ML20092F874

From kanterella
Jump to navigation Jump to search
Rev 3 to Procedure VEGP 00053-C, B-Train Undervoltage Test
ML20092F874
Person / Time
Site: Vogtle 
Issue date: 03/26/1990
From:
GEORGIA POWER CO.
To:
Shared Package
ML20092F288 List: ... further results
References
CON-IIT05-027-90, CON-IIT05-028-90, CON-IIT05-029-90, CON-IIT5-27-90, CON-IIT5-28-90, CON-IIT5-29-90, RTR-NUREG-1410 VEGP-00053-C, VEGP-53-C, NUDOCS 9202190542
Download: ML20092F874 (22)


Text

{{#Wiki_filter:_ _ - - - ~ ^ 'PAOCEDUAE NO GEVISION PAGE NO VEGP 00053.C 3 12 of 10 ORTGTNAl. mm* TEMPORARY PROCEDURE APPROVAL FORM TEMPORARY PROCEDURE 1, UMBER h [dE - 7[-/2 UNIT [nF i 1 m TITLE f - /m 4 / ;. i r,-. j% e /rf F REV [ 1 ONE TIME USE ONLY YES V NO: 1F NO, TERMINATION DATE y/e/7c PURPOSES ..,.iIe Ih V ev&c, n ! !!??/*' n,j n ___ } c c.. hle< l, /,,, S n n e,., e, r,W <l I ? o ,r., Jern i PRB REVIEW REQUIRED: V YES NO ORIGINATED BY ([ [ 6,f/m,) / */uk. ON-SITE V 0FFSITE p % w f5 4 ./ .5 - t v-f o DATE COGNIZANT SUPERVISOR e </feh / t' DATE J[t.r[9 o DEPARTMENT MANAGER / SUPT [hu k. DATE 3 -2[-in z O PRB REVIEW (if required) lEETING NO. __ 40 -W DATE SHf.Mua 3-26-90 3: 9-K O RECOMMEND: ( V)i APPROVAL ( ) DISAPPROVAL - Return to responsible LL. department Mgr./ Supt. Z UNREVIEWED SAFETY QUESTION INVOLVED: YES ( ) NO (T PRB CHAIRMAN J01 NM GENERAL MANAGER - NUCLEAR PLANT (if required) DISPOSITION: ([ APPROVED ( ) REJECTION REASON FOR REJECTION: A%nM shc/va GENERAL MANAGER 2 NUCLEAR PLANT DATE / FIGURE 2 9202190542 920116 (Example) PDR ADOCK 05000424 S PDR A ?03445

ORIGINAL' VEGP 000056-C Rev 9 Page 17 of 19 DETERMINATION OF NEED FOR SAFETY EVALUATION SHEET 1 OF 4 Document ID No. T-ENG-90-lL Rev. O SECTION 1.0 1.1 Descrapt1on of pr opos ert chango, t e r, t, or exportmenti B Train Diesel Generator test simulating LOSP. This temporary procedurr. aligns the plant and simulates a Loss of Offuito Power. The plants response is recorded, documenting the proper operation of the Diesel Generators, the Sequencer and various safety related, soquenced loads. The test equipment is removed at the end of the test, and the plant is restored under the control of the Unit One Shift Supervisor. The test structure and methodology is similar to that of the recently completed ESFAS Surveillance procedures, 54055-1, and 34065-1. 1.2 rceu von for p r opo seri charge, test. or experiment: This UV (LOSP) is being simulated to assiet in the tro;619 shooting of the two A Train Diesel Generator (DGt trips experienced du~ing the Mbrch 20, 1970 LOSP event. This procedure will plats the D train of the ( plant into a configuration which is similar to that during the LOSP event. The response of the Diesel Generator and Sequencer will be closely monitored and recorded. The results of this procedure will be used to determine the root cause of the trips such that corrective action can ensure that the Diesel Generator an.4 9equencer are prepared to perform their safety i 4"6:iton should another LOSP occur. l

1. 3 km

.ie proposed change i tivol ve a change to Technical Spec t i ; cati ons? Yes No X F odanation: The Tech Specs for the affected components, Diesel Generators and Sequencer, are not af f ected by this temporary procedure. The tout of the l plants responsa to a LOSP is required to be l demonstrated at least every 10 months by Tech Spec 4.8.1.1.2. This is nortnally perf ormed by Engineering l Surveill ance procedures 54055-1 and 54065-1. This procedure performs the same testing as those procedures, and is required to assist in the trouble shooting of the DG trips. ThiG procedure represents no physical change to the plant. The Tech Spec assocluted with this test is 3/4.8.1.1.2.h.

T o ORIGINAL SHEET 2 0F 4

1. 4 Don the proposcd chongo i n sol & O t h a n t2 0 in the f acili t y n c' t% t r i b e d in t h(- FSAR' N e v.

tki X E plonotaone This temporary procedure represents no phyuical change to the plant. The operation of the Diesel Generators / Sequencer is addressed in unction 0.3 cd the FSAR.* The performance of thi s procedure will be similar in structure and methodology to the tunting performed in the 10 month Enginuering Surveillance tuuts of the ESFAS System, 54055-1, and 54065-1 which are required by FDAR section 0.3 and Tech Spec 7/4.G.1.1.2.h.

1. 5 Don t he pr opot>ud chantne anvolve a change in procedures ou deacribod in the FEnR?

Yes IJo X C :pl anet t un t This temporary procedure is similar in structure and methodology to the 10 month Engtneering Surveillance procedures which test the ESFAS System, 54055-1, and 54065-1. The ESFAG procedures are addresned in sections 0.3, ar.d 16.3 of the FSAR and in Tech Spec 3/4.0.1.1.2.h. The periormance of this pr ocedure is required ta provide inf ormation needed to idtenti f y the root cause of the DG1A trips. This procedure involves no changes to procedures described in the FGAR, although it in modeled after one. l 1,6 Does the proposed change involve a test or experiment not d%cr i be d in the USAR? You No X l! : p l an ati on: This tempotary procedure performs testing of the Diesel l Generator and Sequencer as described in FSAR section 0.3 and Tech Spec l 3/A.0.1.1.2. No other test or exper iment is involved with this temporary procedure. This 'arocedure is intended to assist in the trouble shooting of the recent DG1A trips, and to demonstrate the proper operation of the Diesel Generator / Sequencer. The operation of the Diesel Generator / Sequencer in described in FSAR section 0.3, and the ESFAS testing of the Diesel Generator / Sequencer is addressed in Tech Spec 3/4.8.1.1.2.h. / Fvaluator r,.,,,,__ _,____Dato,.h fk _,_ Ouper vi sor _ [ [ ML __,_Date__,J jf.10,___ 1( the propo md c her ge in alves a dosi un it'odi f Icat1 on (DCP, Temp Mod, Minor j Departure from Design (MI A, Ge. tion 2.0 must be completed.VEGP 00056-C l

