Letter Sequence Meeting |
---|
|
|
MONTHYEARML20136D1721985-12-31031 December 1985 Forwards S&W Proprietary Calculations Re Design of Containment Downcomers Discussed During 851220 Meeting. S&W Affidavit Encl.Calculations Withheld (Ref 10CFR2.790) Project stage: Meeting ML20137M3941986-01-22022 January 1986 Forwards Safety Evaluation Re Power Ascension Program Proposed Test Mods Submitted by 850821,0920,23 & 30 Ltrs. Review of Listed Test Mods Completed.Amend to FSAR for Acceptable Test Mods Requested Project stage: Approval ML20140G0761986-01-31031 January 1986 Summary of 860124 Meeting W/Consultants to Discuss Adequacy of Downcomer Design in Context of Reanalysis Performed by Util.Design Marginal.Recommends Granting OL W/Listed Condition.List of Attendees Encl Project stage: Meeting ML20141N5311986-02-10010 February 1986 Comments on Review of Structural Adequacy of BWR Mark II Downcomers for Nine Mile Point 2 Nuclear Power Station. Allowable Moments Are Less than Calculated Applied Moment of 4914 in-kips Project stage: Other ML20141N5321986-02-14014 February 1986 Summarizes 860124 Meeting W/Nrc & EC Rodabaugh Re Structural Integrity of Facility Downcomer Design.Design Meets Licensing Requirements for Upset & Emergency Conditions Project stage: Meeting ML20236U2261987-11-23023 November 1987 Notification of 871207 Meeting W/S&W & Util in Bethesda,Md to Discuss Downcomers for Facility Project stage: Meeting 1986-01-31
[Table View] |
|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20217D1001999-09-24024 September 1999 Summary of 990901 Meeting with Nmpc,Nyseg & Amergen Energy Co in Rockville,Maryland Re NMPC Plans & Pending Submittal Re Transfer of NMPC Interest & Authorities Under Operating Licenses for Nine Mile Point ML20207K3831998-12-31031 December 1998 Summary of 981218 PRB Meeting Re 2.206 Petition Request from P Gunter to W Travers,Nrc Requesting That NRC Convene Public Hearing to Consider Revocation of Nine Mile Point,Unit 1 Operating License ML20203H2091998-02-24024 February 1998 Summary of 980211 Telcon W/Niagara Mohawk Power Corp on Licensee Progress in Responding to NRC Request for Addl Info Requested During 970822 Telcon Re Licensee Application for License Amend to Change Rc Chemistry Requirements in TSs ML20141H9231997-05-20020 May 1997 Summary of 970516 Telcon W/Niagara Mohawk Power Corp Re Licensee Plans for non-code Repair to Reactor Water Cleanup Sys Piping at Nine Mile Point Nuclear Station 1. List of Participants & Info Submitted by Licensee Encl ML20137Z4011997-04-18018 April 1997 Summary of 970410-11 Telcon W/Util Re Licensee on Core Shroud Welds & Tie Rod Assemblies for Plant ML20147J1271997-04-0707 April 1997 Summary of Telcon on 970403 W/Nmpc to Discuss Licensees Observations from Insp of Weld 32-WD-050 Between Recirculation Sys Suction Piping & Isolation Valve 32-376 at Plant ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20207L9571986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl1986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20215G0561986-10-0707 October 1986 Summary of 860911 Meeting W/Bwr Owners Group in Bethesda,Md Re Strawman Generic Requirements for Enhancing BWR Containment Performance in Severe Accident Conditions.Second Technical Exchange Meeting in mid-Nov 1986 Proposed ML20140G0761986-01-31031 January 1986 Summary of 860124 Meeting W/Consultants to Discuss Adequacy of Downcomer Design in Context of Reanalysis Performed by Util.Design Marginal.Recommends Granting OL W/Listed Condition.List of Attendees Encl ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20136J5351985-08-0909 August 1985 Summary of 850805 Meeting W/Util & S&W in Bethesda,Md Re Preservice & Inservice Insp Programs ML20128N4771985-05-22022 May 1985 Summary of Operating Reactors Events 850515 Meeting.Div Directors or Representatives Briefed on Events Occurring Since 850507 Meeting.Assignment of Followup Review Responsibilities Discussed.Attendance List Encl ML20127M5991985-05-0101 May 1985 Summary of ACRS Subcommittee 850220-21 Meetings w/util,C-E & S&W in Syracuse,Ny Re Application for License.Schedule of meeting,sign-in Sheets of Attendees & List of Meeting Handouts Encl ML20148C1311979-12-20020 