Text
_
Approv41 -
Vogtle Electric Generating Plant A
29101-C.
Proc 50ure No.
j
,,[ A[
NUCLEAR OPERATIONS
/
g,,,,,,n y,,
eg Unit COMM'ON Georgia Power e.o no 9
O bil b -3C
>-.k EMERGENCY LIGHTING SURVEILLANCE p
(FSAR Fire Protection Surveillance)
CO u.J Q
OZ' C
=
Ob x
REV.
REASONS FOR REVISION DATE
-0 Original Procedure 09/01/89 1
Correct tag numbers on Data Sheets OV i.-
s-9 4.
av O
920221042f. 920116 PDR ADOCK 05000424 S
PDR TQ3tC1A MCSi30
. - -, ~.
x PAoCEDURE No.
REVISloN PAGE No,
-VEGP
'29101-C 1
2 of 96 1.0 PURPOSE 1.1 This procedure provides instructions for inspecting and testing emergency lighting systems per FSAR 9.5.3,4 (Commitment 1388) 1.2 This procedure is applicable to Emergency Lighting located in the following areas:
1 2.1 Main Control Room 1.2.2 Remote Shutdown Rooms 1.2.3 Auxiliary Feedwater Pumphouse Panel Pooms 1.2.4 Diesel Generator Panel Rooms 1.2.5 Access and Egress routes between the rooms identified above.
1.2.6 Other areas throughout the plant site as identified in this procedure.
2.0 PRECAUTIONS AND LIMITATIONS O-2. l' This procedure shall be performed in accordance with the applicable portions of Procedure 92025-C, " Fire Protection Surveillance Program".
2.2 Batteries produce explosive gases.
Avoid sparks and open flames when working around batteries.
2.3 Use only distilled or demineralized water to fill batteries do not. overfill.
2.4 Avoid contact with battery electrolyte since it will cause corrosive burns.
2.5 Contact Health Physics personnel before entering containment or any radiation area.
l 2.6 When replacing bulbs, use same type removed or approved equivalent..
2.7 To prevent premature bulb failure,-do not handle bulbs with bare hands.
Use-clean cloths to install bulbs.
O
~
~
P"toCEDURE No.
REVISloN PAGE No VEGF 29101-C 1
3 of 96
-(O
~
- _j 3.0 PREREQUISITES Ok INITIAL CONDITIONS Notify the On Shift Operations Supervisor (OSOS)/ Shift Supervisor (SS) prior to beginning this procedure.
4.0 INSTRUCTIONS 4.1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS 4.1.1 At each emergency light listed on Checklist 1,2,3,5, 6, 7, 8, and 9 perform the following:
4.1.1.1 Verifv the battery charge indicator (voltmeter, LED, Hi-Low Charge indicator light etc.) shows that the batteries are charged.
For Holophane M+19 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> battery units, the proper battery voltage as read on units voltmeter should be between 12 and 14 volts DC.
If the observed indicated voltage is below 12 volts DC, the batteries are defective and/or the AC power feed to the fixture is off.
Record in comments section.
4.1.1.2 Visually inspect the battery electrolyte level of each cell and ensure the electrolyte is between the maximum
(/
and minimum fill line, if applicable.
Add water to
\\-
bring electrolyte level to within proper limits, as applicable.
Record in comments section.
This step does not apply to Holophane M-19 battery units.
4.1,1.2.1 Remove front cover of unit.
Check exposed battery connections for corrosion (for Holophane M-19 units only).
Record in comments section.
4.1.1.2.2 Observe the fixtures' status indicating LEDs and lamp heads: (normal conditions underlined) record in comments section.
Green' light ON Indicates AC power is available.
Also indicates that AC feeder has tripped if accompanied with a low battery reading (below-12VDC).
Red light OFT Indicates that lamp heads are not operating.
No loss or AC power has occurred.
O f4
PAOcEDUXE NO.
BEVISION PAGE NO.
VEGP 29101-C 1
4 of 96
/N Amber-light OFF Indicates batteries are on b
tloat charge.
Green light OFF Indicates loss of AC power to unit.
Sealed beam lamp head should be on as well as Red LED.
Red light ON Indicates loss of AC power.
Sealed beam lamp heads should be operating.
Amber light ON Indicates batteries are on high charge.
Normally occurs after restoration of AC power.
4.1.1.3 Press the test button.
This stimulates a loss of AC gower to the fixture.
While still pressing the test
>utton observe the fixtures status indicating LEDs and sealed beam lamp heads.
Record in comments section.
Green light OFF Indicates loss of AC power.
Red light ON Indicates loss of AC power,
,r s Amber light OFF Does not function.
V' 4.1.1.4 Verify lamps are aimed to provide maximum lighting coverage, or per the appropriate drawings, as applicable.
4.1.1.5 Release test button and obscrve the fixtures' status indicating LEDs and sealed beam lamp heads.
Green light On Indicates AC power is available.
Red light OFF Indicates that lamp heads are not operating.
Amber light ON Indicates batteries are on high charge.
LED will extinguish when batteries are on float charge.
Replace any defective lamps or LEDs and record in comments section (for steps 4.1.1.2.2 through 4.1.1.5).
?C3445
P;.oCEDURE No. -
REVISloN PAGE No.
]'
JWEGP-29101-C 1
5 of 96 j )
4.1.1.6 Record test results.
NOTE Repeat Steps 4.1.1.1 thru 4.1.6 for each emergency lighting system identitied on Checklist 1, 2, 3 or 5.
4.2 INVERTER POWERED EMERGENCY LIGHTING SYSTEMS c.2.1 For each emergency lighting system listed on Checklist 4, perform the following:
4.2.1.1 Verify that the electrolyte level of each battery cell is-between the maximum and minimum fill lines.
Add water to bring electrolyte level to within proper limits, as applicable.
Record in comments section.
4.2.1.2 Verify that the surface of each battery is free of contamination and corrosion, if not clean battery.
4.2.1.3 Verify that utility power is on to the inverter as evidenced by green light illuminated.
(~N
'4.2.1.4 Press the. test button and verify that all lamps
(_)
associated with the unit energize.
Replace any burnt out lamps-and record in Comm- 's section of Data Sheet.
4.2.1,5 Verify lamps are aimed to p
.de maximum lighting coverage, or per the.approp7 ete drawings, as appl? cable.
4.2.1.6 Release inverter test button and verify all lamps associated with the unit de-energize.
4.2.1.7 Check battery voltage and inverter output.
4.2.1.8 Record test results.
NOTE Repeat Steps 4.2.1.1 thru 4.2.1.8 for each lighting system identified on checklist 4.
4.3 Notify the OSOS/SS upon completion of this procedure.
O
.~.m__-
i PHoCEDUREho.
p(y'S'ON PAGE No.
VEGP 29101-C 1
6 of 96 5.0 ACCEPTANCE CRITERYA L
5.1 The lamps associated with the emergency lighting unit energize when the r.est button is pressed.
5.2 Battery charge ir.dicators indicate that the batteries are charged.
5.3 The lamps are aimed to provide maximum light coverage or per the appropriate drawing, as applicable.
5.4 The emergency lighting system has been returned to normal operation.
5.5 Batteries are clean and free of foreign material.
5.6 Any materials used in repair of emergency lighting are l$sted in comments section with MER number and a copy of MER as applicable.
6.0 RETERENCF.S 6.1 Trocedure 92025-C,
" Fire Protection Surveillance Program" 5
6.2 NFPA 101-HB81
" National Fire Protection Association Life Safety Code Handbook" 6.5 AX3ANO3-16-1 "Holophane, H-19,12V DC Power i
Pack, Installation and Maintenance" 6.4 1x3AN09-500-1
" Lighting Equip - CHLOR EMER AC INVERTER SYS - IM" 6.5 1X3AN09-502-0
" Lighting Equip. CHLOR EMER AC INVERTER SYS - DATA" 6.6 UNIT 1 CONTAINMENT LIGHTING AND COMMUNICATIONS DRAWINGS 6.6.1 1X3DG50A 6.6.2 1X3DG50B 6.6.3 1X3DG50C 6.6.4 1X3DG50D 6.6.5 IX3DG51A m.-
. ~, ~ _ -. - - -. _, -. _
TT
~
~ '#ROCEDUHL NO-REVISION PAGC NQ.
VECP 29101-C 1
7 of 96
+g
)
6.6.6 1X3DG51B 6.6.7 1XSDGSIC 6.6.8 1X3DG51D 6.6.9' 1X3P3504 6.6.10 1X3DG514 6.7 UNIT 2 CONTAINMENT LIGHTING AND COMMUNICATIONS DRAWINGS 6.7.1 2X3DG52B 6.7.2 2X3DG52C 6.7.3 2X1DG52D 6.7.4 2X3DG53B 6.7.5 2X3DG53C 6.7.6 2X3DG53D 6.7.7 2X3DG521 6.7.8 2X3DG522 8.
6.7.9 2X3DG524 6.7.10 2X3DG525 6.7.11 2X3DG526 6.7.12 2X3DG532 i
6.7.13 2X3DG534 6.7.14 2X3DG535 6.8 FSAR 9.5.1-10 6.9 FSAR 9.5.3.4 END OF PROCEDURE TEXT O
?]lJ45
-,. ~ - -....,-
....,.-m
- - - -, ~ ~ - - _.,
---,-.-x-,-~.,,.--.--.---.---..---w..----,,--
~
~ _, - - - ~..
. - - ~ - - - -
_. - -. ~. _ >...
I PROCEDURE No-84fVibloN PAGE NO.
VEGP 29101-C 1
8 of 96 O
Sheet 1 of 1 EldERGENCY LIGHTING SURVEILLANCE 4
CHECKLIST ACCFPTANCE CRITERIA AND PERFORMER IDENTIFICATION ACCEPTANCE CRITERIA The lamps associated with the emergency lighting unit energize when the test button is' pressed.
Battery charge indicators indicate that the batteries are charged.
The lamps are aimed to provide maximum light coverage, or per the appropriate drawing, es applicable.
The energency lighting system has been returned to norinal operation.
Batteries are clean and ftce of ftreign material.
PERFORMER IDENTIFICATION Each person performing this procedure and initia111ng the checklists will place his/her name, initials, and signature below.
NAME (Print)
INITIALS- _
SIGNATUPE o
e one-i ear hh O
-'.Y h
-....s..,,._.__.._w.,..,_.,a__..~,-._,_..m..,~.,_..
,..,,,,.L.._.,_,,....._._.,.~.,
O O
O Procedure No.
I,..swm Pay No VEGP 29101-C 1
9 of 96 Sheet 1 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWIhG ACCEPT LOC.
NO.
NO.
[YES/NO)
INIT. / DATE COMMENTS R-114 INLP30-22-1 IX3DG33A East of C.S.
Outside Door R-117 INLP43-8-2 IX3DG313 R-117 1NLP43-8-3 IX3DG313
-lI R-123 INLP31-4-1 IX3DG323 1 light aimed at FV 3010 R-123 INLP31-6-1 IX3DG323 North valve rm.
I
- R-123 INLP31-6-2 IX3DG33A North valve rm.
l 1 light aimed at PV 3020 R-122 INLP31-6-3 IX3DG323 North valve rm.
2 1
i 1
"c o$b 9
O O
O Procedure No.
fhasson Pap No VEGP 29101-C 1
10 of 96 Sheet 2 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYJTEMS 3
BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWING ACCEFI 7 OC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS R-123 1NLP31-6-4 IX3DG323 i
R-123 INLP36-13-1 IX3DG33A North valve rm.
Lights aimed at HV-3019 R-138 INLP43-8-4 IX3DG313 R-138 INLP43-8-5 IX3DG313 1
R-143 1NLP31-3-1 1X3DG313 R-149 INLP43-8-1 1X3DG313 I
R-149 INLP43-8-6 IX3DG313 4
i s
q p
O('s
(
eroceoure no news or, e.ge no VEGP 29101-C 1
11 of 96 Sheet 3 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGilTING SYSTEMS l
l l
BUILDING:
UNIT 1 CONTROL BUILDING l
EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS R-155 INLP43-20-1 IX3DG303 I&C Shop at Control Rm.
R-155 1NLP43-20-2 1X3DG313 ISC Shop at Control Rm.
R-163 INLP35-10-1 IX3DG303 Control Room R-163 INLP35-10-2 1X3DG303 Control Room Lights aimed at HVAC panel R-163 INLP35-10-3 IX3DG303 Control Room Lights aimed at HVAC panel R-163 INLP35-10-4 1X3DG313 Control Room R-163 1NLP35-10-5 IX3DG313 Control Room R-163 INLP35-17-1 1X3DG303 Control Room Lights aimed at HVAC panel R-163 INLP36-10-1 1X3DG303 Control Room Lights aimed at HVAC panel R-163 INLP36-10-2 1X3DG303 Control Room Lights aimed at IIVAC panel R-163 INLP36-10-3 IX3DG303 Control Room R-163 1NLP36-10-4 IX3DG303 Control Room I
^~
/*
f~~~~\\
(s U
v Procedtne teo.