O ORIGINAL Sheet 3 of 4 SAFETY EVALUATION Document ID No.T-ENG-90-(f Rev.0 SECTION 2.0 J.1 Itm pr opowd A nge, test. or emperiment may increaw the probebilit y of occurrunce or consequencen of an accident described in the FSAR? Yen tio X ti :p l ana t t on /Justi f i c at i on: 'This procedure simulates a Loss of Ofisite Power an described in FSAR section 8.3. This procedure is being performed to assist in the trouble shooting of the DG1A trips experienced during the March 20, 1990 LOSP event. The performance of this proceduru will not increase the probability of occurrence or consequences of a LOSP as described in FSAR chapter D.3. This procedure will be used to identify the cause of the recent trips. This will allow corrective actions which will ensure that, if a LOSP were to occur, the Diesel Generator will be prepared to operate to mitigatu the event. .2 T h c, propowd c h.in g e, test, or experiment may increase the probability os occurrence of consequences of a mal f uncti on of sniety-related equipnent or component previounly ovaluated in the FSAR? Yes No X l' plsnation/Justificat1on: This temporary procedure will not increase the probability of occurrence or consequences of failure of any component evaluated in the FSAR. The procedure is being performed to 4 Jentify the cause of the DG1A trips during the March 20, 1990 LOSP avent. Corrective actions taken as a result of this information will provide the assurance that the DG is prepared to respond to an LOSP as described in section 0.3 of the FSAR. Testing will be performed as described in 3/4.0.1.1.2.h of the Tech Specs. 2.1 Ihv propowd thenge, test, or enperiment may create the possibility for an accident or equipment / component malfunction of a different type other than any evaluated previously in the FSAR7 Yes No X E :p) anata on /Justi f ita t i on The structure and methodology of this procedure is similar to that of the ESFAS System testing specifically required by Tech Spot 3/4.0.1.1.2.h and described in FSAR section 0.3. This testing is being performed to ensure that the Diesel Generator and j Sequencer is prepared to perf orm its saf ety related f unction in response to an LOSP. l ?.4 Dors the proposed change, test, or exportment decreate the margin of

afety cofined by the b ue's for the Technical Speciftcation' Yes No X

i E planation/Jostification: The methodology and structure of this procedure is similar to that of the ESFAS System Tests, 54055-1 and 54065-1. The relative safety of this procedure is the same as that of the ESFAS procedures which are specifically required by Tech Spec 3/4.0.1.1.2.h and FSAR nection 0.3. l

V. ORIGINAL SHEET 4 OF 4 c.5 The propnu d thsnoe. ,t e n t. cr ':: p er i rwrit may i nvol ve an unredcued reafety quention? o No X U n p l an a t i t.n / J u s t i f i c a t i on : Dased on the answers to the above questi ons, thin temporary procedure raises no Unreviewed Saf ety Question. This testing is required to provide information which will identify the cause of DG1A trips during the March 20, 1990 L'JSP event. This knowledge will be used to perform corrective mainternance to ensure that the saf ety related Diesel Generator /Sequenter is prepared to purf orm its safety function as described in FSAR section 8.3, and Tech Spec 3/4.8.1.1.2.h. E v'a l ua t or __ _ _ _ '.. _ _ _,__,___Date_ 2/ g_ _.. _

  1. L_ &

d ____ome_zah,_ smpe_ 1 _,t _ 1 -,_& _ A___om._1um 9 p. v 'ww 4'"P S

) e-octoua t ho~ r,c mion we,t no VEGP 00056-C 9 19 of 19 @[ l kRONMENTALEVALUATIONDETERMINATION Document 1D: [~ d/ '/1 ~ Revision No.: C 1. Could implementation of this document pose adverse environmental effects of any type either directly or indirectly? (Unit 1 and Unit 2 Operating License, Appendix B) Check a or b A' [] a. Possibly. (Explain): (( b. No. The nature of'this document is such that it will not result in a condition which significantly alters the impact of the station on the environment. Evaluator I % /[ d ,,v,-Date $b/[yo Supervisor NN /[1m/ c2 do Date J 3 t / g 2. If an environmental question is posad (item la is checked) the document will not be ap 3 roved tintil evaluated. Forward the package to the Health P1ysics/ Chemistry Department for an environmental review. 3. Attach completed environmental review and return to the evaluator (item 1) for continued processing. I i l l TIGURE 2 m...

f I i T-ENG-90-12 Rov. 0 B-TRAIN UNDERVOLTAGE TEST Expiration Date: April 8, 1990 l U T Forehand NSSS Engineer I 6 Date 2( 20 I Approval d[.k Dept. Mgr. or GMNP as required. /

1 T-ENG-90-12 SHEET 2 OF 16 1.0 PURPOSE / SCOPE The purpose of this procedure is to, in part, prove operability of the D-Train DG. Data collected during this test will be used to determine the root cause of the DG anomalies experienced during the most.recent DG run on March 23, 1990. This test alone is not intended to prove operability of the DG. 2.0 PRECAUTIONS AND LIMITATIONG: 2.1 This tent, once begun, shall be carried through to completion. If the test must be interrupted, then a detailed explanation of the interruption must be entered in the test log, 2.2 Operator assistance shall be obtained to operate equipment as required. 2.3 Procedures 11885-C, "DG Operating Log", 13145-C, " Diesel Generators", and ETP 55038-C, "DQ Start Log" shall be filled out throughout the test. 2.4 Observe all appropriate precautions and limitations in 1 plant operating procedures for equipment operated during the test. 2.5 Power for test equipment shall be taken from verified reliable power sources other than those powered by the train in test. These are detailed in Attachment 1. 2.6 Observe all precautions and limitations for Diesel t l Generator Operation as listed in Procedure 13145-1, " Diesel Generators". l 2.7 Prior to the start of the test, the Responsible Engineer shall review the Prerequisites and Initial Conditions, section 4.0. 2.8 If testing must be suspended due-to equipment i malfunction, unacceptable plant response, or significant l scheduling delays then the Unit Shift Superv.isor (USS) may 7 realign systems as required to support plant operation. If system alignment changes are required, the Responsible Engine 6r shall make appropriate entries in the Test log and ensure performance of applicable prerequisites, initial conditions, I and/or alignments upon test restart. The test log entry should detail the reason and the procedure step number /section. t .r--- + n- .v .,n,,.,.u ,v.,,,,.,

T-ENG-90 '2 SHEET 3 0F 16 2.9 All procedural steps may be signed off by the Responsible Engineer, Unit Shif t Supervisor, or designated individual. 2.10 In the event of a DG trip, chserve the appropriate trip annunciator at the DG engine panel and transfer the thermocouple selector switch, 1TS-19169, to the appropriate position and record the temperature and switch position in the test log. 3.0 MEASUREMENT AND TEST EQUIPMENT: 3.1 One (1) Gould 3000 Series Recorder or equivalent. 4.0 PREREQUISITES OR INITIAL CONDITIONS: 4.1 The following must he completed prior to establishing or verifying testing prerequisites or initial conditions per this procedure. 4.1.1 The Responsible Enginear,has reviewed Section 2.0. / 4.1.2 Open DG MWO's have been reviewed by the DG System Engineer and determ ned HQI to have any negative impact on this i l test. l l / DG System Engineer 4.1.3 Unit 1 is operating in mode 5 or 6. / 4.1.4 The Unit Shift Supervisor has reviewed the applicable test section(s) and given permission for performance of prerequisites and initial conditions. /_, l 4 1.5 Shutdown loads are supported by Train A and electrical requirements are met by Train A. /

- - ~ T-ENG-90-12 SHEET 4 OF 16 4.2 The following Train D systems are functional and lined up, as required to support this test, per the following; 4.L.1 11405-1, "125V DC 1E Electrical Distribution System Alignment For Startup and Normal Operation" / ~ 4.2.2 11427-1, "4160V AC 1E Electrical Distribution System Alignment For Startup and Normal Operation" 4..'