December 1979 Summary of Meeting W/Mark II Owners Group in Bethesda,Md Re Status of Several long-term Program Tasks in Advance of Final Documentation.Agenda,List of Attendees & Viewgraphs Encl ML20213D0331979-08-22022 August 1979 Summary of 790717-18 Meeting W/Mark II Owners Group Re long-term Program Tasks ML20213C8911979-03-14014 March 1979 Summary of 790213-14 Meeting W/Mark II Owners Group Re Lead Plant Acceptance Criteria & Intermediate Plant Program Tasks ML20150C6821978-11-13013 November 1978 Agenda for 781128-30 ACRS Meeting in San Francisco of Fluid Hydraulic Dynamic Effects Subcomm Re Mark II LOCA & SRV Pool Dynamic Loads & Load Combinations ML20062A9741978-10-0505 October 1978 Summary of 780921 Meeting Re Proposed Installation of Radwaste Incinerator at Facility.Agenda Encl ML20125C5621978-05-0101 May 1978 Summary of 780309-10 Meeting W/Mark I Owners Group in Bethesda,Md Re Changes in Long Term Program as Reflected in Rev 3 to Mark I Owners Group Program Action Plan ML20127A4681978-03-0101 March 1978 Summary of 771129 Meeting W/Mark I Owners Group & GE in San Franciso,Ca Re Listed Topics,Including Results & Bases for long-term Program Decision Point 3.List of Attendees & Viewgraphs Encl ML20214G8711978-01-11011 January 1978 Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl ML20214G8691978-01-10010 January 1978 Summary of 770518-19 Meetings W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads Program ML20214G8451977-12-0202 December 1977 Summary of 770510 Meeting W/Mark II Owners Executive Committee Re Mark II Containment Dynamic Loads Program.List of Attendees & Viewgraphs Encl ML20214G8351977-11-29029 November 1977 Summary of 770401 & 0707 Meetings W/Mark II Owners & GE Re Methods for Combining Dynamic Loads for Structural Design of Mark II Containment.List of Attendees & Viewgraphs Encl ML20214G7951977-08-0202 August 1977 Summary of 770729 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Load Program ML20214G7841977-06-23023 June 1977 Summary of 770615 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Loads.List of Attendees Encl ML20214G7741977-06-0808 June 1977 Summary of 770526 Meeting W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads.List of Meeting Attendees Encl ML20141N3471977-05-20020 May 1977 Summary of 770411 Meeting W/Mark I Owners Group & GE to Discuss Structural Acceptance Criteria for Mark I Containment long-term Program.List of Attendees Encl ML20214G6951977-04-18018 April 1977 Summary of 770216-17 Meeting W/Mark II Owners,Ge & BNL Re Mark II Containment Pool Dynamic Load Support Program.List of Meeting Attendees & Viewgraphs Encl ML20214G4271976-12-29029 December 1976 Summary of 761202 Meeting W/Mark II Owners & GE Re Mark II Containment Structural Design & Pool Dynamic Loads Supporting Program.Attendee List & Viewgraphs Encl ML20214G4371976-12-0707 December 1976 Summary of 761027-28 Meetings W/Mark II Owners,Ge & BNL Re Pool Dynamic Loads Analytical Model & Test Program.Lists of Attendees & Viewgraphs Encl ML20125C5711976-09-0909 September 1976 Summary of 760812 Meeting W/Mark I Owners Group,Ge,Epri & Techncial Consultants Re Listed Long Term Program Tasks ML20125C5721976-09-0909 September 1976 Summary of 760819 Meeting W/Mark I Owners Group,(Ge) in Bethesda,Md Re Discussions on Mark I Containment Ltp.List of Attendees Encl ML20125D6581976-08-18018 August 1976 Summary of 760717-08 Meeting W/Representatives of Mark I Owners Group in Bethesda,Md Re Discussions on Reassessed Content of Mark I Containment LTP & Recently Submitted Responses to Questions on STP Final Rept ML20214G4501976-06-0808 June 1976 Summary of 760429 Meeting W/Ge,Mark II Owners & Respective Aes Re GE 751105 Design Basis Document NEDE-21061, Mark II Containment Dynamic Forcing Function Info Rept (Dffr) ML20214G6031975-08-26026 August 1975 Summary of 750821 Meeting W/Mark II Owners,Sargent & Lundy, Bechtel,S&W & B&R in Bethesda,Md Re Load Factors & Load Combinations for Assessing Capability of Mark II Containments to Accommodate Safety/Relief Valve Loads ML20235E9641975-08-0606 August 1975 Summary of 750717 Meeting W/Mark I Owners Group Re Role of Mark I Owners Group Program & Schedule for Determining Mark I Safety/Relief Valve & LOCA Dynamic Loads & Impact of Loads on Operating Mark I Plants.List of Attendees Encl ML20214G7791975-07-0303 July 1975 Summary of 750630 Meeting W/Mark II Owners,Aes & GE in Bethesda,Md Re Role of Mark II Owners,Status of Const of Various Mark II Units & Program for Determining Mark II LOCA & Safety/Relief Valve Loads 1999-09-24
