MONTHYEARML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20248K3761989-04-10010 April 1989 Summary of Operating Reactors Events Meeting 89-014 on 890405.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams for Wk Ending 890402 Encl ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20245H8011989-02-23023 February 1989 Summary of Operating Reactors Events Meeting 89-08 on 890222.Attendee List & Events Discussed & Significant Elements of Events Encl ML20235M1671989-02-17017 February 1989 Summary of Operating Reactors Events Meeting 89-07 on 890215.List of Attendees,List of Events Discussed,Summary of Events for Long Term Followup or Input to NRC Performance Indicator Program & Summary of Reactor Scrams Encl ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20195H0271988-11-25025 November 1988 Summary of Operating Reactor Events Meeting 88-46 on 881122 ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20206E3591988-11-10010 November 1988 Summary of Operating Reactors Events Meeting 88-44 on 881108.List of Meeting Attendees,Significant Events & Summary of Reactor Scrams Encl.One Significant Event Identified for Input to Performance Indicator Program ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20207M0771988-10-0505 October 1988 Summary of Operating Reactors Events Meeting 88-39 on 881004.List of Attendees & Viewgraphs Encl ML20207K9461988-10-0404 October 1988 Summary of 880830 Meeting W/Util in Rockville,Md Re Fire protection-related Issues.Draft Fire Protection Engineering Evaluation, Cables on Svc Bldg Outside Wall & List of Attendees Encl ML20245D8411988-09-28028 September 1988 Summary of Operating Reactors Events Meeting 88-38 on 880927 Re Events Which Occurred Since Last Meeting on 880920 ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20154F7971988-09-15015 September 1988 Summary of 880901 QA Meeting W/Util in Rockville,Md to Discuss Rev 2 of Util Operational QA Plan for Plants.Agenda & List of Participants Encl ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153G6331988-08-30030 August 1988 Summary of Operating Reactor Events Meeting 88-35 on 880830, Including Summary of Reactor Scrams for Wk Ending 880828. Significant Event Identified for Input to NRC Performenance Indicator Program ML20153C1861988-08-23023 August 1988 Summary of Operating Reactors Events Meeting 88-34 on 880823 ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20151Q8131988-08-0303 August 1988 Summary of Operating Reactors Events Meeting 88-031 on 880802.Viewgraphs & List of Attendees Encl ML20207E2961988-07-28028 July 1988 Summary of 880714 Meeting W/B&W Owners Group Re Industry & NRC Actions to Resolve Issues Raised in Generic Ltr 87-12. List of Attendees,Viewgraphs & B&W Design Differences Encl ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20151K6901988-07-18018 July 1988 Summary of Operating Reactors Events Meeting 88-28 on 880712.Viewgraphs & List of Attendees Encl ML20150D7171988-07-0707 July 1988 Summary of Operating Reactors Events Meeting 88-26 on 880628 ML20153B0281988-06-22022 June 1988 Summary of Operating Reactors Events Meeting 88-25 on 880621.List of Attendees,Discussion of Significant Elements of Events & Summary of Reactor Scrams Encl ML20150E0241988-06-21021 June 1988 Summary of 880615 Meeting W/Utils Re Proposed Establishment & Licensing of Sys Energy Resource,Inc as Operators & Licensing Agent for Plants ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20195B2211988-06-0808 June 1988 Summary of Operating Reactors Events Meeting 88-23 on 880607.List of Attendees,Events Discussed & Summary of Reactor Scrams Encl 1989-09-06
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20248K3761989-04-10010 April 1989 Summary of Operating Reactors Events Meeting 89-014 on 890405.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams for Wk Ending 890402 Encl ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20245H8011989-02-23023 February 1989 Summary of Operating Reactors Events Meeting 89-08 on 890222.Attendee List & Events Discussed & Significant Elements of Events Encl ML20235M1671989-02-17017 February 1989 Summary of Operating Reactors Events Meeting 89-07 on 890215.List of Attendees,List of Events Discussed,Summary of Events for Long Term Followup or Input to NRC Performance Indicator Program & Summary of Reactor Scrams Encl ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20195H0271988-11-25025 November 1988 Summary of Operating Reactor Events Meeting 88-46 on 881122 ML20206E3591988-11-10010 November 1988 Summary of Operating Reactors Events Meeting 88-44 on 881108.List of Meeting Attendees,Significant Events & Summary of Reactor Scrams Encl.One Significant Event Identified for Input to Performance Indicator Program ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20207M0771988-10-0505 October 1988 Summary of Operating Reactors Events Meeting 88-39 on 881004.List of Attendees & Viewgraphs Encl ML20207K9461988-10-0404 October 1988 Summary of 880830 Meeting W/Util in Rockville,Md Re Fire protection-related Issues.Draft