Text
. - __.
~
WO WORK PLAN Removal / Replacement of breakers 2Y-06-01 & 05 WO 9612088,9612094 Wade Berger UNIT 2 January 2,1997 1.0 PURPOSE This WO work plan provides dircetion for the removal of breakers 2Y-06-01 & 05 and replacement with Westinghouse EHD 101515 amp breakers.
I 2.0 INrflAL CONDITIONS
- 1. Reactor is in a cold shutdown OR defueled.
2
- 2. Verify loads listed in Retum to service steps a
on be taken OOS.
- 3. Permission has been granted to remove / replace breakers 2Y-06-01 & 05.
a 3.0 ATTACHMENTS 3.1 Maintenance Electrical Safety Checklist, PBF-9044 form 4
3.2 Wire Removal Form. PBF-0036 4.0 REFERENCE DRAWINGS Westinghouse elementary drawing sheets 839,877,878,901.1534, and 1539 5.0 MATERIALS
- 1. Westinghouse EHD 1015 breaker (Quantity 2) 4 C L. WP saxasJmarr por 9705130088 970505
~
Page 1 of 5 PDR ADOCK 05000301 P
4 WO WORK PLAN Removal / Replacement of breakers 2Y-06-01 & 05 WO 9612088, 9612094 UNIT 2 January 2,1997 Iloid Step Point No.
Work Plan Description Worker Date NOTE Breakers 2Y-06-01 & OS provide power to COI MOBS 175,178-181,183,184, and 2CO3 MOBS 240, 241, 271, and U2 Preseperator system.
Verify initial conditions have been met.
/-h-9/
g OPS
- CAUTION
- ALL COSIPONENTS AND TERMINALS LOCATED IN TIIE PANEL ARE ASSUMED TO BE ENERGlZED, TAKE NECESSARY PRECAINIONS.
Responsible Engineer to perform'a pre-job briefing to include scope of project,
//1//7 2
personnel safety, and installation.
Re FME:
General FME Statement: Tools and equipment shall be checked for loose parts and debris and temporary covers should be installed for foriegn material exclusion (FME) of system /comnonents, per Exclusion of Foreign Material from Plant Components and systems, NP 8.4.10.
/-6-D 3
Verify that breakers 2Y-06-01 & 05 are in the "OFF" position OR coordinate with OPS to place breakers 2Y-06-01 & 05 in "OFF".
(ITN Remove 2Y-06 panel cover. Post panel with appropriate " Danger alive" fg 4
placards.
MTN Disconnect wirmg from breakers 2Y-06-01 & 05, recording wires removed on
~
,., f y 5
PB-0036 Wire Removal Form.
37q
)
/
m Remove breakers 2Y-06-01 & 05 from panel.
- f. f s
s 6
MTN NOTE:
Utili:e the spare EllD 1015 breakers removedfrom 2Y-Si(WOs 9613292 & 9613293) for installation in 2Y-06.
Prior to installing the replacement breakers, cycle breakers five times per the following directions; Tf~
, g f.,
7
- l. Close breaker
- 2. Trip breaker using the trip to test button (red) on breaker.
- 3. Open breaker.
- 4. Use continuity checks to verify proper positioning of breaker contact on final cycle (closed, trip free, and open.
Acceptance Criteria: Closed f;.1 ohm / Open > 1 Mohm 8
Install the replacement Westinghouse fiHD 1015 breakers in 2Y-06-01 & 05.
/- / ? 5 MTN Reconnect leads using attached PBF-0036 Wire Removal Form.
f f7.,9 9
MTN Page 2 of 5
WO WORK PLAN Removal / Replacement of breakers 2Y-06-01 & 05 WO 9612088,9612094 UNIT 2 January 2,1997 10 Torque the load side leads per the following step.