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217D1001999-09-24024 September 1999 Summary of 990901 Meeting with Nmpc,Nyseg & Amergen Energy Co in Rockville,Maryland Re NMPC Plans & Pending Submittal Re Transfer of NMPC Interest & Authorities Under Operating Licenses for Nine Mile Point ML20207K3831998-12-31031 December 1998 Summary of 981218 PRB Meeting Re 2.206 Petition Request from P Gunter to W Travers,Nrc Requesting That NRC Convene Public Hearing to Consider Revocation of Nine Mile Point,Unit 1 Operating License ML20203H2091998-02-24024 February 1998 Summary of 980211 Telcon W/Niagara Mohawk Power Corp on Licensee Progress in Responding to NRC Request for Addl Info Requested During 970822 Telcon Re Licensee Application for License Amend to Change Rc Chemistry Requirements in TSs ML20141H9231997-05-20020 May 1997 Summary of 970516 Telcon W/Niagara Mohawk Power Corp Re Licensee Plans for non-code Repair to Reactor Water Cleanup Sys Piping at Nine Mile Point Nuclear Station 1. List of Participants & Info Submitted by Licensee Encl ML20137Z4011997-04-18018 April 1997 Summary of 970410-11 Telcon W/Util Re Licensee on Core Shroud Welds & Tie Rod Assemblies for Plant ML20147J1271997-04-0707 April 1997 Summary of Telcon on 970403 W/Nmpc to Discuss Licensees Observations from Insp of Weld 32-WD-050 Between Recirculation Sys Suction Piping & Isolation Valve 32-376 at Plant ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20207L9571986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl1986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20215G0561986-10-0707 October 1986 Summary of 860911 Meeting W/Bwr Owners Group in Bethesda,Md Re Strawman Generic Requirements for Enhancing BWR Containment Performance in Severe Accident Conditions.Second Technical Exchange Meeting in mid-Nov 1986 Proposed ML20140G0761986-01-31031 January 1986 Summary of 860124 Meeting W/Consultants to Discuss Adequacy of Downcomer Design in Context of Reanalysis Performed by Util.Design Marginal.Recommends Granting OL W/Listed Condition.List of Attendees Encl ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20136J5351985-08-0909 August 1985 Summary of 850805 Meeting W/Util & S&W in Bethesda,Md Re Preservice & Inservice Insp Programs ML20128N4771985-05-22022 May 1985 Summary of Operating Reactors Events 850515 Meeting.Div Directors or Representatives Briefed on Events Occurring Since 850507 Meeting.Assignment of Followup Review Responsibilities Discussed.Attendance List Encl ML20127M5991985-05-0101 May 1985 Summary of ACRS Subcommittee 850220-21 Meetings w/util,C-E & S&W in Syracuse,Ny Re Application for License.Schedule of meeting,sign-in Sheets of Attendees & List of Meeting Handouts Encl ML20148C1311979-12-20020 December 1979 Summary of Meeting W/Mark II Owners Group in Bethesda,Md Re Status of Several long-term Program Tasks in Advance of Final Documentation.Agenda,List of Attendees & Viewgraphs Encl ML20213D0331979-08-22022 August 1979 Summary of 790717-18 Meeting W/Mark II Owners Group Re long-term Program Tasks ML20213C8911979-03-14014 March 1979 Summary of 790213-14 Meeting W/Mark II Owners Group Re Lead Plant Acceptance Criteria & Intermediate Plant Program Tasks ML20062A9741978-10-0505 October 1978 Summary of 780921 Meeting Re Proposed Installation of Radwaste Incinerator at Facility.Agenda Encl ML20125C5621978-05-0101 May 1978 Summary of 780309-10 Meeting W/Mark I Owners Group in Bethesda,Md Re Changes in Long Term Program as Reflected in Rev 3 to Mark I Owners Group Program Action Plan ML20127A4681978-03-0101 March 1978 Summary of 771129 Meeting W/Mark I Owners Group & GE in San Franciso,Ca Re Listed Topics,Including Results & Bases for long-term Program Decision Point 3.List of Attendees & Viewgraphs Encl ML20214G8711978-01-11011 January 1978 Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl