|
---|
Category:DRAFT COMMISSION PAPER
MONTHYEARML20127B2011984-01-20020 January 1984 Draft Commission Paper Re Processing of Allegations Involving Applications for Ols.Nrr & IE Designated Full Time Allegation Coordinators.Procedures for Resolution of Allegations Encl ML20136B2851981-12-10010 December 1981 Draft Commission Paper Recommending Approval of Transmittal of Encl 10CFR50.54(f) Ltr to Util Re Error in Seismic Design of Equipment & Piping in Containment Annulus.Related Documentation Encl ML20209B1761981-11-25025 November 1981 Draft Commission Paper Recommending That Commission Approve Proposed Response to Congressmen Dingell & Ottinger ML20151H1241981-11-19019 November 1981 Draft Commission Paper Re Transmittal of Encl Ltr to PG&E Re Required Design Verification Programs ML20151H1321981-11-17017 November 1981 Draft Commission Paper Re Transmittal of Encl Draft Ltr on Seismic Design,To PG&E ML20151H1171981-11-13013 November 1981 Draft Commission Paper Re 10CFR50.54(f) Ltr to Be Sent to Util Re Seismic Design Errors ML20151H1071981-11-0505 November 1981 Draft Commission Paper Re Obtaining Approval for Transmittal of Attached 10CFR50.44(f) Ltr to Util.Recommends Approval 1984-01-20
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20211A9981999-07-12012 July 1999 Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure ML20207A7181999-05-13013 May 1999 Safety Evaluation Supporting Amends 134 & 132 to Licenses DPR-80 & DPR-82,respectively ML20206H2861999-05-0303 May 1999 Safety Evaluation Supporting Amends 133 & 131 to Licenses DPR-80 & DPR-82,respectively ML20206D5661999-04-29029 April 1999 Safety Evaluation Supporting Amends 132 & 130 to Licenses DPR-80 & DPR-82,respectively ML20205B6061999-03-26026 March 1999 Safety Evaluation Supporting Amends 131 & 129 to Licenses DPR-80 & DPR-82,respectively DCL-99-045, 1998 Annual Financial Rept for PG&E Corp. with1998-12-31031 December 1998 1998 Annual Financial Rept for PG&E Corp. with ML20249B6881998-06-11011 June 1998 Safety Evaluation Supporting Amends 128 & 126 to Licenses DPR-80 & DPR-82,respectively ML20249B5961998-06-0505 June 1998 Safety Evaluation Supporting Amends 127 & 125 to Licenses DPR-80 & 82,respectively ML20249B6041998-06-0505 June 1998 Safety Evaluation Supporting Amends 126 & 124 to Licenses DPR-80 & DPR-82,respectively ML20248D4041998-05-28028 May 1998 Safety Evaluation Supporting Amends 125 & 123 to Licenses DPR-80 & DPR-82,respectively ML20248L8761998-03-12012 March 1998 Safety Evaluation Supporting Amends 124 & 122 to Licenses DPR-80 & DPR-82,respectively ML20197B7091998-02-27027 February 1998 Safety Evaluation Supporting Amends 123 & 121 to Licenses DPR-80 & DPR-82,respectively ML20203J5141998-02-26026 February 1998 LER 98-S02-00:on 980127,following Security Sys Failure Compensatory Measures Were Not Implemented within 10 Minutes Due to Personnel Error.Caused by Failed Disk Drive. Replaced Disk Drives,Reviewed Security Computer Maint Plans ML20203L4881998-02-17017 February 1998 Safety Evaluation Supporting Amends 122 & 120 to Licenses DPR-80 & DPR-82,respectively ML20203L2981998-02-13013 February 1998 Safety Evaluation Supporting Amends 121 & 119 to Licenses DPR-80 & DPR-82,respectively ML20203M4321998-02-0303 February 1998 Safety Evaluation Supporting Amends 120 & 118 to Licenses DPR-80 & DPR-82,respectively ML20217G5151997-12-31031 December 1997 1997 PG&E Corp Annual Rept ML20205F5881997-07-24024 July 1997 Decommissioning Cost Estimate for Diablo Canyon Power Plant,Units 1 & 2 ML20149H4281997-07-17017 July 1997 Corrected SE Re Amends 119 & 117 to Licenses DPR-80 & DPR-82,respectively ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML17083C6231997-01-31031 January 1997 Rev 4 to WCAP-13705, W Setpoint Methodology for Protection Sys Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation. ML16343A4741997-01-31031 January 1997 WCAP-11595,Rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology Diablo Canyon Units 1 & 2 24 Month Fuel Cycle Evaluation. ML16342D5351997-01-31031 January 1997 WCAP-14826, Instrumentation Calibr & Drift Evaluation Process for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation. ML18102B6911997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Diablo Canyon Power Plant,Units 1 & 2.W/970218 Ltr ML16342D5541996-12-31031 December 1996 Non-proprietary Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. DCL-97-045, Pacific Gas & Electric Co 1996 Annual Rept1996-12-31031 December 1996 Pacific Gas & Electric Co 1996 Annual Rept ML20129G9351996-10-25025 October 1996 Safety Evaluation Supporting Amends 117 & 115 to Licenses DPR-80 & DPR-82,respectively ML20129G7771996-10-25025 October 1996 Safety Evaluation Supporting Amends 116 & 114 to Licenses DPR-80 & DPR-82,respectively ML20129J4311996-10-18018 