TAC:10993
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
Questions Answers | |
From | |
MONTHYEARML20067D7071982-12-14014 December 1982
[table view]Responds to Concerning Response to Draft Technical Evaluation Rept Re Control of Heavy Loads.Util Reviewing Request to Submit Phase II Rept.Response Will Be Provided 830131 ML20079Q1801983-05-0606 May 1983 Forwards Response to Open Item on Safe Load Paths Contained in NRC 820923 Technical Evaluation Rept of Util 820201 Submittal Re Control of Heavy Loads (NUREG-0612) ML20077L7891983-08-0909 August 1983 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation Rept ML20083D6381983-12-16016 December 1983 Forwards Response to Section 5.1.1(4) of NUREG-0612, Control of Heavy Loads of Nuclear Power Plants, Consisting of Test Results of Missile Shield Lifting Harness Per DG Eisenhut ML20097E0961984-09-11011 September 1984 Forwards Insp Table Missile Shield Lifting Harness & Generic Load Path for Heavy Loads Not Covered by Specific Procedures.Info Resolves NUREG-0612,Phase I Items ML20106A6541984-09-24024 September 1984 Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept 1983-05-06 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:10993&oldid=3480215"