Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept
ML20106A654
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/24/1984
From: Bomberger C
FRANKLIN INSTITUTE
To: Singh A
NRC
Shared Package
ML20106A656 List:
References
CON-NRC-03-81-130, CON-NRC-3-81-130, REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR TAC-10993, TER-C5506-348, NUDOCS 8410090384
Download: ML20106A654 (30)


Text

4- .%

TECHNICAL EVALUATION REPORT CONTROL OF HEAVY LOADS (C-10)

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT 1 NRCDOCKETNO. 50-346 FRC PROJECT C5506 NRC TAC NO. 10993 FRC ASSIGNMENT 13 NRC CONTRACT NO. NRC-03-81-130 FRC TASK 348 .

Preparedby Franklin Research Center Author: C. Bomberger 20th and Race Streefs N. Ahmed Philadelphia,PA 19102 FRC Group Leader: I. H. Sargent Prepared for Nuclear Regulatory Commission Washington, D.C. 20555 Lead NRC Engineer: A. Singh September 24, 1984 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agenc,y thereof, or any of their employees, makes any warranty, expressed or implied, or assumes any legal liability cr responsibility for any third party's use, or the results of such use, of any information, appa-ratus, product or process disclosed in this report, or represents that its use by such third party would not infringe privately owned rights. -

Prepared by: Reviewed by: Approved by:

= Av1 N Principal Auth>r Sqp(sp (Leader

$h

/Npartme [ Dire $or Date: 4/d81/8 Date: D'l Date: 9 2&%

\ .

'w FRANKLIN RE!EARCH CENTER DIVI; ION OF gmoo:to 9 4 '& /J< VIN /CALSPAN 20thand Race Streets Philadelphia, PA 19103 aT7!: ,

s, .

TER-C5506-348 a

CONTENTS Section Title Page 1 INTRODUCTION. . . . . . . . . . . . . . I 1.1 Purpose of Review . . . . . . . . . . . I 1.2 Generic Background . . . . . . . . . . . 1 1.3 Plant-Specific Background . . . . . . . . . 2 2 EVALUATION . . . . . . . . . . . . . . 4 2.1 General Guidelines . . . . . . . . . . . 4 2.2 Interim Protection Measures. . . . . . . . . 20 3 CONCLUSION. . . . . . . . . . . . . . . 23 3.1 General Provisions for Load Handling . . . . . . 23 3.2 Interim Protection Measures. . . . . . . . . 23 4 REFERENCES . . . . . . . . . . . . . . 25 p

e iii

'?*.: __

l l

TER-C5506-348 o

TABLES

. Number Title Page 2.1 Davis-Besse Unit 1/NUREG-0612 Compliance Matrix . . . . . 5 2.2 Handling Systems Subject to NUREG-0612 Compliance . . . . 10 2.3 Handling Systems Excluded from Compliance with NUREG-0612 . . . . . . . . . . . . . . . 10 e

I I

iv l

N _ . _ - . ~ - - . _ _ _ _ _ _ _ _ , . _ . . _ _ . , _ . .

  • l

. . -- 1 s _- ,

I I

TER-C5506-348 l l

FOREWORD This Technical Evaluation Report was prepared by Franklin Research Center under a contract with the U.S. Nuclear Regulatory Commission (Office of Nuclear Reactor Regulation, Division of Operating Reactors) for technical assistance in support of NRC operating reactor licensing actions. The technical evaluation was conducted in accordance with criteria established by

'the NRC.

Mr. C. Bomberger and Mr. I. H. Sargent contributed to the technical Preparation of this report through a subcontract with WESTEC Services, Inc.

I e

am 9

e V

E _

- -- . . = ~ . -. _ . . - _ = - _ = -

. 'i.-  !

1 3

TER-C5506-348

1. INTRODUCTION 1.1 PURPOSE OF REVIEW l This technical evaluation report documents an independent ceview of general load handling policy and procedures at Toledo Edison Company's Davis-Besse Nuclear Power Station Unit 1. This evaluation was performed with the following objectives:
o. to assess conformance to the general load handling guidelines of NUREG-0612, " Control of Heavy Loads at Nuclear Power Plants" [1],

Section 5.1.1 L o to assess conformance to the interim protection measures of 4

NUREG-0612, Section 5.3. '

l.2 GENERIC BACKGROUND

, Generic Technical Activity Task A-36 was established by the Nuclear Regulatory Commission (NRC) staff to systematically examine staff licensing criteria and the adequacy of measures in effect at operating nuclear power plants to ensure the safe handling of heavy loads and to recommend necessary changes in these measures. This activity was initiated by a letter issued by the NHC staff on May 17, 1978 [2] to all power reactor licensees, requesting information concerning the control of heavy loads near spent fuel.

The results of Task A-36 were reported in NUREG-0612, " Control of Heavy Loads at Nuclear Power Plants." The staff's conclusion from this evaluation was that existing measures to control the handling of heavy loads at operating plants, although providing protection from certain potential problems, do not

adequately cover the major causes of load handling accidents and should be

-upgraded.