Fire Protection Engineering Evaluation, Cables on Svc Bldg Outside Wall & List of Attendees Encl ML20245D8411988-09-28028 September 1988 Summary of Operating Reactors Events Meeting 88-38 on 880927 Re Events Which Occurred Since Last Meeting on 880920 ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20154F7971988-09-15015 September 1988 Summary of 880901 QA Meeting W/Util in Rockville,Md to Discuss Rev 2 of Util Operational QA Plan for Plants.Agenda & List of Participants Encl ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153G6331988-08-30030 August 1988 Summary of Operating Reactor Events Meeting 88-35 on 880830, Including Summary of Reactor Scrams for Wk Ending 880828. Significant Event Identified for Input to NRC Performenance Indicator Program ML20153C1861988-08-23023 August 1988 Summary of Operating Reactors Events Meeting 88-34 on 880823 ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20151Q8131988-08-0303 August 1988 Summary of Operating Reactors Events Meeting 88-031 on 880802.Viewgraphs & List of Attendees Encl ML20207E2961988-07-28028 July 1988 Summary of 880714 Meeting W/B&W Owners Group Re Industry & NRC Actions to Resolve Issues Raised in Generic Ltr 87-12. List of Attendees,Viewgraphs & B&W Design Differences Encl ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20151K6901988-07-18018 July 1988 Summary of Operating Reactors Events Meeting 88-28 on 880712.Viewgraphs & List of Attendees Encl ML20150D7171988-07-0707 July 1988 Summary of Operating Reactors Events Meeting 88-26 on 880628 ML20153B0281988-06-22022 June 1988 Summary of Operating Reactors Events Meeting 88-25 on 880621.List of Attendees,Discussion of Significant Elements of Events & Summary of Reactor Scrams Encl ML20150E0241988-06-21021 June 1988 Summary of 880615 Meeting W/Utils Re Proposed Establishment & Licensing of Sys Energy Resource,Inc as Operators & Licensing Agent for Plants ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20195B2211988-06-0808 June 1988 Summary of Operating Reactors Events Meeting 88-23 on 880607.List of Attendees,Events Discussed & Summary of Reactor Scrams Encl ML20154S0341988-05-27027 May 1988 Summary of 880519 Meeting W/Middle South Utils Representatives Re Proposed Establishment & Licensing of Middle South Utils Nuclear Operating Co.Agenda Encl 1989-09-06
[Table view] |
Text
_ __. .
7.
d,
, a i r - y ,
i e DISTRIBLITION Acket Files (2)
IE Files FEB 9 1981 HJWong Rdg Files REB Rdg Files IR Rdg Files RRRI Rdg Files Docket No. 50-546
- 547 MEMORANDWI FOR: J. H. Sniezek Director Division of Resident and Regional Reactor Inspection IE FROM: H. J. Wong, Civil Structural Engineer, Mechanical Structural and Metallurgical Section, Reactor Engineering Branch, RRRI, IE
SUBJECT:
SID9tARY OF JANUARY 8,1981 MEETING WITH PtBLIC SERVICE COMPANY OF INDIANA. INC.
A meeting was held on January 8,1981 in Bethesda, Maryland with Public Service of Indiana, Inc. (PSI) to discuss the results of inspections and additional testing performed by PSI relating to cadweld splices at Marble Hill Units 1 and 2. The meeting agenda, a list of th9 attendees, and handouts provided during the meeting are enclosed (Enclosures 1, 2, and 3).
PSI's inspection of accessible cadwelds, as par *, of the " Construction Verifi-cation" program at Marble Hill Units 1 and 25 revealed neberous visual deficiencies which exceeded tne acceptance criteria,both the Marble Hill project and manufacturer's specifications. Of the 2431 accessible cadwalds inspected, 504 cadweld's (20%) were identified to have deficiencies which would cause rejection of the cadwelds under the original project specifications. Approximately 50% of the deficient cadweids }
had gage mark indication problems although there is not a requirement for permanent 'l markings. Approximately 7500 cadwelds are buried in concrete and therefbre not accessible for inspection.
l Tests on accessible cadwalds were performed to evaluate the types of deficiencies in the accessible population to draw conclusions on the acceptability of the buried cadwelds. A random sample of 59 cadwelds were selected and reinspected.
For cadwelds which failed the visual inspection or radiography criteria, tensile ;
tests were performed. All 59 cadwelds met the visual inspection criteria or l had acceptable tensile test results. An additional sample of 58 cadwelds with gage mark deficiencies, biased by selecting the worst cases, were radio-ggepted. Three cadwelds were additionally identified to exceed gage mark tolerances. These were tens 11ed tested and had acceptable results. Also, 21 cadwelds with the worst case physical deficiencies were removed and tensile l tested. These 21 also set the tensile test requirements. Based on the acceptable results from the additional tests and inspections performed and ,
l the PSI evaluation that the anbedded cadwalds were at least as good as those v. /
cadwelds accessible. PSI concluded that no additional testing was necessary li "
__and that no "substandageadweTd si iT -
.Teruxf .- t Marb. le. Hil. l .-
41d3M&%./ 'g 7 .
