Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20117L1091996-05-13013 May 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Apr 1996 ML20117L1001996-03-31031 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Mar 1996 ML20117L0951996-03-13013 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Feb 1996 ML20117L0841996-03-0606 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Jan 1996 ML20117L0811995-12-31031 December 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Dec 1995 ML20117L0731995-11-30030 November 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Nov 1995 ML20117L0561995-10-31031 October 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Oct 1995 ML20117L0471995-09-30030 September 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Sept 1995 ML20117L0451995-08-31031 August 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Aug 1995 ML20117L0311995-07-31031 July 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Jul 1995 ML20117K8321995-07-31031 July 1995 University of Missouri Research Reactor Operations Monthly Summary for June 1995 ML20117K8291995-06-26026 June 1995 University of Missouri Research Reactor Operations Monthly Summary for May 1995 ML20117K8261995-04-30030 April 1995 University of Missouri Research Reactor Operations Monthly Summary for Apr 1995 ML20117K7991995-04-26026 April 1995 University of Missouri Research Reactor Operations Monthly Summary for Mar 1995 ML20117K7951995-03-21021 March 1995 University of Missouri Research Reactor Operations Monthly Summary for Feb 1995 ML20117K7911995-02-22022 February 1995 University of Missouri Research Reactor Operations Monthly Summary for Jan 1995 ML20078Q5881994-10-31031 October 1994 MURR Independent Mgt Assessment Rept ML20117A2051992-11-23023 November 1992 Rept on Possession of Low Enriched U-235 in Excess of License Limits at Univ of Missouri-Rolla Reactor Facility ML20210B8111986-09-0101 September 1986 Missouri Univ Research Reactor Upgrade Neutronics Analysis Using AMPX-II/BOLD Venture IV Computation Sys Benchmarked to Destructive Analysis of Fuel Element 775F3. W/Three Oversize Drawings ML20210B8031986-06-30030 June 1986 Extended Life Aluminide Fuel Final Rept 1996-05-13
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212D4471999-09-20020 September 1999 Safety Evaluation Supporting Amend 31 to License R-103 ML20211B1671999-07-13013 July 1999 Special Rept on 990614 Re Test of Scram Set Point of Two of Five Low Primary Coolant Flow Safety Sys Channels.Caused by Trip Set Points Being Too Close to TS Limits.Compliance Procedure 23 Will Be Revised ML20206A9681999-04-21021 April 1999 Revised Page 4 to MURR QA Plan ML20202G9051998-12-31031 December 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Dec 1998 ML20207A6981998-12-31031 December 1998 Reactor Operations Annual Rept for 980101-1231, for Univ of Missouri Research Reactor Facility.With ML20202G9171998-11-30030 November 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Nov 1998 ML20202G9271998-10-31031 October 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Oct 1998 ML20154M3301998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Univ of Missouri Research Reactor ML20154M3401998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Univ of Missouri Research Reactor ML20236Y5941998-08-0606 August 1998 Special Rept:On 980706,operator Noted That One Sample Listed as Inches Long on Loading Sheet,Only 2 Inches Long.Errors Constitute Observed Inadequacy in Implementation of Administrative & Procedural Control.Procedures Revised ML20154M3431998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Univ of Missouri Research Reactor ML20236S1711998-07-15015 July 1998 Ro:On 980615,large & Rapid down-shift on Three Different Meter Indications from One Ni Drawer Was Discovered.Caused by Failed Preamplifier in Wide Range Amplifier Subject Ni Drawer.Replaced Cabling,Detector & Preamplifier ML20154M3651998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Univ of Missouri Research Reactor ML20154M3731998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Univ of Missouri Research Reactor ML20154M3841998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Univ of Missouri Research Reactor ML20246P9931998-03-31031 March 1998 Monthly Operating Rept Summary for Mar 1998 for Univ of Missouri Research Reactor ML20246Q0231998-02-28028 February 1998 Monthly Operating Rept Summary for Feb 1998 for Univ of Missouri Research Reactor ML20203H4271998-02-26026 February 1998 Safety Evaluation Supporting Amend 30 to License R-103 ML20246Q0201998-01-31031 January 1998 Monthly Operating Rept Summary for Jan 1998 for Univ of Missouri Research Reactor ML20198K9441998-01-0808 January 1998 Special Rept:On 971209,reactor Shutdown by High Power Scram Initiated by Wide Range Monitor of Nuclear Instrument Sys. Caused by Unanticipated Positive Reactivity Insertion. Reflector Sample Opened & Inspected ML20203L0531997-12-31031 December 1997 Reactor Operations Annual Rept,970101-1231, for Univ of Missouri Research Reactor Facility ML20202H4091997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Univ of Mo Research Reactor ML20197D2751997-12-15015 December 1997 Ro:On 971026 & 