ML20214G8691978-01-10010 January 1978 Summary of 770518-19 Meetings W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads Program ML20214G8451977-12-0202 December 1977 Summary of 770510 Meeting W/Mark II Owners Executive Committee Re Mark II Containment Dynamic Loads Program.List of Attendees & Viewgraphs Encl ML20214G8351977-11-29029 November 1977 Summary of 770401 & 0707 Meetings W/Mark II Owners & GE Re Methods for Combining Dynamic Loads for Structural Design of Mark II Containment.List of Attendees & Viewgraphs Encl ML20214G7951977-08-0202 August 1977 Summary of 770729 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Load Program ML20214G7841977-06-23023 June 1977 Summary of 770615 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Loads.List of Attendees Encl ML20214G7741977-06-0808 June 1977 Summary of 770526 Meeting W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads.List of Meeting Attendees Encl ML20141N3471977-05-20020 May 1977 Summary of 770411 Meeting W/Mark I Owners Group & GE to Discuss Structural Acceptance Criteria for Mark I Containment long-term Program.List of Attendees Encl ML20214G6951977-04-18018 April 1977 Summary of 770216-17 Meeting W/Mark II Owners,Ge & BNL Re Mark II Containment Pool Dynamic Load Support Program.List of Meeting Attendees & Viewgraphs Encl ML20214G4271976-12-29029 December 1976 Summary of 761202 Meeting W/Mark II Owners & GE Re Mark II Containment Structural Design & Pool Dynamic Loads Supporting Program.Attendee List & Viewgraphs Encl ML20214G4371976-12-0707 December 1976 Summary of 761027-28 Meetings W/Mark II Owners,Ge & BNL Re Pool Dynamic Loads Analytical Model & Test Program.Lists of Attendees & Viewgraphs Encl ML20125C5711976-09-0909 September 1976 Summary of 760812 Meeting W/Mark I Owners Group,Ge,Epri & Techncial Consultants Re Listed Long Term Program Tasks ML20125C5721976-09-0909 September 1976 Summary of 760819 Meeting W/Mark I Owners Group,(Ge) in Bethesda,Md Re Discussions on Mark I Containment Ltp.List of Attendees Encl ML20125D6581976-08-18018 August 1976 Summary of 760717-08 Meeting W/Representatives of Mark I Owners Group in Bethesda,Md Re Discussions on Reassessed Content of Mark I Containment LTP & Recently Submitted Responses to Questions on STP Final Rept ML20214G4501976-06-0808 June 1976 Summary of 760429 Meeting W/Ge,Mark II Owners & Respective Aes Re GE 751105 Design Basis Document NEDE-21061, Mark II Containment Dynamic Forcing Function Info Rept (Dffr) ML20214G6031975-08-26026 August 1975 Summary of 750821 Meeting W/Mark II Owners,Sargent & Lundy, Bechtel,S&W & B&R in Bethesda,Md Re Load Factors & Load Combinations for Assessing Capability of Mark II Containments to Accommodate Safety/Relief Valve Loads ML20235E9641975-08-0606 August 1975 Summary of 750717 Meeting W/Mark I Owners Group Re Role of Mark I Owners Group Program & Schedule for Determining Mark I Safety/Relief Valve & LOCA Dynamic Loads & Impact of Loads on Operating Mark I Plants.List of Attendees Encl ML20214G7791975-07-0303 July 1975 Summary of 750630 Meeting W/Mark II Owners,Aes & GE in Bethesda,Md Re Role of Mark II Owners,Status of Const of Various Mark II Units & Program for Determining Mark II LOCA & Safety/Relief Valve Loads 1999-09-24
[Table view] |
Text
. .
- UNITED STATES 8 'o,A NUCLEAR REGULATORY COMMISSION
(.....,/ .
JAN 311986 Docket No.: 50-410 ;
MEMORANDUM FOR: R. M. Bernero, Director Division of BWR Licensing THRU:
G. C. Lainas, Assistant Director for BWR Division of BWR Licenisng i
FROM: B. D. Liaw, Chief Engineering Branch Division of BWR Licensing
SUBJECT:
DOWNCOMER DESIGN FOR NINE MILE POINT NUCLEAR STATION, UNIT 2 (NMP-2)
REFERENCE:
Letter from C. V. Mangan to E. Adensam, dated 1/23/86,regardingabovesubject.
On January 24, 1986, the NRC staff met with its consultants to discuss the adequacy of NMP-2 downcomer design in the context of a reanalysis performed by the applicant, Niagara Mohawk Power Corporation, and transmitted by the letter referenced above. The list of attendees is attached. The discussion focused on the acceptability of the design of the downcomers for NMP-2 and on corrective actions that might be required if the current design is found unacceptable.
