Category:CONTRACTED REPORT - RTA
MONTHYEARML20148D6041997-03-31031 March 1997 Confirmatory Survey for Fsv Nuclear Station,Psc, Platteville,Co,Final Rept ML20148D5861997-03-26026 March 1997 Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station ML20134C8721997-01-29029 January 1997 Draft Confirmatory Survey for Fsv Nuclear Station Public Svc Co of Co,Platteville,Co ML20092G3681995-06-19019 June 1995 Confirmatory Survey for Repower Area Fsv Platteville,Co, Final Rept ML20084F3931995-05-16016 May 1995 Draft Rept, Confirmatory Survey for Repower Area Fsv Platteville,Co ML20245E6601989-01-0606 January 1989 Independent Review of Fire Protection Program Plan,Public Svc Co of Co,Fort St Vrain Nuclear Generating Station ML20245D1951988-10-31031 October 1988 Integrated Technical Evaluation Rept for Review of Fort St Vrain Tech Spec Upgrade Program ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept ML20151S6061988-02-29029 February 1988 Rev 1 to Technical Evaluation Rept for Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20195G9611987-12-14014 December 1987 Technical Evaluation of Proposed Redundancy Requirements for Helium Circulation Tech Specs to Accommodate Rapid Depressurization Accident, Technical Evaluation Rept ML20234D6291987-12-14014 December 1987 Technical Assistance to Region IV (Fort St.Vrain), Monthly Business Ltr Rept for Oct 1987 ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20236C2611987-09-28028 September 1987 Fort St Vrain Safe Shutdown Using Condensate Sys ML20236U7221987-08-0606 August 1987 Addendum to Review of Proposed Tech Spec Change:Core Inlet Valves/Min Helium Flow & Max Core Region Temp Rise, Limiting Conditon for Operation 4.1.9, Technical Evaluation Rept ML20246J3191987-07-31031 July 1987 Evaluation of Operator Roles in Mitigating High Energy Line Break at Fort St Vrain Nuclear Generating Station ML20235R6121987-07-0101 July 1987 Investigating Causes & Consequences of Cracked Graphite Fuel Elements ML20235M8321987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Fort St Vrain, Final Informal Rept ML20215A9031987-06-0505 June 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Apr 1987 ML20235G1141987-06-0404 June 1987 Draft Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20234C6091987-06-0404 June 1987 Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20215L9331987-05-31031 May 1987 Evaluation of Integrated Sys Study of CRD Mechanism Rod Position Indication Instrumentation for Fort St Vrain Nuclear Generating Station, Informal Technical Evaluation Rept ML20214H2061987-05-15015 May 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Mar 1987 ML20215M3901987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Fort St Vrain, Informal Rept ML20210A3851987-04-13013 April 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Feb 1987 ML20214R8711987-03-31031 March 1987 Technical Evaluation Rept Evaluation of Bldg 10 Electrical Mods Fort St Vrain Nuclear Generating Station, Informal Rept ML20214Q5411987-03-31031 March 1987 Evaluation of Confinement Environ Temp Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Informal Technical Evaluation Rept ML20207T3721987-03-10010 March 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Jan 1987 ML20207R9471987-03-0606 March 1987 Rev 1 to Review of Fort St Vrain Onsite AC `Standby' Power Sys Re Compliance to Single Failure Criterion & Ser ML20212F6771987-02-13013 February 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Dec 1986 ML20216J1991987-02-0404 February 1987 Evaluation of Long-Term Effects of Moisture Ingress in Fort St Vrain Nuclear Reactor ML20210P6451987-01-31031 January 1987 Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept ML20245B3401986-12-31031 December 1986 Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Technical Evaluation Rept ML20207K4701986-12-31031 December 1986 Final Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept ML20212B7321986-11-30030 November 1986 Evaluation of Proposed CRD & Orifice Assembly 300 F Temp Limits,Fort St Vrain Nuclear Generating Station ML20197C5981986-10-31031 October 1986 Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept ML20213D8251986-10-31031 October 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Sept 1986 ML20214W4521986-10-16016 October 1986 Review of Proposed Tech Spec Change:Core Inlet Orifice Valves/Min Helium Flow & Max Core Region Temp Rise, Technical Evaluation Rept ML20214P4681986-09-30030 September 1986 Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20211A6091986-09-26026 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Aug 1986 ML20236D3811986-09-24024 September 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station ML20209F1021986-09-0505 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr for Jul 1986 ML20212Q1011986-08-31031 August 1986 Conformance to Reg Guide 1.97,Fort St Vrain Nuclear Generating Station, Informal Rept ML20213G5811986-08-0707 August 1986 Draft Review of Fort St Vrain Onsite AC 'Standby' Power Sys W/Regards to Compliance to Single Failure Criterion & Ser ML20205E3711986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept ML20244E1901986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St Vrain ML20204E6811986-07-24024 July 1986 Technical Assistance to Region IV - Fort St Vrain, Monthly Business Ltr Repts for May & June 1986 ML20207J7931986-07-0909 July 1986 Fort St Vrain Fuel Element Dynamic Response ML20236D3741986-06-20020 June 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station 1997-03-31
[Table view] Category:QUICK LOOK
