM/PD3-1 F
LA/PD3-1 0.
PD/PD3-1 f-NAME BWetzel 8 44/
CJamerson Of CCarpenter /M p
ih l
DATE 08//198 08/8498
/
08/Gl98 I
OPFICIAL RECORD COPY
)
9808170069 980812
" "' ',,, - g p y
'Wd1 *yug b PDR ADOCK 05000266 eg[&
g[{
{
m) e
- M P
'b
]
p** %q p
t UNITED STATES s
g j
NL CLEAR REGULATORY COMMISSION j
WASHINGTON, D.C. 20066-0001
\\m 4
August ,1998 Mr. Michael B. Sellman Chief Nuclear Officer Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: GENERIC LETTER 97-05 " STEAM GENERATOR TUBE INSPECTION TECHNIQUES" (TAC NO. MA0484)
Dear Mr. Sellman:
1 On March 17,1998, Wisconsin Electric (WE) Power Company submitted its response to GL 97-05. During review of WE's response to GL 97-05, the staff identified one area that required additional clarification in order to assess the adequacy of steam generator inspection techniques employed at Point Beach Nuclear Plant, Unit 1. The staffs request for additional j
inforrr.ation (RAI)is enclosed.
Please provide your response to the staffs RAI within 30 days of receipt of this letter in order to support the staffs review schedule. If you have any questions regarding the content of the RAl, please contact me at (301) 415-1355.
Sincerely, I*V
.{
Beth A. Wetzel, Sea;or Project Manager Project Directorate 111-1 Division of Reactor Projects -lil/IV Office of Nuclear Reactor Regulation Docket No. 50-266
Enclosure:
RAI cc w/ encl:
See next page l
l
+
?
O Mr. Michael B. Sellman Point Beach Nuclear Plant Wisconsin Electric Power Company Unitt 1 and 2 cc:
Mr. John H. O'Neill, Jr.
Ms. Sarah Jenkins Shaw, Pittman, Potts & Trowbridge Electric Division 2300 N Street, NW Public Service Commission of Wisconsin Washington, DC 20037-1128 P.O. Box 7854 Madison, Wisconsin 53707-7854 Mr. Richard R. Grigg President and Chief Operating Officer Wisconsin Electric Power Company i
231 West Michigan Street Milwaukee, Wisconsin 5'l01 f
Mr. Scott A. Patuiski Site Vice President Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road
.Two Rivers, Wisconsin 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, Wisconsin 54228 Chairm.sn Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 Regional Administrator, Region lli U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Resident inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Rosa Two Rivers, Wisconsin 54241 I
R$erch 1998 L-- -
..+'
l 0
BEQUEST FOR ADDITIONAL INFORMATION Based on the your response to GL 97-05, the NRC staff was unable to determine the mode of degradation responsible for development of the volumetric steam generator tube indications that were stated to be currently in operation at Point Beach Unit 1. Specifically, supply the location for the volumetric indications discussed in the GL response and related pulled tube or industry data that supports your con;'usion regarding the nature of the indications. Since these indications are dispositioned by sizing, submit a written report that describes the qualification of the nondestructive examination method being used and the technical basis for the acceptability of the technique used.