On the basis of a review of the applicant's reanalysis and assuming that; -
there are no significant errors in the new calculations; and the way that the applicant applies the 800-series chugging loads is acceptable, the staff and the consultants (the Group) conclude that the unbraced downcomer design at NMP-2 is marginal. The Group also concludes that the NMP-2 design meets the licensing criteria for upset and emergency conditions; however, the applicant has not adequately demonstrated the design adequacy for the faulted condition. 51ecifically the downcomer may lose geometrical stabilitybeforereac11ngthecalculatedstresslevelsforthefaulted condition.
, 1
Contact:
R. Li
- X-24417 I g(ooaosOK5s)@yg. l
o .
o
. R. M. Bernero JAN 311555 In reaching these conclusions, the Group discussed technical areas where excessive design conservatisms may be reduced in order to justi,fy the adequacy of the downcomer design; e.g.,
higher structural dampir.g; load combination methodology; use of cert.ified material data (yield strengths) instead of Code-specified minimum; and load definitions.
1 Other than the use of certified material data, the applicant has already taken credit for the relaxed criteria that the NRC staff has accepted. The
, Group was informed that the downtomer pipes are rolled-and-welded, not seamless pipes. Attual material yield strengths would be higher for the latter. For welded pipes, some geometrical imperfections (out-of-i roundn'ess, non uniformities in seam welds, etc.) and the residual stresses j are present; therefore, it may not be appropriate to provide relief in this area unless one can quantify the effect of these imperfections and residual j stresses to properly allow for the use of certified material data, i In spite of the conclusions stated above, the Group recommends that the staff proceed with granting an operational license on the condition that by the first refueling, the design adequacy with respect to the faulted condition be demonstrated, e.g., out-of plant testing which simulates the downcomer installation for NMP-2, or hardware modifications to the downcomers be made during the first refueling outage. The bases for this recommendation are as follows: .
Themateria]usedfortheNMP-2recirculationpipingsystemis316NG which is cohsidered much less susceptible to intergranular stress i
corrosion ended pipecracking; therefore,ll.theprobabilityofhavingamajordouble-break is rather sma The probability of the simultaneous occurrence of a LOCA and SSE is small for the life of the plant and is even smaller during the first fuel cycle.
The existing design is adequate to meet either SSE or LOCA loads in combi-nation with other normal loads, but not both.
R. M. Bernero JAN 31 1935 Therefore, the Group concludes that the oleration of the plant to the first refueling outage poses no significant risi to the public healtd and safety.
iq..:':-t *; :
C. :;. D::t B. D. Liaw, Chief Engineering Branch i Division of BWR Licensing i
Attachment:
As stated i
, cc: H. R. Denton l
D. G. Eisenhut R. W. Houston G. C. Lainas 1 E. Adensam M. Haughy R. LaGrange W. Hazelton R. Hermann E. Rodabaugh G. Wilkowski B. Saffell .
R. Mesloh M. Hartzman K. Wichman C. P. Tan Y. Li -
DISTRIBUTION:
umb - Docket Files BWEB Reading Files BWEB NMP-2 Files BWEB Li Chron. Files l
l 3 1
- SEE PREVIOUS SHEET FOR CONCURRENCE. s~
j i k Otc : BWEB : BWEB : 5 ] : WD0 : : ;
........__....__.......____.......$.4(.M..:...[A ........... __ .__......__.........__.......
NAME :R. Li: jar :R.LaGrange : BOLibw : G. (nas : R.B ro :
DATE : 1/28/86 :1/ /86 : 1/qi /86 : 1/ g\ /86 : / /8 : :
0FFICIAL RECORD COPY,. .
_ ~ . - . _ _ _ . - - _ . -
ATTACHMENT
- LIST OF ATTENDEES MEETING ON DOWNCOMERS NMP-2 JANUARY 24, 1986 NRC Staff:
R. Bernero - Director, DBL (part-time)
G. Lainas - Assistant Director, DBL (part-time)
B. D. Liaw - Chief, EB, DBL Y. C. Li - Mechanical Engineer, EB, DBL C. P. Tan - Structural Engineer, EB, DBL M. Hartzman - Sr. Mechanical Engineer, EB, DPL-B K. Wichman - Sr. Materials Engineer, EB, DPL-B Consultants:
E. C. Rodabaugh (E. C. Rodabaugh & Associates)
G. Wilkowski (BCL)
B. Saffell (BCL)
R. Mesloh (BCL) c h*-
\ '
s