- .t t 'I r o -4; y ZF '
J. H. Sniezek 2 FEB 9 1981 I
- The cadweld deficiencies at Marble Hill were clearly beyond those covered by NRC Regulatory Guide 1.10 and normal industry practica. The NRC staff had previously expressed that in addition to reviewing the strength charac-teristics of the defective cadwelds, PSI should evaluate the affects of l
' strain (softening) on the behavior of the structures. To address this issue l PSI evaluated the past and current code requirements for cadweld splices, )
compared testa performed for the cadweld manufacturer (Erico) and the situation edfMarble Hill, and performed stress analysis of structures assuming no load carrying capability for physically defective cadwelds. In sinumary, PSI concluded that (1) strength ndrstrain is the primary criterion of concern; (2) the Erico tests, although more severe than the situation at Marble Hill, showed acceptable results; and (3) the ACI code allowable stress-fbr reinforcing bar was met for the worst case (crecking is not significant). R In conclusion, the NRC staff provided the following cannents:
1.
PSI should submit a written report describing with sufficient detail the discussions presented during this meeting. It was agreed that the report would be previded by January 23. 1981.
2.
As an itan for inferimetion, the Region III Office would review the results of the radiography test program.
3.
PSI should rejectable cadwelds. address the corrective actions, if any, planned for the visually The NRC would review those specific cases in which removal and replacement of cadwelds would be impractical (such as "B" type splices attached to the contaissent liner).
4.
PSI should indicate in the written report the acceptance criteria that would be used for the future production of cadwelds. PSI indicated that thesubsequent for original Marble work. Hill project acceptance criteria would be applied l S.
l PSI sho41d provide in the written report a. discussion of the effects of
! deformation (deflection) on the structurns related to the analysis assaing i
no load carrying capability for the physically defective cadwelds, 6.
A detailed NRC review of the written report will be necessary, but it appears based on the discussions during this meeting that additional testing will not be required. PSI would be formally notified if additional actions are required.
The written report has been submitted to the NRC and is being initially reviewed in this office. It is anticipated that the review of this issue will be formally transferred to MRR. The Structural Engineering Branch, NRR has been kept informed of this issue at Marble Hill and has been involved in discussions with the IE staff.
u IE: REB .IE: REB : IE:RRRI:DD HJWong:mkm Howard J. Wong Civil Structural Engineer n' RWoodruff . ~ELJordan. Mechanical. Structural & Metallurgical section 2/ 5/81 2/ /81 2/ /ql Reactor EngineerifFJ IrtnCIP, RPRI, IE
--m -
_ . - , , _m_ ---- ,_-----,-.y ., - __ - ,,m -..,+- -- - - , , - , , , -
.=e---- -- y, ,e.
4 i 4 tsp F F / V J. H. Sniezek 3 FEB 9 1981 Encloswes: As stated cc: w/ enclosures C. Williams, RIII F. Schauer, HRR G. Arndt, SD w/o enclosures E. Jordan, IE J. Henderson, IE J. Keppler, RIII G. Fiorelli, RIII D. Hayes, RIII A. Varela, RI D. Eisenhut, NRR T. Novak, NRR
- 8. Youngblood, NRR J. W11 son, NRR D. Jong, NRR R. Liptaskt. NRR S. Chan, NRR H. Graves, SD swe -4.- w
. e.eese emosene e,m ew*
A Io
.. . - . . ..mm ... w. .
~ . . . ..% . . . - _ . . ...e.. . . . . . . . .
w -- - s ,- -- m t!
s , ,
f7"TACN'MEnff AGENDA FOR MEETING ON
- - "CADWELDS AT MARBLE HILL" Agenda A. Background of Cadweld Data ;
i
- 1. Construction Verification Program at Marble Hill
- a. Visual Inspection Results i b. Radiography Results I c. Tensile Test Results
~
- 2. Production and Sister Splice Test Results
- 3. Similarities and Differences Between Accessible and Inaccessible Cadwelds (Locations of Inaccessible)
- 5. PSI Evaluation of Adequacy of Dr. bedded and Accessible Cadwelds
- C. f
- RC Ccnce.as
- 1. Stress / Strain Measurements
. 2. Adequacy of Embedded Cadwelds
- 3. Others as identified i
i r
i .
I I f
I
~
4 E . . - . - . _ . _ ,__ , - . . - . . , , , _ _ , _
. - = _. _ _ . . . _
., , 1 e .
Attachment 2 MEETING ATTENDEES MEETING WITH PUBLIC SERVICE OF INDIANA, INC.
ON JANUARY 8,1981 PU3LIC SERVICE OF INDIANA, INC. NRC H. Wong S. Brewer D. Jeng W. Petro R. Lipinski D. Ingmire H. Graves G. Arndt SARGENT AND LUNDY J. Henderson F. Schauer A. Morcos A. Varela P. Wattelet C. Williams K. Kostal D. Hayes D. Carreira J. Wilson
- 0. Zaben k