ML20235R612
From kanterella
Jump to navigation
Jump to search
ML20235R612 | |
Person / Time | |
---|---|
Site: | Fort Saint Vrain |
Issue date: | 07/01/1987 |
From: | Bennett D LOS ALAMOS NATIONAL LABORATORY |
To: | NRC |
References | |
CON-FIN-A-7258 NUDOCS 8710080125 | |
Download: ML20235R612 (214) | |
Similar Documents at Fort Saint Vrain | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20148D6041997-03-31031 March 1997
[Table view]Confirmatory Survey for Fsv Nuclear Station,Psc, Platteville,Co,Final Rept ML20148D5861997-03-26026 March 1997 Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station ML20134C8721997-01-29029 January 1997 Draft Confirmatory Survey for Fsv Nuclear Station Public Svc Co of Co,Platteville,Co ML20092G3681995-06-19019 June 1995 Confirmatory Survey for Repower Area Fsv Platteville,Co, Final Rept ML20084F3931995-05-16016 May 1995 Draft Rept, Confirmatory Survey for Repower Area Fsv Platteville,Co ML20245E6601989-01-0606 January 1989 Independent Review of Fire Protection Program Plan,Public Svc Co of Co,Fort St Vrain Nuclear Generating Station ML20245D1951988-10-31031 October 1988 Integrated Technical Evaluation Rept for Review of Fort St Vrain Tech Spec Upgrade Program ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept ML20151S6061988-02-29029 February 1988 Rev 1 to Technical Evaluation Rept for Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20195G9611987-12-14014 December 1987 Technical Evaluation of Proposed Redundancy Requirements for Helium Circulation Tech Specs to Accommodate Rapid Depressurization Accident, Technical Evaluation Rept ML20234D6291987-12-14014 December 1987 Technical Assistance to Region IV (Fort St.Vrain), Monthly Business Ltr Rept for Oct 1987 ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20236C2611987-09-28028 September 1987 Fort St Vrain Safe Shutdown Using Condensate Sys ML20236U7221987-08-0606 August 1987 Addendum to Review of Proposed Tech Spec Change:Core Inlet Valves/Min Helium Flow & Max Core Region Temp Rise, Limiting Conditon for Operation 4.1.9, Technical Evaluation Rept ML20246J3191987-07-31031 July 1987 Evaluation of Operator Roles in Mitigating High Energy Line Break at Fort St Vrain Nuclear Generating Station ML20235R6121987-07-0101 July 1987 Investigating Causes & Consequences of Cracked Graphite Fuel Elements ML20235M8321987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Fort St Vrain, Final Informal Rept ML20215A9031987-06-0505 June 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Apr 1987 ML20235G1141987-06-0404 June 1987 Draft Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20234C6091987-06-0404 June 1987 Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20215L9331987-05-31031 May 1987 Evaluation of Integrated Sys Study of CRD Mechanism Rod Position Indication Instrumentation for Fort St Vrain Nuclear Generating Station, Informal Technical Evaluation Rept ML20214H2061987-05-15015 May 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Mar 1987 ML20215M3901987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Fort St Vrain, Informal Rept ML20210A3851987-04-13013 April 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Feb 1987 ML20214R8711987-03-31031 March 1987 Technical Evaluation Rept Evaluation of Bldg 10 Electrical Mods Fort St Vrain Nuclear Generating Station, Informal Rept ML20214Q5411987-03-31031 March 1987 Evaluation of Confinement Environ Temp Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Informal Technical Evaluation Rept ML20207T3721987-03-10010 March 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Jan 1987 ML20207R9471987-03-0606 March 1987 Rev 1 to Review of Fort St Vrain Onsite AC `Standby Power Sys Re Compliance to Single Failure Criterion & Ser ML20212F6771987-02-13013 February 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Dec 1986 ML20216J1991987-02-0404 February 1987 Evaluation of Long-Term Effects of Moisture Ingress in Fort St Vrain Nuclear Reactor ML20210P6451987-01-31031 January 1987 Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept ML20245B3401986-12-31031 December 1986 Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Technical Evaluation Rept ML20207K4701986-12-31031 December 1986 Final Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept ML20212B7321986-11-30030 November 1986 Evaluation of Proposed CRD & Orifice Assembly 300 F Temp Limits,Fort St Vrain Nuclear Generating Station ML20197C5981986-10-31031 October 1986 Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept ML20213D8251986-10-31031 October 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Sept 1986 