ML20116F568
| ML20116F568 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/31/1992 |
| From: | Feigenbaum T, Nardone P NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-92154, NUDOCS 9211100386 | |
| Download: ML20116F568 (5) | |
Text
_ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
4 P.O. Box 300 Odi Seabrook. N s 03874 f
Telephone (603)474 9521 fj hhffh
-,,ry Facsimile (603)474-2987 Energy Service Corporation Ted C. Felgenbaum Senior Vice President and -
Chief Nuclear Officer NYN-92154 November 4,1992 United States Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Document Control Desk
Reference:
Facility Operating License No. NPF 86, Docket No. 50-443
~
Subject:
h'.onthly Operating Report Gentlemen:
Enclosed please find Monthly Operating Report 92-10.
This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of October,1992 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Very tru
- yours, b.
y g);y Ted C. Fe num Enclosure cc:
Mr. Thomas T. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Gordon E. Edison, Sr. Project Manager Project Directorate 1-3 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Noel Dudley NRC Senior Resident inspector P.O. Box 1149 Seabrook, NH 03874
'} P nnnno e
9211100386 921031 1 member of the Northeast Utilities system
/ ' ' ~7 I
PDR ADOCK 05000443 i
R.
pon
.m
..~
n:
.=
OPERATING DATA REPORT DOCKET NO.
50-443 UNIT Seabrook 1
'I
'DATE 11/04/92 COMPLETED BY P. Nardone TELEPHONE (603? 474-9521
'(Ext. 4074)-
OPERATING STATUS 1.
Unit Neme:
Seabrook Station Unit 1 2.
Reporting Period:
OCTOBER 1992 3.
Licensed Th*rmal Power (MWt):
3411 4.
Nameplate Rating (Gross MWe):
1197 5.
Design Electrical Rating (Net MWe):
1148 6
Maximum Dependable Capacity (Gross MWe):
1200 7.
Maximum Dependable. Capacity (Net MWe):
11501 b.
If Changes occur in Capacity Ratings (Items Number 3 Through-7)
Since Last Report.1 Give Reasons:
Not Applicable
- 9.
Power Level To.Which-Restricted If Any:
None-
.10. Reasons For. Restrictions, If Any:
Not Applicable This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 745.0 7320.0 52969.0
- 12. Number Of Hours Reactor Was Critical 0.0 5999.5 18365.0
- 13. Reactor Reserve Shutdown Hours 0.0-0.0 953.3 14 Hours Generator On-Line 0.0 5999.0 16523.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0.
- 16. Gross Thermal Energy Generated (MWH) 0 20302552 53372412 U
- 17. Gross Elec. Energy Generated (MWH) 0 7098902 18470152
- 18. Net Electrical Energy Generated (MWH) 0 6824172 17732547
-*20.
Unit Availability Factor-0.0 82.0 78.5
- 19. Unit Sarvice_ Factor 0.0 82.0 78.5
- 21.: Unit Capacity Factor (Using MDC Not) 0.0
-81.1' 7 5. *22. Unit Capacity Factor.(Using DER Net) 0.0 81.2 75.3
- 23. Unit Forced Outage-Rate.
-5.4 0.0 0.0
- 24. Shutd ans Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
REFUELING. 09/07/92. 62 DAYS
- 25. If-Shut Down At End Of Report Period, Estimated Date Of-Startup:-
11/07/92
~* NOTE: " Cumulative" values based on total hours starting 08/19/90,. date. Regular Full b.
Power Operation began.
\\.
1 of.4
?
1
=
AVERAGE DAILY UNIT i>0VER LEVEL DOCKET NO.,._ 50-443 UNIT Seabrook 1 DATE 11/04/92 COMPLETED BY P.
Nardone TElFDHONE 1603) 474-9521 (Ext. 4074)
MONTH OCTOBER, 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P0tvER LEVEL (MWe-Net)
(MWe-Net) 1 0
16 0
2 0
17 0
3 0
18 0
4g 0
19 0
5 0
20 0
6 0
21 0
7 0
22 0
8 0
22 0
9 0
24 0
10 0
25 0
11 0
26 0
12 0
27 0
13 0
28 0
14 J
0 29 0
15 0
30 0
M 31 0
INSTRUCTIONS On this f orma t, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
2 of 4 l
DOCKET NO.
50-443 UNIT SHUTDOWNS AND POWER REDUCTIONS UNI Seabrook 1 DATE 11/04/92 REPOR1 MONTH OCTOBER, 1992 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074)
No.
Date Type Duration Reason Method of Licensee Cause & Corrective l
2 (Hours)
Shutting Event Action to Down Reactcr Report f Prevent Recurrence 3
Page 1 of 1 92-01 10/01/92 S
745 C
4 N/A Scheduled Refueling Outage 3
1 2
Method:
F:
Forced Reason:
1-Manual S:
Scheduled A-Equipment Failure (Explain) 2-Manual Scram B-Maintenance or Test 3-Automatic Scram C-Refueling 4-Continued from D-Regulatory Restriction E-Operator Training & License Examination previous month 3-Power Reduction F-Administrative (Duration = 0)
G-Operational Error (Explain) 9-Other (Explain)
H-Other (Explain) 3 of.4 o
T-
- 1 1
M DOCKET [NO,:
50-443-UNIT 1 Seabrook l'
'j
-DATE 11/04/92-COMPLETED BY P. Nardone TELEPHONE'1603)-474-9521 (Ext. 4074)
REFUELING INFORMATION REQUEST l.
Name ofLtacilitys-Seabrook Unit 1 2.
Scheduled date for next refueling shutdown:
Refueling Outage 2, 09/07/92 Refueling Outage 3,'03/26/99 3.
Scheduled date for restart following refueling:
Refueling Outage 2, 11/07/92 Refueling Outage 3, 05/20/94 4.
Will' refueling or resumption of operation thereafter require a technical' specification. change or other license amendment?
r f
No
.5.
Scheduled date(s) for subrc.itting licensing action-and supporting L information:
N/A 6.
Important licensing considerations associated with refueling, e.g..-new a
or different fuel design.or-supplier, unreviewed design or' performance' analysis methods, significant changesJin fuel.designi_new-operating-_
procedures:
5 This refueling will be the-initial start'_of thel eighteen-month fuel cycle' schedule.
7..
The number of' fuel assemblies (a) in-the_. core and (b):in the spentLfuel storage pools (a).In Core:
193 (b).
136
- 8.
The present licenced spent _ fuel-- pool storage capacity and the siae of:
~
any increase in licensed storage capacity-that has been: requested-or is
-planned, in number.of fuel assemblies:
Present licensed capacity:
1236
-No increase in storage' capacity requested or. planned.
0 19.
fThe projected date of the last refueling that canLbe discharged'to tho p
= spent. fuel' pool assuming the:present licensedicapacity:
Licensed capacity.of'1236 fuel assemblies based on two l
annual and twelve: eighteen-month refuelings with full?
core offload' capability.
L l
.The._currentflicensed. capacity;is adequate until at s
-least the yeatl2010.,
~
4'of 4 i
l-l:
_