In order to upgrade measures provided to control the handling of heavy loads, the staff developed a series of guidelines designed to achieve a

- twe> part objective using an accepted approach or protectioa philosophy. The i

first part of the objective, achieved through a set of general guidelines identified in NUREG-0612, Section 5.1.1, is to ensure that all load handling systems at nuclear power plants are designed and operated so that their n, -

s . .

v TER-C5506-348 probability of failure is uniformly small and appropriate for the critical tasks in which they are employed. The second part of the staff's objective, achieved through guidelines identified in NUREG-0612, Sections 5.1.2 through 5.1.5, is to ensure that, for load handling systems in areas where their failure might result in significant consequences, either (1) features are provided, in addition to those required for all load handling systems, to ensure that the potential for a load drop is extremely small (e.g., a single-failure-proof crane), or (2) conservative evaluations of load handling accidents indicate that the potential consequences of any load drop are acceptably small. Acceptability of accident consequences it quantified in NUREG-0612 into four accident analysis evaluation criteria. '

A defense-in-depth approach was used to develop the staff guidelines to ensure that'all load handling systems are designed and operated so that their probability of failure is appropriately small. The intent of the guidelines is to ensure that licensees of all operating nuclear power plants perform the following:

{,

o define safe load travel paths, through procedures and operator training, so that, to the extent practical, heavy loads are not carried over or.near irradiated fuel or safe shutdown equipment o provide sufficient operator training, handling system design, load handling instructions, and equipment inspection to ensure reliable operation of the handling system.

Staff guidelines resulting from the, foregoing are tabulated in Section 5 of NUREG-0612. Section 6 of NUREG-0612 recommended that a program be initiated  ;

to ensure that these guidelines are implemented at operating plants.  ;

1.3 PLANT-SPECIFIC BACKGROUND On December 22, 1980, the NRC issued a letter [3] to Toledo Edison, the Licensee for Davis-Besse Auclear Power Station, requesting that the Licensee review provisions for handling and control of heavy loads at Davis-Besse Unit 1, evaluate these provisions with respect to the guidelines of NUREG-0612, and Provide certain additional faformation to be used for an independent determina-tion of conformance to these guidelines. Toledo Edison responded to this i

. . . . . _ _ . - . _ . , . - - - - - - - - - - - - - - ' " - - - - - - ~ " - ~ - " ' ~ ~ ~ " ' ~ - - - ~ ~

t: *

  • TER-C5506-348 request on February 1, 1982 [4]. A draf t technical evaluation report (TER) was pr'epared based on this information and was informally transmitted to the Licensee for review and comment. On November 15, 1982, a telephone conference call was conducted with representatives of NRC, FRC, and Toledo Edison to discuss unresolved issues. As a result of this call, additional information was submitted by the Licensee on January 31, 1983 [5], May 2, 1983 (6), May 6,

+ 1983 [7], December 16, 1983 [8], and July 23, 1984 [9]. This TER is based on information provided in References 4 through 9.

S o

Of e

~

TER-CS506-348

2. - EVALUATION AND RECOpeSNDATIONS This section presents a point-by-point evaluation of load handling provisions at Davi,s-Besse Nuclear Power Station Unit I with respect to NRC staff guidelines provided in NUREG-0612.. Separate subsections are provided for both the general guidelines of NUREG-0612, Section 5.1.1 and the interim

' measures of NUREG-0612,' Section 5.3. In each case, the guideline or interim measure.is presented, Licensee-provided information is summarized and evaluated, and a conclusion as to the extent of compliance, including recommended additional action where appropriate, is presented. These conclusions are summarized in Table 2.1.

I2.1 . GENERAL GUIDELINES The NRC has established seven general guidelines which must be followed in order to provide a defense-in-depth approach for the handling of heavy loads. These guidelines consist of the following criteria from Section 5.1.1 of NUREG-0612:

Guideline 1 - Safe Load Paths Guideline 2 - Load Bandling Procedures Guideline 3 - Crane Operator Training Guideline 4 - Special Lifting Devices Guideline 5 - Lifting Devices (Not Specially Designed)

Guideline 6 - Cranes (Inspection, T,esting, and Maintenance)

Guideline 7 - Crane Design.

~

These seven guidelines should be satisfied by all overhead handling systems and procedures used to handle heavy loads in the vicinity of the reactor vessel, near spent fuel in the spent fuel pool, or in other areas  ;

where a load drop may damage safe shutdown systems. The Licensee's assessment f i 'of the extent to which these guidelines have been satisfied and an independent

- evaluation of this assessment are contained in Sections 2.1.1 through 2.1.8 of this report. .

i

-. I M J

e e

4 Tehle 2.1 Deele-seese Unit 1/NumEC-0632 Compliance Matrie

  • Solght Interim Interle

. or Goldeline 1 Guldettne 2 Culdeline 3 Culdeline 4 Culdeline S culdeline 6 culdeline ?

Cepeelty safe 1,oed Measure ! Isoasure 6 Crane operator Specte! Litting Crane - Test Technice!

ageer % _ltonel Pathe Proceduree d retning Deeless S1lnee Special and InspMtion Crane IMelon Speelfleettene Attention -

1. Polar Crane 1908253 -- - C -- -- ' C C --

C peector Plenum 59.9 C C --

C -- -- -

Assembly --

C pesetor vessel 165 C C --

C -- - --

meed 1995)

C Internale Indesing Fletere 15.6 C C --

C - - -- --

C Plenum 9.3 C C -

C I Assembly C

f Lifting Rig .

Amtematic 16 C C - -- C -- --

heector --

C Inspectton Deelce 1-seen 0-ming 6 C C - --

C - -- --

OretIng C supporte D-ming --

C C - -- C -- -- --

C Grating sectione steen 7 C C - - C -- -- -

C Cenerator Demovable Supporte poactoe 67.3 C C -- C -- - -- -

C

.i-iie shleide 2 Al I

O un C = Licensee action compiles with the numeG-0612 Caldeline. U9

-- a seat app!! cable. g g

n,a b

M

TER-C5506-348

  • u u u u u u u u u u u u u u u 1 }:!