11429al, "480V AC 1E Electrical Distribution System Aaq, ment For Startup and Normal Operation"

/-- 1.2.( 11431-1, "120V AC 1E Vital Instrument Distribution Oy:a,em Normal Alignment" / 4.2.5 11145-1, and 13145-1 " Diesel Generator Alignment for l Startup and Normal Operation" & " Diesel Generators". /_. 4.2.6 Train "B" NSCW is aligned as required and in operation per Procedure 13150-1, " Nuclear Service Cooling Water Systen". l (Pumps 2 &4 in service) l / 4.2.7 Train "B" CCW is aligned as required and in operation per l Procedure 13715-1, " Component Cooling Water System". (Pumps 2 &4 l in service) / 4.2.8 Train B Containment Cooling Fans are aligned in standby per Procedure 13120-1, " Containment Building Cooling System". /

~ T-ENG-90-12 SHEET 5 OF 16 4.3 Ensure RHR "t," letdown is in service if needed. / 4.4 Ensure "A" Charging is in service, if needed. / 4.5 No other testing or maintenance activitjes are being performed on the Deactor Trip System of the ESF Actuation System which will, or has significant potential to, cause signal inputs tc Train B Solid State Protection System. / 4.6 Train B Safety Fehtures Sequencer Subsystem (SFSS) is operational as indicated by no Main Control Room klarms annunciated. / 4.7 Train B Solid State Protection System Input Error Inhibit Switch is in the " INHIBIT" position, and the Mode Selector Switch is in " TEST". -l 4.8 Notify Chemistry that PERMS may be affected during the actuation. / 4.9 Sufficient support personnel ~are available to perform / monitor / document performence of the test and have been l briefed on test sequence and individual scope of responsibility. All involved personnel have synchronized their personal watches with the Control Roon clock. Communications have been established as follows: QHVC: One QEAB: One on Headset SNGR 1BA03: One on Headset (Signal Initiator) l Sequencer Panel: One on Headset QMCB: One on Headset j BOP Board:- One DG1B: One on Headset, Four for data recording / l t

I j T-ENG-90-12 SHEET 6 OF 16 i ( 4.10 Ensure the PROTEUS computer is powered from MCC 1NBS instead of the maintenance power supply 1NBR. / l 4.11 It is not desirable te havo the following components operating during this test.- At the discretion of the Shift Supervisor the following components are to be locked out from auto energization if doing so will not negatively impact the plant: SIP-B, CCP-B, ACCWP-B, MDAFWP-B, CEP-B. / 4.12 A designated individua2 is prepared to acoustically monitor the outlet of the jacket water Hx for any anomalies. Note any anomalies in the test log. / 4.13 Prior to DG start position the thermocouple selector switch 1TS-19169 to position "J W OUT". / 4.14 Inntall test equipment in accordance with Attachment 1. / 4.15 Preparations have been made to record D/G parametera and annunciators through the use of video cameras per the NOTE just prior to step 5.5. / l 1

] T-ENG-90-12 SHEET 7 OF 16 5.0 TEST SECTIOll: DIESEL GENERATOR START ON LOSS OF OFFSITE POWER 5.1 The Responsible Engineer has verified all required Prerequisites and Initial Conditions per section 4.0, completed and satisfactory for test start, 5.2 Protest briefing completed and all personnel on station for test support. / 5.3 Obtain Unit Shift Supervisor authorization to perform test. __/ - /__ TIME DATE UNIT SHIFT SUPV. 5.4 If the Diesel Generator engine cylinder have not been checked for moisture within the last four hours refer to Procedure 13145-1, "Dilsel Generators" and COMPLETE " Cylinder Moisture Check". t / l NOTE PREPARATIONS MUST BE MADE TO RECORD D/G PARAMETERS AND ANNUNCIATORS AS THEY ALARM AND RESET. THE USE OF TWO OR MORE VIDEO CAMERAS AT THE 0/G PANELS AND THE SOUTH END OF THE ENGINE IS REQUIRED. NOTES FROM THESE RECORDINGS MUST BE ATTACllED TO THIS PROCEDURE UPON COMPLETION. 5.5 Alert personnel in the plant that. a Train B LOSP, and Diesel Generator start is commencing. i .-] 5.6 Verify the Diesel Data Recorder is in Standby Readiness. ---./

T-ENG-90-12 SHEET 8 OF 16 5.7 Initiate data recording on the Data Sheet. / 5.7.1 Record the ambient room temperature. .F' /_ 5.7.2 Record both air receivers' pressures prior to DG start. 1PI-9065 PSIG 1PI-9061 PSIG / 5.8 Open the turbo lube oil orifice bypass valve, 1-2403-U4-131, one to two minutes before starting the Diesel Generator. J 5.9 In the Train B Diesel Generator room start the Diesel Data Recorder with a speed of 10 mm/second, immediately prior to Diesel start per performance of Step 5.10. l / 5.10 At 1BA0300 initiate a UV signal by simultaneously l pressing the test pushbuttons PS-1 and PB-2 for about 2 seconds and verify that 1BA0301 trips. Immediately release the pushbuttons. / l 5.11 Close T/C Lube oil valve 1-2403-U4-131 immediately after Diesel Generator start. i l / 5.12 Record both air receivers' pressures about 1 minute after DG start. 1PI-9065 PSIG 1PI-9061 -PSIG /

= T,ENG-90-12 SHEET 9 OF 16 5.13 Verify the following components are load shed and auto energized as appropriate: MPL/ LOAD SHED AUTO COMPONENT SATISFACTORY ENERGIZATION SATISFACTORY (2) 1-1202-P4-002 / / NSCWP 2 (2) 1-1202-P4-004 / / NSCWP 4 (3) 1-1203-P4-002 / / CCWP 2 (4) 1-1203-P4-004 / / CCWP 4 (5) 1-1501-A7-003 N/A / CCU (HS) (6) 1-1501-A7-004 N/A / CCU (HS) (7) 1-1501-A7-007 N/A / CCU (HS) (8) 1-1501-A7-008 N/A / CCU (HS) i 5.14 About 1 minute after DG start decrease the Diesel Data l recorder chart speed to 5 mm/second and mark the chart with this speed change. _/ 5.15 Stop the Diesel after > 15 minutes. of run time and l request the SS to realign, per the appropriate procedures, all equipment which has been cycled during this test to support the l plant conditions at the completion of this section. / l

V t T-ENG-90-12 SHFET 10 OF 16 5.16 Verify the following and attach charts to procedures: a. Diesel starts on the auto start signal ( LOSP) and energizes emergency bua 1BA03, with permanently connected loads (diesel output breaker 1BA0319 closure) within 11.5 secondt. s e c.<, 11.5 sec _.Actual time T.S. Max / b. Diesel operates for greater than, or equal to, 5 minutes while its generator is loaded with the shutdown loads, min 2 5 min Actual time T.S. Min / c. After energization the steady state voltage and frequency of the emergency busses remain within the limits below for the duration of the test. 3750 volts s volts $ 4330 Volts T.S. Min Actual T.S. Max / __ 58.8 Hz < Hz $ 61.2 Hz T.S. Min Actual T.S. Max / 5.17 Advise the Shift Supervisor cf the test results. / l )

LT l T-ENG-90-12 SHEET 11 OF 16 6.0 RESTORATION l T.1 Remove Test Equipment and perform IVOR per Attachment 1. 1 6.2 Remove all video cameras. l / IVOR 7.0 ACCEPTANCE CRITERIA 7.1 All steps have been completed satisfactorily. l i l t i l l

. ~. -... -. - - - -.... -.... ~. -.. - - _ - - T-ENG-90-12 SHEET 12 OF 16 1 DG1B INSTRUMENT DATA SHEET 1-TI-19138 1-TI-19139 1-TI-19141 1-TI-19140 TIME JW HX IN JW HX OUT UW NSCW IN JW NSCW OUT MINUTES / DEG F. DEG F. DOG F. DEG F. SECONDS 0

30 1:00 1:30

._2:00 2:30 3:00 3:30 4: Q(a 4:30 5:00 j l 6:00 7 : 0.2 8 : O_Q. 9:00 l 10:00 l= l 11:00 12:00 l 13:00 14 00 1 15:00 16:00 ., _. ~. -.. _..