MONTHYEARML20148D6041997-03-31031 March 1997 Confirmatory Survey for Fsv Nuclear Station,Psc, Platteville,Co,Final Rept ML20148D5861997-03-26026 March 1997 Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station ML20134C8721997-01-29029 January 1997 Draft Confirmatory Survey for Fsv Nuclear Station Public Svc Co of Co,Platteville,Co ML20092G3681995-06-19019 June 1995 Confirmatory Survey for Repower Area Fsv Platteville,Co, Final Rept ML20084F3931995-05-16016 May 1995 Draft Rept, Confirmatory Survey for Repower Area Fsv Platteville,Co ML20245E6601989-01-0606 January 1989 Independent Review of Fire Protection Program Plan,Public Svc Co of Co,Fort St Vrain Nuclear Generating Station ML20245D1951988-10-31031 October 1988 Integrated Technical Evaluation Rept for Review of Fort St Vrain Tech Spec Upgrade Program ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept ML20151S6061988-02-29029 February 1988 Rev 1 to Technical Evaluation Rept for Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20195G9611987-12-14014 December 1987 Technical Evaluation of Proposed Redundancy Requirements for Helium Circulation Tech Specs to Accommodate Rapid Depressurization Accident, Technical Evaluation Rept ML20234D6291987-12-14014 December 1987 Technical Assistance to Region IV (Fort St.Vrain), Monthly Business Ltr Rept for Oct 1987 ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20236C2611987-09-28028 September 1987 Fort St Vrain Safe Shutdown Using Condensate Sys ML20236U7221987-08-0606 August 1987 Addendum to Review of Proposed Tech Spec Change:Core Inlet Valves/Min Helium Flow & Max Core Region Temp Rise, Limiting Conditon for Operation 4.1.9, Technical Evaluation Rept ML20246J3191987-07-31031 July 1987 Evaluation of Operator Roles in Mitigating High Energy Line Break at Fort St Vrain Nuclear Generating Station ML20235R6121987-07-0101 July 1987 Investigating Causes & Consequences of Cracked Graphite Fuel Elements ML20235M8321987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Fort St Vrain, Final Informal Rept ML20215A9031987-06-0505 June 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Apr 1987 ML20235G1141987-06-0404 June 1987 Draft Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20234C6091987-06-0404 June 1987 Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20215L9331987-05-31031 May 1987 Evaluation of Integrated Sys Study of CRD Mechanism Rod Position Indication Instrumentation for Fort St Vrain Nuclear Generating Station, Informal Technical Evaluation Rept ML20214H2061987-05-15015 May 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Mar 1987 ML20215M3901987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Fort St Vrain, Informal Rept ML20210A3851987-04-13013 April 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Feb 1987 ML20214R8711987-03-31031 March 1987 Technical Evaluation Rept Evaluation of Bldg 10 Electrical Mods Fort St Vrain Nuclear Generating Station, Informal Rept ML20214Q5411987-03-31031 March 1987 Evaluation of Confinement Environ Temp Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Informal Technical Evaluation Rept ML20207T3721987-03-10010 March 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Jan 1987 ML20207R9471987-03-0606 March 1987 Rev 1 to Review of Fort St Vrain Onsite AC `Standby' Power Sys Re Compliance to Single Failure Criterion & Ser ML20212F6771987-02-13013 February 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Dec 1986 ML20216J1991987-02-0404 February 1987 Evaluation of Long-Term Effects of Moisture Ingress in Fort St Vrain Nuclear Reactor ML20210P6451987-01-31031 January 1987 Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept ML20245B3401986-12-31031 December 1986 Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Technical Evaluation Rept ML20207K4701986-12-31031 December 1986 Final Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept ML20212B7321986-11-30030 November 1986 Evaluation of Proposed CRD & Orifice Assembly 300 F Temp Limits,Fort St Vrain Nuclear Generating Station ML20197C5981986-10-31031 October 1986 Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept ML20213D8251986-10-31031 October 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Sept 1986 ML20214W4521986-10-16016 October 1986 Review of Proposed Tech Spec Change:Core Inlet Orifice Valves/Min Helium Flow & Max Core Region Temp Rise, Technical Evaluation Rept ML20214P4681986-09-30030 September 1986 Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20211A6091986-09-26026 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Aug 1986 ML20236D3811986-09-24024 September 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station ML20209F1021986-09-0505 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr for Jul 1986 ML20212Q1011986-08-31031 August 1986 Conformance to Reg Guide 1.97,Fort St Vrain Nuclear Generating Station, Informal Rept ML20213G5811986-08-0707 August 1986 Draft Review of Fort St Vrain Onsite AC 'Standby' Power Sys W/Regards to Compliance to Single Failure Criterion & Ser ML20205E3711986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept ML20244E1901986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St Vrain ML20204E6811986-07-24024 July 1986 Technical Assistance to Region IV - Fort St Vrain, Monthly Business Ltr Repts for May & June 1986 ML20207J7931986-07-0909 July 1986 Fort St Vrain Fuel Element Dynamic Response ML20236D3741986-06-20020 June 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station 1997-03-31