Revtson Page No VEGP 29101-C 1
12 of 96 Sheet 4 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENC LIGHTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWING ACCEPi
- LOC, NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS R-163 INLP36-10-5 1X3DG313 Control Room R-163 1NLP36-10-6 1X3DG313 Control Room R-163 1NLP36-17-1 IX30G303 Control Roca Lights aimed at HVAC panel R-163 INLP36-17-2 IX3DG303 Control Room Lights aimed at HVAC panel l
4 R-180 INLP35-13-2 IX3DG303 R-180 INLP36-13-6 IX3DG303 R-189 INLP83-6-1 1X3DG303 R-199 1NLP35-13-1 IX3DG303 Small hall to I&C and Control Room R-225 1NLP28-5-1 1X3DG304 R-225 1NLP28-5-3 IX3DG314 R-225 1NLP28-5-7 IX39G304 R-230 l1NLP28-5-4 IX3DG314 l
~'
N CN
\\
Procedure No_
Rense Page No VTOP 29101-C 1
13 of 96 Sheet 5 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS R-230 INLP28-5-5 1X3DG314 R-230 INLP28-5-2 IX3DG304 R-245 1NLP28-5-6 1X3DG314 R-312 INLP36-18-1 IX3DG315 R-313 1NLP36-18-2 IX3DG315 R-313 1NLP36-18-3 1X3DG315 i
R-314 INLP44-5-1 1X3DG315 R-316 INLP44-5-2 1X3DG315 8
R-319 1NLP44-5-3 IX3DG315 l
B R-320 INLP35-20-6 IX3DG315 I
l R-321 INLP35-20-7 IX3DG315 l1X3DG315 R-322 INLP36-18-4 9 >h
O O
O Procedure No Revison Page No
~
VEGP 29101-C 1
14 of 96 Sheet 6 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NG.
(YES/NO). INIT. / DATE COMMENTS R-322 INLP36-18-5 1X3DG315 Lights aimed at Breaker #22 on IBYA1 R-322 INLP36-18-6 IX3DG315
\\
R-325 1NLP35-20-1 1X3DG305 i
R-325 INLF35-20-2 2X3DG305 1 light aimed at Breaker Jll on ANBC R-325 1NLP35-20-3 IX3DG305 R-325 1NLP35-20-4 IX3DG305 R-325 1NLP35-20-5 IX3DG305 R-325 1NLP35-20-8 IX3DG305 e
R-408 ANLP42-11-1 IX3DG316 i
i i
R-410 ANLP42-11-2 IX3DG316 4
f f
l R-410 ANLP42-11-3 IX3DG316
. R-410 ANLP42-11-4 1X3DG316 l
k
O O
O Procedure No.
Revisson PapeNo_
-29101-C 1
15 of 96 Sheet 7 of 17 CHECKLIST 1 SELF CCNTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS I
BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWING ACCEPT LOG.
NO.
NO.
[YES/NO)
INIT. / DATE COMMENTS I
t R-410 ANLP42-11-5 IX3DG316 R-A34 INLP35-8-3 IX3DG312 R-A36 INLP35-8-4 IX3DG312 R-A36 INLP36-8-8 IX3DG312 R-A38 1NLP34-14-1 1X3DG.512 t
R-A38 INLP34-14-2 1X3DG312 R-A43 INLP29-1-2 1X3DG312 Key No. 62 Train B Shut Down Panel Lights to be aimed at Shut Down Panel R-A43 INLP32-1-1 1x3DC312 Key No. 62 Train B Shut Down Panel Lights to be aimed at Jhut Down Panel 1
R-A43 INLP32-1-2 1X3DG312 Key No. 62 Train B Shne Down Panel Lights to be aimed et Situt Down Panel
)
R-A43 INLP32-1-3 1X3DG312 Key No. 62 Tr.-In B Shur Down Panel R-A44 1NLP35-8-1 IX3DG302 4
i i
j
(-]>
J U
g A
Procedure No.
Revtsac-)
Page Na VEGP 29101-C 1
16 of 96 Sheet 8 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS R-A44 1NLP35-8-5 1X3DG312 R-A44 INLP36-8-1 IX3DG302 R-A44 1NLP36-8-2 1X3DG302 R-A44 INLP36-8-9 1X3DG312 R-A44 1NLP36-9-1 IX3DG302 R-A48 INLP35-7-1 IX3DG302 Key #64 Train A 4.16KV Swgr Room I light aimed at Breaker #19, 1 light aimed at Breaker 120 R-A48 1NLP35-7-2 IX3DG302 Kev #64 Train A 4.16KV Swgr Room I light aimed at Breaker #10, 1 light aimed at breaker #14 R-A48 INLP35-7-3 IX3DG302 Key #64 Train A 4.16KV Swgr Room 1 light aimed at Breaker #21, 1 light aimed at Breaker #22 R-A48 INLP35-7-6 IX3DG322 Key 164 Train A 4.16KV Swgr Room I light aimed at Breaker il, 1 light aimed at breaker f5 R-A48 1NLP35-7-7 IX3DG302 Key #64 Train A 4.16KV Swgr Room R-A48 INLP35-8-2 IX3DG302 Key #64 Train A 4.16KV Swgr Room R-A48 1NLP36-8-3 IX3DG302 Key #64 Train A 4.16KV Swgr Room m,W i.
O O
O i
Procedure No Revision
. Page No VEGP 29101-C 1
17 of 96 Sheet 9 of 17 CHECKLIST 1 SELF GONTAINED SEALED BEAM EMERGEF.,Y LIGHTING SYSTLMS f
I BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS R-A50 INLP35-7-5
, 1X3DG322 Key 165 Train B 4.16KV Swer Room I light aimed at Ereaker (14, 1 light aimed at Breaker #18 R-A50 INLP36-8-4 IX3DG302 I
Key #65 Train B 4.16KV Swgr Room 1 light aimed at Breaker il, 1 light aimed at Breaker #4 R-A50 INLP36-8-5 IX3DG302 Key #65 Train B 4.16KV Swgr Room 1 light aimed at Breaker f5, 1 light aimed at Breaker #6 R-A50 INLP36-8-6 1X3DG302 Key #65 Train B 4.16KV Swgr Room 1 light aimed at Breaker #19, I light aimed at Breaker #21 R-A50 INLP36-8-7 IX3DG302 Key #65 Train B 4.16KV Swgr Room Lights aimed at Breaker #9 R-A50 INLP36-8-13 In3DG302 Key f65 Train B 4.16KV Swcr Room R-A50 INLP36-11-2 1X3DG322 Key !65 Train B 4.16KV Swgr Room R-A51 INLP35-9-1 IX3DG302 4
t' R-A51.
INLP35-11-3 1X3DG312 i
l R-A51 INLP36-9-2 1X3DG302 R-A51 INLP36-11-3 IX3DG322
)
R-A53 INLP33-6-1 IX3DG312 Key #234 t
1
.w
f'
)
['}
J
'N
\\
Procedure No.
Revew Page No.
VEGP 29101-C 1
18 of 96 Sheet 10 of 17 CHECKLIS1 1 SEI.F CONTAINED SEALED BEAM EMERGENCY LIGifTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT
- DRAWING ACCEPT
' LOC.
NO.
NO.
(YES[NO)
INIT. / DATL COMMENTS R-A54 1NLP35-8-6 IX3DG312 R-A58 1NLP35-7-4 iIX3DG302 R-A58 INLP35-8-7 IX3DC322 R-A58 INLP35-11-1 1X3DG302 R-A58 1NLP35-11-2 IX3DG302 R-A58 INLP36-7-1 1X3DG302 R-AS8 INLP36-8-10 1X3DG322 1
i R-A58 1NLP36-9-3 IX3DG322 1
6 R-A58 INLP36-ll-1 1X3DG302 L
R-A59 INLP35-8-8 1X3DG322 R-A59
'1NLP36-8-11 1X3Dd322 i
L
.I k
i V
b Procedure No Revision pager&3 l
VEGP 29101-C 1
19 of 96 l
Sheet 11 of 17 CliECKLIST 1 SELY CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDINJ:
UNIT 1 CONTROL BUILDING EMERG. LIGHTj DRAWING
! ACCEPT LOC.
NO.
NO.
~(YES/NO)
INIT. / DATE COMMENTS R-A62 1?iLP35-8-9 1X3DG322 R-262 INLP36-8-12 1X3DG322 I
R-A64 INLP35-8-10 1X3DG332
.R-A65 INLP49-6-1 1X3DG332 R-A70 INLP33-3-1 IX3DG302 Lights to be aimed at Shut Down Panel R-A75 1NLP29-1-1 1X3DG302 Key #265 Train "A" Shut Down Panel Lights to be aimed at Shut Down Panel R-A75 INLP29-1-3 1X3DG302 Key #265 Train 'a" Shut Down Panel Lights to be aimed at Shut Down Panel R-A75 INLP29-1-4 1X3DG302 Key #265 Train "A" Shut Down Panel i
R-B39 INLP35-3-4 IX3DG311 ll R-B42 INLP36-1-8 IX3DG311 R-B47 1NLP36-4-1 1X3DG311 1 light aimed at Breaker #3 on IBD12 se
O O
O Procedure No.
Revisaon Page No.
VEGP 29101-C 1
20 of 96 Sheet 12 of 17 CllECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGliTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS 3
1 light aimed at Breaker #1 on IbDIM R-B47 INLP36-4-2 1X3DG311 1 light aimed _at Breaker #4 on IBD1M R-B48 INLP36-1-9 1X3DG311 l
R-B50 INLP35-1-4 1X3DG311 1
R-B50 INLP35-3-1 IX3DG301 t_
R-B50 INLP35-3-2 IX3DG301 1 light aimed at Breaker #10 on 1NB08 R-B50 INLP35-3-5 IX3DG311 1 light aimed at Breaker f5 on 1 NB10 R-B50 INLP35-3-9 1X3DG301 1 light aimed at Breaker #10 on 1NB09 I
R-B50 INLP35-3-10 IX3DG311 i
R-B50 INLP36-1-1 1X3DG301 i
R-B50 INLP36-1-10 1X3DG311 j
R-B50 INLP36-1-12 IX3DG301
{
R-BS2 INLP36-1-2 1X3DG301
- U i
f 4
4>
O O
O procewe na news.on ey no VEGP 29101-C 1
21 of 96 l
Sheet 13 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS i
i BUILDING:
UNIT I CONTROL BUILDING EMERG. LIGHT DRAWING ACCEPI LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS IX3DG301 l 1 light aimed at breaker #1 on IAD1M R-B52 INLP36-1-3 1 light aimed at Breaker f 4 on IADIM i
1 light aimed at breaker 46 on lADll R-BS2 INLP36-1-4 IX3DG301 1 light aimed at Breaker #3 & #8 on ID12 R-B53
_ INLP35-1-1 IX3DG301 Lights aimed at Breaker #14 on IND32 R-B53 ; INLP35-1-8 IX3DG301 Lights aimed at Breaker 171 on IND31 Lights aimed at breakers fiO & ili R-B55 INLP35-1-2 IX3DG3'1 on 1 BYC1 R-B61 INLP36-1-5 IX3DG301 1
1 light aimed at breaker #1 on 1bB07 R-B61 1INLP36-1-6 lIX3DG301 1 light aimed at Breaker #1 on IBB06 I
R-B61 lHLP36-1-18 IX3DG301 i
R-B62 INLP36-6-2 IX3DG301 Key 182 Lights aimed at TV - 12725 R-B62 INLP36-6-3
!IX3DG301 Key #82 R-B63 INLP35-1-5 IX3DG311 t
R-B63 INLP35-1-6_
IX3DG321 f
I
=b
O O
O Pmcedure No Revision Page Na VEGP 29101-C 1
22 of 96 Sheet 14 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGilTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWING ACGEPI LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COFOiENTS R-B63 INLP35-3-3 1X3DG301 R-B63 1NLP36-6-1 1X3DG311 R-B65 1NLP39-22-1 IX3DG311 l
R-B66 INLP39-20-1 IX3DG311 R-B68 INLP35-4-1 1X3DG321 Lights aimed at Breaker #5 on 1NB01 1
R-b68 INLP36-1-20 1.X3DG321 R-B70 INLP35-1-3 1X3DG301 R-B70 INLP35-2-1 IX3DG321 s
R-B70 1FLP35-3-6 1X3DG321 R-B70 INLP36-1-7 1X3DG301 R-B70 IN1.P36-1-13 IX3DG321 R-B70 INLP35-1-14 1X3DG321 R-B 70 INLP36-1-IS 1X3DG321 L
L
O O
O Procedure No Rewsron Page No.
VEGP 29101-C 1
23 of 96 Sheet 15 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWING g (ACCEPT l
LOC.
NO.
NO.