-. ~.. T-ENG-90-12 SUEET 1.3 OF 16 DG1A INSTRUMENT DATA SHEET 1-TI-19143 1-TI-19142 1-TI-19156 1-TI-19155 JW IN TO JW OUT OF LO IN TO LO OUT OF TIME LO COOLER LO COOLER LO COOLER LO COOLER. MINUTES /- DEG F. DEG F. DEG F. DEG F. SECONDS 4

30 1:00 1:30 2:00' 2:30 3:00 3 : 3_Q

_4 00 4:30 5:00 6:00 7:00 I 8:00 9:00 10:00 11:00 12:00 13:00, i l 14:00 15:00 16:00

k T-ENG-90-12 SHEET 14 OF 16 l ATTACHMENT 1 l DIESEL DATA RECORDER CHANNEL DESCRIPTIONS I (See notes 2 and 4) t RCRDR TEST 3IGNAL RANGE CHANNEL COMPONENT PARAMETBR SCALING 1. Tach Relay DG Speed 1-5 VDC 0-600 RPM j 2. DG Frequency DG1B Voltage 0-120 VAC Meter 0-4200 VAC (See acte 1) 3. LOSP Signal LOSP S!gnal Contact to DG1B Closure 4-DG Load DG1B Load 1-5 VDC 0-10,500 KW 5. DG Frequency DG1B 55-65 Hz Meter Frequency (FREQ MODULE) l 6. PG1B Breaker Contact Output Brkr Position Closure 7. DG1B Remote DG1B Remote Contact Gtop Signals Stup signals closure 8. DG1B Emergency DG1B Emerg. Contact Stop Signal Stop Signal Closure t l l MEASUREMENT AND TEET EQUIPMENT M&TE VP-# CAL DUE INITIAL /DATE VP- / / / l VP- / / / VP- / / /- VP- / / / 1 l 1 ~...

^! T-ENG-90-12 SHEET 15 OF 16 ATTACHMENT 1 DIESEL DATA RECORDER INSTALLATION / REMOVAL COMPONENT RECORDER COMPONENT PT. INSTALLED REMOVED REMOVAL CHANNEL REF DWG ,INIT/DATE INIT/DATE INIT/DAfE 1. TACH RELAY (NOTE 3) TERM 7(+),8(-) 1BCPDG4 1X4AK01-462 AX4AK03-563 / / / 2. DG FREQ METER (VOLTS) TERM 3,5 1BCPDG3 1X4AK01-445 / / / 3. LOLP SIGNAL TBE 52(-), 54(+) 13CPDG4 1X4AK01-46 /, / / 4. DG1B LOAD (NOTE 5) c TB, SECT 2 7th PT FROM TOP LEFT LABELED AS 5 l 1BCPDG3 1X4AK01-448 / / / 5. DG FREQ METER TERM 3,5 1BCPDG3 1X4AK01-445 /_ / / (USE FREQ MODULI) 6. DG OUTPUT BRKR TBL 4 (-), 41(+) 1BCPDG4 1X4AK01-47 / / / 7. DG REMOTE STOP SIGNALS (NOTE 6) TERM 221(+),224(-) 1BCPD63 1X4AK01-47 / . _] / 8. DG EMERGENCY STOP SIGNAL (NOTE 6) TERM 194(-),195(+) l'BCPDG3-i 1X4AK01-47 / / / ...m

y v -- 4 T-ENG-90-12 SHEET 16 OF 16 ATTACHMENT 1 NOTES Note 1: Set scale deflection for 3750-5250 VAC Note 2: Label the chart. recording with M&TE number, test number, date, time, chart speed, channel number, channel scaling, and Technician initial and date. Note 3: Requires installation of a precision 250 ohm resistor across terminals 7 and 8. Removal of 50 ohm resistor will be required, if installed. Note 4: The power supply for the DG Data Recorders is to be from level 2 in the DG Bldg to avoid losing power. Note 5: Requires installation of a precision 250 ohm resistor across the sliding link of terminal 7. Recorder negative to be connected on internal side of terminal block, recorder positive to external side of terminal block. Open link after installation of the resistor. Note 6: Signal range is 0-125 VDC. O VDC equals trip signal l present or centact closed. 125 VDC equals trip signal HOT 1 present or contact open. l l l

=. PAOCEDURE NO REVISION DAGE NO VEGP 00053-C 3 12 of 13 O E cM-7D TEMPORARY PROCEDURE APPROVAL FORM t TEMPORARY PROCEDURE NUMBER I-EA/G - 90 A.3 UNIT / l TITLE S e e u e.nc.c. r-Owub.hM CJter K REV o ONE TIME USE ONLY: YES^ X NO: IF NO, TERMINATION DATE bhi 6 IT

  • P""J"

'I t'**~ b h'Ed* Ed*1 h " d PURPOSE: Ehc un, F O n <_ Tm A E L o m m.- Paad 23 .e6 O g PRB REVIEW REQUIRED: ')C YES NO b ORIGINATED BY D.14/ N/Nc4,b f / J 2"f 6'ON-SITE,f_ 0FFSITE J }~ ~ DATE l COGNIZANT SUPERVISOR.N d af DATE Jhs ?o DEPARTMENT MANAGER / SUPT a DATE 3-26-io l PRB REVIEW (if required) MEETING NO. 90-92. DATE '3/2(/?o -O Ln RECOMMEND: ( W APPROVAL ( ) DISAPPROVAL - Return to responstble department Mgr./ Supt. UNREVIEWED SAFETY QUESTION INVOLVED: YES ( ) NO (W PRB CHAIRMAN 7d.Y. M l GENERAL MANAGER - NUCLEAR PLANT (if required) 1 l DISPOSITION: ( ) APPROVED ( ) REJECTION REASON FOR REJECTION: L Me % ha GENERAL MANAGER ' NUCLEAR PLANT / DATE FIGURE 2 jfLp pS66'fbb-Sa

7 1 l VEOP 000056-C Rev 9 Page 1 of 2 Page 17 of 19 DCi LRMINM 10N OF NEED FOR SAFETV EVALUATION SHEET 1 OF Docuwnt ID No. T-ENG-90-13 Rev. 0 SECflUN l.0 1.1 Descr i pti on of proposed change, test, or experimont This procedure will test the undervoltage and safety injection functions of the Train D Sequencer panol. The Sequencer Manual Test Panel will be useo to inject a Test U/V and a Test SI signal to the sequencer l ogi c. The Manual Test Panel is designed to allow periodic manual testing of the Sequencer logic without actuating the sequence step output relays. 1.2 Reason for proposed change, test, or e.x per i ment : This procedure is being performed as an operability check for the Train B Sequencer. 1.3 Loes the proposed change involve a change to Technical Specifications? Yes No X Explanation: This procedure will not actuate the sequence step output relays of the sequencer panel. Tech. Spec. sections 3/4.3.2 and 4.8.1.1.2.h do not address testing of the sequencer logic only. These sections only I address sequencer actions requiring sequencer output l rel ay actuatione. 1.4 Does the proposed change involvo a change in the facility as described in the FSAR? Yes No X Explanations This procedcre doeF not involve a change in the facility as described in FGAR sections 8.3.1.1.2.H or 8.3.1.1.3.F. The Sequencer is designed to allow testing of the sequencer logic f rom the Manual Test Panel without operating the sequence step output relays. 1.5 Does the proposed change involve a change in procedur en ms described in the FSAR7 Yes No X l Explanation: This procedure does not involve a change in procedures as described in Section 8.3.1.1.3.H.3 or Chapter 13 of the FSAR.

