Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20117L1091996-05-13013 May 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Apr 1996 ML20117L1001996-03-31031 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Mar 1996 ML20117L0951996-03-13013 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Feb 1996 ML20117L0841996-03-0606 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Jan 1996 ML20117L0811995-12-31031 December 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Dec 1995 ML20117L0731995-11-30030 November 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Nov 1995 ML20117L0561995-10-31031 October 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Oct 1995 ML20117L0471995-09-30030 September 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Sept 1995 ML20117L0451995-08-31031 August 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Aug 1995 ML20117L0311995-07-31031 July 1995 Univ of Missouri Research Reactor Operations Monthly Summary for Jul 1995 ML20117K8321995-07-31031 July 1995 University of Missouri Research Reactor Operations Monthly Summary for June 1995 ML20117K8291995-06-26026 June 1995 University of Missouri Research Reactor Operations Monthly Summary for May 1995 ML20117K8261995-04-30030 April 1995 University of Missouri Research Reactor Operations Monthly Summary for Apr 1995 ML20117K7991995-04-26026 April 1995 University of Missouri Research Reactor Operations Monthly Summary for Mar 1995 ML20117K7951995-03-21021 March 1995 University of Missouri Research Reactor Operations Monthly Summary for Feb 1995 ML20117K7911995-02-22022 February 1995 University of Missouri Research Reactor Operations Monthly Summary for Jan 1995 ML20078Q5881994-10-31031 October 1994 MURR Independent Mgt Assessment Rept ML20117A2051992-11-23023 November 1992 Rept on Possession of Low Enriched U-235 in Excess of License Limits at Univ of Missouri-Rolla Reactor Facility ML20210B8111986-09-0101 September 1986 Missouri Univ Research Reactor Upgrade Neutronics Analysis Using AMPX-II/BOLD Venture IV Computation Sys Benchmarked to Destructive Analysis of Fuel Element 775F3. W/Three Oversize Drawings ML20210B8031986-06-30030 June 1986 Extended Life Aluminide Fuel Final Rept 1996-05-13
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212D4471999-09-20020 September 1999 Safety Evaluation Supporting Amend 31 to License R-103 ML20211B1671999-07-13013 July 1999 Special Rept on 990614 Re Test of Scram Set Point of Two of Five Low Primary Coolant Flow Safety Sys Channels.Caused by Trip Set Points Being Too Close to TS Limits.Compliance Procedure 23 Will Be Revised ML20206A9681999-04-21021 April 1999 Revised Page 4 to MURR QA Plan ML20202G9051998-12-31031 December 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Dec 1998 ML20207A6981998-12-31031 December 1998 Reactor Operations Annual Rept for 980101-1231, for Univ of Missouri Research Reactor Facility.With ML20202G9171998-11-30030 November 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Nov 1998 ML20202G9271998-10-31031 October 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Oct 1998 ML20154M3301998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Univ of Missouri Research Reactor ML20154M3401998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Univ of Missouri Research Reactor ML20236Y5941998-08-0606 August 1998 Special Rept:On 980706,operator Noted That One Sample Listed as Inches Long on Loading Sheet,Only 2 Inches Long.Errors Constitute Observed Inadequacy in Implementation of Administrative & Procedural Control.Procedures Revised ML20154M3431998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Univ of Missouri Research Reactor ML20236S1711998-07-15015 July 1998 Ro:On 980615,large & Rapid down-shift on Three Different Meter Indications from One Ni Drawer Was Discovered.Caused by Failed Preamplifier in Wide Range Amplifier Subject Ni Drawer.Replaced Cabling,Detector & Preamplifier ML20154M3651998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Univ of Missouri Research Reactor ML20154M3731998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Univ of Missouri Research Reactor ML20154M3841998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Univ of Missouri Research Reactor ML20246P9931998-03-31031 March 1998 Monthly Operating Rept Summary for Mar 1998 for Univ of Missouri Research Reactor ML20246Q0231998-02-28028 February 1998 Monthly Operating Rept Summary for Feb 1998 for Univ of Missouri Research Reactor ML20203H4271998-02-26026 February 1998 Safety Evaluation