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20148D6041997-03-31031 March 1997 Confirmatory Survey for Fsv Nuclear Station,Psc, Platteville,Co,Final Rept ML20148D5861997-03-26026 March 1997 Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station ML20134C8721997-01-29029 January 1997 Draft Confirmatory Survey for Fsv Nuclear Station Public Svc Co of Co,Platteville,Co ML20092G3681995-06-19019 June 1995 Confirmatory Survey for Repower Area Fsv Platteville,Co, Final Rept ML20084F3931995-05-16016 May 1995 Draft Rept, Confirmatory Survey for Repower Area Fsv Platteville,Co ML20245E6601989-01-0606 January 1989 Independent Review of Fire Protection Program Plan,Public Svc Co of Co,Fort St Vrain Nuclear Generating Station ML20245D1951988-10-31031 October 1988 Integrated Technical Evaluation Rept for Review of Fort St Vrain Tech Spec Upgrade Program ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept ML20151S6061988-02-29029 February 1988 Rev 1 to Technical Evaluation Rept for Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20195G9611987-12-14014 December 1987 Technical Evaluation of Proposed Redundancy Requirements for Helium Circulation Tech Specs to Accommodate Rapid Depressurization Accident, Technical Evaluation Rept ML20234D6291987-12-14014 December 1987 Technical Assistance to Region IV (Fort St.Vrain), Monthly Business Ltr Rept for Oct 1987 ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20236C2611987-09-28028 September 1987 Fort St Vrain Safe Shutdown Using Condensate Sys ML20236U7221987-08-0606 August 1987 Addendum to Review of Proposed Tech Spec Change:Core Inlet Valves/Min Helium Flow & Max Core Region Temp Rise, Limiting Conditon for Operation 4.1.9, Technical Evaluation Rept ML20246J3191987-07-31031 July 1987 Evaluation of Operator Roles in Mitigating High Energy Line Break at Fort St Vrain Nuclear Generating Station ML20235R6121987-07-0101 July 1987 Investigating Causes & Consequences of Cracked Graphite Fuel Elements ML20235M8321987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Fort St Vrain, Final Informal Rept ML20215A9031987-06-0505 June 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Apr 1987 ML20235G1141987-06-0404 June 1987 Draft Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20234C6091987-06-0404 June 1987 Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20215L9331987-05-31031 May 1987 Evaluation of Integrated Sys Study of CRD Mechanism Rod Position Indication Instrumentation for Fort St Vrain Nuclear Generating Station, Informal Technical Evaluation Rept ML20214H2061987-05-15015 May 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Mar 1987 ML20215M3901987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Fort St Vrain, Informal Rept ML20210A3851987-04-13013 April 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Feb 1987 ML20214R8711987-03-31031 March 1987 Technical Evaluation Rept Evaluation of Bldg 10 Electrical Mods Fort St Vrain Nuclear Generating Station, Informal Rept ML20214Q5411987-03-31031 March 1987 Evaluation of Confinement Environ Temp Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Informal Technical Evaluation Rept ML20207T3721987-03-10010 March 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Jan 1987 ML20207R9471987-03-0606 March 1987 Rev 1 to Review of Fort St Vrain Onsite AC `Standby' Power Sys Re Compliance to Single Failure Criterion & Ser ML20212F6771987-02-13013 February 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Dec 1986 ML20216J1991987-02-0404 February 1987 Evaluation of Long-Term Effects of Moisture Ingress in Fort St Vrain Nuclear Reactor ML20210P6451987-01-31031 January 1987 Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept ML20245B3401986-12-31031 December 1986 Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Technical Evaluation Rept ML20207K4701986-12-31031 December 1986 Final Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept ML20212B7321986-11-30030 November 1986 Evaluation of Proposed CRD & Orifice Assembly 300 F Temp Limits,Fort St Vrain Nuclear Generating Station ML20197C5981986-10-31031 October 1986 Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept ML20213D8251986-10-31031 October 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Sept 1986 ML20214W4521986-10-16016 October 1986 Review of Proposed Tech Spec Change:Core Inlet Orifice Valves/Min Helium Flow & Max Core Region Temp Rise, Technical Evaluation Rept ML20214P4681986-09-30030 September 1986 Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20211A6091986-09-26026 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Aug 1986 ML20236D3811986-09-24024 September 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station ML20209F1021986-09-0505 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr for Jul 1986 ML20212Q1011986-08-31031 August 1986 Conformance to Reg Guide 1.97,Fort St Vrain Nuclear Generating Station, Informal Rept ML20213G5811986-08-0707 August 1986 Draft Review of Fort St Vrain Onsite AC 'Standby' Power Sys W/Regards to Compliance to Single Failure Criterion & Ser ML20205E3711986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept ML20244E1901986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St Vrain ML20204E6811986-07-24024 July 1986 Technical Assistance to Region IV - Fort St Vrain, Monthly Business Ltr Repts for May & June 1986 ML20207J7931986-07-0909 July 1986 Fort St Vrain Fuel Element Dynamic Response ML20236D3741986-06-20020 June 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station 1997-03-31