9 P Page 2 of 2 1.6 Does the proposed change i nvol vo e tent or experiment not d e.;c e i b e) i ri the FSAR7 Yes No X L p1 ariat i on. This procedure does not involve a test or experiment not described in the FEAR. The Sequencer is designed to allow logic testing f rom the Manual Test Panel. Periormance of thia procedure wi11 not affett the normal operation of the Sequencer because an actual SI or U/V signal will override the tett function of the

panel, Eva1u-* tor 2(7

.__...Date }_:.di nf/>___ iN p e r v i e or.._.'.. /(df.__ O p . __Date _ J.E5 Ty,,._ _ _. g If the propo ed chang inv. vas a design modif cation (DCP, Temp Mod, Minor Depar ure [ rom )esign (MDD), Section 2.0 must be completed. l l l l 1 l l i l I 4 e c ,e-, y -es-

(l PAoCEDURE No. MEVISloN PAGE No VEGP 00056-C 9 19 c f 19 ( ENViit0NMENTAL EVALUATION DETERMINATION Document ID: 7 - EA/G - 6c - /.3 l Revision No.: 0 1. Could implementation of this document pose adverse environmental effects of any type either directly or indirectly? (Unit 1 and Unit 2 Operating License, Appendix B) Check a or b [] a. Possibly. (Explain): M b. No. The nature of this document is such that it will not result in a condition which significantly alters the impact of the station on the environment. Evaluator d% jfhk,b Date 3 - 2S-9s Supervisor h/ /b DateJ[25/9o f4 ta 2. If an environmental question is pq ed (item la is checked) the document will not be ap? roved until evaluated. Forward the package to the Health Paysics/ Chemistry Department for an environmental review. 3. Attach completed environmental review and return to the evaluator (item 1) for continued processing. FIGURE 2 ?G88 -^'

. ~ - 11 L 1 t i! T-2HG-90-13 Rev 0 SEQUENCER OPERABILITY CHECK D.W. HINES Expiration Dater April 6, 199C I S l l.- l l-

T-ENG-90-13 PAGE 2 OF 7

1.0 PURPOSE

This procedure will test the safety related functions of the Unit One Train B Sequencer Panel. The Sequencer Test Panel is used to inject test signals into the' Sequencer. 2.0 PRECAUTIONS AND LIMITATIONS: 2.1 This test, once begun, shall be carried through to completion. If the test must be interrupted, then a detailed explanation of the interruption must ce entered into the log. 2.2 Operator assistance should be obtained to operate equipment as required. 2.3 Observe all appropria,te precautions and limitations in the plant operating procedures for the Sequencer during this test. l 2.4 Prior to the start of the test, the Responsible Engineer shall review the i Prerequisites and Initial Conditions, Section 4.0. 2.5 All procedural steps may be signed off by the . Responsible Engineer, Shift Supervisor, or i designated _ individual. 2.6 Do not perform this test with the DG1B operating in PARALLEL Mode. This procedure will force the Diesel Generator into UNIT Mode. 2.7 Section Sol and 5.2 are independent of each other and may be performed in any order. 2.8 Performing this test does not make the Sequencer In-operable. 2.9 All switches and lights are located on the Unit One Train B Sequencer Test Panel unless otherwise stated. 3.0 MEASUREMENT AND TEST EQUIPMENT NONE

T-ENG-90-13 PAGE 3 OF 7 4.0 PREREQUISITES OR INITIAL CONDITIONS: 4.1 The Responsible Engineer has reviewed Section 2.0 / 4.2 The Unit One Train B Sequencer is in normal operating mode. /. 4.3 The IBA03 Swgr is aligned as required to support this test. / 4.4 Place DG1B into " LOCAL / MAINTINANCE" mode. / 4.5 Place DG1B Output Brkt, HS-1BA0319, into PTL. / 4.6 Establish communications, using sound powered phones, from the Unit une Train B Sequencer panel to the control room. l / __, 4.7 The Unit One Shift Supervisor has given permission to perform this test. / / SS Signature Date Time 5.0 TEST PECTION 5.1 U/V Operational Check 5.1.1 Place the TEST MODE SWITCH into the "SYS" position and verify that the SYS light is flashing. /--

.. -. _ _ _ _ _. _ _... _ _ _. _ _ _ _ ~. _... __.~. _.. _ _. _ _.. _ . _ _ _.. _ ~.-. _. _ _. 1 . ) I l T-ENG-90-13 PAGE 4 OF 7 i 5.1.2 Push the TEST MANUAL pushbu.on and ensure the pushbutton illuminates. This places the sequencer in the system test mode. l 1 1 5.1.3 ENSURE the OUTPUT RELAYS BLOCKED red indicator is illuminated.- / 5.1.4 Push the TEST DLOCK-D-G ENGINE pushbutton and ensure the pushbutton illuminates, / Notes Step's 5.1.6, and 5.1.7 will occur for a short time and clear after performing step 5.1.5. l 5.1.5 Push the Test U/V pushbutton and verify l it ja illuminated. / 5.1.6 Verify the U/V SIGNAL red indicator illuminates for approximately 0.2 seconds. / 5.1.7 Verify the U/V. RELAY ACTUATED red indicator illuminates for approximately 0.2 seconds. / Note Steps 5.1.8 through.5.1.11 will initiate'at the same-time and last for approximately 30 seconds. 5.1.8 Push the TEST D-G BRKR CLOSE pushbutton and verify that it illuminates. / F n m e 's-se r-r te we.-w,-e-< w - c e.=c<E -r -mm


,e n--s

+r w-w- e.- a y.m .m..-----=x%+ + -r+.-*

T-ENG-90-13 PAGE 5 OF 7 5.1.9 Verify the D-0 BRKR CLOSE indicator illuminates l 5.1.10 Verify the Elapsed Time Meter is running. / 5.1.11 Verify the SEQ STEPS INDICATION lamps do NOT illuminate. / 5.1.12 The Sequencer autouatically resets to normal operating conditions at the completion of this U/V test. / 5.1.13 Push the following alarm reset switches. SAF EQPT FAIL TO START UNDERVOLTAGE SEQ LOGIC FAILURE / 5.1.14 Place the TEST MODE SWITCH into the " SEQ" position and verify the SEQ light i l is illuminated. l / l Section 5.1 Complete / sign date 5.2 SI Operational Test 5.2.1 Place the TEST MODE SWITCII into the "BYS" position and verify that the SYS light is flashing. /

