ML20212F677

From kanterella
Jump to navigation Jump to search
Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Dec 1986
ML20212F677
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/13/1987
From: Sullivan H
LOS ALAMOS NATIONAL LABORATORY
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CON-FIN-A-7552 N-DO-TR-87-14, NUDOCS 8703050136
Download: ML20212F677 (4)


Text

.

, ;+ ,

osAamos Los Alamos NationalLaboratory LosAlamos,NewMexico87545

- February 13, 1987 bbb -

N-D0/TR-87-14

~

Nuclear Technology and Engineering Division Mr. E. H. Johnson Reactor Project Branch 1 US Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

Dear Mr. Johnson:

SUBJECT:

MONTHLY BUSINESS LETTER REPORT FOR REGION IV--FIN A7552 (TECHNICAL ASSISTANCE TO REGION IV--FORT ST. VRAIN)

Enclosed is the monthly progress report for December 1986. The purpose of this report is to apprise you of any problems, delays, or scheduling constraints that we currently have or anticipate, in addition to keeping you informed about the progress and costs.

Please do not hesitate to call if you have any questions or requests regarding these reports.

Sincerely yours, AdAC Harold Sullivan Program Manager for Terrestrial Reactors ba Enc. Letter Report cy: R. E. Ireland, Region IV D. M. Meyer, Region IV W. H. Foster, Region IV C. A. Anderson, MEE-13, MS J576 S. W. Moore, MEE-13, MS J576 CRM-4, MS A150 (2) 3 SF T73 g30N An Equal Opportunity Employer / Operated by University of Califorrue 46./

g

-____-.---.____E___.

. pp I

LOS ALAMOS NATIONAL LABORATORY MONTHLY REPORT Project

Title:

Technical Assistance to Region IV (Fort St. Vrain)

FIN NO.: A-7552 NRC 189 Proposal Date: January 11, 1985 Revision No.: NRC Project Manager E. H. Johnson, Reactor Project Branch 1 NRC Technical Monitors: R. E. Ireland, Special Projects and Engineering Section Los Alamos Principal Investigator S. W. Moore (FTS 843-2228)

Period of Performance: October 1, 1985 to December 31, 1986 Reporting Period: December, 1986 A. PROJECT STATUS SECTION

1. Summary of Effort and Progress Project 1: Review and Assessment of CRDH Refurbishment Placed on hold until more information and data are received.

Proiect 2: Technical Suonort of Lona-Term Issues Placed on hold.

2. Problems and Delays Project 1: Review and Assessment of CRDH Refurbishment Placed on hold until more infctmation and data are received.

Project 2: Technical Suncort of Lona-Term Issues Placed on hold.

7 ,

3. Summary of Progress to Date Project Percentaae of Comolation 1 30 2 0 j
4. Plans for Next Reporting Period Proiect 1:

, Meet or coordinate with NRC/PSC to establish'information channel.

Proiect 2:

Initiate subcontract and coordination when appro iate.

I B. FINANCIAL STATUS SECTION 1 l i

1. The total cost (value) of the FSV project as reflected in the proposal (NRC Form 189), the total amount of funds obligated to date, and the balance of funds required to complete the work by end of FY 86 are as follows:

Total Funds Balance of Funds Projected Obligated Required to Complete Tasks Project Cost To Date By End of FY 87

$ 65.0 K $ 65.0 K $ 0.0 K

2. The total direct staff use and amount of funds expended (costed) during the period and the total cumulative to date in the following categories are:

December 1986 Cumulative

a. Direct Staff Effort 0.0 0.2
b. Funds ($000) December 1986 FY 87' Direct Salaries 0.0 K 11.6 K Material and Services (excluding ADP) 0.0 1.8 ADP Support 0.0 0.8 Subcontracts 0.0 0.0 Travel Expenses 0.0 0.0 Indirect Labor Costs 0.0 9.2 Other (specify) General Administrative TOTAL 0.0 K 23.4 K

'3.4 K was inappropriately charged to this project in October. This has been credited to this project.

a -

".'..'~

.3. Total amount of funds expended during the period and cumulative to date for the FSV project is as follows:

Project December 1986 Cumulative Fort St. Vrain 0.0 K 23.4 K

4. Expenditure Summary December 1986 Cumulative Project 1: Review and Assessment CRDM Refurbishment 0.0 23.4 K Proinct 2: -Technical Support on Long Term Issues 0.0 0.0 I

l i

l l

l