YES/NO)
INIT. / DATE COMMENTS R-B71 INLP35-3-7 1X3DG321 R-B71 INLP36-1-19 IX3DG321 R-B73 INLP36-1-16 1X3DG321 R-B74 INLP40-20-1 IX3DG331 R-B76 INLP35-4-2 IX3DG321 Lights aimed at Breaker #1 on IAB04 R-B76 INLP35-4-3 1X3DG321 Lir; hts aimed at Breaker il on 1AB05 R-B76 INLP36-1-17 1X3DG321 R-B77 INLP35-3-8 1X3DG321 4
R-B78 INLP36-1-11 1X3DG331 R-879 INLP35-1-7 IX3DG331 I
i R-BSP 1NLP39-3-1 iIX3DG380 Sump Pump hole accessed in R-B50
- h I 1-
O O
O t
Frocedure no.
saves.cn pyri no VEGP 29101-C 1
24 of 96 1
Sheet 16 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING
- EJ4 ERG. LIGi!T DRAWING ACGEFT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS 188'
.STf2 INLP36-3-1 IX3DG333 Stair #2 g,
STf2 INLP36-3-2 1X3DG333 Stair #2 228' ST#2 INLP36-3-3 IX3DG333 Stair #2 I
248' STf2 INLP36-3-4 IX3DG333 Stair #2 I
268'
~ ~
1 ST#2 INLP36-3-5 IX3DG333 Stair #2 i
288' l
1 STf2 INLP36-3-6 1X3DG333 Stair #2 308' I
STf2 INLP36-3-7 IX3DG333 Stair #2
(
188' STf3 1NLP35-14-1 1X3DG333 Stair #3 Lev. B t
i 208' i
STf3 INLP35-14-2 IX3DG333
__St.a.ir #3 Lev _. A 1
STf3 INLP35-14-3 IX3DG333 Stair #3 Lev. 1 i
R-C01 INLP39-1-3 IX3DG380 Tunnel I
t I
I
~
l 1
f I
.-m
O O
O
- Vocedure F40-
%e Pap rso VEGP 29101-C 1
23 of 96 Sheet 15 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
CiES/NO)
INIT. / DATE COMMENTS R-B71 INLP35-3-7 IX3DC321 R-B71 INLP36-1-19 1X3DG321 i
R-B73 1NLP36-1-16 1X3DG321 R-B74 INLP40-20-1 IX3DG331 R-B76 INLP35-4-2 1X3DG321 Lights aimed at Breaker #1 on IAB04 R-B76 INLP35-4-3 IX3DG321 Lights aimed at Breaker il on IAB05 R-B76 1NLP36-1-l/
IX3DG321 R-B77 1NLP35-3-8 IX3DG321 e
i R-B 78 INLP36-1-11 IX3DG331 R-B79 1NLP35-1-7 IX3DG331 R-BSP 1NLP39-3-1 IX3DG380 Sumo Pump hole accessed in R-B50 l'
(
t
[
l t
e e..
O O
O t
i Prtredure No.
Rewsso:1 P+7No VEGP 29101-C 1
24 of 96 Sheet 16 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 CONTROL BUILDING ENERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS 188' ST#2 INLP36-3-1 1X3DG333 Stair #2 208' STf2 1NLP36-3-2 1X3DG333 Stair #2 228' ST#2 INLP36-3-3 1X3DG333 Stair #2 248' STf2 INLP36-3-4 1X3DG333 Stair 12 268'
~~
ST#2 INLP36-3-5 IX3DG333 Stair #2 28a' STt2 INLP36-3-6 1X3DG333 Stair #2 308' STf2 INLP36-3-7 IX3DG333 Stair 12 188' STf3 INLP35-14-1 IX3DG333 Stair #3 Lev. B 208'
'~
STf3 1NLP35-14-2 IX3DG333
.S t.a.ir # 3 L_e_v_. A STf3 1NLP35-14-3 1X3DG333 Stair #3 Lev. 1 R-C01 INLP39-1-3 IX3DG380 Tunnel
.. + -
A
O O
O Procedure No. -
P.c..asori page No VEGP 29101-C 1
25 of 96 Sheet 17 of 17 CHECKLIST 1 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS t.
BUILDING:
UNIT 1 CONTROL BUILDING
[
EMERG. LIGHT DRAWING ACCEPT
[
LOC.
NO.
NO.
(YES/NO)
INIT.
DATE COf'MENTS R-C02 INLP39-5-1 1X3DG380 Tunnel I
r R-C03 1NLP39-1-1 1X3DG380 Tunnel iR-C09 1NLP39-1-2
- 1X3DG380, Tunnel t
1 I
~
O 4
.i
O O
O ProcMure No.
Fkavtswan y No VEGP 29101-C 1
96 of 96 i
Sheet 1 of 13 CHECKLIST 2 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 AUX BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT.
DATE COMMENTS R-101 INLP110-7-2 IX3DG430 Stair i5 R-103 INLP08-11-2 1X3DG425 R-104 INLP08-7-6 IX3DG425 R-104 1NLP08-9-1 1X3DG425 R-105 1NLP08-7-1 IX3DG425 R-105 1NLP08-9-2 1X3DG425 r
R-105 1NLP08-11-1 IX3DG425 R-108 1NLP08-7-2 IX3DG425 South Valve Room L light aimed at ladder to elev. 233 R-108 1NLP08-7-3 IX3DG425 South Valve Room 1 light aimed at ladder R-108 1NLP08-7-4 IX3DG425 South Valve Room 1 light aimed at PV3030 R-108 INLP08-7-5 IX3DG426 South Valve Room 1 light aimed at ladder i
R-108 INLP08-9-3 IX3DG425 South Valve Room t
I
O O
O Perxedure No Reves+on Pg No VEGP 29101-C 1
27 of 96 Sheet 2 of 13 CHECKLIST 2 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 AUX BUILDING IEMERG. LIGHT DRAWING ACCEPI LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS R-108 1NLP08-9-4 1X3DG425 South Valve Room I light aimed at PV3000 R-108 INLP08-9-5 IX3DG426 South Valve Room 1 light aimed at ladder Lights aimed at HV - 3009 R-108 INLP08-9-6 1X3DG425 South Valve Room i
R-108 1NLP08-9-7 IX3DG425 South Valve Room South Valve Room Lights aimed at ladder to Lvl A R-108 1NLP08-11-3 IX3DG425 "Insul. Pipe Access Cover" 4
R-110 INLP05-1-1 1X3DG425 s
R-112 INLP08-12-1 IX3DG430 Stai-1 R-113 1NLP06-5-1 1X3DG415 8
,R-113 INLP08-10-2 IX3DG415 R-116 INLP08-8-1 1X3DG415
!1 light aimed at Breaker #12 on IBBB R-116 INLP08-8-2 1X3DG415 i
R-118 INLP08-10-1 IX3DG415 E'N)
O O
O Procedure No.
Rev:srort pary. M VEGP 29101-C 1
28 of 96 Sheet 3 of 13 CHECKLIST 2 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 AUX BUILDING EMERG. LIGHT DRAWING ACCEPT i
LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS l
l R-118 INLP08-10-4 IX3DG415 Lights aimed at Breaker #17 on 1 AY2A R-118 1NLP08-10-5 IX3DG415 R-118 INLP08-12-3 IX3DG415 Lights aimed at Breaker #17 on 1ABB R-Il8 INLP08-12-4 IX3DG415 Lights aimed at Breaker #37 on lABB
' R-120 INLP06-5-3 IX3DG415 I
R-120 INLP06-5-4 IX3DG415 Equipment Bldg.
R-120 INLP31-2-1 IX3DG405 R-122 INLP06-5-5 IX3DG415 4
4 R-122 INLP06-5-6 IX3DG415 R-122 INLP08-8-3 IX3DG415 R-122 INLP08-10-3 11X3DG415 L
b l
b e,1.
- i
O O
O Procedure Na Reviseun Page No VEGP 29101-C 1
29 of 96 Sheet 4 of 13 CHECKLIST 2 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTDIS BUILDING:
UNIT 1 AUX BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS R-127 INLP05-2-1 IX3DG415 Fuel Handling Bay R-127 1NLP05-2-2 1X3DG415 Fuel Handling Bay R-202 INLP54-5-7 1X3DG426 R-202 INLP54-5-8 1X3DG426 R-203 1NLP54-5-6 IX3DG426 R-203 1NLP54-5-9 1X3DG426 1
R-204 1NLP54-5-10 1X3DG426 R-204 1NLP54-5-11 IX3DG426 8
R-206 INLP109-7-1 IX3DG430 Stair #3 Between 2 and 1 Level R-207 INLP110-11-1 IX3DG416 R-209 INLP54-5-3 IX3DG416 R-210 INLP54-5-2 IX3DG416 k.
r s
O O
O Procedure No h
Pap No 7
VEGP 29101-C 1
30 of 96 Sheet 5 of 13 CHECKLIST 2 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 AUX BUILDING EMERG. LIGHT DRAWING ACCEPT l INIT. /
LOC.
NO.
NO.
(YES/NO)
DATE COMMENTS R-212 INLP54-5-4 IX3DG416 R-212 INLP54-5-5 IX3DG416 R-212 INL?54-5-1
'1X3DG416 i
R-213 1NLP110-9-1 1X3DG430 Stair f5 Stair #5 Between R-213 1NLP110-7-1 1X3DG430 2 and roof approx. 14 ft. from floor R-A01 INLP16-8-2 IX3DG430 Stair f5 Between A and B Level R-A01 INLP12-11-1 IX3DG430 Stair #5 Between A and 1 Level R-A03 INLP10-11-1 IX3DG424 R-A04 1NLP10-11-2 IX3DG424 R-A05 INLP10-11-3 IX3DG424 R-A05 INLP10-11-5 1X3DG424 R.:05 1NLP10-11-6 IX3DG424 R-A06 INLP10-2-2 IX3DG424 Rad. Area South Valve Room i t jB '
Oh
O O
Procedwe No.
Revesem Pagath VEGP 29101-C 1
31 of 96 Sheet 6 of 13 CHECKLIST 2 SELF CONTAINED SEALED BEAM EMERGLNCY LIGHTING SYSTEMS i
' BUILDING:
UNIT 1 AUX BUILDING EMERG. LIGHT DRAWING ACCEPI LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS 1 light aimed at HV - 8105 R-A09 1NLP129-3-1 IX3DG424 Rad. Area R-A09 INLP129-3-2 IX3DG424 Rad. Area R-A10 INLP10-2-1 IX3DG424 Rad. Area South Valve Room South Valve Room Lights aimed at ladder to Lvl 1 R-A12 INLP129-7-1 IX3DG424 Fix. not marked with last digit of no.
South Valve Room 1' light aimed at HV - 5139 1 light aimed at HV - 5317 R-A12 INLP129-7-2 1X3DG424 Fix. not marked with last digit of no.
South Valve Room 1 light aimed at ladder to elev 208 1 light aimed at ladder to Rm A12 R-A12 INLP129-9-1 IX3DG424 Fix. not marked with last digit of ho.
R-A12 INLP129-9-2 1X3DG424 Fix. not marked with last digit of no.
R-A17 1NLP10-11-4 IX3DG424 R-A17 INLP10-11-7 1X3DG424 R-A21 INLP11-12-1 l IX3DG430 Stair #3 eetween i and A Level R-A22 llNLP09-6-1 1X3DG414
O O
O Procedure No Reves oc Page Na VEGP 29101-C 1
32 of 96 Sheet 7 of 13 CHECKLIST 2 SEli 200NTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 AUX BUILDING EMERG. LIGHT DRAWING ACCEPT
' LOC.
NO.
NO.
(YES/NO)
INIT. /_DATE COMMENTS R-A22 INLP09-6-2 IX3DG414 R-A30 1NLP09-6-3 IX3DG414 R-A40 INLP09-6-4 IX3DG414 i
R-A40A INLP09-6-S 1X3pG414 i
R-A40A INLP09-6-6 IX3DG414 l
R-A40A> INLP09-6-7 IX3DG414 R-A40
!1NLP09-6-10 1X3DG414 R-A52 INLP09-6-8 IX3DG414
=
R-AS4 1NLP09-6-9 1X3DG414 i
Stair R-B01 i 1NLP16-8-1 IX3DG430
- 5 Between B and C Level R-B02 INLP16-6-1 IX3DG423 i
R-B 02 INLP16-6-2 1X3DG423 R-B04 1NLP16-6-3 IX3DG4231 I
(.
\\g' w
N)
Procedure No Revision Page No
^~
VEGP 29101-C 1
33 of 96 Sheet 8 of 13 CHECKLIST 2 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 AUX BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS R-B07 INLP16-6-4 IX3DG423
~
R-B07 1NLP16-6-5 IX3DG423 R-B13 INLP16-6-6 1X3DG423 h-B16 INLP423-16-1 1X3DG423 R-B17 INLP16-6-8 IX3DG423 R-R22 INLP16-6-9 1X3DG423 R-B 22 INLP16-6-10 1X3DG423 R-B23
_1NLP14-26-1 1X3DG423 l ACCW Room a
R-B25 1NLP14-18-1 IX3DG423 R-B27 1NLP15-14-1 IX3DG430 stair #3 Between B and C Level R-B27 INLP15-14-2 1X3DG430 Stair #3 Between A and B Level 2
i i
I l
l
.s
, < ~.
Procedtere No.
Revisaan Page No VEGP 29101-C 1
34 of 96 Sheet 9 of 13 CHECKLIST 2 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 AUX BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS R-B28 1NLP15-5-1 IX3DG413 R-B29 1NLP15-5-2 1X3DG413 R-B48 1NLP15-5-3 IX3DG413 R-B48 1NLP15-5-4 1X3DG413 R-B48 1NLP15-5-5 1X3DG413 R-B63 INLP15-5-6 1X3DG413 R-C83 1NLP19-5-1 1X3DG412 R-C83 1NLP19-5-2 1X3DG412 a
R-C85 1NLP19-5-3 1X3DG412 R-C97 1NLP19-5-4 1X3DG412 R-C98 1NLP19-5-5 1X3DG412 R-C101 INLP19-8-1 IX3DG430 Stair #3 i
A t
.JL
\\
(/
k/
Procedure No Revision Page No.
VEGP 29101-C 1
35 of 96 Sheet 10.of 13 CliECKLIST 2 SELF CONTAINED SEALED BEAM EMERGENCY LIGilTING SYSTEMS BUILDING:
UNIT 1 AUX BUILDING EMERG. LIGilT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE C0141ENTS R-C109 INLP19-5-6 1X3DG422 1 light aimed at Breaker ill on 1 ABD R-C109 1NLP19-5-13 1X3DG422 R-C113 1NLP19-5-11 1X3DG422 R-C113 1NLP19-5-14 1X3DG422 1 light aimed at door to Rm C11A Rad Area 1 light aimed at HV - 8111A R-C114 1NLP18-21-1 1X3DG422 Fix. not marked with last digit of no.