1106,slight Elevation of Fission Products Were Detected in Primary Coolant Water Analyses.Caused by Slight Fabrication Flaw in Element MO-460.Surveillance of Bwx Technologies Fabrication Techniques Will Be Increased ML20202H3931997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Univ of Mo Research Reactor ML20202J1151997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Univ of Missouri Research Reactor ML20202J1201997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Univ of Missouri Research Reactor ML20211B2871997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Univ of Missouri Research Reactor ML20210R2701997-07-31031 July 1997 Univ of Missouri Research Reactor Operations Monthly Summary,July 1997 ML20196G8891997-07-15015 July 1997 Special Rept:On 970616,scram Setpoint for Low Flow Scram for Heat Exchanger 503A Leg Was 25 Gpm Below TS Limit.Caused by Drifting of Setpoint of Vutronik Monitor Switch DPS-928A. Adjusted Trip Setting & Retested Trip Setting ML20149L3761997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Univ of Mo Research Reactor ML20141H6451997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Univ of Mo Research Reactor ML20141H6581997-04-30030 April 1997 Monthly Operating Rept for April 1997 for Univ of Missouri ML20141H6691997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Univ of Missouri ML20136D7211997-03-0606 March 1997 Safety Evaluation Supporting Amend 29 to License R-103 ML20141H7421997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for University of Missouri Research Reactor ML20141H6421997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Univ of Mo Research Reactor ML20141H7001996-12-31031 December 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for Dec 1996 ML20138Q6601996-12-31031 December 1996 Reactor Operations Annual Rept for 1996 ML20141H7221996-10-31031 October 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for Oct 1996 ML20116E2621996-07-30030 July 1996 Ro:On 960701,emergency Generator Shutdown on High Coolant Temp.Caused by Sheared Water Pump Shaft.Replaced Defective Pump ML20141H6781996-06-30030 June 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for June 1996 ML20149L3721996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Univ of Mo Research Reactor ML20117L1091996-05-13013 May 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Apr 1996 ML20117L1001996-03-31031 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Mar 1996 ML20117L0951996-03-13013 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Feb 1996 ML20117L0841996-03-0606 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Jan 1996 ML20100J3991996-02-22022 February 1996 Ro:On 960123,reactor Was Shut Down by Manual Scram When Console Operator Determined That Regulating Blade Was Inoperable.Caused by Seized Bearing on Gearbox Input Shaft. Bearing Replaced ML20097J4391996-01-26026 January 1996 Special Rept:On 951227,reactor Shutdown Occurred Due to Reactor in Operation W/Regulating Blade in Degraded Condition.Replaced Dowel Pin ML20101F5381995-12-31031 December 1995 Revised Pages III-1 & VII-1 to 1995 Operations Annual Rept ML20100M7821995-12-31031 December 1995 Univ of Mo Research Reactor Reactor Operations Annual Rept Jan-Dec 1995 1999-09-20
[Table view] |
Text
. . . _ - . - - .-
.. .sq
' .i wj
( ( . . . . .
fr$ ;- ,
l l
UNIVERSITY OF MISSOURI RESEARCH REACTOR y OPERATIONS MONTHLY
SUMMARY
l i
I October 1995 Prepared by:
Operations Staff 9609120302 960828 PDR FOIA WALSH96-249 PDR ,,
c/;
(
(
4 October 1995 The reactor operated continuously in October with the following exceptions: seven shutdowns for scheduled maintenance and refueling or flux trap changes. There were no unscheduled shutdowns this month.
Major maintenance items for the month included: installing a new Gamma-Metrics source range monitor; replacing the dual scram trip unit for intermediate range channel #2; biennial change-out of control blade offset 'C'; installing a new rhodium detector in the G-4 position; removing the old source range monitor detector and drywell; removing secondary pool heat exchanger bypass valve S-2 and replacing it with a 6 inch bypass line; replacing the shear pin on the outer personnel airlock door.
OPERATION
SUMMARY
HOURS OPERATED THIS PERIOD 669 TOTAL HOURS OPERATED 191,628 HOURS AT FULL POWER THIS PERIOD 663 TOTAL HOURS AT FULL POWER 188,638 INTEGRATED POWER THIS PERIOD 276 MWD TOTAL INTEGRATED POWER 72,748 MWD MAINTENANCE ACTIVITY 10/2/95 Refueled - removed core 95-41, loaded core 95-42.
10/3/95 Shutdown for a flux trap change-out.
10/9/95 Refueled - removed core 95-42, loaded core 95-43.
10/16/95 Refueled - removed core 95-43, loaded core 95-44. Installed new Gamma Metrics source range monitor; replaced dual scram trip unit for intermediate range channel
- 2 10/23/95 Refueled - removed core 95 44, loaded core 95 45. Biennial change-out of offset 'C'.
10/30/95 Refueled - removed core 95-45, loaded core 95-46. Installed new rhodium detector in G-4 position; removed old source range drywell and detector; removed secondary pool heat exchanger bypass valve S-2 and replaced it with a 6 inch bypass line; replaced the shear pin on the outer personnel airlock door.
1 af.. .