8

ss:  :  :  :  :  : : :

s ; *s -)

,s .

a

i  :  :  :  :  :  :  :  :  :  :  :  : : :

&C

  • I st-
.l 4 . i i i i i  : i i i i i i  :  :

"C]

= r * * *

  • 4 4 u u u u u u u U U U o

4 r

,- =as  :  :  :  :  :  :  :  : i i  : i  :- : :

a 4:

1 3j t.

e

= i l  !  !  ! ! :

4 I5 l i l  :  : 1 1 1 its a

~

i i a u .o u u o o u o o u u u u u 3 g 8 2 l

"}I att u u u u u u u o u o u u u o u 13 1

n ,

1 E~ n -

-:g! .e, .

. - .n. . - - . . , ; .:

s, .

r l, 1 r

]E g I. iu a 5

I - 8 m j C1 Ig Sj: 5:

-- j.u{51 -

j gg a

s 1 1 1 1

$}!!klEl33l!a!13ri!$5liGslQR53 E 1

-s-g.~ -

MER-C5506-348 e*-8

, 23 1 I I  !  !  ! I I !  ! I I I I 33V:

2'2:

I 4 I

30

(( e 1 I I v v i i l ! I I I i  !

l{f

- E 1 3 j y v i ! u I u  !  ! !  !  ! I i 1 1

o o

  • I 3-
.l 5,3 u i i u i o i l i i i i i  !

Obj t .

t

!j  !. u u I u  ! u u u u u u u u 3

a i s  :

t=:

1  :"3 I I l  ! I I I  ! ! I I  ! ! I a

4%j

' ~l 5

t =

-8 tit l E~j u  ! ! u I o I  ! ! l l l 1 1 u.te C

t :

3f g i o u  ! u  ! u o u u u u u u 3 3

]5 3

422 l u u I u I u o u o u o u o i#

% 5^ ~

n $,

  • ~

%  % n '

  • n

-8g!

E ,

e s  !

- ,t t 3

l 3

A- if f a i1 2 t 2:

1 "2:

"u 3

. 8 833 t. as

s T E .I It : 18 3 eulil }9 I! Ji t

t{

9 35 i I 5 1 1 1 l o! 1EilII i a  ;  ;

th

I

~ . "

a) . . - i g

4 e

Tehle 2.1 (Cont.)

Weight Interie Interim or Goteetine 1 Guldettne 2 caldeline 3 culdeline 4 culdeline S caldeltne 6 caldeline 7 seesaure 1 seosaure 6 Cepeelty sete imod Crane Operator special Lifting Crane - Test Technical Speclel seeer M r (tonal Pathe Procedates Tretnine Doetees Stines and Inspection Crane Deelen Speelf leetions Attention Diesel Pire 1.8 C C - - C -- -- -- ==

hI Pusy stotor screen Isosh 1.8 C C = -- - C -- -- -- --

Pump Screen teseh S.7 C C -- -- C -- -- -- --

l Puey Isotor i 4

S. Donctor Sorelse S == -- C - -- C C ~ --

Crane

6. Contelament -- == - C -- - C C - -

39elpment J1b Cranes 5

=

A ve VI C

m l

! tas b

a i

l

l

^

l TER-C5506-348 )

2.1.1 Overhead Heavy Load Handling Systems e

a. Summary of Licensee Statements and Conclusions The Licensee reviewed all overhead handling syst. ems in use at Davis-Bes,se Unit 1 aad identified those systems which must be addressed within the scope of NUREG-0612 on the basis that they could carry heavy loads over the core, over spent fuel, or over safety-related equipment. These handling systems are listed in Table 2.2.

Determination of those systems which have been excluded from compliance was also completed by the Licensee. Identification of excluded systems as well as the reasons for exclusion are provided in Table 2.3.

b. Evaluation and Conclusion The Licensee's evaluation of overhead handling systems and the determina-tion of those systems which must comply with NUREG-0612 is consistent with the f ritent cf NUPEG-0612. Exclusion of handling systems from NUREG-0612 compliance is acceptable if (1) no equipment required for safe shutdo m or

[ decay heat removal is lo::ated in close proximity; (2) the handling systems are used for sole-purpose lif ts, do not carry loads over othL safety-related equipment, and are used only when the respective components have been placed out of service; or .(3) handling of components over safety-related equipment is performed only after the systenVequipment has been placed out of service in accordance with Technical Specifications or extr, ting administrative procedures.

2.1.2 Safe Load Paths [ Guideline 1, MUREG-0412, Section 5.1.l(1)]

i " Safe load paths should be defined for the movement of heavy loads to

! minimise the potential for heavy loads, if dropped, to impact irradiated fuel in the reactor vessel and in the spent fuel pool, or to impact safe shutdown equipment. 'The path should follow, to the extent practical, structural floor members, beams, etc., such that if the load is dropped, the structure is more likely to withstand the impact. These load paths E 'should be defined in procedures, shown on equipment layout drawings, and clearly marked on the floor in the area where the load is to be handled.

Deviations from defined load paths should require written alternative procedures approved by the plant safety review committee."

l~

I j - - . - . - . , , . - - . _ .