R-C116 1NLP19-5-7 1X3DG422 R-C117 1NLP19-10-1 1X3DG430 Stair #5 R-C120 INLP19-5-8 1X3DG422 l
R-C121 INLP19-5-9 1X3DG422 i
i R-C121 INLP19-5-15 1X3DG422 z
R-C130 1NLP19-7-1
!1X3DG420 Stair #6 R-C131 1NLP19-5-12 IX3DG420 Upper Stair _f6 4
.a Procedure No.
Pevision Page No.
VEGP 29101-C 1
36 of 96 Sheet 11 of 13 CHECKLIST 2 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS I
BUILDING:
UNIT 1 AUX BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS R-D53 1NLP20-5-1 1X3DG411 R-D53 INLP20-5-2 1X3DG411 i
R-D53 1NLP20-5-3 1X3DG411 R-D56 INLP20-5-4 1X3DG411 R-D56 INLP20-5-5 1X3DG411 R-D60 1NLP21-14-1 1X3DG411 IX3DG411 R-D66 1NLP20-8-1 1X3DG430 Stair 13 Between D and C Level R 367 1NLP20-5-12 1X3DG411 4
R-D67 1NLP20-17-1 1X3DG411 R-D68 1NLP20-5-7 1X3DG421 R-D71 INLP20-10-1 1X3DG421 Stair #5 Between D and C Level l
j i h h, e-a
p
(\\
C(~.\\
O (d
POcthjufe f40 Revision Pagef4o.
VEGP 29101-C 1
37 of 96 Sheet 12 of 13 CHECKLIST 2 SELF CONTAINED 7EALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 AUX BUILDING EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. /DATE COMMENTS R-D73 INLP22-9-1 1X3DG421 R-D74 1NLP20-5-6 1X3DG421 R-D75 1NLP20-5-8 1X3DG421 R-D75 INLP20-5-9 1X3DG421 R-D75 1NLPT.0-5-14 IX3DG421 R-D105_
INLP20-5-13 1X3DG421 1 light aimed at Breaker / 1 on IAB15 R-D110 INLP20-5-11 IX3DG421 l
R-D119 1NLP126-3-1 1X3DG421 y Lights aimed at PI 10115 f
i R-D121 1NLP22-21-1 1X3DG411 ;
-M s
O O
O Procedure No.
Revision Page No.
VEGP 29101-C 1
38 of 96 Sheet 13 of 13 CHECKLIST 2 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1 FUEL HANDLING BLDG EMERG. LIGllT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. /_DATE COMMENTS R-107 1NLP127-2-2 IX3DG405' Fuel Handling Bay R-107 1NLP127-2-3 1X3DG405 Fuel Handling Bay R-107 1NLP127-2-4 1X3DG405 Fuel Handling Bay R-124 INLP127-8-1 1X3DG405 Key #221 R-305 INLP45-9-1 1X3DG406 Accessed from Lev. 3 Control Bldg.
R-A06 INLP02-30-1 1X3DG404 R-A07 1NLP02-30-3 1X3DG404 R-A10 1NLP02-30-2 1X3DG404 Rad Area i
i R-B08 1NLP02-6-1 1X3DG403 R-B08 INLP02-8-1 1X3DG403 R-B11 INLP02-6-2 1X3DG403 R-C06 1NLP39-5-2 1X3DG402 Accessed thru R-C88 Aux. Bldg.
R-C07 1NLP02-1-1 1X3DG402 R-C07 1NLP02-5-1 1X3DG402
- ^ 18. f U
v s
~
_s
(
(
_,)
/
)
N Procedu:e No Revaion Page No VEGP 29101-C 1
39 of 96 Sheet 1 of 7 CllECKLIST 3 SELF CONTAINED SEALED BEAM EMERGENCY LIGliTING SYSTEMS BUILDING:
UNIT 1 DIESEL GENERATOR EMERG. LIGHT DRAWING ACLEPT t
LOC.
NO.
NO.
(YES/NO)
INIT. /DATE COMMENTS l
R101 INLP47-4-5 1X3Dil7D3 Lights aimed at D.G.
Cen. Ctl. panel R101 INLP47-4-6 IX3Dli7D3 Lifits aimed at D. G.
Gen. Ctl. panel R101 INLF50-s-3 1X3DH7D3 R101 INLP50-4-4 1X3Dil7D3 R101 INLP50-4-5 IX3Dil7D3 l
R101 INLP50-4-6 1X3Dil7D3 1
R203 1NLP121-5-1 1X3Dil7D3 R103 1NLP47-4-1 IX3DlI7D3 R103 1NLP47-4-2 1X3DH7D3 1
M R103 1NLP47-4-3 IX3DH7D3 R103 1NLP47-4-4 1X3Dil7D3 R103 1NLP50-4-l 1X3DlI7D3 Lights aimed at D.G.
Gen. Ctl. panel l
R103 1NLP50-4-2 IX3Dil7D3 Lights aimed at D.G.
Gen. Ctl. panel R208 1NLP120-5-1 1X3Dif7D3
(~%
()
ry.
%Y J
Procedure No.
. Revision Page No, VEGP 29101-C 1
40 of 96 Sheet 2 of 7 CllECKLIST 3 SELF CONTAINED SEALED BEAM EMERGENCY LIGliTING SYSTEMS BUILDING:
UNIT 1 DIESEL GENERATOR FUEL OIL STORAGE EMERG. LIGliT DRAWING ACCEPT LOC.
NO.
NO (YES/NO)
INIT. / DATE COMMENTS R-101 INLP52-13-2 1X3Dil?D4 R-A01 INLP52-13-1 IX3DIi7D4 R-A02 INLPS2-13-3 1X3Dli7D4 R-A03 INLPS2-17-1 1X3DIl7D4 i
BUILDING:
UNIT 1 TUNNELS IT2A INLP09-3-1 1X3Dli7E2 ITSA INLP09-1-1 IX3Dil7E2 ITSA INLP09-3-2 IX3Dil7E2 IT2B INLP10-1-1 IX3Dil?F1 IT2B INLP10-1-2 IX3Dil7F1 IT2B INLP10-3-1 1X3Dli7F1 ITSB 1NLP10-5-1 r1X3Dil7F1
, kb
(~N (g
D Procedure No j Revision Page No.
VEGP 29101-C 1
41 of 96 1
Sheet 3 of 7 CHECKLIST 3 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 1' TUNNELS EMERG. LIGHT DRAWING ACCEPT LOC.
NO.
NO.
(YES/NO)
INIT. / DATE COMMENTS IT5B INLP10-17-1 1X3DH7F1 1T3A INLPS2-12-1 IX3DH7El IT3A INLPS2-10-1 IX3DH7El IT3A INLP52-10-2 IX3DH7El IT4A 1NLP40-23-1 IX3DH7C3 IT4A INLP40-23-2 1X3DH7C3 l i'4 A INLP40-23-3 1X3DH7C3 IT4B INLP40-21-1 1X3DH7C3 i
IT4B INLP40-21-2 1X3DH7C3 I
IT_4B INLP40-21-3 1X3DH7C3 1
l
.-w a 1'h, l l
O O
O Procedure No Revision l Page No VEGP 29101-C 1
42 of-96 Sheet 4 of 7 CHECKLIST 3 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
VARIOUS UNIT 1 & COMMON EMERG. LIGllT DRAWING ACCEPT
~
NO.
LOCATION NO.
LYES /NO)
INIT. / DATE COMMENTS CHEM & ELEC.
INLP51-11-1 BLDG 103 AX3DG9K4 CHEM & ELEC.
INLP51-10-1 BLDG 114 AX3DG9K.4 LOW-Volt SW INAY1-26-1 YD. VAV IfSE 1X3DF7A3 DECllLOR.
ANYV1-8-1 BLDG R-102 CX3DG9K1 DECHLOR.
ANYV1-10-1 BLDG R-103 CX3DG9K1 AUX. BLR.
LP-MIA-19-5 RM. R-101 CX3DG7JK AUX. BLR.
LP-MIA-21-9 RM. R-101 CX3DG7JK AUX. BLR.
LP-MIA-21-15 RM. 101 CX3 DG7JL AUX. BLR.
LP-MIA-2.3-17 RM. R-101 CX3 DG7JL POT. WRT.
CHLOR. BLDG.
CNYF1-6-1 PUMP RM AX3DG9J1 POT. WRT.
CHLOR. BLDG.
CNYF1-8-1 PUMP RM AX3DG9J1 1
i
p-p
,,~.
'<d Procedure No Revisbn Page No VEGP 29101-C 1
43 of 96 Sheet 5 of 7 CHECKLIST 3 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
VARIOUS UNIT 1 & COMMON EMERG. LIGHT DRAWING ACCEPT NO.
LOCATION NO.
(YES/NO)
INIT. / DATE COMMENTS AUX.
F.W.
PMP 1NLP50-6-1 HSE. R-101 1X3DH7C4 AUX. F.W.
'lNLP50-6-3 HSE. R-106 1X3DH7C4 1 light aimed at PV - 15129 AUX.
F.W.
PMP 1NLP47-6-2 HSE. R-106 IX3DH7C4
~
AUX.
F.W.
PMP t
INLP47-6-4 HSE. R-106 IX3DH7C4 Lights aimed at panel 1-1302-P5-AFP AUX.
F.W.
PMP 1NLP47-6-5 HSE. FNTRY 1X3DH7C4 AUX.
F.W.
PMP INLP47-6-1 HSE. R-102 1X3DH7C4 CONDENSATE INLP50-6-2 STORAGE TANKS 1X3DH7CS CONDENSATE INLP47-6-3 STORAGE TANKS 1X3DH7C5 lNSCW VLV HSE INLP135-18-1
'R-102 1X3DH7E3 NSCW CNYG1-14-5 CHLORINE BLDC AX3DG7CJ NSCW l
CNYGl-19-7 CHLORINE BLDG AX3DG7GJ l
~
L
e
/3-Paocedure No.
Revision Page No.
VEGP 29101-C 1
44 of 96 Sheet 6 of 7 CHECKLIST 3 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
VARIOUS UNIT 1 & COMMON EMERG, LIGHT DRAWING ACCEPT NO.
LOCATION NO.
(YES/NO)
INIT. I DATE COMMENTS NSCW VLV HSE INLP135-18-2 R-102 IX3DH7E3 NSCW VLV HSE INLP135-18-3 R-102 IX3DH7E3 NSCW VLV HSE INLP136-18-1 R-202 1X3DH7F2 NSCW VLV HSE INLP136-18-2 R-202 1X3DH7F2 NSCW VLV HSE INLP136-18-3 R-202 IX3DH7F2 FIRE PUMP-ANYJ 1 1 HOUSE #1 CX3DG7GL FPH #2 ANYK1-2-1 DSL RM #2 CX3DG7JB FPH #2 ANYK1-5-1 DSL RM #1 CX3DG7JB FPH #2 ANYKI-4-1 EQP RM #3 CX3DG7JB WELL PUMP CNYJ1-4-1 HOUSE f1
' AX3DH9CP WELL PUMP CNYK9-10-1 HOUSE #2 IAX3DH9FB I
e N
~ N Q/
Q_,/
Proc %re No.
Revision Page No VEGP 29101-C 1
45 of 96 Sheet 7 of 7 CHECKLIST 3 SELF CONTA1NED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
VARIOUS UNIT 1 & COMMON EMERG. LIGHT DRAWING ACCEPT l
NO.
LOCATION NO.
(YES/NO)
INIT.
DATE COMMENTS PESB ANLP77-2-1 (SAS)
AX3DH7L1 PESB
!ANLP77-3-1 (HALLWAY)
AX3DH7L1 PESB ANLP77-3-2 (HALLWAY)
AX3DH7L1 PESB ANLP77-6-1 (DIESEL GEN. RM.)
AX3Dif7L1 PESB ANLP77-7-1 (SWITCH GEAR RM.)
AX3DH7L1 PESB ANLP77-7-2 (BATTERY CHRGR.RM.;
AX3DH7L1 I
l t
l
'bk 4
. b kn -
~~
PROCEDURE NO, REVISION PAGE NO.
VECP 29101-C 1
46 of 96
~
Sheet 1 of 4 CHECKLIST 4 INVERTER POWERED EMERGENCY LIGHTING SYSTEMS BUILDING: TURBINE BUILDING INVERTER EQUIPMENT NO:
1-1808-Q3-E00 APFLICABLE DRAWINGS: IX3DC101, 1X3DG102, IX3DG106, 1X3DG122 t
IX3DG132, IX3DG135, IX3DG134, IX3DClll, IX3DGil2, IX3DG121, IX3DG131 NORMAL POWER SUPPLY:
INLP56 CIRCUIT NO:
24 ACCEPT.
(YES)(NO)
INIT.
DATE COMMENTS BATTERY VOLTAGE (66 74 VOLTS DC)
~~~
OUTPUT VOLTAGE (114 - 126 VOLTS) e-4 BUILDING: _ TURBINE BUILDING INVERTER EOUIPMENT NO:
1-1808-03-E01 APPLICABLE DRAWINGS: IX3DG103, IX3DG124, IX3DCl25, IX3DG133, 1X3DC134 IX3DG104, IX3DGil3, IX3DG114, IX3DG123
)
NORMAL POWER SUPPLY:
INLP56 CIRCUIT NO:
26 ACCEPT.
(YES)(NO)
INIT.
DATE COMMENTS BATTERY VOLTAGE (66 - 74 VOLTS DC)
~
OUTPUT VOLTAGE (114 - 126 VOLTS)
BUILDING: WATER-TREATMENT BUILDING INVERTER EQUIPMENT __NO:
A-1801-PS-FZC _
APPLICABLE DRAWINGS AX3DG7GF, AX3DG7GG, NORMAL POWER SUPPLY: ANLP79 CIRCUIT NO:
14 hb)
INIT.