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20148D6041997-03-31031 March 1997 Confirmatory Survey for Fsv Nuclear Station,Psc, Platteville,Co,Final Rept ML20148D5861997-03-26026 March 1997 Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station ML20134C8721997-01-29029 January 1997 Draft Confirmatory Survey for Fsv Nuclear Station Public Svc Co of Co,Platteville,Co ML20092G3681995-06-19019 June 1995 Confirmatory Survey for Repower Area Fsv Platteville,Co, Final Rept ML20084F3931995-05-16016 May 1995 Draft Rept, Confirmatory Survey for Repower Area Fsv Platteville,Co ML20245E6601989-01-0606 January 1989 Independent Review of Fire Protection Program Plan,Public Svc Co of Co,Fort St Vrain Nuclear Generating Station ML20245D1951988-10-31031 October 1988 Integrated Technical Evaluation Rept for Review of Fort St Vrain Tech Spec Upgrade Program ML20154S3461988-08-31031 August 1988 Notification of Contract Execution,Mod 3,to HTGR (Fort St Vrain) Training Course. Contractor:Ga Co ML20154S3511988-08-31031 August 1988 Mod 3,incorporating Change of Name Agreement from Ga Technologies to General Atomics,To HTGR (Fort St Vrain) Training Course ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept ML20151S6061988-02-29029 February 1988 Rev 1 to Technical Evaluation Rept for Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20195G9611987-12-14014 December 1987 Technical Evaluation of Proposed Redundancy Requirements for Helium Circulation Tech Specs to Accommodate Rapid Depressurization Accident, Technical Evaluation Rept ML20234D6291987-12-14014 December 1987 Technical Assistance to Region IV (Fort St.Vrain), Monthly Business Ltr Rept for Oct 1987 ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20236C2611987-09-28028 September 1987 Fort St Vrain Safe Shutdown Using Condensate Sys ML20236U7221987-08-0606 August 1987 Addendum to Review of Proposed Tech Spec Change:Core Inlet Valves/Min Helium Flow & Max Core Region Temp Rise, Limiting Conditon for Operation 4.1.9, Technical Evaluation Rept ML20246J3191987-07-31031 July 1987 Evaluation of Operator Roles in Mitigating High Energy Line Break at Fort St Vrain Nuclear Generating Station ML20235R6121987-07-0101 July 1987 Investigating Causes & Consequences of Cracked Graphite Fuel Elements ML20235M8321987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Fort St Vrain, Final Informal Rept ML20215A9031987-06-0505 June 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Apr 1987 ML20235G1141987-06-0404 June 1987 Draft Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20234C6091987-06-0404 June 1987 Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20215L9331987-05-31031 May 1987 Evaluation of Integrated Sys Study of CRD Mechanism Rod Position Indication Instrumentation for Fort St Vrain Nuclear Generating Station, Informal Technical Evaluation Rept ML20214H2061987-05-15015 May 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Mar 1987 ML20215M3901987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Fort St Vrain, Informal Rept ML20210A3851987-04-13013 April 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Feb 1987 ML20206H7461987-04-0808 April 1987 Notification of Contract Execution,Mod 1,to HTGR (Fort St Vrain) Training Course. Contractor:Ga Technologies ML20206H7621987-04-0808 April 1987 Mod 1,reflecting Administrative Changes Due to NRC Reorganization,To HTGR (Fort St Vrain) Training Course ML20214R8711987-03-31031 March 1987 Technical Evaluation Rept Evaluation of Bldg 10 Electrical Mods Fort St Vrain Nuclear Generating Station, Informal Rept ML20214Q5411987-03-31031 March 1987 Evaluation of Confinement Environ Temp Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Informal Technical Evaluation Rept ML20207T3721987-03-10010 March 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Jan 1987 ML20207R9471987-03-0606 March 1987 Rev 1 to Review of Fort St Vrain Onsite AC `Standby' Power Sys Re Compliance to Single Failure Criterion & Ser ML20212F6771987-02-13013 February 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Dec 1986 ML20216J1991987-02-0404 February 1987 Evaluation of Long-Term Effects of Moisture Ingress in Fort St Vrain Nuclear Reactor ML20210P6451987-01-31031 January 1987 Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept ML20245B3401986-12-31031 December 1986 Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Technical Evaluation Rept ML20207K4701986-12-31031 December 1986 Final Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept ML20212B7321986-11-30030 November 1986 Evaluation of Proposed CRD & Orifice Assembly 300 F Temp Limits,Fort St Vrain Nuclear Generating Station ML20197C5981986-10-31031 October 1986 Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept ML20213D8251986-10-31031 October 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Sept 1986 ML20214W4521986-10-16016 October 1986 Review of Proposed Tech Spec Change:Core Inlet Orifice Valves/Min Helium Flow & Max Core Region Temp Rise, Technical Evaluation Rept ML20214P4681986-09-30030 September 1986 Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20211A6091986-09-26026 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Aug 1986 ML20236D3811986-09-24024 September 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station ML20209F1021986-09-0505 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr for Jul 1986 ML20212Q1011986-08-31031 August 1986 Conformance to Reg Guide 1.97,Fort St Vrain Nuclear Generating Station, Informal Rept ML20213G5811986-08-0707 August 1986 Draft Review of Fort St Vrain Onsite AC 'Standby' Power Sys W/Regards to Compliance to Single Failure Criterion & Ser ML20205E3711986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept 1997-03-31
[Table view] |
Text
__. __ .__ - . -
i CONFIRMATORY SURVEY PLAN FOR THE GROUP E EFFLUENT DISCHARGE PATHWAY AREAS l FORT ST. VRAIN NUCLEAR STATION
- PUBLIC SERVICE COMPANY OF COLORADO PLATTEVILLE, COLORADO INTRODUCTION i
The Public Service Company ofColorado (PSC) operated a 330 MWe High Temperature Gas Cooled Reactor (HTGR) from July 1979 until August 1989. The plant, designated as the Fort St. Vrain j Nuclear Station (FSV), was authorized for construction on September 17,1969 when the U.S.
