ML20134B358
| ML20134B358 | |
| Person / Time | |
|---|---|
| Site: | Vogtle, 05000000 |
| Issue date: | 04/04/1972 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Henderson J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20132B505 | List:
|
| References | |
| FOIA-84-293 NUDOCS 8508150596 | |
| Download: ML20134B358 (1) | |
Text
F o
m n
s'
.J
,I i
April h, 1972 t
i_
J. 3. IIendercon, Chief, Reacter Construction Branch Di'tision of Ccapliance, !!cadquarters I
j GEORGIA POWIR CC:f?XIT (V0G'131 AND 2), DOCKIT !!OS. PZ'iDI30.
i l
Attached Report ' fos. 72-1 covering the initial Cc_-elic.nce and introducto:-r cualit r assuranc e me-tim H 'h -a-a ta--n' are "*- 4 " *-- "--
l I
The appliestion for the Vor;tle facilities is understood. to be scheduled j
for su1=tittal during Anril. The quality assurance audit vill, therefore, be scheduled after review of the application by Region I7.
i Please note that this contractual *arrsngeme'nt vill be slightly different from the Hatch facilities. Detailed design vill be done b7 3echtel in the Ucr.ralk, California, engineering offices. The constructics vill be nanagad by the apulicant; however, no construction contracts have been let.
r F. J. Long CO:II:FJL Genior Reactor Inspector Enclostre:
CO Rnt. ITos. 72-1 (Kelley)
Ucth/ encl:
E. G. Co.se, DRS ('3) l~
R. S. Eoyd, DRL (2)
R. C. DeYoung, DEL (2)
D. J. Skovholt, DEL (3) j H. R. Denton, DRL (2) j L. Kornblith, Jr., CO i
R. H. Engelken, CO l
J. P. O'Reilly, CO:I l'
B. E. Grier, CO:III J. W. Florc, CO:I7 r'
i R. % Smith, CO:V d,", $,/,v & l i
CO Files j
DR Central Files CO:II 40, M
.f l
FJLong:hac h/u/72
,4_g _7,q 3 i
8500150596 050 M g Q
_gg3 PDR C