/- /2 C For breakers with capture wire connections, determine the wire size of the leads connected to the breaker and torque per the following table:
Wire Size
- 14 to #10
- 8
- 6 to #4
- 2 to #1/0 Torque Value (in/lbs) 20 40 45 50 Record torque wrench MTE number and calibration date on the WO and work plan.
S-D
/
MTE /Li'r'7'L) ~ c 7 7 Calibration Due Date NOTE Use calibrated digital voltmeterfor thefollowing step.
l'OST MAINTENANCE TEST
]
f_gg PMT:
11 A. Verify that each breaker reads 0 VAC on the load side of the breaker with MTN the breaker open.
B. Verify that each breaker reads a nominal 120 VAC on the load side of the breaker with the breaker closed.
C. Position the breakers to the off position.
FME:
12 Perform a Foreign Materials Exclusion inspection of panel to verify all tools and
/ ~/2 9 foriegn materials are removed TF 13 Reinstall panel cover.
NR 3
_u MN
,m 14 Record all QAR, MTE and t numbers on WO.
/-/ 76 MN ae0 W o
?}.0 p+0 Page 3 of 5
WO WORK PLAN Removal / Replacement of breakers 2Y-06-01 & 05 WO 9612088,9612094 UNIT 2 January 2,1997 l
2Y-06-01 15 RETURN TO SERVICE TESTING Verify power to the fo! lowing loads:
y 1.
Col and CO2 Am Anciator Fan & DC Power Failure Relay Supply 2.
2LS-4100 througn 2LS-4103,2P-10A and 2P 10B Room Drain and Sump Indica ion (rear C01) 1 3.
2FIS-640,2FIS-649 and 2FIS-650, CCW Flow Indicating
//
Switches g7 4,.
4.
2ilC-105, Boric Acid Storage tank (2T-6C) Recirc Iland h
l Controller 5.
21IIC-957, accumulator Nitrogen Supply Controller 6.
2 POT /I-2085, Reheat Steam Supply Temp Controller 7.
2TC-3620, Turbine Lube Oil Temp Controller 4
8.
Generator Bkr 122 and 142, Auxiliary Relays for Computer and Annunciation 9.
2N15-2083, Steam Generator A Sample Isolation
- 10. 251S-2084, Steam Generator B Sample Isolation
- 11. Unit 2 Auto Turning Gear Control i
- 12. 2 SIS-2042 and 251S-2045, Steam Generator Blowdown Steam Isolation Control Valves
Verify power to the following loads; OPS
- 1. U2 Preseperator system E
4 f
J Page 4 of 5
. ~ - -. -. _ - _
WO WORK PLAN Removal / Replacement of breakers 2Y-06-01 & 05 WO 9612088,9612094 UNIT 2 January 2,1997 Comments:
Old> ! han n o /L,Y 3 L sid a)) jub A
\\
<su,
A N A M /5s Ast it'-e t -l
\\
ATE ir Lm As n JA Vo _l-?
^~
sJL J. MLA w o
~ L A L',,, 11.1L+ A n, L i-l
. J rh A L' H u G
, L'E L 4 2,J L E D,f /,2 4 Jn X A o
? L J/.
911.'L Lu~W '2.2L. rL i: L, n rio A -J l Kb d do
%1% JR Afd/ n. D 1x. AnL w A m !
L L Jbi J n A e:>anL b di b
4 M 4:%:e 1 % '.
~l wMr 6, %&,ymm L'e ;M n'L &n,W,h,x, ' !
^ '-
r o
r
~
l Page 5 of 5
~.. _
Point Beach Nuclear Pltat WIRE REMOVAL LOG Sheet [
of l
His log to be used when more than one wire is lifted at a time.
f-I 7 9 7 Removal Date
/'/1" b Restoration Date i
}
NOTE: Use of thisfonn does not supersede any of the requirements of PBNP 3.1.1 Independent Venfication and Concurrent 4
Checks.
4
^
Fill in the applicable block (s)
Initials Location TB No.
Wire No.