Nuclear Regulatory Commission (NRC) issued a provisional construction permit. Construction was completed in December 1973 and a facility operating license, License No. DPR-34, Docket No 50-267, was granted on December 21,1973. Initial fuel loading commenced on December 26,1973 and initial criticality was achieved January 31,1974. After a prolonged period of startup testing, low-power operation and plant modifications, the plant was committed for commercial operation on July 1,1979. Full power was achieved November 6,1981 (PSC 1995a).
In the nuclear steam supply system for FSV, heat was produced by fission in the HTGR utilizing a uranium-thorium fuel cycle. Graphite was used for the moderator, core structure, and reflector. High temperature helium was used as the primary coolant to produce superheated and reheated steam at a temperature of 1,000 degrees F to match conventional thermal station conditions. The entire nuclear steam supply system, including the reactor core, graphite moderator and reflector, steam generators and helium circulators, was contained within a Prestressed Concrete Reactor Vessel (PCRV).
9706020014 970326 l PDR ADOCK 05000267 1 H PDR Prepared by the Environmental Survey and Site Assessment Program, Environmental and Health Sciences Division, Oak Ridge Institute for Science and Education, under interagency agreement (NRC FIN No. A-9093) between the U.S. Nuclear Regulatory Conunission and the U.S. Department ofEnergy.
Fort St Vram Nuclear Stahon (687) March 26.1997 essapplans'atvram'atvr 004 l
l 1
l During the operational period, FSV operated for approximately 890 effective full-power days; FSV was shut down on August 18, 1989. The PSC Board of Directors reviewed and confirmed the l
l Executive Management decision that FSV would not be restarted, and that PSC would pursue decommissioning of FSV. The decision to permanently shut down and decommission FSV was based on related technical and financial considerations. Problems were identified with the control rod drive l assemblies and the steam generator steam ring headers that presented significant technical obstacles which could be overcome, but at a significant financial cost and time commitment. In addition, due
, to the uniqueness of the HGTR fuel cycle, the cost to purchase new fuel was prohibitive. This, in conjunction with low plant availability and correspondingly high operating costs, made continued operation of FSV impractical.
In May 1991, the NRC granted PSC a 10 CFR 50 Possession Only License. On November 23,1992, the NRC issued the Order to Authorize Decommissioning of Fort St. Vrain and Amendment No. 85 to Possession Only License No. DPR-34 (PSC 1995b). PSC's objective was the dismantlement and decommissioning of FSV to release all site areas for unrestricted use. To accomplish this, a portion of the PCRV structure and the radioactive balance-of-plant equipment that exceeded the limits for unrestricted use were decontaminated or removed as described in the Fort St. Vrain Decommissioning Plan.
The n dWogical 93tus of the FSV environs was evaluated in the FSV Initial Radiological Site Charactedzation Report in order to provide information pertinent to the decommissioning and final survey of FSV (PSC 1992). There were no spills or accidents during operation of FSV which had the potential of contaminating the site. The Radiological Environmental Monitoring Program (REMP) was continued throughout the decommissioning to ensure that any contamination of the site environs which could have occurred as a result of decommissioning activities was detected.
The FSV facility was largely left intact following decommissioning; dismantlement of structures was j confined to the PCRV, and portions of the Reactor Building, Turbine Building, and Liquid Waste System. Following defueling, the PCRV contained the majority of the remaining radioactive 1
inventory. The radioactive source term at FSV was primarily a result of neutron activation of both metallic and concrete components, and impurities contained in graphite components of the PCRV.
l Fort St Vram Nuclear Station (687) March 26.1997 2 p4pi.n.s.ivr 'aivr.004
These activation products included beta-gamma emitters such as Co-60, Eu-152, and Eu-154, and low-energy beta and x-ray emitters such as H-3, C-14, and Fe-55, with H-3 and Fe-55 the largest contributors to the total radionuclide inventory (PSC 1995a).
