WO Work Plan WO 9612088, Removal/Replacement of Breakers 2Y-06-01 & 05
ML20140H348
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/17/1997
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20140G761 List:
References
WO-9612088, WO-9612094, NUDOCS 9705130088
Download: ML20140H348 (8)


Text

. - __.

~

WO WORK PLAN Removal / Replacement of breakers 2Y-06-01 & 05 WO 9612088,9612094 Wade Berger UNIT 2 January 2,1997 1.0 PURPOSE This WO work plan provides dircetion for the removal of breakers 2Y-06-01 & 05 and replacement with Westinghouse EHD 101515 amp breakers.

I 2.0 INrflAL CONDITIONS

1. Reactor is in a cold shutdown OR defueled.

2

2. Verify loads listed in Retum to service steps a

on be taken OOS.

3. Permission has been granted to remove / replace breakers 2Y-06-01 & 05.

a 3.0 ATTACHMENTS 3.1 Maintenance Electrical Safety Checklist, PBF-9044 form 4

3.2 Wire Removal Form. PBF-0036 4.0 REFERENCE DRAWINGS Westinghouse elementary drawing sheets 839,877,878,901.1534, and 1539 5.0 MATERIALS

1. Westinghouse EHD 1015 breaker (Quantity 2) 4 C L. WP saxasJmarr por 9705130088 970505

~

Page 1 of 5 PDR ADOCK 05000301 P

PDR

4 WO WORK PLAN Removal / Replacement of breakers 2Y-06-01 & 05 WO 9612088, 9612094 UNIT 2 January 2,1997 Iloid Step Point No.

Work Plan Description Worker Date NOTE Breakers 2Y-06-01 & OS provide power to COI MOBS 175,178-181,183,184, and 2CO3 MOBS 240, 241, 271, and U2 Preseperator system.

Verify initial conditions have been met.

/-h-9/

g OPS

  • CAUTION
  • ALL COSIPONENTS AND TERMINALS LOCATED IN TIIE PANEL ARE ASSUMED TO BE ENERGlZED, TAKE NECESSARY PRECAINIONS.

Responsible Engineer to perform'a pre-job briefing to include scope of project,

//1//7 2

personnel safety, and installation.

Re FME:

General FME Statement: Tools and equipment shall be checked for loose parts and debris and temporary covers should be installed for foriegn material exclusion (FME) of system /comnonents, per Exclusion of Foreign Material from Plant Components and systems, NP 8.4.10.

/-6-D 3

Verify that breakers 2Y-06-01 & 05 are in the "OFF" position OR coordinate with OPS to place breakers 2Y-06-01 & 05 in "OFF".

(ITN Remove 2Y-06 panel cover. Post panel with appropriate " Danger alive" fg 4

placards.

MTN Disconnect wirmg from breakers 2Y-06-01 & 05, recording wires removed on

~

,., f y 5

PB-0036 Wire Removal Form.

37q

)

/

m Remove breakers 2Y-06-01 & 05 from panel.

f. f s

s 6

MTN NOTE:

Utili:e the spare EllD 1015 breakers removedfrom 2Y-Si(WOs 9613292 & 9613293) for installation in 2Y-06.

Prior to installing the replacement breakers, cycle breakers five times per the following directions; Tf~

, g f.,

7

l. Close breaker
2. Trip breaker using the trip to test button (red) on breaker.
3. Open breaker.
4. Use continuity checks to verify proper positioning of breaker contact on final cycle (closed, trip free, and open.

Acceptance Criteria: Closed f;.1 ohm / Open > 1 Mohm 8

Install the replacement Westinghouse fiHD 1015 breakers in 2Y-06-01 & 05.

/- / ? 5 MTN Reconnect leads using attached PBF-0036 Wire Removal Form.

f f7.,9 9

MTN Page 2 of 5

WO WORK PLAN Removal / Replacement of breakers 2Y-06-01 & 05 WO 9612088,9612094 UNIT 2 January 2,1997 10 Torque the load side leads per the following step.

