Insp Rept 50-155/85-18 on 850909-10,25-26 & 1009-10.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp Work Activities,Including Generic Ltr 84-11 Insp
ML20138H531
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/24/1985
From: Danielson D, Ward K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20138H483 List:
References
50-155-85-18, GL-84-11, NUDOCS 8510290066
Download: ML20138H531 (5)


Text

.. _ _ , _ _ - . - - . - - - _ _ _ .-. _ - . _ = - - ..

'I l-

.

l

^

U.S. NUCLEAR REGULATORY COMMISSION l REGION III

i i Report No. 50-155/85018(DRS)

} Docket No. 50-155 License No. DPR-6

.

Licensee: Consumers Power Company j 212 West Michigan Avenue

Jackson. MI 49201 4

Facility Name: Big Rock Point Nuclear Plant i

.

-l i Inspection At: Big Rock Site, Charlevoix, Michigan i

Inspection Conducted: September 9-10, 25-26 and Oc.tober 9-10, 1985 >

Inspector:

$A Yd K. D. Ward /h) J'

l

<

Date l

I Approved By:

M D. H. Danielson, Chief b /d 24/ff Materials and Processes Date/

. Section i

1  :

Inspection Summary 2

]

l Inspection on September 9-10, 25-26, and October 9-10, 1985 (Report

No. 50-155/85018(DRS))

. Areas Inspected: Routine, unannounced inspection of inservice inspection (ISI) work activities including NRC Generic letter 84-11 inspections. This 4 inspection involved a total of 27 inspector-hours by one NRC inspector including 3 inspector-hours during off-shift .

Results: No violation or deviations were identified.

I

!

i

1 i i i

,

,

,

,

i l  !

% i l G "%88# !!488f33 PDR I j

i , [

_ -. _ . _ ... _ - _ .-_ _ _ _ ._.. _ . _ . _ . _ . . _ . . - . . . _ _ _ - - . . . _ . _ _ .

.

.

DETAILS 1. Persons Contacted Consumers Power Company (CPCo)

  • L. Monshor, QA Superintendent
  • G. Withrow, Engineering and Maintenance Superintendent
  • R. Alexander, Technical Engineer R. Abel, Production and Performance Superintendent M. Acker, ISI Coordinator J. Toskey, General Engineer Nuclear Regulatory Commission (NRC)
  • S. Guthrie, Senior Resident Inspector Magnaflux Quality Services (HQS)

D. Culver, Level III Factory Mutual Engineering D. Young, ANII Supervisor R. Riegler, ANII The inspector also contacted and interviewed other licensee and contractor employee * Denotes those present at the final exit interview October 10, 198 . Inservice Inspection General CPCo contracted Consumers Power Company Systems Protection and Laboratory Services (SP&LS) and Magnaflux Quality Services (MQS)

to perform the ISI in accordance with ASME Section XI, 1977 Edition, Summer 1978 Addend NRC Generic Letter 84-11 " Inspections of BWR Stainless Steel Piping" was sent to all licensees of operating reactors, applicants for oper-ating license, and holders of construction permits for boiling water reactors on April 19, 1984. Examinations conducted at several boiling water reactors (BWRs) revealed intergranular stress corrosion cracking (IGSCC) in large diameter Recirculation and Residual Heat Removal (RHR)

System pipin These examinations were conducted pursuant to IE Bulletin 82-03, Revision 1, and IE Bulletin 83-0 . _ - _

.. _ - . - _ _ . _ _ .

.

.

The following table was the licensee's sampling plan for addressing the IGSCC concerns in NRC Generic Letter 84-11:

Pipe Inspected This Size Outage GL-84-11 System 24" 2 Recirculation 17" 3 Recirculation 14" 4 Recirculation 6" 3 Shut Down (Big Rocks, RHR)

5" 3 Recirculation 4" 3 Recirculation Total 18 Percent 20% (18 of 87)

The above welds were examined and found to be acceptabl MQS performed liquid penetrant (PT) and ultrasonic examinations (UT). The Level II and III UT personnel performing evaluations on crack indications were qualified at the EPRI NDE Center by success-fully performing the practical IE Bulletin 83-02 examinatio SP&LS performed PT, UT, liquid penetrant (PT) and visual examinations (VT).