FSV's final survey included all pertinent structures, surfaces, systems and components, concentrating on those - previously identified as contaminated or potentially contaminated during the l
dismantlement / decommissioning phases. At the request of the NRC's Division of Waste i L
Management, the Environmental Survey and Site Assessment Program (ESSAP) of the Oak Ridge Institute for Science and Education (ORISE) performed an independent confirmatog survey of the repower area in March 1995 at the Fort St. Vrain site (ORISE 1995a). Subsequent independent survey activities at FSV included licensee survey package reviews, confirmatory surface scans, and comparison -surface activity measurements (e.g., side-by-side measurements) performed from l
September 25 through 27,1995 (ORISE 1996a). During the period January 22 through 25,1996, I ESSAP performed instrument comparison activities-including side-by-side surface activity-L measurements and surface scans-and reviews of the licensee's embedded piping program and use ;
ofin situ gamma spectrometty for determining the licensed material contribution to exposure rate (ORISE 1996b). Most recently, ESSAP performed independent confirmatory surveys during the period September 30 through October 3,1996. Specifically, ESSAP performed surface scans, surface activity measurements, and exposure rate measurements; and reviews of the licensee's hard to detect nuclide (HTDN) assessment program. a dr~ft report describing these activities was prepared and submitted to the NRC for comment on Lug 30,1997 (ORISE 1997).
In October 1996, PSC completed final survey activities for the Group E Efiluent Discharge Pathway areas at FSV and issued Volume 6 of the Final Survey Report (PSC 1996). The effluent discharge pathway consists of open land areas, storage and evaporation ponds and basins, concrete-lined ditches, unlined ditches, and the 10.1 hectare (25 acre) Farm Pond. Water from both ditches was routinely used for irrigation of the surrounding Selds and pasture.s. It is also known that water would leak from the Goose Quill Ditch providing a means of transport of radioactive materials to the i
Fort St Vram Nuclear St.ti n (687) . March 26.1997 3 pwi.n.,.tvr .tvr.004
. , . , . . ,= _ , . , , ,- -
surrounding soil. Additionally, the ditches were periodically dredged to maintain flow rates and avoid overflow. The removed vegetation and sediment v/as routinely deposited on the banks adjacent to the ditches (PSC 1996).
l The NRC's Division of Waste Management has requested that ESSAP perform independent i confirmation survey activities of the Liquid Effluent Pathway areas at Fort St. Vrain.
SITE DESCRIPTION i
l The FSV facility is located approximately 56 kilometers [km(35 miles)] north of Denver and 5.6 km ,
northwest of the town ofPlatteville, in Weld County, Colorado. The site it located in an agricultural area ofgently rolling hills. Grade elevation at the plant is 1,460 meters (4,790 feet) above sea level; The site consists of 6995 hectares owned by PSC, identified as the Owner-Controlled Area, of which
)
I approximately 260 hectares were designated as the exclusion area during plant operation. Farming has been continued on Owner-Controlled areas of the site, but there are no farming aperations or permanent residences located within the Restricted Area. The Restricted Area is su.Tounded by a security fence, and access is controlled for purposes of protection ofindividuals from exposure to ,
radiation.
L The station is located on the east side of county road 19 % approximately 3.2 km south of the confluence of the South Platte River and the St. Vrain River. Neither of the rivers is considered navigable. Cooling for the plant was provided by mechanical draft cooling towers. Make-up to the cooling towers was provided from the rivers, and supplemented by shallow well water. Nineteen shallow wells are located on the site. The licensee also owns rights to surface water in four irrigation ditches which traverse portions of the site. ,
Efiluent from the plant was discharged to a point west of the plant and County Road 19 %, where it entered the concrete-lined Goose Quill Ditch. The Goose Quill Ditch runs north and east approximately 2,135 meters (m) before terminating at the Jay Thomas Ditch. The Jay Thomas Ditch
! flows north approximately 700 m from the confluence with the Goose Quill Ditch where it empties
! into the Farm Pond. Outfall from the pond eventually terminated at the South Platte River.
Fort 5t Vram Nuclear statmn(687) March 26.1997 4 essapNplan:Wvramwvr 004
l -
l l
PSC divided the Liquid EfIluent Pathway ai -ts into fourteen survey units, designated E001 through E014, and classified the units into two categous based on the potential for residual contamination.
The two categories, referred to as affected or unaffected are defined as follows: Affected areas are l l
those areas that have potential radioactive contamination or known radioactive contamination; unaffected areas are all areas not classified as affected and are not expected to contain residual radioactivity. Area classification was determined by plant operating history and the results of ;
previous radiological surveys. PSC designated eleven of the survey units as affected to include the
! Goose Quill Ditch and its banks (E001 and 002), the Farm Pond and its outfall (E003), the Jay Thomas Ditch and its banks (E004 and 006), irrigation ditches 1 through 6 and the North and South Marshes (E008 and 010), permanent pasture and farmland both east and west of County Road 19 %
(E011 through 013), and a sediment storage area (E014). All affected survey units are outside the FSV restricted area. Three survey units within the restricted are were classified unaffected and j l include the East and West Settling Basins and Storage Basins (E005), Sewage Lagoons 1 and 2 and East and West Evaporation Ponds (E007), and the South Evaporation Pond (E009).