ML20214W4521986-10-16016 October 1986 Review of Proposed Tech Spec Change:Core Inlet Orifice Valves/Min Helium Flow & Max Core Region Temp Rise, Technical Evaluation Rept ML20214P4681986-09-30030 September 1986 Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20211A6091986-09-26026 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Aug 1986 ML20236D3811986-09-24024 September 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station ML20209F1021986-09-0505 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr for Jul 1986 ML20212Q1011986-08-31031 August 1986 Conformance to Reg Guide 1.97,Fort St Vrain Nuclear Generating Station, Informal Rept ML20213G5811986-08-0707 August 1986 Draft Review of Fort St Vrain Onsite AC Standby Power Sys W/Regards to Compliance to Single Failure Criterion & Ser ML20205E3711986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept ML20244E1901986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St Vrain ML20204E6811986-07-24024 July 1986 Technical Assistance to Region IV - Fort St Vrain, Monthly Business Ltr Repts for May & June 1986 ML20207J7931986-07-0909 July 1986 Fort St Vrain Fuel Element Dynamic Response ML20236D3741986-06-20020 June 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station 1997-03-31 Category:QUICK LOOK MONTHYEARML20148D6041997-03-31031 March 1997
[Table view]Confirmatory Survey for Fsv Nuclear Station,Psc, Platteville,Co,Final Rept ML20148D5861997-03-26026 March 1997 Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station ML20134C8721997-01-29029 January 1997 Draft Confirmatory Survey for Fsv Nuclear Station Public Svc Co of Co,Platteville,Co ML20092G3681995-06-19019 June 1995 Confirmatory Survey for Repower Area Fsv Platteville,Co, Final Rept ML20084F3931995-05-16016 May 1995 Draft Rept, Confirmatory Survey for Repower Area Fsv Platteville,Co ML20245E6601989-01-0606 January 1989 Independent Review of Fire Protection Program Plan,Public Svc Co of Co,Fort St Vrain Nuclear Generating Station ML20245D1951988-10-31031 October 1988 Integrated Technical Evaluation Rept for Review of Fort St Vrain Tech Spec Upgrade Program ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept ML20151S6061988-02-29029 February 1988 Rev 1 to Technical Evaluation Rept for Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20195G9611987-12-14014 December 1987 Technical Evaluation of Proposed Redundancy Requirements for Helium Circulation Tech Specs to Accommodate Rapid Depressurization Accident, Technical Evaluation Rept ML20234D6291987-12-14014 December 1987 Technical Assistance to Region IV (Fort St.Vrain), Monthly Business Ltr Rept for Oct 1987 ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20236C2611987-09-28028 September 1987 Fort St Vrain Safe Shutdown Using Condensate Sys ML20236U7221987-08-0606 August 1987 Addendum to Review of Proposed Tech Spec Change:Core Inlet Valves/Min Helium Flow & Max Core Region Temp Rise, Limiting Conditon for Operation 4.1.9, Technical Evaluation Rept ML20246J3191987-07-31031 July 1987 Evaluation of Operator Roles in Mitigating High Energy Line Break at Fort St Vrain Nuclear Generating Station ML20235R6121987-07-0101 July 1987 Investigating Causes & Consequences of Cracked Graphite Fuel Elements ML20235M8321987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Fort St Vrain, Final Informal Rept ML20215A9031987-06-0505 June 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Apr 1987 ML20235G1141987-06-0404 June 1987 Draft Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20234C6091987-06-0404 June 1987 Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20215L9331987-05-31031 May 1987 Evaluation of Integrated Sys Study of CRD Mechanism Rod Position Indication Instrumentation for Fort St Vrain Nuclear Generating Station, Informal Technical Evaluation Rept ML20214H2061987-05-15015 May 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Mar 1987 ML20215M3901987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Fort St Vrain, Informal Rept ML20210A3851987-04-13013 April 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Feb 1987 ML20214R8711987-03-31031 March 1987 Technical Evaluation Rept Evaluation of Bldg 10 Electrical Mods Fort St Vrain Nuclear Generating Station, Informal Rept ML20214Q5411987-03-31031 March 1987 Evaluation of Confinement Environ Temp Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Informal Technical Evaluation Rept ML20207T3721987-03-10010 March 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Jan 1987 ML20207R9471987-03-0606 March 1987 Rev 1 to Review of Fort St Vrain Onsite AC `Standby Power Sys Re Compliance to Single Failure