She 2 41973
Jersey Central Power & Light Company
Attention:
Mr. Ivan R. Finfrock
Vice President of Power Generation
i
Madison Avenue at Punch Bowl Road
'
,h
Morristoun, New Jersey 07960
'
Gent 1 amen:
.
This refers to the inspection condteted by Mr. Cantrell of this office
4
on June 26th thru 29th, 1973 at Oyster Creek, Forked River, New Jersey
of activities authorized by AEC License No. DPR-16, and to the discussions
j
i
of our findings held by Mr. Cantrell with Mr. Carroll of your staff at
the conclusion of the inspection and to subsequent telephone discussions
between Mr. Carroll and Mr. Cantrell on July 24, 1973.
l
[
Areas examined during this inspection included: administrative controls ;
J
operations conducted during the period December 8,1972 thru June 29, 1973;
i
records of surveillance testing; minutes of meetings of the Plant Operations
i
Review Committee - December 1972 thru June 1973; Minutes of the General
l
Office Review Board meetings - March 1972 through January 1973; facility
procedures; reactivity and power control; auxiliary systems; local power
range monitor rod block bypass; modification of the supports for the
,
electromatic relief valve discharge piping; non-destructive testing of the
core spray system piping; results of the inspection of paddic type flow
switches; the alarm setting of the concentrated waste tank; plant house-
keeping aspects; controls planned for high radiation areas; and the circum-
'
stances related to equipment malfunctions and abnormal occurrences (AO)
'
discussed in your reports to the Directorate of Licensing dated April 24
(two (AO's), May 15 and 30, and June 5 (three AO's), and June 22, and 28
(two AO 's) , 1973. Within these areas, the inspection consisted of selec-
1
3
l
tive examination of procedures and representative records, interviews with
personnel, measurements made by the inspector sad observations by the
j
inspector.
Our inspector also enmined the activities conducted under
your license relating to the subject discussed in your letter to the
i
Directorate of Regulatory Operations, dated Jme 5, 1973. We have no
1
further questions regasding this matter.
During this inspection, it was found that cartain of your activities
appes. red to be in violation of AEC requirements. The itema and references
to the pertinent requirements are listed by severity category in the
k
enclosure to this letter.
e
MC#
CRESS"b
"
" '
""~" ~
" " " " " " ' "
N
" " '
069250
Greenmah :eby
Caphton
Ca
n
0
ly
f;_A
3i'>rT7'$~.B),
-
su==aut >
F*-
qd3=, -
"
=
-
.
m.,,.
..,n o m .s.
9604120013 960213
'
.
_
J
---
-
-
--
- - -
.
_ _ - _ . . - - -
.
=- -
-
. . -
l
..
.
,Jere'y Central For
& Light Company
',
e
,
Docket No. 50-219 -
~
.Page :
4
Item A.1 - Your corrective action was described in your letter to the
Directorate of Reguistory Operatione, dated .hste 5,1973; therefore,
.
no reply is required with respect to this matter.
$
Its A.2 - Your corrective estion was deoeribed in your letter to the
Directorate of una==tas, dated June 28, 1973; therefore, no reply is
.
required with respect to this matter.
-
Itam B.1 - Written vertiteation of the inspection of the control red
,
drive (CBD) housing support system was obtained from the sentracter
i
that performed this inspeetten, and a sory of this verification was
,
supplied to 20:1 ter review; therefore, no reply is required with
3
respeet to this matter.
,i
In accordance with Section 2.790 of the ABC's " Rule of Practice", Part 2,
!
Title 10, code of Federal Regulations, a eeyy ef.this letter and the en-
closed inspection report will be placed in the AEC's Public Document
2
Boom. If this report contains any information that you (or your een=
tractors) believe to be proprietary, it is necessary that you make a
written application within 20 days to this office to withhold euch in-
formation from public disclosure. AnF such application must include
'
a full statement of the reasons en the basis of which it is claimed that
.
the information is proprietary, and should be prepared so that proprietary
,
information identified in the application is contained in a separate part
4
of the document. If we do not hear from you in this regard within the
specified period, the report will be pisoed in the Public Document Room.
Should you have any questions concerning this inspection, we will be
l
pleased to discuss them with you.
Sincerely,
,
James F. O'Ba811y
Director
Enclosures
1.
Description of Violations
.
'
2.
30 Inspection asport me. 50-219/73-11
cc:
Mr. J. T. Carroll
Plant Superintendent
Oyster Creek Nuclear Station
Jersey Central Power & Light Company
Forked River, New Jersey 08731
l
i
. _ -
.-
.
-
-
-
-
- -
-
- -
- .
_.
_
_
.
-
.
..
.
.
.
,
.-
_3
,
!
RO Chief, Field Support and Enforcement Branch, HQ
bec:
RO HQ (4)
RO Files
DR Central Files
Central Mail & Files
Directorate of Licensing (4)
-
Local FDR
RSIC
DTIE
State of New Jersey
4
7
i
,
I
i
1
.
1
.
h
- -
-
- - -
. .