DATE COMMENTS
(
s BATTERY VOLTAGE (45 - 51 VOLTS DC)
~
OUTPUT VOLTAGE (114 - 126 VOLTS)
O nun g-y
-v-
,r
-e
,.m.
PROCEDURE NO REVISION PAGE NO VEGP-29101-C 1
47 of 96
~
Sheet 2 of 4 CHECKLIST 4 INVERTER POWERED EMERGENCY LIGHTING SYSTEMS BUILDING: MAINTENANCE BUILDING INVERTER EQUIPMENT NO:
C1808-Y3-501 APPLICABLE DRAWINGS: CX3DG7FM, CX3DG7JP. CX3DG7JR CX3DG7JS, CX3DG7JT CX3DL7JW NORMAL POWER SUPPLY: LP-MIA CIRCUIT NO:
24 ACCEPT.
(YES)(NO)
INIT.
DATE COMMENTS BATTERY VOLTAGE (51 - 57 VOLTS DC)
OUTPUT VOLTAGE
'(263 - 290 VOLTS)
BUILDING:
SERVICE BUILDING INVERTER EQUIPMENT NO:
C-1702-YS-501-APPLICABLE DRAVINGS: CX3DG7Hl. CX3DG7RA, CX3DG7HB, CX3DG7HC, AX3DG7H1 AX3DG7H2, CX3DG7H4 NORMAL POWER SUPPLY: LP-SIA CIRCUIT NO:
14 ACCEPT.
(YES) (NO)
'INIT, DATE COMMENTS BATTERY VOLTAGE (l14 - 126 VOLTS DC)
OUTPUT VOLTAGE (263 - 290 VOLTS)
BUILDING: ADMINISTRATION BUILDING INVERTER EQUIPMENT NO:- C1808-Q3-50)
APPLICABLE DRAWINGS: CX3DG7MK, CX3DG7ML, CX3DG7MM. CX3DG7MN, AX3DG7MQ, CX3DG7MP, CX3DF7ML NORMAL POWER SUPPLY: LP-Al CIRCUIT NO:
10 ACCEPT.
(YES)(NO)
INIT.
DATE COMMENTS BKrTERY VOLTAGE (51 - 57 VOLTS DC)
OUTPUT VOLTAGE (263 - 290 VOLTS) l l
']}i 5 %
=
PROCEDURE NO.
REVISION PAGE NO
-VEGP-29101-C 1
48~of 96 Sheet 3 of 4 CHECKLIST 4 INVERTER-POWERED EMERGENCY LIGHTING SYSTEMS a
BUILDING:
PRODUCTION WAREHOUSE INVERTER EQUIPMENT NO:
C1808-Q3-502 APPLICABLE DRAWINGS: CX3DG9NA, CX3DG9NB, CX3DG9N8, CX3DG9N9 NORMAL POWER SUPPLY: LP-WI CIRCUIT NO:
'29~
ACCEPT.
-(YES)(NO)
.INIT.
DATE COMMENTS BATTERY VOLTAGE (45 - 51 VOLTS DC)
_0UTPUT VOLTAGE (263 - 290 VOLTS)
BUILDING: RECEIVING WAREHOUSE INVERTER EQUIPMENT NO: 01808-Q3-503 APPLICABLE DRAWINGS: CX3DG9NA, CX3DF9N3
-=
' CIRCUIT NO: 23 ACCEPT.
(YES)(NO)
INIT.
DATE COMMENTS BATTERY. VOLTAGE (45 VOLTS DC)
OUTPUT VOLTAGE (263 - 290 VOLTS)
BUILDING:
TURBINE' BUILDING INVERTER EQUIPMENT NO:
2-120'l-Q 3-E00
- APPLICABLE DRAWINGS
2X3DG141, 2X3DG142, 2X3DCl46, 2X3DC151, 2X3DG152, 2X3DG161. 2X3DG162, 2X3DG171, 2X3DC172, 2X3DG175 NORMAL POWER SUPPLY: 2NLP56 -
ACCEPT.
(YES)(NO)
INIT.
DATE COMMENTS BATTERY VOLTAGE (45 - 51 VOLTS DC)
OUTPUT V'6.TAGE (263 - 290 VOLTS)
- - -,. -. ~,
i-,
PROCEDURE NO.
REVISION PAGE NO.
VEGP 29101-C 1
49 of 96 F
Sheet 4 of 4 CHECKL7ST 4 LJ INVERTER POWERED EMERGENCY I.IGHTING SYSTEMS BUILDIN5:
TURBINE BUILDING INVERTER EQUIPMENT NO: 2-1208-Q3-E0L APPLICABLE DRAWINGS:
2X3DC143, 2X3DG144, 2X3DG153, 2X3DC154, 2X3DG163, 2X3DG173, 2X3DG174. 2X3DG165 NORMAL POWER SUPPLY:
2NLP56
~
ACCEPT.
(YES)(NO)
- INIT, DATE COMMENTS BATTERY VOLTAGE-(45 - 51 VOLTS DC)
OUTPUT VOLTAGE (263 - 290 VOLTS)
]
4 O
O r
O O
O hocedwe 40 Reviston
. Page N2 VEGP 29101-C 1
50 of 96 Sheet 1 of 5 CHECKLIST 5 SELF CONTAINED SEALED BEAM EMERGENCY LIG!ITING SYSTEMS BUILDING:
UNIT 1 CONTAINMENT BUILDING EMER. LIGi!T ACCEPT.
NO.
LOCAT10N (YES/NO) INIT. / DATE COMMENTS 1-CNMT-1 1-CNMT-2 i
I l-CNMT-3 1-CNMT-4 l-CNMT-5 1-CNMT-6 1-CNMT-7 e
1-CNMT-8 1-CNMT-9 l-CNMT-10 1
1-CNMT-11 i
1-CNMT-12 1-CNMT-13
~
a.
gg
)
8 6
'f %
9 5
f f
o o
1 2
5 tee h
S S
M ETSY S
.oN G
e N
g I
aP THG I
L YCN E
S G
T R
N E
E M
M E
M O
M C
\\
A 1
E
'[
B DE E
L T
A A
E D
S
/
DE N
T I
G I
n io A
N N
T I
I isv N
D e
R O
L
.)
C I TO U PN F
B E/
L CS E
T CE S
N AY E
(
M N
IA C
T N
N 1
O O
0 C
I 1
T 9
1 A
2 C
T O
I L
NU 5
TH I,
P T
G 4
5 6
7 8
9 0
1 2
3 4
5 6
7 G
S G I 1
1 1
1 1
1 2
2 2
2 2
2 2
2
's,
. E I
N L oN V L
I O
T T
T T
T T
T T
T T
T T
T T
r K
D
.N M
M M
M M
M M
M M
M M
M M
M e
u C
L R N
N N
N N
N N
N N
N N
N N
N d
E I E C
C C
C C
C C
C C
C C
C C
C e
l U M s
c l
o r
C B E 1
1 1
1 1
1 l
l 1
1 1
1 1
l P
- n
1l i
I I
l
[
I l
O 6
4 9
5 f
f o
o' 2
3 5
tee hS S
METSY S
o G
N N
e I
ga T
P HG IL YCN E
S G
T R
N E
E M
M E
M O
M C
A O
1 EB D
E.
E D
S D
E N
T I
G I
m A
N N
K T
I I
S N
D tve O
L
.)
H C
I TO U PN F
B E/
L CS E
T CE S
N AY E
(
M N
IA C
T N
N 1
O O
0 C
I 1
T 9
1 A
2 C
T O
I L
NU 5
'2
'H P
T O
G 8
9 0
1 2
3 4
5 6
7 8
9 0
1 G
S G I 2
2 3
3 3
3 3
3 3
3 3
3 4
4
- E I
N L oV L
I O
T T
T T
T T
T T
T T
T T
T T
N K
D
.N M
M M
M M
M M
M M
M M
M M
M e
C L R N
N N
N N
N N
N N
N N
N N
N ru E
I E
C C
C C
C C
C C
C C
C C
C C
de H
U M c
C B E 1
1 1
1 1
1 1
1 1
1 1
1 1
1 o
rP
t l
I O
6 9
5 f
f o
o' 3
4 5
tee hS S
M ETSY S
o G
N N
e I
ga T
P HG IL YCNE S
G T
R N
E E
M M
E M
O M
C A
I E
O B
DE E
L.
T A
A E
D S
DE.
N T
I G
I n
A N
N o
T I
I a
is N
D ve O
L
.)
R C
I TO i
U PN F
B E/
L CS E
T CE S
N AY E
(
M N
I m
A m.
a C
T N
N 1
O O
0 C
I 1
T 9
1 A
2 C
T O
I L
NU 5
T H
P T
G 2
3 4
5 6
7 8
9 0
1 2
3 4
5 O
G S
G I 4
4 4
4 4
4 4
4 5
5 5
5 5
5
.E I
N L oV L
I O
T T
T T
T T
T T
T T
T T
T T
N K
D
.N M
M M
M M
M M
M M
M M
M M
M e
C L R N
N N
N N
N N
N N
N N
N N
N ru E
I E C
C C
C C
C C
C C
C C
C C
C de H
U M c
C B E 1
1 1
1 1
1 1
1 1
1 1
1 1
1 o
rP
V 4
6 9
5 f
f o
o' 4
5 5
tee hS S
M ETSY S
o G
N N
e I
ga T
P HG I
1 1
1 1
L 1
1 0
0 5
5 5
5 Y
G G
G G
C D
D D
D N
3 3
3 3
E S
X X
X X
G T
1 1
l 1
R N
f E
E M
M E
M G
G G
G O
W W
W W
M C
D D
D D
A
- m. U 1
E B
(
DE E
L T
A A
E D
S DE N
T I
G I
A N
N T
I I
is N
D ve O
L
.)
R C
I TO U PN F
B E/
L CS E
T CE S
N AY E
(
MN IA C
T N
N 1
O O
0 C
I Y
Y Y
Y 1
T NR NR NR NR 9
1 A
C DL DL DL TL T
O NL NL NL hL I
TG TG TG TG U
5 T
H 1
2 3
4 P
T G
6 7
8 9
0
-(L
.E I
N L G
S G I 5
5 5
5 6
6 6
6 6
oV L
I O
T T
T T
T 0
0 0
0 N
K D
.N M
M M
M M
3 3
3 3
e C
L R N
N N
N N
P P
P P
ru E
I E C
C C
C C
L L
L L
de H
U M N
N N
N c
C B E 1
1 1
1 1
I I
I I
MJ o
r P
O t
a,
(:
~
i Procedure No.
Revision Pr,ge No.
VEGP 29101-C 1
55 of 96 Sheet.1 of 14 CHECKLIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS t
s' i
9 1
BUILDING:
UNIT 2 CONTROL BUILDING
- i EMER.- LIGHT DRAWING ACCEPT.
LOC.
NO.-
EO.
'(YES/NO) INIT. / DATE COMMENTS R-101 2NLP35-5-1 2X3DG373 STAIR #4 I
1 R-101 2NLP35-5-2
-2X3DG373 STAIR #4 R-105 2NLP43-17-6 2X3DG363 I
R-108 2 NLP36-10-5 2X3DG343 R-114 2NLP31-6-1 2X3DG37A R-115 2NLP35-12-4 2X3DG343 R-116 2NLP35-3-1 2X3DG373 STAIR #1 I
R-116 2NLP35-3-2 2X3DG373 STAIR #1 s
R-117 2NLP36-10-1 2X3DG343 i
R-117 2NLP35-12-6 2X3DG343 l
+
j R-117 2NLP36-12-6 2x3DG343 R-117 2NLP137-17-1 2X3DG37A EQUIP. BLDG
(
R-118 2NLP36-10 2X3DG343 I
i d
F
~
'l e
pg
/.
7~3-Procedure No Revimyi Page No.
VEGP 29101-C 1
56 of 96 Sheet 2 of 14 CHECKLIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 CONTROL BUIIDING EMER. LIGHT DRAWING ACCEPT.
LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS R-122 2NLP31-4-1 2X3DG37A R-123 2NLP31-4-2 2X3DG363 R-123 2NLP31-6-2 2X3DG363 R-123A 2NLP31-2-1 2X3DG363 R-128 2NLP43-17-7 2X3DC353 R-138 2NLP43-17-4 2X3DG353 R-136 2NLP43-17-5 2X3DG353 R-141 2NLP43-17-3 2X3DG353 R-164 2NLP35-12-3 2X3DG343 R-164 2NLP35-14-1 2X3DG343 R-164 2NLP35-14-2 2X3DG343 R-164 2NLP35-14-3 2X3DG343 R-164 2NLP35-14-4 2X3DG353 R-164 2 NLP35 5 2X3DG353 d )kJ A
es
-~.
(,
\\s Procedure No.
Revise Page No.
VEGP 29101-C 1
57 of 96 Sheet 3 of 14 CHECKLIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 CONTROL BUILDING EMER. LIGHT DRAWING ACCEPT.
LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS R-164 2NLP35-14-7 2X3DG343 R-164 2NLP36-10-3 2X3DG343 R-164 2NLP36-10-4 2X3DG343 R-164 2NLP36-12-1 2X3DG343 R-164 2 NLP36 2 2X3DG343 R-164 2NLP36-12-3 2X3DG343 R-164 2NLP36-12-4 2X3DG343 R-164 2NLP36-12-5 2X3DG353 R-202 2NLP35-5-3 2X3DG373 STAIR #4 R-215 2NLP35-16-1 2X3DG344 R-215 2 NLP35-16-6 2X3DG364 g-219 2NLP35-3-3 2X3DG373 STAIR #1 R-222 2NLP35-16-2 2X3DG344
'IP le
O O
O Procedure No.