October 1996 Safety Evaluation Approving Corporate Restructuring & Establishment of Holding Company Under Temporary Name PG&E Parent Co.,Inc of Which PG&E Would Become Wholly Owned Subsidiary ML20117E5541996-08-19019 August 1996 Safety Evaluation Supporting Amends 115 & 113 to Licenses DPR-80 & DPR-82,respectively ML20116B8491996-07-22022 July 1996 Revised Special Rept SR 95-03:on 950621,EDG 1-2 Failed to Load During Surveillance Testing.Caused by Loose Fuse Holder Contact Clip.Retensioned Loose Fuse Holder Contact Clip & Tightened Loose Wire Connection ML20116B8521996-07-22022 July 1996 Revised Special Rept SR 95-04:on 950718,EDG 1-2 Load Swings Occurred.Caused by Defective Electronic Governor Stability Potentiometer.Replaced Electronic Governor DCL-96-155, Revised Special Rept SR 95-05:on 950806,EDG 1-2 to Achieve Rated Output Frequency within TS Limits.Caused by Degraded Electronic Governor Performance.Replaced Electronic Governor Motor Operated Potentiometer & Electronic Governor1996-07-22022 July 1996 Revised Special Rept SR 95-05:on 950806,EDG 1-2 to Achieve Rated Output Frequency within TS Limits.Caused by Degraded Electronic Governor Performance.Replaced Electronic Governor Motor Operated Potentiometer & Electronic Governor ML20117K4671996-05-28028 May 1996 Safety Evaluation Supporting Amends 113 & 111 to Licenses DPR-80 & DPR-82,respectively ML20236Q2611996-04-15015 April 1996 Rev 0 to DCP M-050284, Design Change Package for Installation of CCW Surge Tank Pressurization Sys for Unit 1 ML20094M6251995-11-21021 November 1995 Final Part 21 Rept of Investigation & Analysis of Suspect Fasteners Event 29257.B&G-Cardinal Discontinued Using Heat Treatment Equipment at Cardinal Facility Until Such Time That Satisfactory Mods Made to Hardware & Procedures ML20092F3411995-08-23023 August 1995 Corrected SE Supporting Amends 107 & 106 to Licenses DPR-82 & DPR-80,respectively ML18064A8631995-08-14014 August 1995 LER 95-004-00:on 950714,determined That Redundant DG Circuits Not Separated Per App R Due to Insufficient App R Program Documentation.Hourly Fire Tour Established in EDG 1-1 Room & Review of LERs for App R Completed ML20082H9121995-04-11011 April 1995 Safety Evaluation Supporting Amends 99 & 98 to Licenses DPR-80 & DPR-82,respectively ML18100B2981994-05-24024 May 1994 LER 94-014-00:on 940426,SG 1-2 Automatically Started When Two Indicating Light Sockets Shorted Together Due to Personnel Error.Description of Event & Lessons Learned Will Be Published in Operations Incident Summary.W/940524 Ltr ML20063M1481994-03-0303 March 1994 Safety Evaluation Supporting Amends 90 & 89 to Licenses DPR-80 & DPR-82,respectively ML20063M1111994-03-0202 March 1994 Safety Evaluation Supporting Amends 89 & 88 to Licenses DPR-80 & DPR-82,respectively ML20063M0431994-02-24024 February 1994 Safety Evaluation Supporting Amends 88 & 87 to Licenses DPR-80 & DPR-82,respectively ML16342C3091993-12-31031 December 1993 Monthly Operating Repts for Dec 1993 for Dcnpp Units 1 & 2 ML16342A3691993-08-31031 August 1993 Revised MOR for Aug 1993 for Dcnpp Unit 1 ML16342A3681993-07-31031 July 1993 Revised MOR for July 1993 for Dcnpp Unit 1 ML20046A6611993-07-21021 July 1993 Cycle 6 Startup Rept. ML20059G6811993-06-30030 June 1993 Revised MOR for June 1993 for Dcnpp Unit 1 ML20045D1731993-05-31031 May 1993 Monthly Operating Repts for May 1993 for Diablo Canyon,Units 1 & 2 ML16342A3671993-05-31031 May 1993 Revised MOR for May 1993 for Dcnpp Unit 1 1999-07-12
[Table view] |
Text
___
\\
}
Q 4,
Qo s
m.
l i
.r.
e
\\)
A S
Novj g
- hssg ff f/- lo X A O
NOV 131981
<%. p l
Fort:
The Comissioners Fkui:
William J. Dircks, Executive Director for Operations
SUBJECT:
DIASLO CANYON UkIT 1 SEISHIC DESIGN ISSUES PURPOSE:
To obtain Commission approval for transmittal of the attached 10 CFR 50.54(f) lettar to the Pacific Gas & Electric Company DISCUSS 10ti:
In SLCY-bl-636, the staff forwarded a draf t 50.54(f) letter to Pacific Gas & Electric Company (PGaE). The Cocnission was briefec on this matter on November 9,1931.
based upon discussions during that meeting, the draft 50.54(f) letter to P6&E was revised.
RECOMMENDATION:
It is recomended that the Comnission approve the transmittal of the attached letter to PG4L.
GD2 William J. Din:ks William J. Dircks, Executive Director for Operations Enclosure
/h cc: SECY S
OCA hy OcC Contacts FrarA J. Miraglia, NRR X27243 I
, h 12030079 811113 i l
EDO, f
)f
\\ CF ADOCK 05000275 \\
0 WDirck!
\\m
\\
r 31ff tfg1
\\
CF W
V' N
y 3-
'..y D
...g@.........
..NN DIR
- 3 OELD L-eav,eny
...(.-
-9 9t g.
g.,....
...g....
.y.y p
g
.u -,,
eme
./. 8..1.......1.1.. J.. /. 8.1...
....1.1../......../. 8.1...
....1.1......./. 8.1...
11
/81 11/ Q../. 81......1.1.. h../.8 w:c ro u pg 4 b4 NACM 0m OFFICIAL R$ CORD COPY umm mi-m
.