SP&LS did not perform NDE on the recirculation and shut down system welds. (NRC Generic Letter 84-11).

b. Program Review Consumers Power Company's centralized inservice inspection (ISI)

program was disbanded. In its place each operating plant now has its own independent program for performing the ISI function. The NRC inspector reviewed the SP&LS Department Nondestructive Testing (NDT) Services 1985 Big Rock Point Inservice Examination Program

Plan, No. NDT-PP-12, Revision 0, and the CPCo Outage Plan, Revision 0, and found them to be acceptable.

'

i c. Procedure Review

The inspector reviewed the following procedures:

  • CPCo, Magnetic Particle Examination, No. NDT-MT-03, Revision * CPCo, Liquid Penetrant Examination, No. NDT-PT-03, Revision * CPCo, Ultrasonic Thickness Measurements, No. NDT-UT-02 Revision * CPCo, Ultrasonic Examination of Ferris, Austenitic Piping and Branch Connection Welds, No. NDT-UT-03, Revision * CPCo, Ultrasonic Examination of Studs, Bolts, and Pins, No. NDT-UT-07 Revision 0, i

- .

.

.

  • CPCo, Visual Examination, No. NDT-UT-03, Revision * MQS, Magnetic Particle Examination Dry Method (Yoke),

No. 21.A.3, Revision >

  • MQS, Magnetic Particle Examination of RPV Closure Studs and Nuts Wet Method, No. 21.A.4, Revision * HQS, Ultrasonic Examination of Class 1 and 2 Vessel Welds in Ferris Materials Greater than 1 inch in thickness, No. 22.A.15, Revision '
  • MQS, Ultrasonic Examination of class 1 and 2 Piping Welds, No. 22.A.16, Revision * HQS, Ultrasonic Examination of Dissimilar Metal Welds in Class 1 and 2 Piping Systems, No. 22.A.19, Revision * MQS, Ultrasonic Examination, General Requirements No. 22.A.21, Revision * MQS, Ultrasonic Examination of Austenitic Piping and Branch Connection Welds, No. 22.A.34 9evision * MQS. Ultrasonic Examination of Austenitic Piping and Branch Co ur.ction Welds for IGSCC, No. 22.A.35, Revision 3.

'

  • HQS, d.' asonic Examination of Closed Pressure Vez.sel Support Welds, No. 22.A.37, Revision !
  • MQS, Ultrasonic Examination of CRD "J" Welds, No. 22.A.46, Revision 0.

,

  • HQS, Ultrasonic Examination of CRD Housings, No. 22.A.47,
Revision * HQS, Ultrasonic Examination of Stub tubes to Lower RPV Head
Welds, No. 22.A.45, Revision 0.

[

  • MQS, Penetrant Examination of Class 1 and 2 Components, Visible Dye, No. 23.A.1, Revision 2.

l * MQS, ISI Visual Examination /VT-1, No. 26.A.200, Revision NDE Personnel Certifications and Observation of Work Activities The NRC inspector reviewed several NDE personnel certifications in accordance with SNT-TC-1A.

j The NRC inspector also observed the work and had discussions with

! personnel during liquid penetrant examination on weld No. 6-CSS-201-7 and ultrasonic examination on weld No. 6-ECS-102-14. These observa-l 'tions included calibrations, performance of the examinations, and l . review of documentation.

'

, 4

,

.. . -. .

. ,. - -

.

. Review of Data, Audits, Material and Equipment Certifications The inspector reviewed the following documents and determined the applicable QA/QC requirements were met:

  • Data reports of 1984 outage and present outage of IS * Ultrasonic instruments, calibration blocks, transducers and couplant certification * Liquid penetrant, cleaner and developer certification * Magnetic particles and equipmen * Audit of ISI by Factory Mutual Engineering ANII Superviso * Audit of ISI by CPCo Q No violations or deviations were identifie . Exit Interview The inspector met with site representatives (denoted in Persons Contacted paragraph) at the conclusion of the inspection. The inspector summarized the scope and findings of the inspection noted in this report. The inspec-tor also discussed the likely_ informational content of the inspection report with regard to documents or processes reviewed by the inspector during the inspection. The licensee did not identify any such documents /

processes as proprietar .

!