.~ 1 - T-ENG-90-13 PAGE 6 OF 7 5.2.2 Push the TEST MANUAL pushbutton and-cnsure the pushbutton illuminaten. This places the sequencer in the system test mode. / 5.2.3 ENSURE the OUTPUT RELAYS BLOCKED red indicator is illuminated. / 5.2.4 Push the TEST BLOCK D-G ENGINE pushbutton and ensure the pushbutton illuminates. / 5.2.5 Push the TEST SI pushbutton and verify it is illuminated, ~ i / 5.2.6 Verify the SI MAIN RELAYS ACTUATED red indicator illuminates ON for approximately 0.2 seconds. / 5.2.7 Verify the SI NOM RELAY ACTUATED red L indicator illuminates for approximately l 0.2 seconds l [ l' 5.2.8 Verify the 8I SIGNAL red indicator l illuminates-for:approximately10.2--; l seconds. l l / l 5.2.9 Verify the Elapsed Time Meter is-running. The timer will run for-approximately 30= seconds. / ,swev er-p -+-*. w w-- ..e, 2.,., ,.e-.-s--ogy--rn e w,, y w w w-+,ww g y +-gyte-r yvy-g y-g -weey,+t*-*

o T-ENG-90-13 PAGE 7 OF 7 5.2.10 The SEQ STEPS INDICATION lamps do NOT illuminate. -- / 5.2.11 The Sequ'encer automatically resets to normal operating conditions at the completion of this SI test. / 5.2.12 Push the following alarm reset switches. SAF EQPT FAIL TO START UNDERVOLTAGE SEQ LOGIC FAILURE / 5.2.13 Place the TEST MODE SWITCH into the " SEQ" position and verify the SEQ light is illuminated. / Section 5.2 Complete / sign date 6.0 RESTORATION 6.1 Verify the following lights are not illuminated TEST MANUAL pushbut, ton OUTPUT RELAYS BLOCKED TEST BLOCK D-G ENGINE TEST U/V pushbutton TEST D-G BRKR CLOSE TEST SI / 7.0 ACCEPTANCE CRITERIA 7.1 All steps.have been completed satisfactorily. / g

~ PROC / REY. NO. 'G E A>4 13 T0: M LO Nty rfut, PRB COPNENT REVIEW SHEET Page cf i THRU: D/ er PRB 90 V2-Date M2@ / The PRB. has reviewed the attached procedtre and recomends approval with coments as noted below. Mandatory (M) coments shall be incorporated prior to approval of the procedure. If not incorporated the procedure shall be resubmitted to the board. You have the responsibility to determine whether the Optional (0) coments should be included at this time, savec for later inclusfoa, or otherwise resolved. This procedure does not constitute an unreviewed safety question. No. Scction M/0 PRB Initials Coments Resolutions

  • %'f,:

At Jes Jnck h 25'stwsh) Apcc<h ce& Ai+s n_u t % Lose a La ek //u;L/s es2rcfec/ 4 he n/ 1 ofiC (a/xx i -> c /?sj pc1/$< nut,, ce ad i -cLu, sA' esd of Cs+') \\ 2-

4. 3 M

3ES h/ud "as vraw n d ' for S & up e4 \\ 1Bho3 \\ 3 V.O 14 GES lhE Dw-waaid}c & for diesc{ w \\ \\ rLo-enM'& r>-o de ( bre a k u-Ln pa//- \\n n -/z> - /o c4, TOGlfo y 9% a - 14Mtl Add L2 mbL cx Cn k w sko M a U :cleos 'Aa-se W c-o w(14d 56hs(1 5 4 " I =i S ';!" tw 3GA Alacl h wcLak broLdw r, v& l a oF FML l 0 z.s M 35A t?wxed Jf M-tu h uf wned l lf -+Lrir>uzL +o cmoLehw e#MbM wcu bL~'p&ud cl W /a-{- T 5.1.1I M 37&A CLdd " Wri hi l-C 4

    • M " + o e
r.2 % n rc,a

~ed" Changes to this procedure other than those addressing the board's coments will require resubmittal to the board. Upon resolution of the above coments, the procedure-should be forwarded to the General Manager for approval. Upon approval the procedure should be returned to the PRB Secretary for further processing. l Attachment PR8 Chairman M I

WY exoceouxe no nevision noe no VEGP 00053-C 3 12 of 13 6. TEMPORARY PROCEDURE APPROVAL PORM O ~d~ TEMPORARY PROCEDURE NUMBER T-EN6 - YO / V UNIT C 00 E TITLE U"*f C^da'n 8 D/_.F EO YlTVDO70.SES/1FNUR PmJCIECNhh REV O ONE TIME USE ONLY: YES K NO: IF NO, TERMINATION DATE M'RIL 2C /'70

  • D ^ P" "A"'

1"I f ** " h ' '~k""" "'"A' PURPOSE: Om.bCn Ein B.5<oue,ica-bra DC PRR - Y/ n;CC Z7 % 9e C.) g', PRB REVIEW REQUIRED: 1 YES NO ORIGINATED BY Du lhht h L /3/23/10 ON-SITE X OFFSITE f.] v/ DATE. COGNI2 ANT SUPERVISOR ta DATE 3 ~id DEPARTMENT MANAGER / SUPT. / M h1 DATE 3-O~fd D*.* 3 PRB REVIEW (if required) MEETING NO. 90M DATE 3/2 7/90 i Cr RECOMMEND: ( ( APPROVAL ( ) DISAPPROVAL - Return to responsible department Mgr./ Supt. UNREVIEWED SAFETY QUESTION INVOLVED: YES ( ) NO (4 PRB CHAIRMAN @ ~7 GENERAL MANAGER - NUCLEAR PLANT (if required) DISPOSITION: ([ APPROVED ( ) REJECTION ' EASON FOR REJECTION: 1 / bud Wnho GENERAL MANAGER - NUCLEAR PLANT DATE / (s FIGURE 2 (Example) lV Q {_s

b 4 L YEGP 000056-C Rev 9 Pege 17 of 19 DETERMINA'iION CF NEED FOR SAFETY EVALUATION SHEET 1 OF 2 Document ID No. T-ENG-90-14 Rev. 0 SECTION 1.0 1.1 Description of proposed change, test, or experiment: This procedure will functionally test the U/V RESET SWITCH, the remote U/V reset relay (K311), the D-G Brkr Fail To Close relay (K317), and the U/V Roset-Enable relay (K306). The Train B 4160V Switchgear will be de-energized and the D-G oatput breaker wiki be locked out during the performance of this procedure. The Train B Sequencer will receive a U/V signal and will operate the sequencer output rel ays. 'This test will prove that the Sequencer can be manually reset by the U/V RESET SWITCH or relay K311 if the D-G output breaker does not close. It will also prove that the Sequencer cannot be reset by the U/V RESET SWITCH or relay K311 while the D-G output breaker is closed and the Sequencer is cycling. 1.2 Reason for proposed change, tast, or experi mo 's This procedure is being performed as a functional test for modifications made by DCP 88-V1N0070.

1. 3 Does the proposed change involve.a chGnge to Technical Specifications?

