Forwards Insp Rept 50-219/73-01 on 730102,05-06.No Violations Noted.Major Areas Insp:Circumstance Related to Turbine Trip on 721229 & Resulting Primary Sys Blowdown to Torus as Result of Relief Valve Failing to Rewater
ML20107B647
Person / Time
Site: Oyster Creek
Issue date: 02/09/1973
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Simms R
JERSEY CENTRAL POWER & LIGHT CO.
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 NUDOCS 9604170010
Download: ML20107B647 (3)


See also: IR 05000219/1973001

Text

_

. _

.

.

_ _

_

.

_

._.

_

_

..

_

.

(. kY

r

s

.I

,

- - -

.s

$

1

l

Jersey Central Power and Light Campany

Dockat No. 50-219

!

Attentions Mr. R. H. Sissis

Vice President -

Hadison Avenue at Punch Bowl Road

'

Morristown, New Jersey

07960

Gentismen:

<

l

f

This refers to the inspection conducted by Mr. Centre 11 of this office

'

on January 2, 5, and 6, 1973 of activities authorized by AEC License No.

2

i

DPR-16 and to the discussions of our findings held by Mr. Cantrell with

'

y

Messrs. McCluskey, Carroll, Riggle and Sullivan on January 2, 1973, and-

i

to subsequent telephone discussions between Mr. McCluskey and Mr. Centre 11

on January 3, 4, 5, and 8,1973 and between Mr. McCluskey and Mr. Caphton

s

,

of this office on January 10, 1973.

-

!

Areas examined during this inspection included: the circumstance relat-

i

!

ing to the turbine trip on December 29, 1972, and the resulting primary

system blowdown to the torus as a result of a relief valve failing to re-

-

-

,

i

!

seat; the transfer to storage tanks of 53,000 gallons of surplus torus

j

!

water; the malfunction of a mainstenin isolation valve and an isolation

condenser condensate drain valve; the special surveillance test program

+ -

,

on safety related valves developed and conducted by you in response to

,

Regulatory concerns that assurance be obtained that all safety related

'

<

.

valves be operable prior to returning to power, and the results of this

'

3

testing; and radioactive releases associated with this event. Eithin

.

,

I

these areas, the inspection consisted of selective examinations of pro-

cedures and representative records, interviews with personnel, and ob-

servations by the inspector.

1

,

i

,

j

Within the scope of this inspection no violations or safety items were

i

j

j

observed.

1

i

'

i

l

I'

i

0

3t

l

h

-n];ikr

-

~

nx-

,c, - -

- - - -

-

- - - - - - -

-

c

SURNAME >

. . .. d.

A...

.

. . . .

.

2/9/73-

..

. . . . . . . .. . . . .

..

<

oAn >

.

.

. . . . . . . . .

.

. . .

. . . . . . . . . .

. Form A$C-5te (Rev,9 53) AECM 0340

960417'0010 960213

PDR

FOIA

DEKOK95-258

PDR

--

.

.

4

-

g

..

v

s

l

1

-2-

.

t

.

In accordanco with Section 2.7t'0 of the AEC's ' Rules of Practice," Part 2,

(

Title 13, Code of Federal :.0rulations, a co?y of this letter and the enclosed

i

inspection report will bo pir.ced in the A.CC'c Public :10cument Room.

If this

report contains any information that you (or your contractor) belicyc to be

!

proprietary, it la necccoary that you nahe a uritten application within 20

'

days to this offico to withhnid auch infornation fron public dicciosure.

Any such application must inelude a full atatcaent of the reasons on the

i

basis of which it is clained that the infot0.ation ic proprietary, and should

,

be prepared so that propricenry infornation identified in tha application is

,

contained in a coparate part of the docunant.

If we do not hear from you in

!

thin regard within the specified period, the report vill be placed in the pub-

'

lic Docur.cnt hoon.

,

It is our understanding bt.ord on the referenced diccuusions and your letter,

dated January 17,1?7:, reporting these valve nalfunctions to the Director-

ote of Lican.:la,q t: :t you pla i ta revie.. your curve 111ance tcat pro,ran of

cafety relatcJ vn3v

to dotc).. inc if nore reliabic cgcration can h.+ cbtained

by inercaning the tc t frequency and/c r nathed of tacting; and to exploro

J th . ,7ve r .:.ufc. tm :rn c.nd c: cr v4.1 e t.rer.; possible nodific.a tica to in-

creasu the reliability of thcae valves. Ue vill revic'.. your pronram during

a future ins; metier..

,

Should you have any questions concerning this inspection, we vill be pleased

,

i

to dincusa thu:a uit fou.

Cirecre]y,

Robert ". Cer3ron. Chief,

l'acility Operatican Franch

1:ncionare :

h0 in:1pection i; aport 50--219/73-01

cc:

Mr. T. J. McCluskey, Plant Superintendent

.

(

.

-

.

,

i

bec: R0 Chief, Reactor Test & Operations Bra"ch, HQ