Text
,
ar ' *
'e f
PRIORITY ROUTING
(.-
(
First Second a
((ass pro j
DRMA FILE --
/
UNIVERSITY OF MISSOURI RESEARCH REACTOR
~
j OPERATIONS MONTHLY
SUMMARY
1 9'
W May 1995 Prepared by:
j Operations Staff i
i i
k l
6 199Y 9609120180 960828 Ng2 PDR FOIA WALSH96-249 PDR k/N/
.._y
(
i
)
s May 1995 The reactor operated continuously in May with the following exceptions: five shutdowns for scheduled maintenance and refueling. There were no unscheduled shutdowns this month. The biennial emergency training drill involving outside emergency support organizations was completed this month.
Maintenance items for the month included: installing a boral shield on beamport "B"; shipping eight depleted fuel elements in the BMI-1 cask; replacing the drive motor on the outer personnel airlock door; and replacing the detector on nuclear instrument channel #5 (power range monitor).
OPERATION
SUMMARY
HOURS OPERATED THIS PERIOD 659 TOTAL HOURS OPERATED 188,369 HOURS AT FULL POWER THIS PERIOD 657 TOTAL HOURS AT FULL POWER 185,396 INTEGRATED POWER THIS PERIOD 274 MWD TOTAL INTEGRATED POWER 71,396 MWD MAINTENANCE ACTIVITY 5/1/95 Refueled removed core 95-18, loaded core 95-19. Installed boral shield on beamport "B" beam tube.
5/7/95 Refueled - removed core 95-19, loaded core 95 20. Shipped eight depleted fuel elements in BMI 1 cask.
5/15/95 Refueled - removed core 95-20, loaded core 95-21. Replaced the drive motor for the outer personnel airlock door. Replaced NI Channel #5 (PRM) detector.
5/22/95 Refueled - removed core 95-21, loaded core 95-22.
5/30/95 Refueled - removed core 95 22, loaded core 95 23.
Environmental Health & Safsty Research Park Development Bldg.
I Columbia. Missouri 65211 Telephone (314)882 7018 FAX [314] 882=7940 UNIVERSITY OF MISSOURI-COLUMBIA Hazardous Waste Management 882-7018 Industrial Hygiene Services 882-7018 Radiation Safety Office 882-7221 Workers' Compensation 882 7018 May 12,1995 John B. Martin, Regional Administrator U.S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle,IL 60632-435 i RE:
License No. 24-00513-32 Docket No. 030-02278 Response to Notice of Violation 3c
Subject:
Monthly Progress Report of Safety Performance improvement Program - Action Plan for
^
the University of Missouri-Columbia Radiation Safety Program
Dear Sir:
l In accordance with commitments made by the University of Missouri-Columbia and with the NRC Order dated July 13,1994, this report is being submitted to you. The purpose of this report is to provide you with monthly progress on the completion status of the action items identified in the Safety Performance Improvement Program (dated June 20,1994). I have been providing you these monthly progress reports by the 15th of each month.
The University began Phase Three ofits Action Plan in January 1995. No duc date was established for completion of Action Plan items in April 1995. The University has submitted a written request (dated February 15,1995) to change the frequency of these progress reports. We understand that no change may be made without your written approval.
Sincerely, M
Susan M. Langhorst, P hilP Radiation Safety Ofricer j
l cc:
C.A. Kiesler, Chancellor
)
B.J. Deston, Chief of Staff K.W. Groshong, Vice Chancellor j
J.K. Jones, Associate Vice Chancellor J.P. McCormick, Vice Provost W.H. Miller, RSC Chair i
J.L Beckett, Director MAY 2 51995