/- /2 C For breakers with capture wire connections, determine the wire size of the leads connected to the breaker and torque per the following table:

Wire Size

  1. 14 to #10
  1. 8
  1. 6 to #4
  1. 2 to #1/0 Torque Value (in/lbs) 20 40 45 50 Record torque wrench MTE number and calibration date on the WO and work plan.

S-D

/

MTE /Li'r'7'L) ~ c 7 7 Calibration Due Date NOTE Use calibrated digital voltmeterfor thefollowing step.

l'OST MAINTENANCE TEST

]

f_gg PMT:

11 A. Verify that each breaker reads 0 VAC on the load side of the breaker with MTN the breaker open.

B. Verify that each breaker reads a nominal 120 VAC on the load side of the breaker with the breaker closed.

C. Position the breakers to the off position.

FME:

12 Perform a Foreign Materials Exclusion inspection of panel to verify all tools and

/ ~/2 9 foriegn materials are removed TF 13 Reinstall panel cover.

NR 3

_u MN

,m 14 Record all QAR, MTE and t numbers on WO.

/-/ 76 MN ae0 W o

?}.0 p+0 Page 3 of 5

WO WORK PLAN Removal / Replacement of breakers 2Y-06-01 & 05 WO 9612088,9612094 UNIT 2 January 2,1997 l

2Y-06-01 15 RETURN TO SERVICE TESTING Verify power to the fo! lowing loads:

y 1.

Col and CO2 Am Anciator Fan & DC Power Failure Relay Supply 2.

2LS-4100 througn 2LS-4103,2P-10A and 2P 10B Room Drain and Sump Indica ion (rear C01) 1 3.

2FIS-640,2FIS-649 and 2FIS-650, CCW Flow Indicating

//

Switches g7 4,.

4.

2ilC-105, Boric Acid Storage tank (2T-6C) Recirc Iland h

l Controller 5.

21IIC-957, accumulator Nitrogen Supply Controller 6.

2 POT /I-2085, Reheat Steam Supply Temp Controller 7.

2TC-3620, Turbine Lube Oil Temp Controller 4

8.

Generator Bkr 122 and 142, Auxiliary Relays for Computer and Annunciation 9.

2N15-2083, Steam Generator A Sample Isolation

10. 251S-2084, Steam Generator B Sample Isolation
11. Unit 2 Auto Turning Gear Control i
12. 2 SIS-2042 and 251S-2045, Steam Generator Blowdown Steam Isolation Control Valves
13. 2C-144,2 SIS-2090, SW Supply to 2P-29 Seals 2Y-06-05 16 RETURN TO SERVICE TESTING t

Verify power to the following loads; OPS

1. U2 Preseperator system E

4 f

J Page 4 of 5

. ~ - -. -. _ - _

WO WORK PLAN Removal / Replacement of breakers 2Y-06-01 & 05 WO 9612088,9612094 UNIT 2 January 2,1997 Comments:

Old> ! han n o /L,Y 3 L sid a)) jub A

\\

<su,

A N A M /5s Ast it'-e t -l

\\

ATE ir Lm As n JA Vo _l-?

^~

sJL J. MLA w o

~ L A L',,, 11.1L+ A n, L i-l

. J rh A L' H u G

, L'E L 4 2,J L E D,f /,2 4 Jn X A o

? L J/.

911.'L Lu~W '2.2L. rL i: L, n rio A -J l Kb d do

%1% JR Afd/ n. D 1x. AnL w A m !

L L Jbi J n A e:>anL b di b

4 M 4:%:e 1 % '.

~l wMr 6, %&,ymm L'e ;M n'L &n,W,h,x, ' !

^ '-

r o

r

~

l Page 5 of 5

~.. _

Point Beach Nuclear Pltat WIRE REMOVAL LOG Sheet [

of l

His log to be used when more than one wire is lifted at a time.

f-I 7 9 7 Removal Date

/'/1" b Restoration Date i

}

NOTE: Use of thisfonn does not supersede any of the requirements of PBNP 3.1.1 Independent Venfication and Concurrent 4

Checks.