Revissort Page No.
VEGP 29101-C 1
58 of 96 Sheet 4 of 14 CllECKLIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 CONTROL BUILDING EMER. LIGHT DRAWING ACCEPT.
LOC.
NO.
NO.
(YES/NO)
INIT.
/ DATE COMMENTS R-224 2NLP35-16-3 2X3DG344 R-224 2NLP35-16-4 2X3DG344 s
R-224 2NLP35-16-5 2X3DG354 R-257 2NLP28-5-1 2X3DG354 R-263 2 NLP35-14-6 2X3DG354 R-301 2NLP35-3-4 2X3DG373 STAIR #1 R-305 2 NLP36-18-2 2X3DG345 R-305 2NLP36-18-3 2X3DG355 i
R-308 2 NLP36-18-1 2X3DG355 R-308 2NLP36-18-4 2X3DG355 R-309-2NLP44-5-2 2X3DG355 R-309 2NLP44-5-3 2X3DG355 a
i l
'I
/,
y-Procedure No.
Revisxm Page No.
VEGP 29101-C 1
59 of 96 Sheet 5 of 14 CHECKLIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS
= -
I BUILDING:
Ut!IT 2 CONTROL BUILDING EMER. LIGHT DRAWING ACCEPT.
(YES/NO)l
- LOC, NO.
NO.
INIT. / DATE COMMENTS R-310 2NLP35-13-1 2X3DG355 R-311 2NLP35-13-2 2X3DG
'5 R-325 2NLP35-13-3 2X3DG345 R-325 2NLP35-13-4 2X3DG345 R-325 2NLP35-13-5 2X3DG345 R-325 2NLP35-13-6 2X3DG345 R-401 2NLP35-3-5 2X3DG373 STAIR fl R-403 2NLP36-17-1 2X3DG356 R-403 2NLP36-17-2 2X3DG356 R-403 2NLP36-17-3 2X3DG356 R-407 2NLP36-17-4 2X3DG356 R-A01 2NLP35-11-1 2X3DG372 i
{
d 4 n
'- m' i
o o
o
. %en nu ws.on
% no VEGP 29101-C 1
60 of 96 Sheet 6 of 14 CHECKLIST 6 SELF CONTAINED SEALED BEAM EMEP.GENCY LIGHTING SYSTEMS s
BUILDING:
UNIT 2 CONTROL BUILDING EMER. LIGHT DRAWING ACCEPI.
LOC.
NO.
NO.
(YES /NO) INIT. / DATE COMMENTS R-A02 2 NLP4 9-6-1 2X3DG372 R-A04 2NLP35-8-10 2X3DG362
-R-A04 2 NLP36-8-18 i 2X3DG362 R-A07 2NLP35-8-11 2X3'DG362 R-A07 2NLP36-8-17 ZX3DG362 R-A09 2NL?33-2-1 2X3DG362
)
i R-A09 2NLP33-4.
I 2X3DG362 R-A09 2NLP33-6-1 2X3DG372 R-All 2NLP35-7-7 2X3DG352 l)
R-A12 2NLP33-6-2 2X3DG352 R-A14 2NLP35-8-1 2X3DG342 R-A14 2NLP35-8-12 2X3DG352 R-A14 2NLP36-8-15 2X3DG342 I
l i
I
C-(
OV j Procedure No, Revisaan Page No VEGP.
29101-C 1
61 of 96 I
Sheet 7 of 14 l
CHECKLIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 CONTROL BUILDING EMER. LIGHT DRAWING ACCEPT.
I LOC.
NO.
NO.
(YES/NO) -INIT. / DATE
_ 0Mi4EN TS
^
R-A14 2NLP36-8-16 2X3DG362 R-A15 2NLP35-8-2 2X3DG362 L
R-AIS 2NLP36-8-1 2X3DG342 l
R-Al5 2NLP36-8-10 2X3DG342 R-AIS 2NLP36-8-11 2X3DG342 R-A15 2NLP36-8
'.2 2X3DG342-R-AIS 2NLP36-8-13 2X3DG342 l
}
R-AIS 2NLP36-8-14 2X3DG362 R-A16 2NLP35-7-1 2X3DG342
-R-A16 2NLP35-7-2 2X3DG342 R-A16 2NLP35-7-3 2X3DG342
+
R-A16 2NLP35-7-4 2X3DG342 l
R-A16 2NLP35-7-6 2X3DC362
~
l
.h;
O O
O Procedure No Remson Page rh VEGP 29101-C 1
62 of 96 Sheet 8 of 14 CHECKLIST 6 SELF CONTAINED SEAL BEAM EMERGENCY LIGHTING SYSTEMS i
BUILDING:
UNIT 2 CONTROL BUILDING EMER. LIGHT DRAWING AC EPI.
~
LOC.
NO.
NO.
-(YES/NO)
INIT. / DATE COMMENTS R-A16 2 NLP35-8-3 2X3DG342 i
R-A16 2NLP36-8-2 2X3DG342 R-A17 2NLP36-5-4 2X3DG373 STAIR 14 i
R-A18 2NLP35-8-4 2X3DG362 L
4 r
R-A18 2NLP35-8-5 2X3DG342 l
R-A18 2iiLP36-8-3 2X3DC362 i
R-A18 2NLP36-8-5 2X3DG342 i
R-A18 2NLP36-9-1 2X3DG362 R-A18 2NLP36-8-4 2X3DG342
[-A19 2NLP35-5-5 2X3DG373 STAIR #1 R-A23 2NLP33-3-I 2X3DG342 i
R-A23 2NLP36-7-1
- 2X3DG342 l
R-A23 2NLP35-7-8 2X3DG352 i
J:
s,.,m
O O
O eroceee na newsion page te VEGP 29101-C 1
63 of 96 Sheet 9 of 14 CHECKLIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEM l
EUILDING:
UNIT 2 CONTROL BUILDING EMER. LIGHT DRAWING lACCEPI.
LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS R-A23 2NLP36-11-1 2X3DG342 l
R-A23 2NLP36-9-2 2X3DG342 L
R-A23 2NLP35-11-2 2X3DG342
.R-A24 7?II '20 ' ?
2X3DC352 R-A24 2NLP32-1-1 2X3DG352' R-A24 2NLP32-1-2 2X3DG352 l 2NLP32-1-3 R-A24 2X39G352 R-A29 2NLP35-8-8 2X3DG352 t
R-A30 2NLP34-14-1 2X3DG352 R-A30 2NLP34-14-2 2X3DG352 t
R-A32 2NLP35-8-9 2X3DG352 I
iR-A76 2NLP29-1-2 2X3DG342 4
1 I
f I-A76 2NLP29-1-3 R
2X3DG342 I
i
- R-A76
' 2X3DG342; i
O O
O Procedure No.
Henseon Page PA).
VEGP 29101-C 1
64 of 96 Sheet 10 of 14 CHEC.{ LIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGifrING SYSTEMS SUILDING:
UNIT 2 CONTROL BUILDING s
EMER. LIGHT
~ DRAWING ACCEPI.
' LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS t
1R-A79 2NLP33-6-3 2X3DG352 L
R-B01 2NLP35-2-1 2X3DG371
- R-B02 2NLP36-4-10 2X3DG371
[R-B03 2NLP36-2-1 2X3DG361
.R-B04 2NLP35-4-1 2X3DG361 I
1R-B04 2NLP35-6-1 2X3DG361 l
j l
R-B04 2NLP36-6-10 2X3DG361 l
R-B05 2NLP38-11-1 2X3DG361-4 R-B06 2NLP35-2-2 2X3DG361 R-B06 2NLP35-6-2 2X3DG361 R-B06 2NP35-6-3 2X3DG341 i
R-B06 2NLP36-2-2 l 2X3DG361 R-B06 2NLP36-4-1
' 2X3DG341,
{
o 1
I
.r
O O
O
~
Procedure Ph Revesson Page No_
VEGP 29101-C 1
65 of 96 l
Sheet 11 of 14 CHECK. LIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 CONTROL BUILDING EMER. LIGHT DRAWING ACCEPT.
i LOC.
NO.
NO.
(YES/NO)
INIT.
DATE COMMENTS R-B06 2NLP36-4-11 2X3DG361 i
R-B06 2NLP36-6-1 2X3DG361 R-B07 2NLP35-4-2 2X3DG361 4
R-B07 2NLP36-4-2 2X3DG361 i
R-B09 2NLP36-4-3 2X3DC361 R-B10 2NLP38-2-1 2X3DG371 R-B12 2NLP37-8-1 2X3DG351 i
R-B13 2NLP35-2-3 2X3DG361 i
a g
R-B13 2NLP35-6-4 2X3DG351 6
I R-B13 2NLP35-6-5 2X3DG351 i
R-B13 2NLP36-6-2 2X3DG341 R-B14 2NI.P35-4-3 2X3DG361 i
f R-B14 2NLP36-4-4 2X3DG361 l
l ey
O O
O 1
a Procedure No Renwi Page No VEGP 29101-C 1
66 of 96 Sheet 12 of 14 CHECKLIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS 1
i-BUILDING:
UNIT 2 CONTROL BUILDING EMER. LIGHT DRAWING ACCEPI.
1 MC.
NO.
NO.
(YES/N0) INIT. / DATE COMMENTS R-BIS 2NLP35-5-6 2X3DG373 STAIR 14 i
{
'R-B17 2NLP36-6-3 2X3DG341
'R-B17 2NLP36-6-4 2X3DG341
\\
.R-B18 2NLP36-1-1 2X3DG341 1
!R-B18 2NLP36-1-2 2X3DG341 i
4
!R-B18 2NLP36-6-5 2X3DG341 i
R-B19 2NLP37-16-1 2X3DG351
-B21 2NLP35-5-7
- 2X3DG373, STAIR # 1 4
1 R-B26 2NLP35-1-1 2X3DG361
-B26 2NLP35-1-5 2X3DG341l
~R-B28 2NLP35-1-2 2X3DG341 I
i
.R-B28 2 NLP35-1-3 i2X3DG341 i
1
,R-B28 2NLP35-1-4 12X3DG341 i
b y
O O
O Procedisre f40.
Rmsron Pg tdo VEGP 29101-C 1
67 of 96 Sheet 13 of 14 CHECKLIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS i
IBUILDING:
UNIT 2 CONTROL BUILDING EMER. LIGHT DRAWING ACCEPI.'
- LOC.
NO.
NO.
(YES /NO) INIT. / DATE COMMENTS 4
'R-B29 2NLP35-6-6 2X3DG341 fR-B29 2NLP35-6-7 2X3DG341 R-B29 2NLP35-6-8 2X3DG341
]
R-B29 2NLP35-6-9 2X3DG341 R-B31 2NLP35-6-10 223DG351 i
'R-B33 2NLP35-4-4 2X3DG351
~
+
R-B33 2NLP35-4-5 2X3DG351 l
R,B33 2NLP35-4-6 2X3DG341 4
R-B33 2NLP35-7-5 2X3DG341 R-B33 2NLP36-2-3 2X3DG351 R-B33 2NLP36-4-5 2X3DG341 l
R-B33 2NLP36-6-6 2X3DG341 l
l R-B36 2NLP36-4-6 2X3DG351 i
4 d-B36 2NLP36-4-7 2X3DG351 l
1 l
O O
O Procedure No Reusson Paga No_
VEGP 29101-C 1
68 of 96 Sheet 14 of 14 CHECKLIST 6 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 CONTR)L BUILDING EMER. LIGHT DRAWING ACCEPI.
LOC.
NO.
NO.
(YES/NO)
INIT.
/ LATE COMMEh~rS R-B36 2NLP36-4-8 2X3DG351 1
i-
! R-Sin 2NLP36-4-9 2X3DG351 R-C04
'2NLP3r j, _
2X3DG390 TUNNEL R-COS 2NLP37-1-1
[_2X3DG390 TUNNEL
._.f
. __ U,..->-3 1 2X3ry:390-i TUNNEL
- :P cn%
l g p a-
~
6.
+
- Il2'_ P3 7 - 5 i I 2Z3DG2C 5 i
TUNNEL
- ..E_ne
-_ q I lR-C07
!2tG M-)-2 1 2X3DG390i I
TUNNEL R-C07 2NLP37-3-2 2X3DG390:
TUNNEL 4
R-C07 2NLP37-3-3 2X3DG390 TUNNEL R-C07 2NLP37-3-4 2X3DG390 TUNNEL R-C07 2NLP37-5-3 2X3DG390 TUNNEL R-C08 2NLP37-1-3 2X3DG390 TUNNEL L
O O
O Procedure No.
Rensum
- P y No VEGP 29101-C 1
69 of 96 Sheet 1 o f 13 CHECKLIST '7 SELF CONTAINED SEALED BE/M EMERGENCY LIGHTING SYSTEMS i.
E BUILDING:
UNIT 2 AUXILIARY BUILDING EMER. LIGHT DRAWING ACCEPT.
LOC.
NO.
NO.
