ML20117K795

From kanterella
Jump to navigation Jump to search
University of Missouri Research Reactor Operations Monthly Summary for Feb 1995
ML20117K795
Person / Time
Site: University of Missouri-Columbia
Issue date: 03/21/1995
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
Shared Package
ML20117K785 List:
References
FOIA-96-249 NUDOCS 9609120164
Download: ML20117K795 (2)


Text

- . . - . . - . - - . . - - - .- . __ . ... -

E

%i _ PP.!O.T 1T..Y._7 01m. NG...,

j r

.~: . . . ~ . . . . . .

.t. : _ . . .

~~ --

7. ,

1

.~.

~~15,/ Mad._ .[

UNIVERSITY OF MISSOURI RESEARCH REACTOR OPERATIONS MONTHLY

SUMMARY

f February 1995 i

- Prepared by:

Operations Staff 1

i l

l i

I

! .E t - , 95 9609120164 960828 PDR FOIA WALSH96-249 PDR

\

,(

February 1995 -

The reactor operated continuously in February with the following exceptions: five shutdowns for scheduled maintenance and refueling. There were no unscheduled shutdowns this month.

Major maintenance items for the month included: installing a new Rosemount flow transmitter for pool loop 'A'; repairing the amplifier for the indicating pen drive on the primary temperature recorder.

I OPERATION

SUMMARY

i HOURS OPERATED THIS PERIOD 617 TOTAL HOL aOPERATED 186,388 HOURS AT FULL POWER THIS PERIOD 613 TOTAL HOURS AT FULL POWER 183,422 INTEGRATED POWER THIS PERIOD 256 MWD TOTAL INTEGRATED POWER 70,573 MWD i

i MAINTENANCE ACTIVI'IT 2/6/95 Refueled - removed core 95-5, loaded core 95-6.

2/13/95 Refueled - removed core 95-6, loaded core 95-7.

2/20/95 Refueled - removed care 95-7, loaded core 95-8.

2/27/95 Refueled - removed core 95-8, loaded core 95-9. Installed new Rosemount flow transmitter in pool loop 'A'. Repaired the indicating pen drive amplifier on the primary temperature recorder.