ML20151R163

From kanterella
Jump to navigation Jump to search
Forwards Sser Input Supporting Power Ascension Test Program Acceleration.Proposed Rod Scram,Reactor Loading,Computer, OD11 & TIP Uncertainty Test Mods Acceptable.Salp Input Also Encl
ML20151R163
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/22/1986
From: Lainas G
Office of Nuclear Reactor Regulation
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML20151R168 List:
References
NUDOCS 8602050432
Download: ML20151R163 (2)


Text

. .

JAN 2 21986 MEMORANCUM FOR: Elinor Adensan, Directcr DISTRIBUTION BWR Project Directorate No. 3 Docket File Division of BWR Licensing NRC PER

- Local PCR FROM: Gus C. Lainas, Assistant Director PD#3 Reading for BWR AD/BWR, PWR-A,B Division of BWR Licensing , DWagner EHylton

SUBJECT:

HOPF CREEK GEfiERATIf4G STATION - SUPPLEMEhTAL SAFETY EVALUATION REPORT IlWUT - TEST MODIFICAT10h5 Plant Name: Hope Creek Generating Station Docket No.: 50-354 Licensing Status: OL Responsible Branch: BWR-PDv3 Project Manager: D. Wagner Review Branch: RSB Review Status: Complete The Reactor Systems Branch has revicwed the following test r.odificctions for their acceptability as requested by Dave Wagner.

1. Test 3 - Reactor Loading
2. Test 5 - Rod Scram
3. Test 11 - Computer, OD11
4. Test 16 - TIP Uncertainty We find the proposed changes acceptable.

Enclosure 2 is our input to SALP.

Origins 1 mnet by Gus C. Lainas, Assistant Director for BWR Division of BWR Licensing

Enclosure:

As stated cc: R. Bernero D. Wagner L. Phillips W. Hodges CONTACT: H. Richings, x29418

  • Previously concurred: f RSB RSB Al red: DBL-
  • HRichings *LPhillips G1 as 1)\lozn it e 01/16/E6 01/16/86 01/g/86 ,/ p l %

pe82oR885! 8E8%i4 #

a

~

p =e

/  %, UNITED STATES

. o NUCLEAR REGULATORY COMMISSION D E WASHINGTON, D. C. 20555

% , , , , , e' JRR E 3 986 MEMORANDUM FOR: Elinor Adensam, Director BWR Project Directorate No. 3 Division of BWR Licensing FROM: Gus C. Lainas, Assistant Director for BWR Division of BWR Licensing

SUBJECT:

HOPE CREEK GENERATING STATION - SUPPLEMENTAL SAFETY EVALUATION REPORT INPUT - TEST MODIFICATIONS Plant Name: Hope Creek Generating Station Docket No.: 50-354 Licensing Status: OL Responsible Branch: BWR-PDt3 Project Manager: D. Wagner Review Branch: RSB Review Status: Complete The Reactor Systems Branch has reviewed the following test modifications for their acceptability as requested by Dave Wagner.

1. Test 3 - Reactor Loading
2. Test 5 - Rod Scram
3. Test 11 - Computer 0011
4. Test 16 - TIP Uncertainty We find the proposed changes acceptable.

Enclosure 2 is our input to SALP.

a us C. Lainas, Assistant Director for BWR Division of BWR Licensing

Enclosure:

As stated cc: R. Bernero D. Wagner L. Phillips W. Hodges CONTACT: H. Richings, x29418

.