Supporting Amend 30 to License R-103 ML20246Q0201998-01-31031 January 1998 Monthly Operating Rept Summary for Jan 1998 for Univ of Missouri Research Reactor ML20198K9441998-01-0808 January 1998 Special Rept:On 971209,reactor Shutdown by High Power Scram Initiated by Wide Range Monitor of Nuclear Instrument Sys. Caused by Unanticipated Positive Reactivity Insertion. Reflector Sample Opened & Inspected ML20203L0531997-12-31031 December 1997 Reactor Operations Annual Rept,970101-1231, for Univ of Missouri Research Reactor Facility ML20202H4091997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Univ of Mo Research Reactor ML20197D2751997-12-15015 December 1997 Ro:On 971026 & 1106,slight Elevation of Fission Products Were Detected in Primary Coolant Water Analyses.Caused by Slight Fabrication Flaw in Element MO-460.Surveillance of Bwx Technologies Fabrication Techniques Will Be Increased ML20202H3931997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Univ of Mo Research Reactor ML20202J1151997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Univ of Missouri Research Reactor ML20202J1201997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Univ of Missouri Research Reactor ML20211B2871997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Univ of Missouri Research Reactor ML20210R2701997-07-31031 July 1997 Univ of Missouri Research Reactor Operations Monthly Summary,July 1997 ML20196G8891997-07-15015 July 1997 Special Rept:On 970616,scram Setpoint for Low Flow Scram for Heat Exchanger 503A Leg Was 25 Gpm Below TS Limit.Caused by Drifting of Setpoint of Vutronik Monitor Switch DPS-928A. Adjusted Trip Setting & Retested Trip Setting ML20149L3761997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Univ of Mo Research Reactor ML20141H6451997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Univ of Mo Research Reactor ML20141H6581997-04-30030 April 1997 Monthly Operating Rept for April 1997 for Univ of Missouri ML20141H6691997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Univ of Missouri ML20136D7211997-03-0606 March 1997 Safety Evaluation Supporting Amend 29 to License R-103 ML20141H7421997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for University of Missouri Research Reactor ML20141H6421997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Univ of Mo Research Reactor ML20141H7001996-12-31031 December 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for Dec 1996 ML20138Q6601996-12-31031 December 1996 Reactor Operations Annual Rept for 1996 ML20141H7221996-10-31031 October 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for Oct 1996 ML20116E2621996-07-30030 July 1996 Ro:On 960701,emergency Generator Shutdown on High Coolant Temp.Caused by Sheared Water Pump Shaft.Replaced Defective Pump ML20141H6781996-06-30030 June 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for June 1996 ML20149L3721996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Univ of Mo Research Reactor ML20117L1091996-05-13013 May 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Apr 1996 ML20117L1001996-03-31031 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Mar 1996 ML20117L0951996-03-13013 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Feb 1996 ML20117L0841996-03-0606 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Jan 1996 ML20100J3991996-02-22022 February 1996 Ro:On 960123,reactor Was Shut Down by Manual Scram When Console Operator Determined That Regulating Blade Was Inoperable.Caused by Seized Bearing on Gearbox Input Shaft. Bearing Replaced ML20097J4391996-01-26026 January 1996 Special Rept:On 951227,reactor Shutdown Occurred Due to Reactor in Operation W/Regulating Blade in Degraded Condition.Replaced Dowel Pin ML20101F5381995-12-31031 December 1995 Revised Pages III-1 & VII-1 to 1995 Operations Annual Rept ML20100M7821995-12-31031 December 1995 Univ of Mo Research Reactor Reactor Operations Annual Rept Jan-Dec 1995 1999-09-20
[Table view] |
Text
- .
q '.. I.. O d i_'t R O..U. T: N _G g ---- ,
i- - --. . : by:$ ..
1 h -
. .._ __ _ J p.
D; , ..
If;;;,T'* ---- . ... ~
^ :--- l
___ _. _I i
- - ~ .
. . ._ _ . . __ q
]qr--- -------
UNIVERSITY OF MISSOURI RESEARCH REACTOR j OPERATIONS MONTHLY
SUMMARY
1 1
G i
i I
l l
)
l l
July 1995 Prepared by:
Operations Staff I
{
l 1
1 l
- . e .
..p a 1 ;, }%
9609120296 960828 '
PDR FOIA WALSH96-249 PDR -
I d July 1995 The reactor operated continuously in July with the following exceptions: five shutdowns for scheduled maintenance and/or refueling; two unscheduled shutdowns.
