ML20117L045

From kanterella
Jump to navigation Jump to search
Univ of Missouri Research Reactor Operations Monthly Summary for Aug 1995
ML20117L045
Person / Time
Site: University of Missouri-Columbia
Issue date: 08/31/1995
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
Shared Package
ML20117K785 List:
References
FOIA-96-249 NUDOCS 9609120299
Download: ML20117L045 (2)


Text

..

3.;. ;g .,_

(-

(

y ~. s s %L1 -

\Mt '.'

iit t._ .J _ ;r-

\q'.*f.j .. -5,h

~

..Ql'.'-- 4

\ c: . ,

'{i.hl t ;a;.

l._ -l$, : A--} '} \

-. s ....~,

, f*L;.

w gg .. . . - - - -

UNIVERSITY OF MISSOURI RESEARCH REACTOR OPERATIONS MONTHLY

SUMMARY

i l

1 August 1995 Prepared by:

Operations Stafr 9609120299 960828 PDR FOIA WALSH96-249 PDR ,

/[

6

( f August 1995 The reactor operated continuously in August with the following exceptions: five shutdowns for scheduled maintenance and/or refueling. There were no unscheduled shutdowns this month.

Major maintenance items for the month included: replacing the compensated ion chamber detector for nuclear instrument channel #2 (intermediate range monitor); shipping eight depleted fuel elements in the BMI-1 cask; replacing both the high and low speed drive motors for the intermediate range monitor chart recorder; replacing control blade "D" blade full in photo-cell bulb.

OPERATION

SUMMARY

HOURS OPERATED THIS PERIOD 680 TOTAL HOURS OPERATED 190,287 HOURS AT FULL POWER THIS PERIOD 677 TOTAL HOURS AT FULL POWER 187,307 INTEGRATED POWER THIS PERIOD 282 MWD TOTAL INTEGRATED POWER 72,193 MWD  !

MAINTENANCE ACTIVITY 8/7/95 Refueled - removed core 95-32, loaded core 95-33. Replaced control blade "D" blade full in photo-cell bulb.

1 8/14/95 Refueled - removed core 95-33, loaded core 95-34. Replaced the compensated ion chamber detector for nuclear instrument channel #2 (intermediate range monitor).

)

8/20/95 Refueled - removed core 95-34, loaded core 95-35. Shipped eight depleted fuel element in the BMI-1 cask. Replaced the high and low speed drive motors for the intermediate range monitor chart t ecorder.

)

8/28/95 Refueled removed core 95-35, loaded core 95-36.

1 I

l I