TER-C5506-348 Table 2.2. Handling Systems Subject to NUREG-0612 Compliance

. Containment polar crane / auxiliary hoist

~

Reactor service crane t Containment equipment jib cranes l ._

Spent fuel shipping cask crane / auxiliary hoist Component. cooling pump monorails Intake structure gantry crane Table 2.3. Handling Systems Excluded from Compliance with NUREG-0612 A. Excluded on the basis that no safe shutdown equipment is located in proximity:

o Turbine building handling systems o' water treatment building handlin.J systems

' o Circulating water pump' house handling systems o Miscellaneous auxiliary building handling systems o East ECCS pump room monorail o Startup feed pump monorail o Containhent spray pump monorails o High pressure injection pump monorails o Letdown cooler heat exchanger monorail o Monorail for equipment hatch and decay heat coolers o Makeup pump monorails l, o Refueling canal rail removal jib crane o Main station exhaust fan motor monorails B. Excluded on the basis that handling systems are sole-purpose, do not carry loads over other safety-related equipment, and are only used when the respective components have been placed out of service in accordance with plant procedures or specifications:

1-o Auxiliary feed pump monorails o Emergency diesel generator monorails j o Battery room monorails C. Excluded on the basis that component handling over safety-related equipment is performed only after the plant has been safely shut down (safe shutdown components are considered to be those required to achieve and maintain hot uhutdown conditions):

o Pressuriser heater bundle monorail o control rod drive maintenance jib crane

(

i

m--

l

~

TER-C5506-348

a. Summary of Licensee statements and Conclusions

[heLicenseestatedthatheavyloadmovementsforthehead, internals, equipment associated with the reactor, and the missile shields are made in accordance with procedures which define safe load paths for each load. For remaining miscellaneous loads, a general purpose load path has been developed which avoids the reactor cavity area. Equipment is to be moved within this load path area and is allowed to deviate for the following reasons: (1) to travel to a-laydown area or to pickup equipment outside of the load path (use shortest distance) or (2) to move around equipment that is in the path and then return to the load path. In addition, the following areas have been excluded from the general load path:

o main reactor cav Ey area (except as necessaty for reactor maintenance, inspection, and refueling).

o edge of the .D-ring and refcaling canal (to prevent loads from falling '

'into the reactor cavity area).

Finally, each heavy load lift will be supervised by a designated individual who will be responsible for enforcing procedural requirements.

I

' Deviations from these procedures require prior approval of the plant superintendent.

b. Evaluation Safe load paths which have been developed at Davis-Besse Unit 1 satisfy the criteria of this guideline on the basis tihat defined load paths exist for

. major loads handled within the containment and these loads paths have been incorporated into applicable procedures. In addition, use of a general load path for remaining miscellaneous loads is acceptable, based on the Licensee's information that such a load path avoids the reactor cavity area and

irradisted fuel. Use of a designated individual to supervise each load movement has previoasly been accepted as an acceptable alternative to parasnent floor markings. Lastly, deviations from approved load paths are approved in a manner consistent with that specified in this guideline.

N . . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

9 t

TER-C5506-348 I

c. Conclusion Development of safe load paths at Davis-Besse Unit I has been accom-l plished in a manner consistent with Guideline 1 of NUREG-0612.

2.1.3 Load Handling Procedures [ Guideline 2, NUREG-0612, Section-5.1.l(2)]

" Procedures should be developed to cover load handling operations for heavy loads that are or could be handled over or in proximity to irradit.ted fuel or safe shutdown equipment. At a minimum, procedures should cover handling of those loads listed in Table 3-1 of NUREG-0612.

These procedures should include: identification of required equipmenc,

, inspections and acceptance criteria required before movement of load; the steps and proper sequence to be followed in handling the loads defining the safe path; and other special precautions."

-'a. Summary'of Licensee Statements and Conclusions The Licensee identified the procedures in use or being developed for the various NUREG-0612' cranes. These procedures include the following:

Polar Crane SP 1104.46 " Polar Crane System Procedure" SP 1504.01 " Reactor Vessel Closure Head Removal and Replacement" SP 1505.01 " Reactor Internals Removal and Replacement" Component Cooling Water Pump Monorail SP 1104.13 " Component Cooling Water Pump Monorail System Procedure" Spent Puel Cask Crane SP 1104.50 " Spent Puel Cask Crane Operating Procedure" ,

Intake Gantry Crane SP 1104.53 " Intake Gantry Crane System Procedure" l' -

The Licensee stated that all lifting procedures, including those

identified above, have been updated to satisfy the requirements of Section

. 5.1.1(2) of NJREG-0612.

l Evaluation b.-

The criteria of this guideline are satisfied on the basis of the Licensee's verification that load handling procedures contain the information I identified in NURRG-0612.

t

_?~ .--,...-..___--.,-----s.-~-.-------------

. .- l

. I w .

~

TER-C5506-348

c. Conclusion a

Procedural provisions for heavy load handling at the Davis-Besse plant are consistent with Guideline 2.

2.1.4 Crane Operator Training (Guideline 3, NUREG-0612, Section 5.1.l(3))

" Crane operators should be trained, qualified, and conduct themselves in accordance with Chapter 2-3 of ANSI B30.2-1976, ' Overhead and Gantry Cranes' [10}."  :

i a. . Summary of Licensee Statements and Conclusions The Licensee stated that procedures for the qualification and training of crane operators are contained in Davis-Besse Administrative Directive AD 1844.06J which requires that crane operators be qualified to criteria essentially identical to the provisions of ANSI B30.2-1976, Chapter 2-3. This general directive is implemented at Davis-Besse Unit 1 by training / examining prospective operators and documenting successful qualification on specific qualification cards for each crane. Training and examination of prospective operators are performed by designated instructors.

