MONTHYEARML18018B1161985-09-30030 September 1985 Nine Mile Point Unit 2 - Detailed Control Room Design Review Final Summary Report Program Implementation Volume 2 Project stage: Request ML20136D1721985-12-31031 December 1985 Forwards S&W Proprietary Calculations Re Design of Containment Downcomers Discussed During 851220 Meeting. S&W Affidavit Encl.Calculations Withheld (Ref 10CFR2.790) Project stage: Meeting IR 05000220/19850141985-12-31031 December 1985 Exam Rept 50-220/85-14 on 850910-12.Exam Results:All Candidates Passed.Util 851004 Comments & Recommendations to NRC Re Reactor & Senior Reactor Operator Exams on 850910 Encl Project stage: Request IR 05000220/19850231986-01-0808 January 1986 Insp Repts 50-220/85-23 & 50-410/85-40 on 851125-27.No Violation or Deviation Noted.Major Areas Inspected:Nuclear Matl Control & Accounting,Organization & Operation,Shipping & Receiving,Inventory & Mgt of Matls Control Sys Project stage: Request ML20137M3941986-01-22022 January 1986 Forwards Safety Evaluation Re Power Ascension Program Proposed Test Mods Submitted by 850821,0920,23 & 30 Ltrs. Review of Listed Test Mods Completed.Amend to FSAR for Acceptable Test Mods Requested Project stage: Approval ML17055B1431986-01-23023 January 1986 Forwards Proprietary S&W Calculations Re Design of Facility Containment Downcomers & Response to NRC Concerns Discussed in .Calculations Supersede Calculations Submitted on 851231.Encls Withheld (Ref 10CFR2.790) Project stage: Other IR 05000410/19850481986-01-24024 January 1986 Preoperational Security Program Insp Rept 50-410/85-48 on 851216-19.No Violation Noted.Major Areas Inspected:Review of Implementing Procedures for Receipt of Snm.Info Partially Withheld (Ref 10CFR2.790) Project stage: Request ML17055B2251986-01-31031 January 1986 Advises That Based on Review of Recent Applicant Submittals, Unbraced Downcomer Design Marginal.Although Licensing Criteria for Upset & Emergency Conditions Met,Design Adequacy for Faulted Condition Inadequately Demonstrated Project stage: Approval ML20140G0761986-01-31031 January 1986 Summary of 860124 Meeting W/Consultants to Discuss Adequacy of Downcomer Design in Context of Reanalysis Performed by Util.Design Marginal.Recommends Granting OL W/Listed Condition.List of Attendees Encl Project stage: Meeting ML20141N5311986-02-10010 February 1986 Comments on Review of Structural Adequacy of BWR Mark II Downcomers for Nine Mile Point 2 Nuclear Power Station. Allowable Moments Are Less than Calculated Applied Moment of 4914 in-kips Project stage: Other ML17055B2811986-02-12012 February 1986 Forwards Bd Liaw 860131 Memo to RM Bernero,Summarizing 860124 Meeting W/Consultants Re Downcomers Project stage: Meeting ML20141N5321986-02-14014 February 1986 Summarizes 860124 Meeting W/Nrc & EC Rodabaugh Re Structural Integrity of Facility Downcomer Design.Design Meets Licensing Requirements for Upset & Emergency Conditions Project stage: Meeting ML17058A5221986-03-18018 March 1986 Forwards Draft SER & NRC Consultants Repts on Downcomer Design Issue.Nrc Reviewing 860218 Exemption Request Project stage: Draft Approval ML17055B4471986-04-0101 April 1986 Notification of 860402 Meeting W/Util in Bethesda,Md Re Loads on Downcomers Project stage: Meeting ML17055B5571986-04-23023 April 1986 Summary of 860402 Meeting W/Util & S&W Re Structural Adequacy of Downcomers.Handout & List of Attendees Encl Project stage: Meeting ML17055B9351986-06-26026 June 1986 Forwards Draft Section 6 of Sser 3 Containing Util Request for Exemption on Downcomers Project stage: Draft Approval ML17055C1551986-07-31031 July 1986 Staff Requirements Memo Re Commission 860723 Briefing in Washington,Dc on Status of near-term OL Plants Project stage: Other ML17055C6661986-11-26026 November 1986 Requests Info to Assess Util Progress in Completing Actions Required to Meet GDC 2 & to Schedule NRC Review of Downcomer Issue,No Later than 10 Working Days Before Commission Briefing.Info Should Include Progress Since 860218 Project stage: Approval ML20236U2261987-11-23023 November 1987 Notification of 871207 Meeting W/S&W & Util in Bethesda,Md to Discuss Downcomers for Facility Project stage: Meeting ML17055D4541987-12-16016 December 1987 Summary of 871207 Meeting W/Util & S&W Re Downcomers for Facility.Handout & List of Meeting Attendees Encl Project stage: Meeting NUREG-0808, Forwards Safety Evaluation Accepting Revised Safety Relief Valve & Condensation Oscillation Loads Per NUREG-0802 & NUREG-0808 & Temp Cutoff Value Used for Elimination of Data Base for Load Computations1988-06-29029 June 1988 Forwards Safety Evaluation Accepting Revised Safety Relief Valve & Condensation Oscillation Loads Per NUREG-0802 & NUREG-0808 & Temp Cutoff Value Used for Elimination of Data Base for Load Computations Project stage: Approval 1986-02-12
[Table View] |
Text
-
t
^o UNITED STATES y
NUCLEAR REGULATORY COMMISSION U
1 wasHWGTON, D. C. 2065$
\\...../
January 22, 1986 Docket No. 50-354 Mr. Corbin A. McNeill, Jr., Vice President-Nuclear Public Service Electric & Gas Company Nuclear Administration Building P. O. Box 236 i
Hancocks Bridge, New Jersey 08038
)
Dear Mr. McNeill:
I
SUBJECT:
HOPE CREEK POWER ASCENSION PROGRAM TEST f1ODIFICATIONS By letters dated August 21, September 20.23 and 30, 1985 PSE&G submitted for i
staff review a number of proposed test modifications to the Hope Creek Power Ascension Program. The proposed test modifications were submitted for staff review as part of a program to accelerate power ascension testing for Hope Creek. Additionally, the Hope Creek accelerated power ascension program is the lead plant in an effort by General Electric to similarly accelerate the power ascension program on a number of other boiling water reactors.
