IR 05000155/1985001

From kanterella
Jump to navigation Jump to search
SALP Board Rept 50-155/85-01 for Jul 1983 - Oct 1984
ML20126L356
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 07/24/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20126L349 List:
References
50-155-85-01-BA, 50-155-85-1-BA, NUDOCS 8507310188
Download: ML20126L356 (2)


Text

. . _ _ . .__ _ __ __ _ _ _ . _ _._s .. . ._ _ _ _ ,

,

APPENDIX SALP 5 SALP BOARD REPORT U. S. NUCLEAR REGULATORY COMMISSION

REGION III

'

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE 50-155/85001 Inspection Report N Consumers Power Company Name of Licensee Big Rock Point Name of Facility July 1, 1983 - October 31, 1984 Assessment Period i

.

.

,

,

!

h507310188850724 ADOCM 05000155

! O PDR

,_ ,. .- . - . . _ _ _ _ _ . _ . _ _ _ , ._ , _, ._ . ., _ ._ _. . . _ ,

.-

.-

Big Rock Point Facility Summary of Meeting with Consumers Power Company on March 12, 1985 The findings and conclusions of the SALP Board are documented in Report No. 50-155/85001 and were discussed with the licensee on March 12, 1985, in the Region III offic While the meeting was primarily a discussion between the licensee j and NRC, it was open to members of the public as observer i The following licensee and NRC personnel were in attendance, as well as the noted observer The attendees for this meeting are the same as those for the SALP meeting for the Palisades Nuclear Plan Consumers Power Company D. P. Hoffman, Plant Superintendent, Big Rock Point T. C. Bordine, Staff Licensing Engineer R. J. Alexander, Technical Engineer, Big Rock Point J. W. Reynolds, Executive Vice President, Energy Supply R. B. DeWitt, Vice President, Nuclear Operations J. F. Firlit, General Manager, Palisades R. D. Orosz, Engineering and Maintenance Manager, Palisades G. Slade, Executive Director, NAD D. J. VandeWalle, Nuclear Licensing Administrator D. W. Rogers, Technical Engineer K. M. Farr, Plant Public Affairs Director, Palisades Nuclear Regulatory Commission James G. Keppler, Regional Administrator W. D. Shafer, Chief, Projects Branch 2 D. C. Boyd, Chief, Projects Section 2D R. DeFayette, Project Inspector, Big Rock Point G. C. Wright, Chief, Projects Section 2A J. F. Suermann, Project Inspector, Palisades B. L. Jorgensen, Senior Resident Inspector E. R. Swanson, Senior Resident Inspector Nuclear Reactor Regulation (NRR)

T. Wambach, Licensing Project Manager, Palisades R. Dudley, Licensing Project Manager, Big Rock Point

- Other D. R. Hahn, Michigan Department of Public Health