(YES/NO) INi?. / DATE COMMENTS R-126 2NLP08-10-1 2X3DG460 STAIR fl R-127 2NLP06-5-1 2X3DG445 R-127 2NLP06-5-2 2X3DG445 i
. R-137 2NLP08-8-1 2X3DG445 R-137 2NLP08-12-6 2X3DC445 R-139 2NLP08-8-5 2X3DG445 R-139
'2NLP08-10-5 2X3DG445 R-139 2NLP08-12-1 2X3DG445 R-144 2NLP08-10-4 2X3DG445 a
R-145 2NLP08-12-2 2X3DG460 STAIR f 2 i
R-146 2NLP08-8-4 2X3DG445 R-IL6
.2NLP08-12-3 2X3DG445 i
R-147 2N:308-8-3 2X3DG445 i
B-147 2NLP08-10-3 2X3DG445 t
-w L
O O
O Ffocedure No Revesson Page h VEGP 29101-C 1
70 of 96 l
Sheet 2 of 13 l
CHECKLIST 7 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS i
I l
BUILDING:
UNIT 2 AUXILIARY BUILDING EMER. LIGHT DRAWING ACCEPT.'
LOC.
NO.
NO.
(YES/NO)*INIT. 1 DATE COMMENTS i
R-149 2NLP08-8-2 2X3DG445
\\
R-149 2NLP08-10-2 2X3DG445 1
i i
R-149 2NLP08-12-4 2X3DG445 R-149 2NLP08-12-5 2X3DG445 l
R-150 2NLP08-7-1 2X3DG460 STAIR f 4 R-152 2NLP08-9-5 2X3DG455 R-153 2NLP08-7-2 2X3DG455 I
f R-153 2NLP08-9-4 2X3DG455 R-153 2NLP08-11-1 2X3DG455 t
R-157
.;NLP05-1-1 2X3DG455 I
R-159 2NLP05-1-2 2X3DG456 R-159 2NLP05-1-3 2X3DG456 i
R-159 2NLP08-7-3 2X3DG455 !
l I
h tl x
O O
O l Procedure No Rensson Page No VEGP 29101-C 1
71 of 96 Sheet 3 of 13 CHECKLIST 7 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS
' BUILDING:
UNIT 2 AUXILIARY BUILDING EMER. LIGHT DRAWING ACCEPI.
- LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS fR-159 2NLP08-9-1 2X3DG455 f
!R-159 2NLP08-9-2 2X3DG455 A
t
[R-159 2NLP08-9-3
! 2X3DG455 iR-159 2NLP08-11-2 2X3DG455 i
!R-217 2NLP128-12-1 2X3DG446
.R-219 2NLP109-7-1 2X3DG446 R-219 2NLP109-9-1 2X3DG446 R-220 2NLP110-7-1 2X3DG446 i
R-221 2NLP109-9-2 2X3DG446 R-221 2NLP109-10-1 2X3DG446 i
R-221 2NLP110-7-2 2X3DG446 R-221 2NLP110-9-1 2X3DG446 R-224 2NLP109-7-3 2X3DG460 l
R-226 2NLP110-7-3 2X3DG456 1 t
.h v.
n O
O O
Processe No.
Revtsson Page No.
VEGP 29101-C 1
72 of 96 g
f Sheet 4 of 13 CHECKLIST 7 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 AUXILIARY BUILDING EMER. LIGHT DRAWING ACCEPT.
LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS R-226 2NLP110-7-4 2X3DG456 R-226 2NLP110-9-2 2X3DG456 R-227 2NLP109-7-2 2X3DG45G R-22.7 2NLP109-9-3 2X3DG456 R-227 2NLP109-11-1 2X3DG456 l
R-229 2NLP109-7-4 2X3DG456 R-229 2NLP109-11-2 2X3DG456 R-230 2NLP110-11-1 2X3DG460 STAIR f 4 R-A40B 2NLP11-9-2 2X3DG444 R-A40B 2NLP11-11-2 2X3DG444 i
R-A55 2NLP11-6-1 2X3DC460 STAIR # 1 R-A5G 2NLP11-5-1 2X3DG444 R-A61 2NLP12-5-3 2X3DG454 R-A69 2NLP11-11-1 2X3DG444 b
1 O
O O
l Procedure No.
Rewrso.
Dage= No VEGP 29101-C 1
73 of 96 Sheet 5 of 15 CHECKLIST 7 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 AUXILIARY BUILDING EMER. LIGHT DRAWING ACCEPI.
LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS R-A69 2NLP11-13-1 2X3DG444 R-A75 2NLP11-9-1 2X3DG444 R-A76 2NLP11-8-1 2X3DG460 STAIR #2 6
R-A89 2NLP11-10-1 I 2X3DG444 R-A89 2NLP11-12-1 2X3DG444 l
1 R-A90 2NLP11-12-2
! 2X3DG444 R-A94 2NLP12-6-3 2X3DG460 STAIR f 4 R-A96 2NLP12-6-1 2X3DG454 R-A96 2NLP12-6-2 2X3DG454 R-A96 2NLP12-10-1 2X3DG454 f
R-A97 2NLP12-8-1
! 2X3DG454' I
l R-A98 2NLP12-12-1
? 2X3DG454 i
R-A98 I 2NLP12-14-1 2X3DG454 lR-A99 2NLP12-7-1 2X3DG454
,*M i"
O O
O Pra edwe No Rewsson ~
' Page No
{
VEGP 29101-C 1
74 of 96 Sheet 6 of 13 CHECKLIST 7 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTDtS BUILDING:
UNIT 2 AUXILIARY BUILDING EMER. LIGHT DRAWING ACCEPT.
LOC.
NO.
NO.
(YES/MO)
INIT.
DATE COMMENTS R-A99 2NLP12-7-2 2X3DG454 UNDER LADDER PLATFORM a-R-A102 2NLP12-5-1 2X3DG454
^
R-A103 2NLP10-1-1 2X3DF454 i
R-A103 2NLP12-9-2 2X3DG454 R-A105 2NLP12-5-2 2X3DG454 R-A105 2NLP12-7-3 2X3DG454 R-A105 2NLP12-7-4 2X3DG454 R-A105 2NLP12-9-1 2X3DG454
[
R-B69 2NLP15-7-1 2X3DG443 STAIR #1 i'
R-B69 2NLP15-7-2 2X3DG443 STAIR fl l
R-B70 2NLP15-8-1 2X3DG443 R-B80 2NLP15-8-2 2X3DG443 i
R-B80 2NLP15-9 2X3DG443+
l R-H80 2NLP15-11-1 2X3DG443 i
~
l k t l
O O
O t
Procedure No
~
d' Page No VEdP 29101-C 1
75 of 96 3J_
Sheet 7 of 13 CHECKLIST 7 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS L'!
\\
BUILDING:
UNIT 2 AUXILIARY BUILDING EMER. LlGHT DRAWING ACCEPI.
LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS I
R-B92 2NLP15-9-2 2X3DG443 R-B93 2NLP15-7-3 2X3DG443 STAIR #2 i
R-B93 2NLP15-7-4 2X3DG443 STAIR #2 R-B96 2NLP15-13-1 2X3DC443 R-B103 2NLP15-10-1 2X3DG443 R-B103 2NLP15-12-1 2X3DG443 R-B104 2NLP130-17-1 2X3DG443_
R-B105 2NLP15-14-1 2X3DG443 l
R-B107 2NLP15-10-2 2Z3DG443 R-B113 2NLP130-21-1 2X3DG453 i
R-B114 2NLP15-15-1 2X3DG453 i
i R-B114 2NLP16-15-1 2X3DG453 i
6 R-B115 2NLP16-7-1 2X3DG453 1
f t
R-B122 2NLP16-5-1 2X3DG453 i
l l
b b
J
'J Procedure No Revism Faya No VEGP 29101-C 1
76 of 96 Sheet 8 of 13 CHECKLTST'7 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 AUXILIARY BUILDING j
EMER. LIGHT DRAWING ACCEPT.
LOC.
NO.
NO.
(YES/NO)
INIT DATE COMMENTS R-B123 2NLP16-9-1 2X3DG453 R-B125 2NLP16-13-1 2X3DG453 I
- R-B130 2NLP16-5-2 2X3DG453 R-B130 2NLP16-13-2 2X3DG453
'R-B131 2NLP16-5-3 2X3DG453 R-B131 2NLP16-7-2 2X3DG453 R-B134 2NLP16-10-1 2X3DG460 STAIR # 4 R-B134 2NLP16-10-2 2X3DG460 STAIR # 4
^
R-B135 2NLP16-3-1 2X3DG453 R-B135 2NLP16-13-3 2X3DG453 4
R-B136 2NLP15-9-3 2X3DG443 R-C07 2NLP19-14-1 2X3DG452 R-C07 2NLP19-14-2 2X3DG452 l
R-COS 2NLP19-11-1 2X3DG452 STAIR # 7 1
I
O O
O Proceduse No.
Revis: ort Page NO 1
VEGP 29101-C 1
77 of 96 Sheet 9 of 13 CHECKLIST 7 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT-2 AUXILIARY BUILDING EMER. LIGHT DRAWING ACCEPI.
LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS e
R-CIO 2NLP19-10-1 2X3DG452 R-CIO 2NLP19-14-3 2X3DG452' R-C11 2NLP131-5-1 2X3DG452 i
R-C13 2NLP19-16-1 2X3DG452 i
j R-C14 2NLP19-8-1 2X3DG460 STAIR # 4 R-CIS 2NLP19-16-2 2X3DG452 R-CIS 2NLP19-20-1 2X3DG452 R-C19 2NLP19-10-2 2X3DG452 R-C20 2NLP19-7-1 2X3DG460 STAIR # 2 l
R-C21 2NLP19-12-1 2X3DG442 f
I R-C24 2NLP19-15-2 2X3DG442 R-C24 2NLP19-17-1 2X3DG442 R-C25 2Ni,P18-19-1 2X3DG442 l
I R-C25 32NLP18-19-2 2X3DG442 f
ka
^
O 0
NOCedure No.
Revis.on Page No VEGP.
29101-C 1
78 of 96
~
Sheet 10 of 13 CHECKLIST 7 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS 4
BUILDING:
UNIT 2 AU.XILIARY BUILDING EMER. LIGHT DRAWING l ACCEPI.
LOC.
NO. -
NO.
(YES/NO) INIT. / DATE COMMENTS i
R-C25 2NLP18-19-3 2X3DG442 R-C26 2NLP18-19-4 2X3DG442 R-C26 2NLP18-19-5 2X3DG442 R-C26 2NLP18-19-6 2X3DG442 1
R-C27 2NLP18-8-1 2X3DG442 R-C31 2NLP19-14-4 2X3DG442 R-C38 I 2NLP13-8-2
' 2X3DG442 k3-C44 2NLP19-5-1 2X3DG442 l
R-C44 2NLP19 '3-1 2X3DG442 i
4,P,- C 4 9 l '>NLP19-13-2 2X3DC442
.I l-
-i (R-C49 l2NLPis-P '
1130C442
[
8 2
4
=
'5 -C58 21?LIl'l' J
, ' O DG44 2 R
zX3DG460 STAIR # 1
[
R-C59 2NLP19-9-1 1
t 4
1 r
I 1
i I
-~
m
\\
)
\\Q
\\
]
Procedure No Reviseori Page No VEGP 29101-G 1
79 of 96 Sheet 11 of 13 CHECKLIST 7 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS 1
BUILDING:
UNIT 2 AUXILIARY BUILDING EMER. LIGHT DRAWING ACCEPI.
LOG.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS R-L01 2NLP20-13-4 2X3DG451 R-D06 2NLP20-15-1 2X3DG451 R-D06 2NLP20-17-1 2X3DG451 R-D07 2NLP20-10-1 2X3DG451 STAIR f4 R-D10 2NLP20-23-1 2X3DG460 STAIR f 2 R-D11 2NLP20-19-1 2X3DG451 R-D11 2NLP20-21-1 2X3DG451 R-D15 2NLP20-5-1 2X3DG451 R-D32 2NLP20-23-2 2X3DG451 R-D32 2NLP20-23-3 2X3DG451 R-D41 2NLP20-16-1 2X3DG451 R-D44 2NL420-11-1 2X3DG460 STAIR f 1 R-D53 2NLP2t}-5-2 2X3DG451 E-D104 2NLP20-13-1 2X3DG451 ne r
O O
O Procedure No.
F4vese Page No VEGP 29101-C 1
80 of 96 Sheet 12 of 13 CilECKLIST 7 SELF CONTAINED SEALED BEAM EMERGENCY LIGilTING SYSTEMS BUILDING:
UNIT 2 AUXILIARY BUI). DING EMER. LIGHT DRAWING 1 ACCEPT.
, LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS R-D106 2NLP20-13-2 2X3DG451 R-D106 2NLP20-15-2 2X3DG451 R-D107 2NLP22-13-1 2X3DG451 R-D108 2NLP20-13-3 2X3DG451 R-D109 2NLP20-10-2 2X3DG451 R-D113 2NLP133-13-1 2X3DG451 R-D123 2NLP22-15-1 2X3DG451 I
i i
,j;
O[\\
C/
(
^
Procedure No.
ra..m Page No VEGP 29101-C 1
81 of 96 Sheet 13 of 13 CHECKLIST 7 SELF CONTAINED SEALED BFAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 FUEL HANDLING BUILDING i
EMER. LIGHT DRAWING ACCEPT.
j LOC.
NO.
NO.
(YES/NO)
INIT.
DATE COMMENTS i'
R-105 l 2NLP127-2-1 2X3DG435 R-105 2NLP127-2-2 2X3DG435 R-105
'2NLP127-2-3 2X3DG435 i
R-120
'2NLP127-8-1 2X3DG435 R-124
'2NLP127-8-2 2X3DG435 R-A01 2NLPO2-21-1 2X3DG434 R-A04 2NLP02-19-1 2X3DG434 R-AOS 2NLP02-17-1 2X3DG434 R-801 2NLP02-11-1 2X3DG434 R-B01 2NLP02-11 7 2X3DG434
,R-B06 2NLP02-6-1 2X3DG433 i
L e
~4 4 o
'VN q)
LJ wJ Procedure No.