Criterion & Ser ML20212F6771987-02-13013 February 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Dec 1986 ML20216J1991987-02-0404 February 1987 Evaluation of Long-Term Effects of Moisture Ingress in Fort St Vrain Nuclear Reactor ML20210P6451987-01-31031 January 1987 Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept ML20245B3401986-12-31031 December 1986 Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Technical Evaluation Rept ML20207K4701986-12-31031 December 1986 Final Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept ML20212B7321986-11-30030 November 1986 Evaluation of Proposed CRD & Orifice Assembly 300 F Temp Limits,Fort St Vrain Nuclear Generating Station ML20197C5981986-10-31031 October 1986 Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept ML20213D8251986-10-31031 October 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Sept 1986 ML20214W4521986-10-16016 October 1986 Review of Proposed Tech Spec Change:Core Inlet Orifice Valves/Min Helium Flow & Max Core Region Temp Rise, Technical Evaluation Rept ML20214P4681986-09-30030 September 1986 Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20211A6091986-09-26026 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Aug 1986 ML20236D3811986-09-24024 September 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station ML20209F1021986-09-0505 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr for Jul 1986 ML20212Q1011986-08-31031 August 1986 Conformance to Reg Guide 1.97,Fort St Vrain Nuclear Generating Station, Informal Rept ML20213G5811986-08-0707 August 1986 Draft Review of Fort St Vrain Onsite AC Standby Power Sys W/Regards to Compliance to Single Failure Criterion & Ser ML20205E3711986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept ML20244E1901986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St Vrain ML20204E6811986-07-24024 July 1986 Technical Assistance to Region IV - Fort St Vrain, Monthly Business Ltr Repts for May & June 1986 ML20207J7931986-07-0909 July 1986 Fort St Vrain Fuel Element Dynamic Response ML20236D3741986-06-20020 June 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station 1997-03-31 Category:ETC. (PERIODIC MONTHYEARML20148D6041997-03-31031 March 1997
[Table view]Confirmatory Survey for Fsv Nuclear Station,Psc, Platteville,Co,Final Rept ML20148D5861997-03-26026 March 1997 Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station ML20134C8721997-01-29029 January 1997 Draft Confirmatory Survey for Fsv Nuclear Station Public Svc Co of Co,Platteville,Co ML20092G3681995-06-19019 June 1995 Confirmatory Survey for Repower Area Fsv Platteville,Co, Final Rept ML20084F3931995-05-16016 May 1995 Draft Rept, Confirmatory Survey for Repower Area Fsv Platteville,Co ML20245E6601989-01-0606 January 1989 Independent Review of Fire Protection Program Plan,Public Svc Co of Co,Fort St Vrain Nuclear Generating Station ML20245D1951988-10-31031 October 1988 Integrated Technical Evaluation Rept for Review of Fort St Vrain Tech Spec Upgrade Program ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept ML20151S6061988-02-29029 February 1988 Rev 1 to Technical Evaluation Rept for Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20195G9611987-12-14014 December 1987 Technical Evaluation of Proposed Redundancy Requirements for Helium Circulation Tech Specs to Accommodate Rapid Depressurization Accident, Technical Evaluation Rept ML20234D6291987-12-14014 December 1987 Technical Assistance to Region IV (Fort St.Vrain), Monthly Business Ltr Rept for Oct 1987 ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20236C2611987-09-28028 September 1987 Fort St Vrain Safe Shutdown Using Condensate Sys ML20236U7221987-08-0606 August 1987 Addendum to Review of Proposed Tech Spec Change:Core Inlet Valves/Min Helium Flow & Max Core Region Temp Rise, Limiting Conditon for Operation 4.1.9, Technical Evaluation Rept ML20246J3191987-07-31031 July 1987 Evaluation of Operator Roles in Mitigating High Energy Line Break at Fort St Vrain Nuclear Generating Station ML20235R6121987-07-0101 July 1987 Investigating Causes & Consequences of Cracked Graphite Fuel Elements ML20235M8321987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Fort St Vrain, Final Informal Rept ML20215A9031987-06-0505 June 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Apr 1987 ML20235G1141987-06-0404 June 1987 Draft Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20234C6091987-06-0404 June 1987 Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20215L9331987-05-31031 May 1987 Evaluation of Integrated Sys Study of CRD Mechanism Rod Position Indication Instrumentation for