ML20138Q278

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-4 & NPF-7,changing Unit 1 Tech Spec Section 3/4.8.1, AC Sources to Address Concerns in Unit 2 Tech Specs Re Emergency Diesel Generators.Fee Paid
ML20138Q278
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/19/1985
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Rubenstein L
Office of Nuclear Reactor Regulation
Shared Package
ML20138Q280 List:
References
85-718, GL-84-15, NUDOCS 8512270126
Download: ML20138Q278 (3)


Text

r VIHOINIA EI.n:c'rHIC AND POWI5H COMI*ANY H s e n w ox n, Vi nen ix A c:3 n r.1 w,I..STEWANT Varm Psamassmer Narta. man Ormaatsome December 19, 1985 Mr. Harold R. Denton, Director Serial No.85-718 Office of Nuclear Reactor Regulation N0/ ALM:vlh Attn:

Mr. Lester S. Rubenstein, Director Docket No.

50-338 PWR Project Directorate #2 50-339 Division of PWR Licensing - A License No. NPF-4 U. S.

Nuclear Regulatory Commission NPF-7 Washington, D. C.

20555 Gentlemen:

VIRGINIA ELECTRIC dND POWER COMPANY NORTH ANNA PO)CR STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGE Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License Nos. NPF-4 and NPF-7 for North Anna Power Station Unit Nos. I and 2.

The proposed changes are to Section 3/4.8.1, AC Sources, of the North Anna Unit 1 Technic.a1 Specifications (see Attachment 1). These changes address Emergency Diesel Generators (EDG) reliability concerns that were identified at North Anna in the recent Unit 2 EDG Technical Specification change.

The proposed Unit I

changes are consistent with the recommendations of Generic Letter 84-15, Proposed Staff Actions To Improve and Maintain Diesel Generator Reliability, and the recently approved Unit 2 Technical Specifications. Since the proposed changes are upgrading our existing Unit 1 Technical Specifications and are similar to the Unit 2 approved changes, no detailed explanation of the changes are included.

Proposed changes to the same section of Unit 2 Technical Specifications are being submitted to correct several typographical errors and one inconsistency in the use of a defined term. These proposed changes do not change the intent of the Technical Specifications, but are merely administrative changes to correct errors.

8512270126 851219 ADD:

PWR - A/BC's TECl! SUPPORT PDR ADOCK 0500 8

e P

AD - J. KNIGliT (1tr only)

EB (BALLARD)

EICSB (ROSA)

O PSB (GA>DlILL)

J RSB (BERLINGER)

(

f pg F0B (BENAH0YA)

TJ j

VinosurA Eu.craic anu Powra Cowrawr to

!!r. Ilarold R. Denton This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this change does not pose an unreviewed safety question as defined in 10 CFR 50.59 and does not pose a significant hazards consideration as defined in 10 CFR 50.92.

We have included as attachments the effected pages of Unit 1 Technical Specifications (Attachment 1), a brief discussion of the proposed changes for Unit I with a Safety and Significant Hazards Review (Attachment 2), a historical outline of significant testing and maintenance events for the Unit 1 EDG's (Attachment 3), the effected pages of Unit 2 Technical Specifications (Attachment 4), and a brief discussion of the Unit 2 proposed changes (Attachment 5).

If you have any questions, or need additional information to process this request, please contact us.

Very truly yours, i

W. L. Stewart cc:

Dr. J. Nelson Grace Regional Administrator hRC Region II Mr. M. W. Branch NRC Resident Inspector North Anna Power Station u

COMMONWEALTH OF VIRGINIA )

)

CITY OF RICHMOND

)

The foregoing document was acknowledged before me, in and for the City and Coimmonwealth aforesaid, today by W.

L.

Ste' wart who is Vice President

. Nuclear Operations, of Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company,.and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this M day of D c o < dw.-

, 19 $ 6 My Conanission expires: Edwm

\\o

,19%C\\

Lo %Mb%go Nothry Public (SEAL)