OBJECTIVES The objectives of the confirmatory survey are to provide independent contractor field data reviews and radiological data for use by the NRC in evaluating the adequacy and accuracy of the licensee's procedures and final status survey results.
l RESPONSIBILITY l
l Work described in this survey plan will be perfort aed under the direction of William L. (Jack) Reck, Program Director and Eric W. Abelquist, Assistant Program Director with ESSAP. The cognizant site supervisor has the authority to make appropriate changes to the survey procedures as deemed necessary. After consultation with the NRC site representative, the scope of the survey may be altered based on findings as the survey progresses. Any changes to survey procedures and/or alterations to the survey plan will be noted in the site logbook.
Fort St Vram Nuclear Station (687) . March 26, Im 5 mwwmamwau
l -
t f
DOCUMENT REVIEW l ESSAP has reviewed the licensee's final status survey documentation for those survey units contained within Volume 6 (PSC 1996). Documents were reviewed for adequacy, accuracy, completeness, and consistency. Data were reviewed for appropriateness of calculations and interpretations relative to the guidelines.
PROCEDURES A survey team from ESSAP will perform independent visual inspections, surface scans, and sampling of selected affected and unaffected survey units in the Liquid Efiluent Pathway areas, and other areas designated by the NRC. Field survey activities will be conducted in accordance with the applicable sections of the ESSAP Survey Procedures and Quality Assurance Manuals (ORISE 1995b and c).
l Specific procedures are listed on pages 8 and 9 of this plan.
SURVEY PROCEDURES l
The following procedures apply to survey units selected for independent confirmatory activities.
Reference System Measurement and sampling locations will be referenced to prominent site features and recorded on site drawings.
Surface Scana Surface scans for gamma activity will be performed in selected survey units using Nal scintillation l detectors coupled to ratemeters with audible indicators. The percent of scan coverage in each smvey unit will be based on findings as the survey progresses. Locations of elevated direct radiation identified by scans will be marked for further investigation.
Fort St Yram Nuclear Station (687). March 26.1997 b essapNwamam'ama W
Soil Sampling Surface soil samples (0-15 cm) will be collec;ed at each location of elevated direct radiation identified by surface scans and other biased locations. Subsurface soil samples (greater than 15 cm depth) may be collected if the gamma count rate at the 15 cm depth indicates that subsurface contamination is present.
4 Sediment Sampling Sediment samples will be collected at each location of elevated direct radiation identified by surface scans.
SAMPLE ANALYSIS AND DATA INTERP.RETATION Samples and data will be returned to ORISE's ESSAP laboratory in Oak Ridge, Tennessee for analysis and interpretation. Soil samples vdll be analyzed by gamma spectrometry. The radionuclides of interest are Co-60 and Cs-137; hawever, spectra will be reviewed for other identifiable photopeaks. Sample analysis will be pen'ormed in accordance with the ORISE/ESSAP Laboratory ,
Procedures Manual (ORISE 1995d). Gamma spectrometry data will be reported in units of picocuries per gram (pCi/g). Results will be compared with the licensee's documentation and NRC guidelines established for release for unrestricted use. Results will be presented in a report and provided to the NRC.
l I
I l
Fort St Vram Nucles Station (687)- Much 26.1997 7 emp\planstamn'ama W
l l
l GUIDELINES I
The primary contaminants of concern are beta-gamma emitters resulting from the operation of the l FSV facility. The applicable soil concentration guidelines are radionuclide specific and are as follows (PSC 1996):
Radionuclide Concentration Guideline Value l
Co-60 5.59 pCi/g Cs-134 7.87 pCi/g Cs-137 18.7 pCi/g Eu-l52 13.2 pCi/g Eu-154 12.1 pCi/g Eu-155 439 pCi/g TENTATIVE SCHEDULE Confirmatory Survey March 31 to April 3,1997 Sample Analysis April 1997 Draft Report May 1997 LIST OF CURRENT PROCEDURES L Applicable procedures from ORISE/ESSAP Survey Procedures Manual (Revision 9; April 30,1995) include:
Section 5.0 Instrument Calibration and Operational Check-Out
! 5.1 GeneralInformation 5.2 Electronic Calibration of Ratemeters i 5.3 Gamma Scintillation Detector Check-Out and Cross-Calibration Fort St Vrain Nuclear Station (687)- March 26,1997 b essapiplans\stvrainistvra 004
_. . _ _ . _ _ - _ _ . . _ _ . _ _ ~ _ _ _ _ . _ _ . _ . _ . - - _ _ _ . _ . _ . . . _ _ . . . . _ _ _ _ _ . _ _ _ _ . .
i .
