ML20128D989
| ML20128D989 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 12/05/1975 |
| From: | Stello V Office of Nuclear Reactor Regulation |
| To: | Goller K Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9212070441 | |
| Download: ML20128D989 (1) | |
Text
_. _.
f
~
o y
uvu d File NRR Rdg. File j
DEC 5 iM5 RSB File-Docket No. $0-263 i
~
Earl R. Coller, Assistant Director for Operating Reactore, RL MONTICELLO TECHNICAL SPECIFICATION BASES FOR THE THERMAL LIMITS Plant Names Monticello i
Docket No.
<-$0:763 i
Responsible Branch
%s and Project Leader B. Buckley Technical Review Branch Involved: Reactor Systems Branch j
Review Status:
Complete i
Enclosed are the Technical Specification bases for the Monticello Nuclear Generating Plant which set forth the bases for the established thermal limits of Specifications 2.1, 3.11C, and 4.11C.
Also, the bases for Specification 3.11A, entitled " Average Planar Linear Heat Generation Rate" (APLMgR)- are provided.
Note that the Technical Specification bases for the thermal limits were applied to the Monticello Cycle 4 safety analysis.
j As stated by the licensee, the Cycle 5 analysis was found to be s
bounded by the Cycle 4 analysis.
Therefore, the enclosed bases justify the Technical Specification thermal limits for Cycle 5 plant operation.
Orlainal tigaed by
.DeleteideDe f l
Victor Stello, Jr., Assistant' Director l
4 for Rasctor Safety V
Division of Technical Review.
i p
Office of Nuclear Reactor Regulation-
Enclosure:
't l
Tech. Spec. Bases
)
i cc:
S. Hanauer R. Heineman R. Boyd i
V. Stello
~
D. Ziemann l
B. Buckley
'S l
P. Check I-1 T. Novak W. Minners R. Woods A. Ignatonis f
}
de ries,
-TR;RJBe TR:RSB//
_21t$
RS AI @
11/17/75 ~
vak tello
[I E
sit...h sua a-s
- a ll/l7/75 1$f}/75
/p75
//
i rec = ac ns <aev. 9 sM AECM ONO.
Tr u. s. oovsanusnt rmatino orricas een. sauce
/f 9212070441 751205 l
PDR ADOCK 05000263 l
p PDR
_.