IR 05000155/1985016

From kanterella
Jump to navigation Jump to search
Insp Rept 50-155/85-16 on 850827-30.No Violation or Deviation Noted.Major Areas Inspected:Previous Insp Findings & Site QA Staffing
ML20137Q236
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 09/16/1985
From: Hasse R, Hawkins F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20137Q222 List:
References
50-155-85-16, NUDOCS 8509200087
Download: ML20137Q236 (3)


Text

- ___

.,-

..

,

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-155/85016(DRS)

Docket No. 50-155 License No. OPR-06 Licensee: Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Facility Name: Big Rock Point Nuclear Plant Inspection At: Charlevoix, Michigan Inspection Conducted: August 27-30, 1985 Inspector: R. Hasse%% 3-l6- %.

Date

~

Approved By: F(. Hawkins, Chief 9 / Il, /B S-Quality Assurance Programs Section Date '

Inspection Summary Inspection on August 27-30, 1985 (Report No. 50-155/85016(DRS))

Areas Inspected: Routine inspection by one regional inspector of licensee action on previous inspection findings and site QA staffing. The inspection involved 29 inspector-hours onsit Results: No violations or deviations were identifit DR ADOCK 0 g5

!

t

,

.

. . .

-

DETAILS 1. Persons Contacted Consumers Power Company

  • D. Hoffman, Plant Superintendent
  • G. Withrow, Engineering and Maintenance Superintendent C. Abel, Production and Perfonnance Superintendent
  • R. Alexander, Technical Engineer
  • G. Petitjean, Planning and Administrative Services Superintendent
  • L. Monshor, Quality Assurance Superintendent USNRC
  • S. Guthrie, Senior Resident Inspector
  • F. Hawkins, Chief, Quality Assurance Programs Section Other personnel were contacted as a matter of routine during the inspectio * Denotes those atterding the exit interview on August 30, 198 . Action on Previous Inspection Findings (Closed) Unresolved Item (155/85010-01): Failure to complete equip-ment outage requests (EORs). The licensee had issued a memorandum to operations and maintenance personnel reminding them of the requirement to address all items on the E0R and the reasons for this requirement. The effectiveness of the corrective action will be assessed based on the results of the next audit of this area by the licensee. The inspector was satisfied that the corrective action was appropriate and that the effectiveness would be assessed by the licensee within an appropriate time frame, (0 pen) (Arresolved Item (155/85010-02): Contrary to the requirements i of the revised Nuclear Operations Department Standard N0DS-P01 (" Equipment Status Identification and Verification"), plant operating procedures permitted operability testing to be used as an independent verification of system alignment. At the time of this inspection the licensee had not implemented the revised standard. This item will remain open pending NRC review of licensee actio (0 pen) Unresolved Item (155/85010-03): Failure to ensure that cancelled N005 were not used as "use" references in the administra-tive procedures (APs) or other NODS. The inspector reviewed ten APs to determine if cancelled NODS were used as "use" references. Only one case was identified during this review: AP 1.16 ("Public Affairs Administration") referenced cancelled N0DS A 15 to determine the approvals required to release infonnation to the public relative to potential emergency situations. Based'on this review, the inspector was satisfied that references to cancelled N0DS as a "use" reference was not a generic problem. This item will remain open pending

~

4. .. .

completion of the related corrective actions: deleting references to cancelled N0DS from APs and other NODS and ensuring that all require-ments of the cancelled N0DS have been incorporated into other document The licensee expects to complete these actions by January 1,198 . Site QA Staffing During a previous inspection (Inspection Report No. 155/85010) the inspector expressed the concern that the site QA organization might be understaffed. This resulted from the transfer of functions previously perforved by the General Office to the site QA organization without a corresponding increase in the site QA staffing. During this inspection, .

'

the inspector reviewed overtime usage and the work backlog for the site QA organization. Neither were excessive. Also, additional QA support was anticipated for the refueling outage scheduled to begin in September 1985. Based on this information, the inspector concluded that the current QA staffing level at the Big Rock Point site was adequat . Exit Interview The inspector met with licensee representatives (denoted in Paragraph 1)

at the conclusion of the inspection on August 26, 1985, and summarized the purpose, scope, and findings of the inspection. The licensee indicated that the inspector had no access to proprietary information during the inspectio