[
l i
! Section 6.0 Site Preparation 6.2 Reference Grid System I
Section 7.0 Scanning and Measurement Techniques
! 7.1 Surface Scanning l
l l Section 8.0 Sampling Procedure 1
l 8.1 Surface Soil Sampling
)
l- 8.2 Subsurface Soil Sampling 8.3 Sediment Sampling 8.8 Miscellaneous Sampling l 8.9 Sample Identification and Labeling l
l Section 9.0 Integrated Survey Procedures 9.2 General Survey Approaches and Strategies l'
j Section 10.0 Health and Safety Control of Cross-Contamination l
L
! Section 11.0 Quality Assurance and Quality Control Applicable procedures from the ORISE/ESSAP Quality Assurance Manual (Revision 7; i
January 31,1995) include:
l l
Section 5 Training and Certification l
Section 6 Equipment and Instrumentation Section 7 Quality Control l Section 8 Sample Chain-of-Custody l
l Section 9 Data Management Section 10 Data Review and Validation l Section 11 Records Handling and Storage 1
1 it i
l
- l. '
1 Fort St Vram Nuclear Station (687) . March 26. IM 9 essapiplansistwadatvra 004 l
REFERENCES Oak Ridge Institute for Science and Education (ORISE). Confirmatory Survey for the Repower Area, Fort St. Vrain, Platteville, Colorado. Oak Ridge, TN; June 1995a.
Oak Ridge Institute for Science and Education. Survey Procedures Manual for the Energy / Environment Sy:;tems Division, Environmental Survey and Site Assessment Program, Revision 7. Oak Ridge, Tennessee; April 30,1995b.
Oak Ridge Institute for Science and Education. Quality Assurance Manual for the Energy / Environment Systems Division, Environmental Survey and Site Assessment Program, Revision 7. Oak Ridge, Tennessee; January 31,1995c.
Oak Ridge Institute for Science and Education. Laboratory Procedures Manual for the Energy / Environment Systems Division, Emironmental Survey and Site Assessment Program, Revision 9. Oak Ridge, Tennessee; January 31,1995d.
Oak Ridge Institute for Science and Education Final Report-ORISE Support of NRC License ;
Inspection at Fort St. Vrain on September 25 to 27,1995. Oak Ridge, TN; March 1996a.
Oak Ridge Institute for Science and Education. Final Report-ORISE Support of NRC License Inspection at Fort St. Vrain on January 22 to 25,1996. Oak Ridge, TN; March 1996b.
l Oak Ridge Institute for Science and Education. Confirmatory Survey for the Fort St. Vrain Nuclear l Station, Public Service Company ofColorado, Platteville, Colorado. Oak Ridge, TN; January 1997. '
Public Senice Company ofColorado (PSC). Fort St. Vrain Initial Radiological Site Characterization ,
Report. April 30,1992. '
Public Service Company of Colorado, Final Survey Plan for Site Release, Revision 1. May 25, 1995a.
Public Service Company of Colorado. Final Survey Report for Release of Repower Area. March 2,1995b. l Public Service Company of Colorado. Fort St. Vrain Nuclear Station Decommissioning Project, Final Survey Report (Volume 6). October 29,1996.
Fort St Vr.in Nuclear St. tion (687) . March 26.1997 10 .pspion,wivr.in, tvt.004
. .. j
, ATTACHMENT A l PERFORMANCE PERIOD FY 97 SPENDING PLAN From To Name of Laboratory: Mar-97 Jun-97 Oak Ridge Institute for Science and Education ,
l RFTA Est. Project Cost l Title of Project: #TBD TBD $31,800.00 FSV-Liquid Effluent Pathway, Platteville, CO Fee or Non-Fee Recoverable: NRC Fin Number ORISE Number TAC Number: A9093 TBD l
!!$2"*f@RNMIMMWBffTIMARiSGT3MMMfEERMMMMMMEIBiR ,
l COST ELEMENTS Oct 96 Nov 96 Dec 96 Jan-97 Direct Costs $0.00 $0.00 $0.00 $0.00 Indirect Costs-(G&A, DOE Factor) $0.00 $0.00 $0.00 -
$0.00 l Total Estimate Costs $0.00 $0.00 $0.00 $0.00 Project Completion 0.00 % 0.00 % 0.00 % 0.00%j COST ELEMENTS Feb-97 Mar 97 Apr-97 May-97 _..
Direct Costs $0.00 $10,841.00 $9,636.00 $2,'409.00 Indirect Costs-(G&A, DOE Factor) $0.00 $3,469.00 $3,084.00 $771.00 p Total Estimate Costs $0.00 $14,310.00 $12,720.00 $3.180.00 Project Completion 0.00 % 45.00 % 85.00 % 95.00 %
! Costs $1,205.00 $0.00 $0.00 $0.00
! Indirect Costs-(G&A, DOE Factor) $385.00 $0.00 $0.00 $0.00 l Total Estimate Costs $1,590.00 $0.00 $0.00 $0.00 Project Completion 100.00 % 100.00 % 100.00 % 100.00 %
6%)tF#d5%EEidsif WhisMiESI5hilfel5PG&d@@SM539DEMEMi@l4 ACTIVITY INFORMATION Hours Estimated Cost Site Visit 0.0 $0.00 Document Review 0.0 $0.00 Presurvey 33.0 $3,600.00 Travel- Labor 36.0 $3,900.00 Travel-Other Expenses $5,800.00 Survey Activities 84.0 $9,900.00 l Report Preparation 54.0 $6,300.00 Sample Analysis 22.5 $2,300.00 Other 0.0 $0.00 1
- Total 229.5 $31,800.00 3.21.97.FSV.EFF. PATH.sP,3/21/97- bH lI