Fort St Vrain Nuclear Generating Station, Informal Technical Evaluation Rept ML20214H2061987-05-15015 May 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Mar 1987 ML20215M3901987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Fort St Vrain, Informal Rept ML20210A3851987-04-13013 April 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Feb 1987 ML20214R8711987-03-31031 March 1987 Technical Evaluation Rept Evaluation of Bldg 10 Electrical Mods Fort St Vrain Nuclear Generating Station, Informal Rept ML20214Q5411987-03-31031 March 1987 Evaluation of Confinement Environ Temp Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Informal Technical Evaluation Rept ML20207T3721987-03-10010 March 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Jan 1987 ML20207R9471987-03-0606 March 1987 Rev 1 to Review of Fort St Vrain Onsite AC `Standby Power Sys Re Compliance to Single Failure Criterion & Ser ML20212F6771987-02-13013 February 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Dec 1986 ML20216J1991987-02-0404 February 1987 Evaluation of Long-Term Effects of Moisture Ingress in Fort St Vrain Nuclear Reactor ML20210P6451987-01-31031 January 1987 Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept ML20245B3401986-12-31031 December 1986 Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Technical Evaluation Rept ML20207K4701986-12-31031 December 1986 Final Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept ML20212B7321986-11-30030 November 1986 Evaluation of Proposed CRD & Orifice Assembly 300 F Temp Limits,Fort St Vrain Nuclear Generating Station ML20197C5981986-10-31031 October 1986 Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept ML20213D8251986-10-31031 October 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Sept 1986 ML20214W4521986-10-16016 October 1986 Review of Proposed Tech Spec Change:Core Inlet Orifice Valves/Min Helium Flow & Max Core Region Temp Rise, Technical Evaluation Rept ML20214P4681986-09-30030 September 1986 Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20211A6091986-09-26026 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Aug 1986 ML20236D3811986-09-24024 September 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station ML20209F1021986-09-0505 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr for Jul 1986 ML20212Q1011986-08-31031 August 1986 Conformance to Reg Guide 1.97,Fort St Vrain Nuclear Generating Station, Informal Rept ML20213G5811986-08-0707 August 1986 Draft Review of Fort St Vrain Onsite AC Standby Power Sys W/Regards to Compliance to Single Failure Criterion & Ser ML20205E3711986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept ML20244E1901986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St Vrain ML20204E6811986-07-24024 July 1986 Technical Assistance to Region IV - Fort St Vrain, Monthly Business Ltr Repts for May & June 1986 ML20207J7931986-07-0909 July 1986 Fort St Vrain Fuel Element Dynamic Response ML20236D3741986-06-20020 June 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station 1997-03-31 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML20148D6041997-03-31031 March 1997
[Table view]Confirmatory Survey for Fsv Nuclear Station,Psc, Platteville,Co,Final Rept ML20148D5861997-03-26026 March 1997 Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station ML20134C8721997-01-29029 January 1997 Draft Confirmatory Survey for Fsv Nuclear Station Public Svc Co of Co,Platteville,Co ML20092G3681995-06-19019 June 1995 Confirmatory Survey for Repower Area Fsv Platteville,Co, Final Rept ML20084F3931995-05-16016 May 1995 Draft Rept, Confirmatory Survey for Repower Area Fsv Platteville,Co ML20033G5761990-04-0404 April 1990 Notification of Contract Execution,Task Order 1, Review of Public Svc of Colorado ISFSI Application for Fort St Vrain Plant, to Contract, Fuel Cycle Licensing Technical Assistance Awarded to Science Applications Intl Corp ML20245E6601989-01-0606 January 1989 Independent Review of Fire Protection Program Plan,Public Svc Co of Co,Fort St Vrain Nuclear Generating Station ML20245D1951988-10-31031 October 1988 Integrated Technical Evaluation Rept for Review of Fort St Vrain Tech Spec Upgrade Program ML20154S3461988-08-31031 August 1988 Notification of Contract Execution,Mod 3,to HTGR (Fort St Vrain) Training Course. Contractor:Ga Co ML20154S3511988-08-31031 August 1988 Mod 3,incorporating Change of Name Agreement from Ga Technologies to General Atomics,To HTGR (Fort St Vrain) Training Course ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept ML20151S6061988-02-29029 February 1988 Rev 1 to Technical Evaluation Rept for Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20195G9611987-12-14014 December 1987 Technical Evaluation of Proposed Redundancy Requirements for Helium Circulation Tech Specs to Accommodate Rapid Depressurization Accident, Technical Evaluation Rept ML20234D6291987-12-14014 December 1987 Technical Assistance to Region IV (Fort St.Vrain), Monthly Business Ltr Rept for Oct 1987 ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept ML20236C2611987-09-28028 September 1987 Fort St Vrain Safe Shutdown Using Condensate Sys ML20236U7221987-08-0606 August 1987 Addendum to Review of Proposed Tech Spec Change:Core Inlet Valves/Min Helium Flow & Max Core Region Temp Rise, Limiting Conditon for Operation 4.1.9, Technical Evaluation Rept ML20246J3191987-07-31031 July 1987 Evaluation of Operator Roles in Mitigating High Energy Line Break at Fort St Vrain Nuclear Generating Station ML20235R6121987-07-0101 July 1987 Investigating Causes & Consequences of Cracked Graphite Fuel Elements ML20235M8321987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Fort St Vrain, Final Informal Rept ML20215A9031987-06-0505 June 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Apr 1987 ML20234C6091987-06-0404 June 1987 Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20235G1141987-06-0404 June 1987 Draft Fort St Vrain Safe Shutdown from 82% Power, Technical Evaluation Rept ML20215L9331987-05-31031 May 1987 Evaluation of Integrated Sys Study of CRD Mechanism Rod Position Indication Instrumentation for Fort St Vrain Nuclear Generating Station, Informal Technical Evaluation Rept ML20214H2061987-05-15015 May 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Mar 1987 ML20215M3901987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Fort St Vrain, Informal Rept ML20210A3851987-04-13013 April 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Feb 1987 ML20206H7461987-04-0808 April 1987 Notification of Contract Execution,Mod 1,to HTGR (Fort St Vrain) Training Course. Contractor:Ga Technologies ML20206H7621987-04-0808 April 1987 Mod 1,reflecting Administrative Changes Due to NRC Reorganization,To HTGR (Fort St Vrain) Training Course ML20214Q5411987-03-31031 March 1987 Evaluation of Confinement Environ Temp Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Informal Technical Evaluation Rept ML20214R8711987-03-31031 March 1987 Technical Evaluation Rept Evaluation of Bldg 10 Electrical Mods Fort St Vrain Nuclear Generating Station, Informal Rept ML20207T3721987-03-10010 March 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Jan 1987 ML20207R9471987-03-0606 March 1987 Rev 1 to Review of Fort St Vrain Onsite AC `Standby Power Sys Re Compliance to Single Failure Criterion & Ser ML20212F6771987-02-13013 February 1987 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Dec 1986 ML20216J1991987-02-0404 February 1987 Evaluation of Long-Term Effects of Moisture Ingress in Fort St Vrain Nuclear Reactor ML20210P6451987-01-31031 January 1987 Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept ML20207K4701986-12-31031 December 1986 Final Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept ML20245B3401986-12-31031 December 1986 Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Technical Evaluation Rept ML20212B7321986-11-30030 November 1986 Evaluation of Proposed CRD & Orifice Assembly 300 F Temp Limits,Fort St Vrain Nuclear Generating Station ML20197C5981986-10-31031 October 1986 Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept ML20213D8251986-10-31031 October 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Rept for Sept 1986 ML20214W4521986-10-16016 October 1986 Review of Proposed Tech Spec Change:Core Inlet Orifice Valves/Min Helium Flow & Max Core Region Temp Rise, Technical Evaluation Rept ML20214P4681986-09-30030 September 1986 Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort St Vrain Nuclear Generating Station, Informal Rept ML20211A6091986-09-26026 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr Rept for Aug 1986 ML20236D3811986-09-24024 September 1986 Technical Evaluation of Dcrdr Info Supplementing Summary Rept for Fort St Vrain Nuclear Generating Station ML20209F1021986-09-0505 September 1986 Technical Assistance to Region IV (Fort St Vrain), Monthly Business Ltr for Jul 1986 ML20212Q1011986-08-31031 August 1986 Conformance to Reg Guide 1.97,Fort St Vrain Nuclear Generating Station, Informal Rept ML20213G5811986-08-0707 August 1986 Draft Review of Fort St Vrain Onsite AC Standby Power Sys W/Regards to Compliance to Single Failure Criterion & Ser 1997-03-31 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20235R612&oldid=3947848"