These procedures and practices were reviewed against the provisions of ANSI B30.2-1976, Chapter 2-3. A number of minor changes were made by the Licensee to the procedures and the qualification card process to ensure that all items pertinent to operator training, qua.ification, and conduct were adequately addressed. No exceptions to, ANSI B30.2-1976 are taken by the Licensee.

b. Evaluation Programs implemented by the Licensee satisfy the criteria of this guideline on the basis that no exceptions are taken with Chapter 2-3 of ANSI

!. 330.2-1976.

c. Conclusion

(

l Provisions for crane operator training and qualification at Davis-Bessa Unit 1 are consistent Guideline 3.

i. l:

TER-C5506-348 2.1.5 Special Lifting Devices [ Guideline 4, NUREG-0612, Section 5.1.l(4)]

"Special lifting devices should satisfy the guidelines of ANSI N14.6-1978, ' Standard for Special Lif ting Devices for Shipping Containers Neighing 10,000 Pounds (4500 kg) or More for Nuclear Materials' [11].

This standard should apply to all special lifting devices which carry heavy loads in areas as defined above. For operating plants, certain inspections and load tests may be accepted in lieu of certain material requirements in the standard. In addition, the stress design factor stated in Section 3.2.1.1 of ANSI N14.6 should be based on the combined I

maximum static and dynamic loads that could be imparted on the handling device based on characteristics of the crane which will be used. This is stress design factor on only the weight (static load) of the load and of the intervening components of the special handling device [NUREG-0612, Guideline 5.1.l(4)]."

a. Summary of Licensee Statements and Conclusions The Licensee identified the following special lifting devices to be used in lifts over the reactor vessel:
1. Bead and internals handling fixture
2. Turnbuckle pendants and head lifting pendants
3. Internal handling adapter, pendants, and spreader ring l 4. Internals indexing fixture pendants
5. Missile shield lifting harness.

In addition, no cask or lifting device has yet been selected for spent fuel equipment. .

For the lifting devices identified above, a detailed comparison of ANSI N14.6-1978 was limited to Sections 3.2 and 5 for the following reasons:

a. All of the devices described above were designed by Babcock and Wilcox prior to the existence of ANSI N14.6-1978. In this regard, there are a number of sections in the standard that are difficult to apply in retrospect. These sections are those entitled Designer's Responsi-bilities (Section 3.1); Design Considerations (Section 3.3);

Fabricator's Responsibilities (Section 4.1); Inspector's

. mesponsibilities (Section 4.2); and Fabricator's Considerations (Section 4.3). These sections have not been reviewed item by item for the purpose of identifying and justifying exceptions.

b. Certain sections of ANSI N14.5-1978 are judged as not pertinent to the load handling reliability of the devices and have not been addressed for the purpose of identifying and justifying exceptions.

These sections are Section 1.0, Scoper Section 2.0, Definitions; B

lL4 .___..__ _______ __ _ _ _ _ - _ _ _ _ - _ _

4 TER-C5506-348 Section 3.4, Design Considerations to Minimisc Decontamination

, Effects in Special Lifting Device Use; Section 3.5, Coatings; and Section 3.6, Lubricants,

c. Section 6 of ANSI N14.6-1978 is applicable to lifting devices used for critical loads as defined in Section 2 of the standard. None of the loads ~ lifted by the lifting devices identified above have as yet been determined to be critical loads. Such determinatica would require an analysis of the consequences of various load drops. Since such analyses have not yet been performed, and are not required to be performed until the 9-month report to the NRC, it is premature to designate certain loads as critical loads and, accordingly, to apply the requirements of Section C of ANSI N14.6-1978 to their designated lifting devices.

The detailed comparison of special lifting devices with the requirements of Sections 3.2 and 5 of ANSI N14.6-1978, as supplemented by NUREG-0612, indicates that load bearing components of these lifting devices have actual structural margins that are, in general, significantly higher and, with one exception, meet the-ANSI stress design factors. All parts of the missile shield lifting harr.' ass were found to meet ANSI design criteria with the exception of two 3-inch pins (which will be replaced with higher strength material) and the 1-inch side plates (which meet yield strength criteria but have a factor of safety on ultimate of 4.83). Therefore, it is the Licensee's opinion that no modification of this device is necessary for the side plates.

The Licensee further stated that these devices comply with the standards, with the following exceptions:

Exception 1: Section 5.3.7 of ANSI N14.6-1978 specifies that visual

. inspections by maintenance or nonop,erating personnel be performed at intervals of three months or less. Since these devices are stored in a specific location under a controlled environment and are not subject to any other uses, the Licensee believes that current procedures requiring

- inspections (visual, dimensional, and nondestructive examinstion) prior to each use are sufficient to meet the intent of these standards.

Ruoeotion 2: There are several load-bearing members of special lifting

,d,evloes for which inspection in accordance with Section 5.3.l(2) is igractical due to problems involved in disassembly and paint removal.

The Licensee proposes to institute an annual visual inspection coupled with a more comprehensive 5-year dimensional and nondestructive examination (Mut) program for these members. The proposed inservice inspection program is based upon the Licensee opinion that these devices are:

NO-

TER-C5506-348 11

1. used infrequently and are therefore subjected to fewer stress cycles
- lL. stored in a controlled environment
3. constructed.of materials with ample design safety margins
4. handled in accordance with stringent operating procedures.

! Further, the Licensee believes that the pto; posed inspection program 'is

!' equivalent to the intent of ANSI N14.6 and provides sufficient inspection and examination to identify wear or degradation that could potentially

( reduce design safety margins.

b. Evaluation It is acknowledged that a strict interpretation of compliance of existing special lifting devices with the criteria of ANSI N14.6-1978 cannot be made.

l Therefore, the Licensee's response is consistent with the intent of this guideline in addressing only those sections (3.2 and 5) directly related to the load handling reliability of the lifting devices. It is noted from the

. Licensee's response, that the devices comply with the design safety margins of

, 3 on yield strengtli and 5 on ultimate strength for the four lif ting devices reviewed. Evaluations of the special lifting devices identified satisfy the requirements of this guideline for these sections based on the Licensee's statement that the lifting devices comply with the standards, with the

exceptions noted. It is also agreed that desgin margins of the missile shield lifting harness substantially satisfy ANSI criteria and additional modifica-tion (beyond pin replacement) is not required .