Yes No X E:< p i an at i on s This is a functional test of modifications made in the reset icgic of the Sequencer'and does not require a change to the Technical Specifications. Tech. Spec. sections 3/4.3.2 and 4.0.1.1.2.h do not address l testing of the sequencer with a de-energized buss. l 1.4 Does the propoued change involve a change in the facility as described in the FSAR? Yes No X l l Explanations This procedure does not involve a change in -the facility as described in FSAR sections 8.3.1.1.2.H or 8.3.1.1.3.F. The Sequencer is not discussed in this l evel of detail in the FSAR. l

UILE f of 1. '.4 1)ot-t:

1. n 4 3 pro 00 sed ;tuuigt 4os0 1 v t; t t i tu i q u a ti p r ut ( d ur e r, e

v. do, : r i tu d i -i t h ts i 1: (4H ' Y u t. IJo X L :pl oru t.3 on: This proce' dure does not involve a change in procedures as described i n Sec tion G. 3.1.1. 3.H. 3 or Chepter 13 of the FSAR. lo c. Don Lt o prope.md t h e n,J u i nvni m a teut or r periment ,ot dour) bed in the fS/4R? Y e '.s I J L' X I pl etnstj o m This procedure does not involve e4 test or experimen* not dusct-ibed in the FSAR. Thi s procedure will cycle the Sequencer as in tests outlinco in FSAR Sections 0.T.1.1.3.H.3.a and b except thi n tnSt will not operato any major plant equipment due to buss 1BAB3 btai nq die-ener gi z ed. I L,.)uator_ # ' fj,h 444, Data, f,*[2*_fQ,_ .oper v i so, _ kk y.__. _..trate_.. M ?.80 1i tt e or opom d c h a n ry-involvwn a der.1gn mod)iicetion (DCP, I #1mp Mod, Minor Departurn irom Deci.1 yn (MOD), Gottion 2.O mutt t,e comptM ed. a 4 I i l D

EoCEDUAENo Lg yssioN W Ao r. No w VEGP 00056 C 9 19 c f 19 ENVIRONMENTAL EVALUATION DETERMINATION Document ID: T 4 4 ' < -- 'N /t/ Revision No.: o p 1. Could implementation of this document pose adverse environmental effects of any type either directly or indirectly? (Unit 1 and Unit 2 Operating License, Appendix 'p B) Check a or b () a. Possibly. (Explain): 4 pl b. No. The nature of this document is such that it will I not result in a condition which significantly altero the impact of the station on the environment. Evaluator 7M44 / /)2 [. Date ik // 4 U Date bd '/d Supervisor 2. If an environmental question is posed (item la is checked) + the document will not be aproved until evaluated. Forward the package to the Herith hysics/ Chemistry Department for an environmental review. l l 3. Attach completed environmental review and return to the evaluator (item 1) for continued processing. l l l (. FIGURF. 2 1 ?l)4 1 _,m

_ _. _ _ _. _... _. _ _ _ _ _, _ ~. _.. _. _, _ _. _. _.. ~.. _.. _ _.. -. _. _ _. _.. _ _ _. e. v s.a a mn o es* 4 ) } . j O \\ 1 T-RNG-90-14 Rev 0 UNIT ONE TRAIN 3 DCP 80-Y1M0070 SBQDENCER_ FUNCTIONAL TEST n w. arwRs ,a a: Expiration Date April 20, 1990 0 MM-Cl 3 R710 oat.: Approval: o f b M -) .) C

q a

z y a A O I 3 jy Q {u.;. = =.. m =M

.
..... a +
=

x e.d O .J 3 ,.,a n.Lw) / T h !96

4. 't ' T-ENG-90-14 Pt"4 2 OF 9 1.0 PURPOSE 1 This procedure will test the U/V RESET SWITCH and the remote U/V reset relay (K311) installed in Unit one Train B Sequencer. A Sequencer operability check alcng with this proceduro will complete the functional test requirenants of DCP BO-VlH0070 for Train B. The DG Drkr Foil To Close relay (K317) and the U/V Roset Enable relay (K306) will also be tested in th!s procedure. 2.0 PRECAbTIONS AND LIMITATIONS: 2.1 This test, once begun, shall be carried through to completion. If the test must be interrupted, then a detailed explanation of the interruption must be entered into the log. 2.2 Operator assistance should be obtained to opurate equipment as required. () 2.3 observe all appropriate precautions and limitations in the plant operating provedures for the equipment operated during 3his test. 2.4 Prior to the start of the test, the Responsible l Engineer shall review the Proroquisites and i Initial Conditions, Section 4.0. 2.5 All procedural steps may be signed off by the Responsible Engineer, Shift Supervisor, or designated individual. 2.6 All switches and lights are located on the Unit l One Train B Sequencer Test Panel unless otherwise i stated. 2.7 Train A 4160Vac (IAA02) is meeting the electrical needs of Unit one. Train B 4160Vac (lBA03) switchgear will be de-energized during this l procedura. l l 2.8 Alaros generated during performance of this procedure may be reset at t'ne discretion of the Responsible Engineer. 2.9 Relay K311 may be removed to connect and O(s) disconnect the temporary power supply.

4 () T-ENG-90-14 PAGE 3 OF 9 3eO MEASUREMENT AND TEST EQUIPMENT 3.1 Volt-ohn mater,Simpson model 260 or equivalent, for monitoring a K317 spare normally open contact. This motor will check the operation of K317 relay and will be referred to as relay K317 in this procedure. 3.2 Volt-ohm veter,Simpson model A60 or equivalent, for monitoring a K306 spara normally open contact. This meter will check the operation of K306 relay and will be referred to as relay K306 in this procedure. 3.3 Stop Watch. The stop watch will be used to check the approximate time of relay and light operation. 3.4 A 48vde power nupply to operate thu remote U/V reset relay K306. 3.5 A switched jumper that will be used to simulata DG1B breaker (1BA0319) la closed. 4.0 PREREQUISITED OR INITIAL CONDIT10NSt 4.1 The Mesponsible Engineer hau reviewed Section 2.0 bt.> lf /_3 / Afl90 4.2 The Unit one Train B Sequencer is in normal operating mode. hcJ R / 3/tdh 4.3 The Diesel Generator output Brkr, 1BA0319, in open. t'h IF /7/4T/90 4.4 Establish commuttications, using sound povered phones, from the Vnit one Train B Sequencer panel to the control room. 4 Oa W / 3/12 {9 o . O

l O T-ENG-90-14 PAGE 4 OF 9 4.5 The Unit Or*

  • ift Supervisor han given permission to perforn thiv ~ ~ ' es t.