On July 13, a reactor scram occurred due to the loss of site electrical power. The University Power Plant experienced several grid. wide interruptions. Power was eventually restored and the reactor was refueled and returned to normal operation.
On July 24, a manual scram was initiated when the reactor operator observed the Channel 4 indication spike up 15% and return to its previous indication while another operator was closing the Channel 5 instrument drawer after a gain potentiometer change. The power level indications for Channel 5 and 6 dropped about 15%. Review of the Intermediate Range Monitor (IRM) chart indicates that the IRM indication also dropped about 15%.
Electronics technicians checked the nuclear instrument cabinet cabling to the power range drawers to ensure no cabling was pinched when the Channel 5 drawer was closed. They checked each NI drawer to ensure that the voltage regulator and feedback and test modules were seated.
They also checked the voltage from the common power supplies 2PS1 and 2PS2. ,
1
, The picoammeter module in the WRM (Channel 4) drawer appeared to not be fully seated. The i module plug and the drawer pins were engaged, but the mocule could slightly rock. The Channel 4 I problem could be duplicated by the physical vibration of shutting the Channel 5 drawer, until the picoammeter module was resented. When this module was fully seated, the "up" spike problem on Channel 4 could not be duplicated. i The spurious power level spike on Channel 4 was most likely caused by a momentary open or high resistance in the plug. pin interface for the picoammeter feedback module. The picoammeter feedback module and the Channel 4 range switch provide the feedback loop for the D.C. amplifiers that provide the Channel 4 meter and trip unit output. These amplifiers are operational amplifiers which are very sensitive to the resistance of the feedback loop. Any high feedback loop resistance or j momentary open would cause a spike to occur at the output of the amplifier. !
The drop in indication on Channels 5 and 6 and the IRM chart were most likely the result of regulating blade response to the spurious spike on Channel 4. Channel 4 output is delivered to the Servo Amplifier which drives the regulating blade. The Servo Amplifier detects the error between Channel 4 indicated power and the power demand set point potentiometer and activates the regulating rod to withdraw or insert based on the direction of the error, to reduce the error to zero.
In this particular case, the "up" spike on Channel 4 would cause the regulating blade to drive in, reducing reactor power. The cause of this spurious spike on Channel 4 indication is similar to previous problems associated with problems of momentary opening or high resistance in the l Channel 4 amplifier feedback loop associated with the WRM (Channel 4) range switch and the picoammeter relays themselves which resulted in spurious scrams or rod run. ins. Electronics technicians will add a precaution to their maintenance procedure for Channel 4 to include verification that all modules are firmly seated.
Major maintenance items for the month included: installing an 8" valve on the secondary side of pool heat exchanger 521; loading new pool deionization bed T'; shipping eight depleted fuel elements in the BMI.1 cask; replacing the control power fuse on primary pump 501A breaker; replacing the belts on the alpha lab exhaust fan.
=
o e
UNSCHEDULED SHUrDOWNS Date Number Tyne Cause 7/13/95 1036 Scram Loss of site electrical power 7/24/95 1037 Manual Scram Spurious indication on Channel 4 OPERATION
SUMMARY
HOURS OPERATED THIS PERIOD 650 TOTAL HOURS OPERATED 189,607 HOURS AT FULL POWER THIS PERIOD 649 TOTAL HOURS AT FULL POWER 186,630 INTEGRATED POWERTHIS PERIOD 270 MWI' .
TOTAL INTEGRATED POWER 71,910 MWD 1
MAINTENANCE ACTIVITY l
7/3/95 Refueled - removed core 95-26, loaded core 95-27. !
7/10/95 Refueled - removed core 95-27, loaded core 95-28. Installed 8" valve on the secondary side of pool HX 521.
7/13/95 Refueled - removed core 95-28, loaded core 95-29.
7/14/95 Leaded new pool deionization bed 'F'.
7/16/95 Refueled - removed core 95-29, loaded core 95-30.
l 7/17/95 Shipped eight depleted fuel elements in BMI-1 cask.
l 7/24/95 Refueled removed core 95-30, loaded core 95-31.
7/31/95 Refueled - removed core 95-31, loaded core 95-32. Replaced control power fuse on P-510A breaker. Replaced belts on alpha lab exhaust fan.