Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20127B20120 January 1984Draft Commission Paper Re Processing of Allegations Involving Applications for Ols.Nrr & IE Designated Full Time Allegation Coordinators.Procedures for Resolution of Allegations Encl
ML20136B28510 December 1981Draft Commission Paper Recommending Approval of Transmittal of Encl 10CFR50.54(f) Ltr to Util Re Error in Seismic Design of Equipment & Piping in Containment Annulus.Related Documentation EnclBoric Acid
Earthquake
ML20151H12419 November 1981Draft Commission Paper Re Transmittal of Encl Ltr to PG&E Re Required Design Verification Programs
ML20151H13217 November 1981Draft Commission Paper Re Transmittal of Encl Draft Ltr on Seismic Design,To PG&E
ML20151H11713 November 1981Draft Commission Paper Re 10CFR50.54(f) Ltr to Be Sent to Util Re Seismic Design Errors
ML20151H1075 November 1981Draft Commission Paper Re Obtaining Approval for Transmittal of Attached 10CFR50.44(f) Ltr to Util.Recommends Approval