For those exceptions noted by the Licensee, proposed actions for Exception 1 (periodic inspections by maintenance or nonoperating parsonnel) are consistent with this guideline and with NUREG-0612 guidance for inspection of cranes (Guideline 6). In addition, the L'icensee's intent to perform an annual visual inspection of special lifting devices to ensure continuing i compliance, coupled with comprehensive dimensional and NDE every 5 years, should provide lifting devices with continued reliability consistent with the

~

requirements of this guideline.

c. Conclusion and Recommendations Design of s w ial liftir.g devices at Davi> 5 esse Unit 1 and programs implemented to ensure their continued reliability satisfy Guideline 4.

_r-e.- -- , ,,,: ',---~-,,-..c.,n..--- __--,~_,twn,

~ . _ _ . .. . - .

t TER-C5506-348 2.1.6 Liftine Devices (Not Specially Designed) [ Guideline 5, NUREG-0612,

, Section 5.1.1(5))

i

" Lifting devices that are not specially designed should be installed and usad in accordance with the guidelines of ANSI B30.9-1971, '811ngs'

-[12). .Bowever, in selecting the proper sling, the load used should be the sum of th'e static and maximum dynamic load. The rating identified on the~ sling should be in-terms of the ' static load' that produces the maximum static and dynamic load. Where this restricts slings to use on only certain cranes,'.the slings should be clearly marked as to the cranes with which they may be used."

4

a. Summary of Licensee Statements and Conclusions The Licensee stated thst, with the exception of the spent fuel shipping cask, other loads identified by the Licensee are lifted with slings which are selected, inspected, and maintained in accordance with ANSI B30.9-1971. An analysis has been performed which demonstrates that dynamic loading on slings is within the variance of 14 to 8% of the static loads handledt this dynamic load effect is insignificant and may be disregarded.
b. Evaluation Procedures for use of slings at Davis-Besse Unit 1 satisfy the recosamendations of thiri guideline on the basis that they comply with ANSI B30.9-1971. Dynamic loads are a reasonably small percentage of the overall static loads and may be disregr.cded in rating the slings.

I

c. Conclusion and Recommendations
  • Selection and use of slings at Davis-Besse Unit 1 is consistent with Guideline 5.

2.1.7 Cranes (Inspection, Testing, and Maintenance) [ Guideline 6, NUREG-0612,

, Section 5.1.l(6))

"The crane should be inspected, tested and maintained in accordance with Chapter 2 ,2 of ANSI B30.2-1976, ' Overhead and Gantry Cranes,' with the esception that tests and inspections should be performed prior to use when it is not practical to meet the frequencies of ANSI B30.2 for periodic inspection and test, or where frequency of crane use is less than the specified inspection and test frequency (e.g., the polar crane inside a PWR b

TER-C5506-348 containment may only be used every 12 to 18 months during refueling l gperations and is generally not accessible during power operation. ANSI B30.2, however, calls for certain inspections to be performed daily or monthly. For such cranes having limited usage, the inspections, tests, and maintenance should be performed prior to their use)."

s. Summary of Licensee Statements and Conclusions Davis-Besse preventive maintenance and surveillance test programs provide for crane inspection, testing, and maintenance. The preventive maintenance program outlines a schedule of preventive maintenance per Administrative

. Directives AD 1844.00, Maintenance, and AD 1844.01, Preventive Maintenance.

Periodic Test Procedure PT-5199.02, Station Crane Periodic Test, provides for station crane surveillance. Administrative Directive 1844.04 specifies crane lubrication guidelines. Crane lubrication data are kept in the plant lubrication manual.

These procedures and practices were reviewed against the provisions of ANSI B30.2-1976, Chapter 2-2. Where areas of noncompliance with the standard were identified, revisions to procedures were developed. No exceptions to ANSI B30.2-1976 are taken.

b. Evaluation and Conclusion l Davis-Besse Unit 1 satisfies the requirements of this guideline on the basis that existing p ocedures have been reviewed and revised to comply with ANSI E30.2-1976, with no exceptions.

t I

l 2.1.8 Crane Design [ Guideline 7, MUREG-06121 Section 5.1.l(7) }

[ "The crane should be designed to meet the applicable criteria and guidelines of Chapter 2-1 of ANSI B30.2-1976, ' Overhead and Gantry Cranes,' and of CNhA-70, ' Specifications for Electric Overhead Travelling Cranes' (13). An alternative to a specification in ANSI B30.2 or CNAA-70

( insy be accepted in lieu of specific compliance if the intent of the specification is satisfied."

a. Summary of Licensee Statements and Conclusions '

t Specifications for cranes subject to NURsG-0612 compliance have been com-pared to Cama-70 and to the additional safety requirements of ANSI 830.2-1976.

L ~ - . , - -_ w - -.._ = : - . - - .._ _.-. - _.- - .= = - - _ -. . . _ - . . - - - - - . - . .

