ML20135G649

From kanterella
Jump to navigation Jump to search
Forwards NRC Repts Requested by V Nacario for Philippine Atomic Energy Commission.W/O Encls
ML20135G649
Person / Time
Issue date: 10/29/1981
From: Lafleur J
NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP)
To: Bartolome Z
PHILIPPINES
Shared Package
ML20132A535 List: ... further results
References
FOIA-84-559 NUDOCS 8509200007
Download: ML20135G649 (2)


Text

..

1 a

~ _... _.

,pe us.

[

  1. j UNITED STATES i

f NUCLEAR REGULATORY COMMISSION

/

WASHINGTON, D.C. 20555 October 29, 1981 Dr. Zoilo Bartolome Commissioner, PAEC P. O. Box 932 Metro Manila, The Philippines i

~

i

}

I am enclosing a number of NRC reports requested

. s i

by Vic Nacario for the PAEC.

(pWff f/oseph D. Lafleur, Jr.

[

! Deputy Director t

Office of International Programs

Enclosures:

NUREG-0386, Supp. 2 NUREG-0452, Rev. 3 NUREG-0460 Vols'. 3 and 4 NUREG-0611 NUREG-0623 NUREG-0659 NUREG-0679 NUREG-0691

.NUREG/CR-0603 NUREG/CR-lll9 NUREG/CR-1198, Vol. 1 NUREG/CR-1528 NUREG/CR-1580

_,6 e

t O

Y e

s 8509200007 850807 PDR FOIA SCHLEMMB4-559 PDR

- 1 L

_~

.l

\\

=

i SOSu nted.dr @@

p e< [' p a

1.

R.G.1.97 - Rev. 2 - January 1981 3f 2.

R.G. 1.101 - Rev. 2 - July 1981 J I

3.

SECY 325 - Special Report To Congress - Identifying Unresolved Safety Issues a.

~

+.

[4. NUREG - 0386 - Supplement 2 - USNRC Staff Practice and /

{

1 Procedure Digest - Sept. 1980 h

(5. NUREG - 0452 y Rev. 3 - Standard Technical Specifications for Westinghouse PWRs, Rev. 3 9

NUREG-0460Vol.3&})-AnticipatedTransientswithout 6.

scram for LWRs 1

J efa O /h.__. 7.

NUREG - 0580 - Status Report on Nuclear Power Plants (Blue Book) h~? g 8.

NUREG/CR 0603 - A risk Assessment of a Pressurised Water Reactor for Class 3-8 Accidents (Sept. 1980)

NUrJC - 0611 - Generic Evaluation of Feedwater Transients'and g9.

Small Break 14CA in Westinghouse - Designed -

Operating Plants -

NUREG - 0623 '- Generic Assessment of Delayed Reactor Coolant 40 Pump Trip During Small Break IhCA in PWRs.

Mll. NUnEG 0659 -

Staff Supplement to the Draft Report on Utaman Engineering Guide to Control Room Evaluation M2. NUnEG - 0679 - Pipe Cracking Experience in light Water Reactors, AUG. 1980

h. NUREG - 0691 - Investigation and Evaluation of Cracking incidents

_ in Piping in Pressurised Water Rasetors - Sept.1980 pp 14. NUREG - 0700 - Control Room Design Reviews Guidelines 4

M 5.

NUEEG/CE 1119 - Piping Inelastic Fracture !!echanics Analysis (July 1980) i l

g16. NUREC/CR 1198, Vol. 1, Vol. 2 - Design Guidance and Evaluation Methodology for Fixed Site Physical Protection Systems (July 1980) 4

[7. NUREC/CR 1530 - Human Engineering Guide to Control Room Evaluation NURES/Cn 1528 - Safeguards User's Manual for 1 uclear Haterials

< 18 Managersat and Safeguards System (Aug. 1980) l

19. - IMREG 75/037 - Standard Review Plan (Revised - April 1981) s

- 0 /9

.