Jersey Central Power and Light Campany
Dockat No. 50-219
!
Attentions Mr. R. H. Sissis
Vice President -
Hadison Avenue at Punch Bowl Road
'
Morristown, New Jersey
07960
Gentismen:
<
l
f
This refers to the inspection conducted by Mr. Centre 11 of this office
'
on January 2, 5, and 6, 1973 of activities authorized by AEC License No.
2
i
DPR-16 and to the discussions of our findings held by Mr. Cantrell with
'
y
Messrs. McCluskey, Carroll, Riggle and Sullivan on January 2, 1973, and-
i
to subsequent telephone discussions between Mr. McCluskey and Mr. Centre 11
on January 3, 4, 5, and 8,1973 and between Mr. McCluskey and Mr. Caphton
s
,
of this office on January 10, 1973.
-
!
Areas examined during this inspection included: the circumstance relat-
i
!
ing to the turbine trip on December 29, 1972, and the resulting primary
system blowdown to the torus as a result of a relief valve failing to re-
-
-
,
i
!
seat; the transfer to storage tanks of 53,000 gallons of surplus torus
j
!
water; the malfunction of a mainstenin isolation valve and an isolation
condenser condensate drain valve; the special surveillance test program
+ -
,
on safety related valves developed and conducted by you in response to
,
Regulatory concerns that assurance be obtained that all safety related
'
<
.
valves be operable prior to returning to power, and the results of this
'
3
testing; and radioactive releases associated with this event. Eithin
.
,
I
these areas, the inspection consisted of selective examinations of pro-
cedures and representative records, interviews with personnel, and ob-
servations by the inspector.
1
,
i
,
j
Within the scope of this inspection no violations or safety items were
i
j
j
observed.
1
i
'
i
l
I'
i
0
3t
l
h
-n];ikr
-
~
nx-
,c, - -
- - - -
-
- - - - - - -
-
c
SURNAME >
. . .. d.
A...
.
. . . .
.
2/9/73-
..
. . . . . . . .. . . . .
..
<
oAn >
.
.
. . . . . . . . .
.
. . .
. . . . . . . . . .
. Form A$C-5te (Rev,9 53) AECM 0340
960417'0010 960213
DEKOK95-258
--
.
.
4
-
g
..
v
s
l
1
-2-
.
t
.
In accordanco with Section 2.7t'0 of the AEC's ' Rules of Practice," Part 2,
(
Title 13, Code of Federal :.0rulations, a co?y of this letter and the enclosed
i
inspection report will bo pir.ced in the A.CC'c Public :10cument Room.
If this
report contains any information that you (or your contractor) belicyc to be
!
proprietary, it la necccoary that you nahe a uritten application within 20
'
days to this offico to withhnid auch infornation fron public dicciosure.
Any such application must inelude a full atatcaent of the reasons on the
i
basis of which it is clained that the infot0.ation ic proprietary, and should
,
be prepared so that propricenry infornation identified in tha application is
,
contained in a coparate part of the docunant.
If we do not hear from you in
!
thin regard within the specified period, the report vill be placed in the pub-
'
lic Docur.cnt hoon.
,
It is our understanding bt.ord on the referenced diccuusions and your letter,
dated January 17,1?7:, reporting these valve nalfunctions to the Director-
ote of Lican.:la,q t: :t you pla i ta revie.. your curve 111ance tcat pro,ran of
cafety relatcJ vn3v
to dotc).. inc if nore reliabic cgcration can h.+ cbtained
by inercaning the tc t frequency and/c r nathed of tacting; and to exploro
J th . ,7ve r .:.ufc. tm :rn c.nd c: cr v4.1 e t.rer.; possible nodific.a tica to in-
creasu the reliability of thcae valves. Ue vill revic'.. your pronram during
a future ins; metier..
,
Should you have any questions concerning this inspection, we vill be pleased
,
i
to dincusa thu:a uit fou.
Cirecre]y,
Robert ". Cer3ron. Chief,
l'acility Operatican Franch
1:ncionare :
h0 in:1pection i; aport 50--219/73-01
cc:
Mr. T. J. McCluskey, Plant Superintendent
.
(
.
-
.
,
i
bec: R0 Chief, Reactor Test & Operations Bra"ch, HQ
R0:HQ (4)
l
Directorate of Licensing, HQ (4)
DR Central Files
l
(
j
Local PDR
'
DTIE
State of New Jersey
'
i