TER-C5506-348 Bach of these cranes-the containment polar crane, the reactor service crane, the spent fuel shipping cask crane, and the intake structure gantry crane--was designed in accordance with Bechtel design specifications. These specifica-tions required that each crane be designed in accordance with the minimum requirements for class A cranes, except as the requirements are extended by the Bechtel specification, in which case the more stringent restriction governed. The Licensee noted that the Bechtel specification predates the 1975 revision to CMAA-70. As a result of the above comparison, the Licensee stated that all four cranes have been found to comply with CMAA-70 and ANSI B30.2-1976, with two exceptions:

5 4- 1. The Bechtel specifications place no additional requirements on welding other than the requirement of CMAA-70, which in turn references AWS L D14.1 for welding. . ANSI B30.2-1976 raquires welding to be in accordance with AWS Dl.1 as modified by AWS D14.1. With the exception of requirements for storage of low hydrogen welding rods included in AWS Dl.1, there are no significant differences between AWS Dl.1 and AWS D14.1 that would affect load handling reliability. Licensee review revealed that the manufacturer's shop practices provided for control of low hydrogen rods even though AWS Dl.1 was not specifically used. Therefore, the welding requirements in effect were equivalent to the requirements of ANSI B30.2.

2. In regard to the tolerance on crane runway. dimensions, CMAA-70

[-

specifies that center-to-center distances on runway rails be within

_ 11/8 inch. For the polar crane, the equivalent- center-to-center distance is the diameter-of the circular track. Tne plant designer (Bechtel) and the polar crane manufacturer (Barnischfeger) have used a tolerance of 11/2 inch. It is the Licensee's judgment that this deviation from the standard is not significant to load handling reliability in view of the fact.that both Bechtel and Barnischfeger worked to the same dimensions.

b. Evaluation Cranes at Davis-Bet e Unit 1 satisfy the requirements of this guideline on l

' the basis that they were designed and built to specifications which meet or escoed the criteria of OstA-78 and ANSI B30.2-1976. The Licensee responses regarding esceptions indicate that (1) welding procedures used are equivalent to ANSI B30.2-1976 and meet the intent of this guideline and (2) deviation from the crane center-to-center runway tolerances is not significant to load handling reliability.

p7 _ _ .

r TER-C5506-348

c. Conclusion Design of cranes at Davis-Besse Unit 1 is consistent with Guideline 7.

2.2 IlffERIM PROTBCTION NEASURES The'NRC has established six interim protection measures to be implemented at operating nuclear power plants to provide reasonable assurance that no heavy loads will be handled over the spent fuel pool and that measures exist to reduce the potential for accidental load drops to impact on fuel in the

. core or spent fuel pool. Four of the six interin measures of the report consist of Guideline 1, Safe Load Paths; Guideline 2, Load Handling Procedures; Guideline 3, Crane Operator Training; and Guideline 6, Cranes (Inspection, Testing, and Maintenance) . The two remaining interin measures cover the following criteria:

1. Heavy load ~ technical specifications 2.. Special review for heavy loads handled over the core.

Licensee implementation and evaluation of these interim protection measures are contained in the succeeding paragraphs of this section.

2.2.1 Technical Specifications [ Interim Protection Measure 1, NUREG-0612, Section 5.3 (1)]_ _

" Licenses for all operating reactors not having a single-failure-proof overhead crane in the fuel storage pool area should be revised to include a specification comparable to Standard Technical Specification 3.9.7,

' Crane Travel - Spent Fuel Storage Building,' for PNR's and Standard Technical Specification 3.9.6.2, 'Crano. Travel,' for BWR's, to prohibit handling of heavy loads over fual in the storage pool until implementation of measures which satisfy the guidelines of Section 5.1 (of NUREG-0612)."

a. Evaluation hreviewoftechnicalspecificationsatDavis-BesseUnit1indicatesthat Technical Specification 3.9.7 prohibits movement of loads greater than 2430 lb .

over spent fuel assemblies in the spent fuel pool area.

m . . . _ _ . _ _ - _ . _ . _ _ _ . _ _ _ _ . _ . _ _ _ . . . _ . . _ . _ _ _ _ _ _ . . _ _ _ _ _ _ . _ _ _ _ _ _ _ _

TER-C5506-348

b. -Conclusion a

Davis-Besse Unit 1 complies with Interim Protection Measure 1.

2.2.2 Administrative Controls (Interim Protection Measures 2, 3, 4, and 5, l

NUREG-0612, Sections 5. 3 (2)-5. 3 (5) ]

" Procedural or administrative measures (including safe load paths, load l handling procedures, crane operator training, and crane inspection]...

can be . accomplished in a short time period and need not be delayed for completion of evaluations and modifications to satisfy the guidelinec of Section 5.1 (of NUREG-0612]."

a. Evaluation The specific requirements for load handling administrative controls are t

contained in MUREG-0612, Section 5.1.1, Guidelines 1, 2, 3. and 6. The Licensee's compliance with these guidelines has been evaluated in Sections 2.1.2, 2.1.3, 2.1.4, and 2.1.7, respectively, of this report.