i The staff has completed its review of the following test modifications 1
proposed in the above referenced letters:
l.
Automatic Load Following 2.
Test No.17 Core Performance 3.
Test No. 27 - Recirculation Flow Control System l
4.
Test No. 12 - RCIC System j
5.
Test No. 13 - HPCI System 6.
Test No.14A - Selected process Temperatures j
7.
Test Condition 4 - Natural Circulation Operation 8.
Test No. 20 - Pressure Regulator j
9.
Test No. 21A - Feedwater System Response Testing t
The safety evaluation detailing each review is attached.
For those test modifications which the staff has accepted (Items 1,4,5,6,8 in part and 9
}
in part), we request that the Hope Creek FSAR be amended.
I Sincerely, b-
~
_w = s e --
Robert Bernero, Director Division of BWR Licensing
{
Office of Nuclear Reactor Regulation cc w/ enclosure l
See next page
,l y 3...; ; '. f&
Ve i
A
s Mr. C. A. McNeill Public Service Electric & Gas Co.
Hope Creek Generating Station cc:
Gregory Minor Susan C. Remis Richard Hubbard Division of Public Interest Advocacy Dale Bridenbaugh New Jersey State Department of MHB Technical Associates the Public Advocate 1723 Hamilton Avenue, Suite K Richard J. Hughes Justice Comples San Jose, California 95125 CN-850 Trenton, New Jersey 08625 Troy B. Conner, Jr. Esquire Office of Legal Counsel Conner & Wetterhahn Department of Natural Resources 1747 Pennsylvania Avenue N.W.
and Environmental Control Washington, D.C.
20006 89 Kings Highway P.O. Box 1401 Dover, Delaware 19903 Richard Fryling, Jr., Esquire Mr. K. W. Burrowes, Project Engineer Associate General Solicitor Bechtel Power Corporation Public Service Electric & Gas Company 50 Beale Street P. O. Box 570 T5E P. O. Box 3965 Newark, New Jersey 07101 San Francisco, California 94119 Manager - Licensing Regulation Resident Inspector c/o Public Service Electric & Gas U.S.N.R.C.
Bethesda Office Center, Suite 550 P. O. Box 241 4520 East-West Highway Hancocks Bridge, New Jersey 08038 Bethesda, Maryland 20814 Ms. Rebecca Green Richard F. Engel New Jersey Bureau of Radiation Deputy Attorney General Protection Division of Law 380 Scotch Road Environmental Protection Section Trenton, New Jersey 08628 Richard J. Hughes Justice Complex CN-112P Trenton, New Jersey 08625 Mr. Robert J. Touhey, Mr. Anthony J. Pietrofitta Acting Director General Manager DNREC - Division of Power Production Engineering Environmental Control Atlantic Electric 89 Kings Highway 1199 Black Horse Pike P. O. Box 1401 Pleasantville, New Jersey 08232 Dover, Delaware 19903 Regional Administrator, Region I Mr. R. S. Salvesen U. S. Nuclear Regulatory Commission General Manager-Hope Creek Operation 631 Park Avenue Public Service Electric & Gas Co.
King of Prussia, Pennsylvania 19406 P.O. Box A Hancocks Bridge, New Jersey 08038
i 3
l 2
1 Public Service Electric & Gas Co.. Hope Creek Generating Station f
cc:
Mr. B. A. Preston I
Public Service Electric & Gas Co.
Hope Creek Site MC12Y Licensing Trailer 12LI Foot of Button wood Road j
Hancock's Bridge, New Jersey 08038 1
I i
i i
k j
I 1
i 4
I i
i 1
e go I
e l
i l
-