\
Ocotber 6,1995 1 1
)
i l
CAL No. RIII-95-004 The Curators of the University )
of Missouri i ATTN: Jim Rhyne, Ph.D., Director Research Reactor Center Columbia, MO 65211
SUBJECT:
CONFIRMATORY ACTION LETTER
Dear Dr. Rhyne:
This letter refers to NRC concerns with the control of radioactive . topaz at
" your facility identified by Mr. R. Marsh during an investigation on a
.r?
September 19 and 20, 1995.
Pursuant to Mr. Steve Gunn's letter to Mr. Marsh dated September 20, 1995, as amended on September 21, 1995, it is our understanding that you will:
(1) padlock the inner door to the dark room and place two keys to the room under the control of Mr. John Ernst or his designee and Mr. Matt Sanford or his designee, (2) until further notice, have a University of Missouri Research Reactor (MURR) employee present in a supervisory role when any work is performed in this space,
" l (3) conduct an audit of the material contained in the room under the l direction of Mr. Jim Schuh,
- j' (4) ensure no material is transferred into or out of this room until the inventory has been reconciled under the oversight of Clarence Jett of the University of Missouri Internal Auditing Department, and (5) once the inventory is complete and un'til further notice, ensure a MURR employee supervises all material transfers into and out of the dark room.
Pursuant to Section 182 of the Atomic Energy Act, 42 U.S.C. 2232, you are required to:
- 1) Notify me immediately if your understanding differs from that set forth above; i
4
.~~. .
The Curators of the University of Missouri 2)
Notify me if for any reason you cannot complete the actions within
- . the specified schedule and advise me in writing of your modified 1
schedule in advance of the change; and 3) j Notify me in writing when you have completed the actions addressed in this Confirmatory Action Letter.
- Issuance order of this Confirmatory Action Letter does not preclude issuance of an formalizin of the licensee;g the above commitments or requiring other actions on the part nor does it preclude the NRC from taking enforcement action for violations of NRC requirements that may have prompted the issuance of this letter. In addition, failure to take the actions addressed in this Confirmatory Action Letter may result in enforcement action.
.The responses directed by this letter are not subject to the clearance Reduction Act of 1980, Pub. L. No.96-511. procedures of the Office of M In accordance with 10 CFR 2.YIO of the NRC's'"RulN of Practice," a copy of this (PDR).
letter, and your response will be placed in the NRC Public Document Room privacy, proprietary, or safeguards information so that it can b the PDR without redaction. However, if you find it necessary to include such information, you should clearly indicate the specific information that you desire not to be placed in the PDR,~ and provide the legal basis to support your request for withholding the information from the public. i s
Sincerely,
, , .. e r. . , -
3 l
Cynthia D. Pederson, Director Division of Nuclear Materials Safety Docket No.: 030-30162 License No.: 24-00513-36E cc w/ltr dated 9/20/95: H. Thompson, OEDO J. -Lieberman, OE J. Goldberg, OGC
-D. Cool, NMSS !
C. Jones, NMSS :
H. Miller, RIII State of Missouri, SLO bec w/ltr dated 9/20/95: PUBLIC IE07
- See Previous Cocurrence DOCUMENT NAME: G:
- v. h,..
n.ew.4.com.\LTRS2LIC\.MTLS\030\95330162.L01 at. me. . w v. wm c - con ma n.e.u.a.ncio.ur. r - copy with .tt. chm.at/.ncio.u,. N - no cA 0FFICE *RIII *RIII l l *RIII '
l RIII///'
NAME MMitchell:dp:ch TKozak lC BBurgess CPederson DATE 10/ /95 10/ /95 10/ /95 10/ T /95 OFFICIAL RECORD COPY
j
~ ~~~___ g.a
,' University of Missouri-Columbia
{ Research Reactor Center phone 4314) 882-5273 Research
Columbia, MO 65211 r=x 014) sa2.u43 Robert Marsli September 20,1995 SeniorInvestigator Amended . September 21,1995 U.S. Nuclear Regulatory Commission Office ofInvestigations y . . - - .
- -- ~ -- -
1 Dear Mr. Marsh The following actions have been taken to address your concerns regarding our control ofRadioactiv Topaz in our Non-Licepted Accounts (NLA).
(1) A padlock was purchased this date at Walmart and placed on the inner door to the dark ro keys .:xist, one under the control ofJohn Ernst, or his designee, and one under the control of Ma -
)
l Sanfctd or his designee.
(2) Until fmther notice, the Licensee (MURR) willinsure that a MURR employee is present in a supervisory role when any work is performed in this space.
(3) An audit of the material contained in the room has been started under the direction andi '
ofJim Schuh. .
.~
7 (4) No material will be transferred into or out of this room until the inventory has been reconciled i W2165 Clarence Jett ofthe University ofMissour! Internal Auditing Department will oversee the reconcillation.
1 (5) Until further notice, the Licensee (MURR) will insure that a MURR employee supervises allI matedal transfers into and out of this room.
l Sincerely, .
khw .Y n Steve Gunn Manager, Service Applications CC:
Em Rhyne, Charlie McKibben, John Ernst, Walt Meyer, Steve Morris, Jim Schuh, Matt Sanfo 9F2185 Clarence Jett i