NRC-85-3044, Forwards Proprietary CENC-1302, Analytical Rept for South Texas Project 1,Houston Lighting & Power Co. Withholding from Public Disclosure Requested.Rept Withheld (Ref 10CFR2.790)

From kanterella
(Redirected from ML20128F161)
Jump to navigation Jump to search
Forwards Proprietary CENC-1302, Analytical Rept for South Texas Project 1,Houston Lighting & Power Co. Withholding from Public Disclosure Requested.Rept Withheld (Ref 10CFR2.790)
ML20128F161
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 07/03/1985
From: Rahe E
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Harold Denton, Kadambi P
Office of Nuclear Reactor Regulation
Shared Package
ML19304B161 List:
References
NS-NRC-85-3044, NUDOCS 8507080146
Download: ML20128F161 (2)


Text

x Westinghouse Water Reactor hx 355 Pittsburgh Pennsylvania 15230-0355 Electric Corporation Divisions July 3, 1985 NS-NRC-85-3044 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20055 N- N Attention: P. Kadambi Transmittal of Westinghouse Documents Requested by the USNRC at the South Texas Mechanical Engineering Branch Review on June 26. 1985

Dear Mr. Denton:

Enclosed is one copy of the subject document which was requested at the South Texas Mechanical Engineering Branch Audit review. This document contains information which is proprietary to Westinghouse. Accordingly, we request that this information be withheld from public disclosure. By copy of this letter, one copy of this document is being transmitted to NRC consultants E.

C. Rodabaugh Associates, Inc., Hilliard, Ohio, and one copy to Sam Moore, Y-12 Plant, Oak Ridge, Tennessee, at the request of P. Kadambi, NRC, Project Manager, for the purpose of expediting review.

Document Number Document Type Title CENC-1302 Analytical Report Analytical Report for South Texas Project #1 Houston Lighting and Power Company (Proprietary)

In order not to delay this submittal of information requested by the Commission, we will comply with the requirements of 10 CFR 2.790 to provide proprietary and non-proprietary versions together with an affidavit as soon as the proprietary information contained in the submittal has been specifically identified and the proprietary and non-proprietary versions have been prepared. We will submit the total required number of copies of the proprietary and non-proprietary versions of the information and the required affidavit at that time.

Mr. Harold R. Denton July 3, l?85 NS-NRC-85-3044 In the meantime, we have provided sufficient copies for you to initiate your review. E. Shomaker, Esq., of the NRC Office of the Executive Legal Director, leas advised Westinghouse that he concurs with this procedure.

We expect to be able to fully comply with the requirements for the proprietary and non-proprietary versions of the infont4 tion and an accompanying affidavit within four weeks.

I Very truly yours, WESTINGHOUSE ELECTRIC CORPORATION QYVE. P. Rahe, Jr.

nager Nuclear Safety Department ATP/bek/0525n Attachments 1

cc: E. C. Shomaker, Esq.

Office of the Executive Legal Director, NRC