\\ e3 .J ~Idd / 4 E. JS gnatur%m. "'g Date Time 5.0 TEST SECTION 5.1 Initial Setup 5.1.1 Connect a VOM across a spare normally open contact, 8 and 9, of relay K317. T3cJ (4 / '2l2??,l90 5.1.2 connect a VOH across a spare normally open contact, 4 and 5, of relay K306. rtoi / 3pr/o o_ 5.1.1 Set the DC voltage supply for approximately 48Vdc. 1% I4- /h C D _ 5.1.4 Connect a 48Vdc supply, supply turned off, across the coil, 6 and 7, of relay K311. D C lN / 5 90 Section 5.1 Complete / b / 3/4 2C 'Elgd " date 5.2 SEQUENCyR TEST - U/V RESET WITH DE-ENERGIZED BUSS .M;D DIESEL GENERATOR 1B NOT RUNNING 5.2.1 Place DG1B OUTPUT BRKR (HS-1BA0319 at QEAB).into PTL. W-l+ / 2l2 QlG 0 5.2.2 Place the DG1B in the 14 CAL MAINTENANCE mode. (k OD b f 3 fd W O ~

O T-ENG-90-14 PAGE 5 OF 9 I

WOTE: ~ THE FOLLOWING STEP l WILL DE-ENERGIRE BUSS 13A03. t 5.2.3 open the PREF NORM INCM BRKR (1BA0301) { a / '3,b E',/90 DMIA w 5.2.4 Wait 60 seconds-for time-delay relays to l operate. DwW / Y,7 V)$c f 5.2.5 Using the toggle switch located on the card in slot-A4-2, reset the "3 UV in 2 hours" card. l Cae of the lights on this card sheuld l illuminate after reset. k ree.L<A.4 m.d n.r a / / t.nnu mwL~- na l$ /d e h G..-wulv s ed, % tc t) q.;,, u a ur, nu,.,u3_")27 f C ,,,,m % uheW*'*

  • V N "'

5.2.6 verify relays K317 and K366 are energized. O Dw W i 2h ghD__ 5.2.7 Verify the UV RESCT SWITCH is illuminated. o w 1+ i3/uW10 NOTE 1 Step 5.2.11 will occur approximately. 15 seconds after stop 5.2.8 is performed. Start the stopwatch at step 5.2.8 5.2.8 Depress the UV RESET SNITCH.-- __'h eJ W ^ / 3 f1% k'O t 5.2.9---Verify relays K317 and'K306-de-gnergize. s D u lN / M$O l 5.2.10 Verify the UV RESET SWITCH =is-not-illuminated; D t - N- /$2Yfo L t,, _-.--...,-,-,,..--c..-.-....-.-.-,_.-..-,_,

t j s i j 1 T-ENG-90-14 PAGE 6 OF 9 a 5.2.11 Verify relay K317 energizes approximately 15 seconds after the UV RESET SWITCH was depressed. hru /1 / 7 /*1.1N, d 5.2.12 Verify relay K306 energizes and the UV RESET-I SWITCH illuminates approximately 60 seconds after the UV RESET SWITCH was depressed. i Ote lN / Y, 2 W I NOTE Step 5.2.16 will occur approximately i 15 seconds after stop 5.2.13 is i performed. Start the stopwatch at step 5.2.13. 5.2.13 Momentarily energize relay K311. U " I; _, /.EbVf$r 5.2.14 Verify relays K317 and-K309 de-energize. h1_a ik / 3l2 VlTd 5.2.15 Verify t% UV RESET SWITCH is not illuminated. hr. 11 / 3/2 JIT O 5.2.16 Verify relay K317 energizes approximately-15 i l seconds after relay K311 is energized. NJH / ThVfGd 5.2.17 Verify relay K306-energizes and the UV RESET - SWITCH 111uminates approximatelyf_60 seconds-after relay K311 is energized. O.v h / 3/2MT0 O l s 4+e-A----m, r-e-,= .-m w% m-.v ge..w g gywweem,-+.--r+uw.,-,m -,ve,fewwiew-+.,-pery%.,,,..,,,4,w e,- y, y -e v, w e, yyy,- v wir-w,- cae----y mw w,7 5 y> "t e -n

  • -v e y-

++ tW w-t-- ++,'+.v-,rywy g frew-

O T-ENG-90-14 PAGE 7 0F 9 5.2.18 Using the toggle switch located on the card in slot A4-2, reset the "3 UV in 2 hours" card. One of the lights on this card should illuminate after reset. % lb /3)udfo section 5.2 Completed '. N.; b / 7/2r/90 sign" date 5.3 SEQUENCER TEST - U/V WILL NOT RESET WHILE SEQUENCEP IS CYCLING NOTE-The following steps must be performed before the Sequencer step timer completes the sequence steps (approximately 30 seconds). The sequence will begin O when step 5.3.1 is performed. 5.3.1 Place a jumper from 1TB51-1 to 1T351-3 0b'N / YL/l96 5.3.2 Verify the Sequencer begins to sequence by observing the Elapsed Timer is running. Y / f 1/N4 ' 0h*$ 5.3.3 Depress the UV RESET SWITCH. /)e t4 ) 3/1.SflGo l 5.3.4 Verify that the Sequencer does not reset by observing the Elapsed Timer does not restart from O. UN / 7 {lGo 5.3.5 Momentarily energize relay K311. nvL/; I 3bkln' t J

O T-ENG-90-14 PAGE 8 OP' 9 5.3.6 Verify that the sequencer does not reset by observing the Elapsad Timer does not restart from O. .A ,ik / 3l1b']?O i 4 5.3.7 Remove the jurper from 1TD51-1 to 1TB51-3. O y 11 / 3/2 y(G e, llf / Y$0 IVOR' section 5.3 complete _ A/ . _j Y2 v/f o s gn ' data j 6.0 RESTORATION 6.1 Remove all tost equipment.

1) VOM connected to relay K317 hl0 }h

/ Y2b$,10 v. /Y / hhb IVOR

2) VOM connected to relay K306

.,_.0 w /l- /_]/2 $<l& Af _J 3/28/9d IVOR / /

3) Power supply connected to relay K311 bWh j h2 b/fd,

/bl l bbf/fd IV0R I 6.2 Verify K311 is installed corre tly. Bk) ' i 3/tcho /

  • 20 fb IVOR '

i. 1 \\- O T-ENG-90-14 PAGE 9 OP 9 6.3 Inform the Unit One Shift Supervisor of the complation of this test and 1BA03 may be roturned to service. Ovv i3/zG'L%._ w' 7.0 ACCEPTANCE CRITERIA ""jf t n/T

  • 7.1 All steps have koer, completed satisfactorily.

_ D v i-b J Nl?tNC] G V k

r PROC /REV. NO. TEtJ4 iV t 't TO: M tc dt><+t:n PRB COP 9ENT REVIEW SHEET I I-Page or 'THRU: PRB 90 */c/ Date 7M /- y .The PR8 has. reviewed the attached procedure and recosamends approval with cosaments as noted below. r Mendatory (M) casaments 'shall be incorporated prior to approval of the procedure. If not incorporated the procedure shall be resubnitted to the board. You have the responsibility to deteratine whether the Optional (0) coassents should 0e included at this tisme, saved ~ fcr later inclusion, or otherwise resolved. This procedure ooes not constitute an unreriewed safety question. 1 No. Section M/0 PRS Initials Commsents Resolutions { t kl , TkA fnSt4rs ~ ! kiccl5 &cdd Us flus N.Y&?FEl[.'f i p,vcea m are a acconcwce " ~ "-~- l a.c prp LJLfL 003 bi-C [ s 2-0 +t-nA h)hcr> us&a V o M S h w 4 -/ s k t-c. V* t <.nu._ c l 3 n no d t.f x$sn ber e4Luvs !<rtf. l i 3 SC.Q" Aj CidF Che 57.9 % S z.'S. CAccA Y t- <.w.#t Ltd (AA.cx s ch ProceM. \\ i l l I i t 4 I'- e [ i. j t 4 4 i i I I ) Changes t) this procedure other than those addressing the board's comments will require resubstittal to the board. Upon [ resolutio.: of the above cosaments, the procedure should be forwarded to the General Manager for approval. Upon approval j the procedure should be returned to the PR8 Secretary for further processing. 4.. PR8 Chairman Te>'Tk/w f

Attactanent I-J 4

. -... ~ -}}