4

^

Fill in the applicable block (s)

Initials Location TB No.

Wire No.

Color First Wire Wire Second Person Rernoved Restored Person Check Check

[

'O$

l

/DL \\l

~

i 4

4 k l ci 4

.1

)

i

)

i i

i i

s 4

1,

[

Attach this form to the procedure or MWR.

'Y O 96/2CSG MWR No.

Other SMP/RMP/ICP No.

Y f

h h

PBF-0036 Rnision 2 04/29/94

  • A'AChM'

'd44+4 ar.+_A.

J_,JA#

,_44p_.gy

.g_

m.

q_

- e. : g.._... f m -

7 g_,

a..__

~

-.. m' 'P ' n,,c,> e=w -

.. ' ^ ~.

.m y:; D.LNGER TAG REOUEST '

'~-

1 W

~~

Work Control Document i M /20 N j

Time /Date of application:

/p jf.f 4 Time /Da:: Tags Requirei

/ 70 0

/p /9 pg l

j l

R: ques::n+ Werk Group:

(mar +rrd'4 A M C(

i Reques:ing Indiv: dual:

'r

=

Responsible Supervisor: /%,m,4 ace $u.pcmwEsn=ated Jco Complenon (Time /Date):

/g,g gfg3 f

Equipment ID:

y' of O /

Unit:

g2, f

t scope of Work:

$wafn-NbCEmE&T" I

Addiciccal Work Control Dccu=ents:

94 /20 f t/-

y of-05~

i Recoc= ended Dacge:' Taggi:g/ Expt:2:icc:

Na ~2gs Req'd:

Couble Isciaten: 0 f

F:si:ive Cat:::i: C Greceding Req'd: C

??.:-ini Re= oval Reg'd: C d

f i

NCDi: 171e RM?.']W!DfP.' Wort Orat? Worz ?!.:n may be refere.:cd. cove;'or :he re : mmc:ded danger : gging.

Refe:ences: GVCTE: Mu::.::c:ude Rev. ?.um:erlcr ::n.~:ded d:cime:::: used :o ver.r:t adeq:::cy.)

4 j

l j4 C7~ M [cfcI b

_l d:c:stica:

.i I'l t

Appencix R:

C Yes C Nc

'I yes. scacd Fire R:t:c Stee:

l 3.

1:..

l LCO Reg'd:

C Yes C No

'I 7e:. 2r. :: CC ::c:c:.ng ?cr= ?SF.9133

Date

I f Re:::wer D a':

Appr:ver 'SRC:

Cate a

NCDE: Addinonal revtews.:::d.=ptw.L: reg'.ilcr t.c. ge or ~='~on: :o :rigir.:.i : gou:. Dec:-be c.ange in inlct na: ion :ccion.

Cite Approve: :SRO)

Date Reviewer j

Rev: ewer Dat:

Approve: :SRC)

Date Tag Sene: No.

Donger Tags.v Longer Required 2nd ? otec:ed Mr:ter Log Sign-Offs Compiece o

I Da::

5,e:pctsicle Supertiser g3 A

b i

w

_rv

\\ I' i

?EF 19Cc4 J

- w. vex i

4

i l

Work Order No. kd/2088 l

Return to Service Testino Reviews e

I

~

t g:

I.vmALs I

??5Ee en!e

/ ?** W ??n-RTS l

f I

/

l-

. wow Gretm 3c=T-N4inte rce ItT ng

\\

CYCLE BtAs CHECXZh6-ConTZAM3*r8 l TE$ W6-7E%P vem, as amaw m wu arcas 1

l l

l i

t l

1 l

A 1

4 V ($)

s Seccen'C ? w -ment v

[

1 1

CTeNbbf7/ YME2 Y*re h crece.T eoere b.f.s bv on d. c e1:, of so 1s~de Us f.e5

  • nte N? ~tr ?

hd

)

t.1 9 7

  • i%

I I

w f

( '*

.,a p

--.__$_.8 d'

- M r v-R _

l SEC'~CM *C Dil~'V=E?3G 2TRK*

N A-p

_