Revesson Pag. No VEGP 29101-C 1
82 of 96 g
Sheet 1 of 6 CHECKLIST 8 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS I
BUILDING:
UNIT 2 CONTAINMENT BUILDING EMER. LIGHT ACCEI'I.
t NO.
LOCATION (YES/NO)
INIT. / DATE COMMENTS 2-CNMT-1 2-CNMT-2 i
l 2-CNMT-3 2-CNMT-4 2-CNMT-5 2-CNMT-6 2-CNMT-7 2-CNMT-8 2-CNMT-9 (2-CNMT-10 4
O.
n p
Procedure No
'k.;m PegeF40.
{
VEGP 29101-C 1
83 of 96 Sheet 2 of 6 CHECKLIST 8 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS T
' BUILDING:
UNIT 2 CONTAINMENT BUILDING EMER. LIGHT ACCEPT.
NO.
LOCATION (YES/NO) INIT. / DATE COMMENTS i2-CNMT-11 12-CNMT-12 l
l2-CNMT-13
'2-CNMT-14 1
t 12-CNMT-15 2-CNMT-16 I
I2-CNMT-17 i
l 2.-CNMT-18 i
i 2-CNMT-19 i
2-CNMT-20 f
I i
4 I
I
{
wu
\\
(
(
V v'
Procedure No Revision page th VEGP 29101-C 1
84 of 96 Sheet 3 of 6 CPECKLIST 8 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEPS BUILDING:
UNIT 2 CONTAINMENT BUILDING EMER. LIGHT ACCEPT.
NO.
LOCATION (YES/NO)
INIT.
DATE COMMENTS 2-CNMT-21 2-CNMT-22 2-CNMT-23 2-CNMT-24 2-CNMT-25 2-CNMT-26 2-CNMT-27 2-CNMT-28 e
2-CNMT-29 2-CNMT-30 W
$b
/=
O o
o i
Procedure No P_:-. 5.on Page No.
VEGP 29101-C 1
85 of 96 Sheet 4 of 6 CHECKLIST 8 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 CONTAIhMENT BUILDING EMER. LIGHT ACCEPI.
NO.
LOCATION (YES/NO) INIT. / DATE COP 11ENTS 2-CNMT-31 2-CNMT-32 2-CNMT-33 42-CNMT-34 i2-CNMT-35 e
l2-CNMT-36 J2-CNMT-37 l2-ChMT-38 2-CNMT-39 l2-CNMT-40 i
l
.2-CNMT-41 2_-CNhT-42 2_-CNMT-4 3 i
I
..i
vi..
-m
-s.,
C a
Procedure fJo.
Reyes,on p,7 pg VEGP 29101-C 1
86 of 96 Sheet 5 of 6 CHECKLIST 8 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 CONTAINMENT BUILDING EMER. LIGHT ACCEPT.
NO.
LOCATION (YES/NO)
INIT.
DATE COMMENTS 2-CNMT-44 2-CNMT-45 2-CNMT-46 2-CNMT-47 2-CNMT-48 C-CNMT-49
^
l 2-CNorr-50 l
2-CNMT-51 i
i
)
2-CNMT-52 i
2-CNMT-53 2-CNMT-54 t
l l
8 2-CNMT-55 2-CNMT-56 Eh'
O O
O Procedure Na Revision Pay No.
~
VEGP 29101-C 1
87 of 96 Sheet 6 of 5 CHECKLIST 8 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS
' BUILDING:
UNIT 2 CONTAIPMENT BUILDING
- EMER. LIGHT ACCEPT.
NO.
LOCATION (YES/NO) INIT. / DATE COFDIENTS l2-CNMT-57
- 2-CNMT-58
'2-CUMT-59 TENDON 2NLP30-7-1 GALLERY DWG. #2X3DG521 L
TENDON l2NLP30-9-1 GALLERY DWG. #2X3DG521 TENDON 2NLP30-11-1 GALLERY DWG. #2X3DG531 IENDON 2NLP30-12-1 GALLERY DWG. f2X3DG531 i
8 I
k-
l l
- ^
c S
9 nevision i ~
~
~~
q eroceours no of 96 i
VEGP 29101-C 1
Sheet 1 ot CHECKLIST 9 SELF CONTAINED SEALED BEAM EMERGENCY t.IGHTlaC a.3TEMS EUILDING:
UNIT 2 TirdNELS l
l EMER. L7.GHT J
DRAWING ACCEPI i I
~
LOC.
N3.
' NO (YES/NO)lINIT. / DATE COF24ENTS 2T2B 2NLP09-26-1 2X31?H8F1 2T2B 2NLP09-28-1 2X3DH8F1 2T2B 2NLP09-30-3 2X3DH8F1 2T3A 2NLP52-8-1 2X3DH8El 2T3A 2NI.952-10-1 2X3DH8E1 2T3A 2NLPS2-10-2 2X3DH8E1 I
2T3B 2NLPS2-8-2 2X3DH8E1 2T3B 2NLPS2-12-2 2X3DH8E1 a
2T4A 2NLP35-4-7 2X3DH8C3 4
hT4A 2NLP35-6-11 2X3DH8C3 t
2T4A 2NLP35-6-l?
l 2X3DH8C3 1
l l
Ik
, a, 7
y'
^-'
p s
a
,< 3
, ~. _
\\
%)
'%_/
Procedure No.
fievision Page No.
.29101-C 1-89 of 95 Sheet 2 of 6 CHECKLIST 9 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 TUNNELS EMER. LIGHT
' DRAWING ACCEPI.
LOC.
NO.
NO.
(YES/NO)
INIT.
DATE COMMENTS 2T4B 2NLP36-2-4 2X3DH8C3 2T4B 2NLP36-2-5 2X3DH8C3 2T4 B 2NLP36-6-8 2X3DH8C2 I
2T5B 2h1P09-30-1 2X3DH8F1 2TSB 2NLP09-30-2 2X3DH8F1 i
6
'l h, p.
its
(')
f~%
/~~h
.v V
-Q proceoore na
- newsion e,p r4o.
VEGP 29101-C 1
90 of 96 l
Sheet 3 of 6 CHECFLIST 9 SELF CONTAINED SEALED BEAM EMERGENCY LIbHTING SYE. EMS BUILDING:
UNIT 2 DIESEL GENERATOR EMER. LIGHT DRAWING 1 ACCEPT.
LOC.
NO.
NO.
i(YES/NO)
INIT.
DATE COMMENTS R-101 2NLP47-4-1 2X3DH8D3 R-101 2NLP47-4-2 2X3DH8D3 R-101 2NLP47-4-3 2X3DH8D3 R-101 2NLP50-4-1 2X3DH8D3 A-101 2NLP50-4-2 2X3DH8D3 i
R 103 2NLP47-4-4 2X3DH8D3 103 2NLP47-4-5 2X3DH8D3 R-103 2NLP47-4-6 2X3DH8D3 i
A-103 2NLP47-4-7 2X3DH8D3 lR-103 2NLP50-4-3 2X3DH8D3 I,R-103 2NLP50-4-4 2X3DH8D3 I
R-103 2NLP50-4-5 2X3DH8D3 R-103 2 NLP 5 0 f,'
2X3DH8D34
{
4 -h l' b
.;-x
.,_e.
,:- 6
. ~' x Q
\\ )
~.2 Procedure No.
Revisim Page No.
VEGP-29101-C I
91 of 96 Sheet 4 of 6 CHECKLIST 9 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 DIESEL GENERATOR FUEL OIL STORAGE LO_C.
NO O
( ES 5 INIT. / DATE COMMENTS R-203 2NLP120-5-1 2X3DH8D3 R-208 2NLP121-5-1 2X3DH8D3 R-A01 2NLP052-15-1 2X3DH8D4
-g R-A02 2NLP052-15-2 2X3DH8D4 R-A02 2NLP052-17-1 2X3DH8D4 R-A03 2NLP052-13-1 2X3DH8D4 w~
_,c
08 J
V b
Procedure No.
Revision Page NJ.
VEGP 29101-C 1
92 of 96 M eet 5 of 6 CHECKLIST 9 SELF CONTAINED SEALED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 VARIOUS
- EMER. LIGHT DRAWING ACCEPT.
i LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS 2NLP12-22-1 2X3DH8F4 REFUEL WTR STOR. TNK i
2NLP46-7-1 2X3DH8C5 CONDENSATE STOR. TNK 2NLP46-7-2 2X3DH8C5 CONDENSATE STOR. TNK R-101 2NLP50-8-1 2X3DH8C4 AFW PMP. HSE.
1-102
,2NLP47-6-1 2X3DH8C4 AFW PMP. HSE.
t 1-106
!2NLP47-6-2 2X3DH8C4 AFW PMP. HSE.
1-106 2NLP47-6-3 2X3DH8C4 AFW PMP. HSE.
1-106 2NLP50-6-1 2X3DH8C4 AFW PMP. IlS E.
8 k
3.
ENTRY
'2NLP47-6-4 4 2X3Dil8C4 AFW PMP. IlSE.
7 4
Procedure No_
Revisson Page No.
VEGP 29101-C 1
93 of 96 Sheet 6 of 6 CHECKLIST 9 SELF CONTAINED SEAI.ED BEAM EMERGENCY LIGHTING SYSTEMS BUILDING:
UNIT 2 VARIOUS EMER. LIGHT DRAWING ACCEPT.
LOC.
NO.
NO.
(YES/NO) INIT. / DATE COMMENTS R-302 2NLP136-18-1 2X3DH'8F2 NSCW VLV. HSE.
"B" R-302 2NLi136-18-2 2X3DH8F2 NSCW VLV. HSE.
"B" R-302 2NLP136-18-3 2X3DH8F2 NSCW VLV. HSE.
"B" R-402 2NLP135-18-1 2X3DH8E3 NSCW VLV. HSE.
"A" R-402 2NLP135-18-2 2X3DH8E3 N~#W VLV. HSE.
"A" R-402 2NLP135-18-3 2X3DH8E3 NSCW VLV. HSE.
"A" t
.i PROCEDURE NO-REVISION PAGE NO VEGP.
29101-C 1
94 of 96 e
Sheet 1 of 1 EMERGENCY LIGHTING SURVEILLANCE l
CHECKLIST RETEST SHEET FOR CHECKLIST 1, 2, 3, 5, 6, 7, 8, AND 9 EMER. LIGHT ACCEPT.
l BUILDING NO.
(YES/NO)
INIT.
DATE COMMENTS l
A 1
3 l
i i
I i
i f
v i
i
'C3441
.,,,.,,..m_,_
._-..,,-_,.,_._.,,...,. m.,.,._..-_...,,,,.-..
PROCEDURE NO.
REVISION PAGE NO
'~
-29101-C 1
95 of 96
(]
Sheet 1 of l'
'-W E!GRGENCY f.IGHTING SURVEILLANCE CHECKLIST RETEST SHEET FOR CHECFLIST 4 BUILDING:
INVERTER EQUIPMENT N0t i
ACCEPT.
(YES /NO)
INIT.
DATE COMMENTS BUILDING:
INVERTER EQUIPrfENT NO:
ACCEPT.
(YES/NO)
INIT.
DATE CO'AENTS BUILDING:
INVERTER EQUIPMENT NO:
ACCEPT.
-(YEE/NO)
INIT.
DATE COMMENTS BUILDING:
INVERTER EQUIPMENT NO:
ACCEPT.
(YES /NO)
IN IT.
DATE COMMEFiTS BUILDING:
INVERTER EQUIPMENT NO:
ACCEPT.
(YES/NO)
INIT.
DATE COMMENTS
. BUILDING:
INVERTER EQUI 1' MENT NO:
ACCEPT.
U)
(YES /NO)
INIT.
DATE COMMENTS W
7 57 COMP -
REVT' ccA O
O W
PROCEDt)RE NO.
BEVISION PAGE NO.
VEGP 29101-C 1
95 of 96 C-Sheet 1 of 1 EMERGENCY LIGHTING SURVEILLANCE
~
CHECKLIST RETEST SHEET FOR CHECKLIST 4 BUILDING:
INVERTER EQUIPMENT NO:
ACCEPT.
DES /NO)
INTT.
DATE COMMENTS
~
BUILDING:
INVERTER EQUIPMENT NO:
ACCEPT.
(YES/NO)
- INIT, DATE COMMENTS BUII. DING:
INVERTER EQUIPMENT NO:
ACCEPT.
(YES/NO)
INIT.
DATE COMMENTS BUILDING:
INVERTER EQUIPMENT NO:
ACCEPT.
(YES /NO)
INIT.
DATE C')tNENTS BUILDING:
INVERTER FQUIPMENT NO:
ACJPT. ~
(YES/NO)
INIT.
DATE COMMENTS t
BUILDING:
-INVERTER EQUIPMENT NO:
~~~
ACCEPT.
' (YES /NO)
INIT.
DATE COMMENTS w.
=. _
~
PROCEDURE NO.
REVISION PAGE NO.
VEGP 29101'-C 1
96 of 96 h
Sheet 1 of 1
' (V -
EMERGENCY LIGHTING SURVEILLANCE
' CHECKLIST CCTPLETION SHEET Each systen/ component tested under this procedure meets the acceptance criteria, or corrective action has been initiated and documented in the comments section below.
COMPLETED BY DATE SIGNATURE REVIEWED BY DATE FOREMAN'S SIGNATURE COMMFNTS
~
()