Forwards Co Rept 72-1 Covering Initial Compliance & Introductory QA Meetings W/Mgt.W/O Encl
ML20134B358
Person / Time
Site: Vogtle, 05000000
Issue date: 04/04/1972
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Henderson J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20132B505 List:
References
FOIA-84-293 NUDOCS 8508150596
Download: ML20134B358 (1)


Text

F , o

. . m n .-

s' , .J ,I i

April h, 1972 t

i_ _

J. 3. IIendercon, Chief, Reacter Construction Branch Di'tision of Ccapliance, !!cadquarters I

j GEORGIA POWIR CC:f?XIT (V0G'131 AND 2), DOCKIT !!OS. PZ'iDI30.

i l Attached Report ' fos. 72-1 covering the initial Cc_-elic.nce and introducto:-r cualit r assuranc e me-tim H 'h -a-a ta--n' are "*- 4 " *-- "--

l I

The appliestion for the Vor;tle facilities is understood. to be scheduled j for su1=tittal during Anril. The quality assurance audit vill, therefore, i be scheduled after review of the application by Region I7.

Please note that this contractual *arrsngeme'nt vill be slightly different from the Hatch facilities. Detailed design vill be done b7 3echtel in the Ucr.ralk, California, engineering offices. The constructics vill be nanagad by the apulicant; however, no construction contracts have been let.

  • r F. J. Long CO:II:FJL Genior Reactor Inspector Enclostre:

CO Rnt. ITos. 72-1 .

. (Kelley)

Ucth/ encl:

E. G. Co.se, DRS ('3) l~ R. S. Eoyd, DRL (2)

R. C. DeYoung, DEL (2)

D. J. Skovholt, DEL (3) j H. R. Denton, DRL (2) j L. Kornblith, Jr., CO i R. H. Engelken , CO l J. P. O'Reilly, CO:I B. E. Grier, CO:III l' J. W. Florc, CO:I7 r' i R. % Smith, CO:V i CO Files j

DR Central Files CO:II  ;

d ,", $ ,/,v & l

.f l FJLong:hac 40, M .

h/u/72 i *

,4_g _7,q 3 8500150596 050 M g Q

_gg3 PDR C