Color First Wire Wire Second Person Rernoved Restored Person Check Check
[
'O$
l
/DL \\l
~
i 4
4 k l ci 4
.1
)
i
)
i i
i i
s 4
1,
[
Attach this form to the procedure or MWR.
'Y O 96/2CSG MWR No.
Other SMP/RMP/ICP No.
Y f
h h
PBF-0036 Rnision 2 04/29/94
- A'AChM'
'd44+4 ar.+_A.
J_,JA#
,_44p_.gy
.g_
m.
q_
- e. : g.._... f m -
7 g_,
a..__
~
-.. m' 'P ' n,,c,> e=w -
.. ' ^ ~.
.m y:; D.LNGER TAG REOUEST '
'~-
1 W
~~
Work Control Document i M /20 N j
Time /Date of application:
/p jf.f 4 Time /Da:: Tags Requirei
/ 70 0
/p /9 pg l
j l
R: ques::n+ Werk Group:
(mar +rrd'4 A M C(
i Reques:ing Indiv: dual:
'r
=
Responsible Supervisor: /%,m,4 ace $u.pcmwEsn=ated Jco Complenon (Time /Date):
/g,g gfg3 f
Equipment ID:
y' of O /
Unit:
g2, f
t scope of Work:
$wafn-NbCEmE&T" I
Addiciccal Work Control Dccu=ents:
94 /20 f t/-
y of-05~
i Recoc= ended Dacge:' Taggi:g/ Expt:2:icc:
Na ~2gs Req'd:
Couble Isciaten: 0 f
F:si:ive Cat:::i: C Greceding Req'd: C
??.:-ini Re= oval Reg'd: C d
f i
NCDi: 171e RM?.']W!DfP.' Wort Orat? Worz ?!.:n may be refere.:cd. cove;'or :he re : mmc:ded danger : gging.
Refe:ences: GVCTE: Mu::.::c:ude Rev. ?.um:erlcr ::n.~:ded d:cime:::: used :o ver.r:t adeq:::cy.)
4 j
l j4 C7~ M [cfcI b
_l d:c:stica:
.i I'l t
Appencix R:
C Yes C Nc
'I yes. scacd Fire R:t:c Stee:
l 3.
1:..
l LCO Reg'd:
C Yes C No
'I 7e:. 2r. :: CC ::c:c:.ng ?cr= ?SF.9133
- Date
I f Re:::wer D a':
Appr:ver 'SRC:
Cate a
NCDE: Addinonal revtews.:::d.=ptw.L: reg'.ilcr t.c. ge or ~='~on: :o :rigir.:.i : gou:. Dec:-be c.ange in inlct na: ion :ccion.
Cite Approve: :SRO)
Date Reviewer j
Rev: ewer Dat:
Approve: :SRC)
Date Tag Sene: No.
Donger Tags.v Longer Required 2nd ? otec:ed Mr:ter Log Sign-Offs Compiece o
I Da::
5,e:pctsicle Supertiser g3 A
b i
w
_rv
\\ I' i
?EF 19Cc4 J
- w. vex i
4
i l
Work Order No. kd/2088 l
Return to Service Testino Reviews e
I
~
t g:
I.vmALs I
??5Ee en!e
/ ?** W ??n-RTS l
f I
/
l-
. wow Gretm 3c=T-N4inte rce ItT ng
\\
CYCLE BtAs CHECXZh6-ConTZAM3*r8 l TE$ W6-7E%P vem, as amaw m wu arcas 1
l l
l i
t l
1 l
A 1
4 V ($)
s Seccen'C ? w -ment v
[
1 1
CTeNbbf7/ YME2 Y*re h crece.T eoere b.f.s bv on d. c e1:, of so 1s~de Us f.e5
- nte N? ~tr ?
hd
)
t.1 9 7
- i%
I I
w f
( '*
.,a p
--.__$_.8 d'
- M r v-R _
l SEC'~CM *C Dil~'V=E?3G 2TRK*
N A-p
_