_b. Conclusions and Recommendations Conclusions and recommendations concerning the Licensee's compliance with these administrative controls are contained in Sections 2.1.2, 2.1.3, 2.1.4, and 2.1.7 of this report.

l r

l

! 2.2.3 Special Review for Heavy Loads Handled Over the Core (Interim Protection l Measure 6, NUREG-0612, Section 5.3(6)]

I

...special attention should be given to procedures, equipment, and personnel for the handling of heavy loads over the core, such as vessel L internals or vessel inspection tools. This special review should include

! the following for these loads: (1) review of procedures for installation l of rigging or lifting devices and movement of the load to assure that

! sufficient detail is provided and that instructions are clear and conciser (2) visual inspections of loed bearing components of cranes, elings, and special lifting devices to identify flaws or deficiencies

j. that could lead to failure of the components (3) appropriate repair and replacement of defective oosiponents; and (4) verify that the crane operators have been properly trained and are familiar with specific i procedures used in handling these loads, e.g., hand signals, conduct of
operation, and content of procedures."

i i

_ . ~ _ . . , . _ . _ . - _ . - . . . .-_,._.. _.-.__. o_---.,_._....-, --_ -._

TER-C5506-348

a. Summary of Licensee Statements and Conclusions a

Toledo Edison has performed the special reviews for the Interim Protection Measure 6 of MUREG-0612.

b. Evaluation and Conclusion The Davis-Besse plant complies with Interim Protection Measure 6 based on the Licensee's verification. In light of the responses to Guidelines 2 and 3, it is apparent that procedures for handling loads over the core and for operator training have been reviewed and upgraded as appropriate. In addition, design of cranes and programs for selection and use of slings have been reviewed and found to comply with NUREG-0612.

4 e

m-

. . _ . . - . - . ~ . .. - .

,. . ,( * -

TER-C5506-348

3. CONCLUSION a

6 l

, This summary is provided to consolidate the results of the evaluation contained in Section 2 concerning individual NBC staff guidelines into an overall evaluation of heavy load handling at Davis-Besse Nuclear Power Station

+

Unit 1. Overall conclusions and recommended Licensee actions, where appropriate, are provided with respect to both general provisions for load handling (NUREG-0612, Section 5.1.1) and completion of the staf f recommendations for interim protection (NUREG-0612, Section 5.3).

3.1 GENERAL PROVISIONS FOR IDAD RANDLING The NRC staff has established seven guidelines concerning provisions for handling-heavy loads in the area of the reactor vessel, near stored spent fuel, or in other areas where an accidental load drop could damage equipment required for safe shutdown or decay heat removal. The intant of these

' guidelines ~is twofold. -A plant conforming to these guidelines will have developed and implemented, through procedures and operator training, safe load .

travel paths such that, to the maximum extent practical, heavy loads are not carried over or near irradiated fuel or safe shutdown equipment. A plant l

conforming to these guidelines will also have provided sufficient operator I f training, handling system design, load handling instructions, and equipment inspection to ensure reliable operation of the handling system. As detailed in Section 2, it has been found that load hanJ11ng operations at Davis-Besse Nuclear Power Station Unit 1 can be expected to be conducted in a highly l

reliable manner consistent with the staff's % jectives as expressed in these guidelines.

l 3.2 INTERIM PRDTECTION MEASURES

~The IBtc staff has established certain measures (NUREG-0612, Section 5.3) that should be initiated to provide reasonable assurance that handling of heavy loads will be performed in a safe manner until final implementation of the general guidelines of MUREG-0612, Section 5.1 is complete. Specified measures include the implementation of a technical specification to prohibit NZA

s' ' .

TER-C5506-348 the handling of heavy loads over fuel in the storage pools compliance with Guidelines 1, 2, 3, and 6 of NUREG-0612, Section 5.1.13 a review of load handling procedures and operator training; and a visual inspection program, including component repair or replacement as necessary of cranes, slings, and special lifting devices to eliminate deficiencies that could lead to component failure. The evaluation of information provided by the Licensee indicates that the Davis-Besse plant complies with the staff's measures for interim protection.

E em 0

0 J

A M- - _ _ , __ _ _ _ _ _ _ . - _ _ _ . _ _ _ _ _ _ _

g_

,p.

TER-C5506-348

4. RCFERENCES.

a

1. NRC

" Control of Heavy Loads at Nuclear Power Plants" July 1980 NUREG-0612

2. V. Stello, Jr. (NRC)

-Letter to all Licensees

Subject:

Request for Additional Information on Control of Heavy Loads

, Near Spent Fuel May 17, 1978

3. D. G. Eisenhut (NRC)

Letter to all operating reactors

Subject:

Control of Heavy Loads December 22, 1980

4. R. P. Crouse (Toledo Edison)

Letter to J. F. Stolz (NRC)

Subject:

Contfol of Heavy _ Loads February 1, 1582 ,

5. R. P. Crouse (Toledo Edison)

Letter to J. F. Stolz (NRC)

Subject:

Control of Heavy Loads January 31, 1983

6. R. P. Crouse (Toledo Edison)

Letter to J. F. Stolz (NRC)

Subject:

Control of Heavy Loads May 2, 1983

7. R. P. Crouse (Toledo Edison)
  • Letter to J. S. Stolz (NRC)

Subject:

Control of Heavy Loads ~

l May 6, 1983 l

l 8.- R. P. Crouse (Toledo Edison)

Letter to J. F'. Stolz (NRC)

Subject:

Control of Heavy Loads December 16, 1983

9. Tslefax Information: From A. Singh (NRC) l to I. H. pargent (FRC)

! Subjects Control of Heavy Toads July 23, 1984 k

r .

. ** - o.~

S' e

  • s i

1

)

TER-C5506-348 ,

l

10. American National Standards Institute

" Overhead and Gantry Cranes" ANSI B30.2-1976

11. American National Standards Instituto

" Standard for, Lifting Devices for Shipping Containers Weighing 10,000 Pounds (4500 kg) or More for Nuclear Materials" ANSI N14.6-1978

12. American National Standards Institute

" Slings" ANSI B30.9-1971

13. Crane Manufacturers Association of America

" Specifications for Electric Overhead Travelling Cranes" Pittsburgh, PA CMAA-70 m

E D

as I

IJ C . . _ _ _ _ . . . . , . _ . _ . _ . _ ~ . . _ . _