TAC:10993
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Questions Answers Results
Other: ML17194A953, ML20005A473, ML20023B798, ML20028F966, ML20040B284, ML20079Q180, ML20083D638, ML20097E096, ML20106A654 | |
| From | |
MONTHYEARIR 05000320/19800151980-11-24024 November 1980
[table view]IE Insp Rept 50-320/80-15 on 800901-1018.No Noncompliance Noted.Major Areas Inspected:Plant Operation,Health Physics & Environ Insp & Review ML19340D0701980-12-22022 December 1980 Forwards PA Emergency Mgt Agency 801204 Response to FEMA Re Offsite Emergency Planning Contentions for TMI-1 Restart Hearings.List of Documents Initially Submitted to Regional Assistance Committee Encl.Related Correspondence ML17194A9531981-02-0303 February 1981 Ltr to All Licensees of Operating Plants,Applicants for OLs & Holders of CPs Re Control of Heavy Loads.Forwards Missing Pages to Encl 3 of 801222 Generic Ltr.W/Related Info ML20005A4731981-06-22022 June 1981 Advises That Review of Controls of Heavy Loads Per NUREG-0612 Scheduled for Completion by 810731 ML20040B2841982-01-14014 January 1982 Advises of Intention to Submit Partial Response to NRC Re Control of Heavy Loads by 820201 ML20027C5001982-08-27027 August 1982 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station,Unit 1, Draft Technical Evaluation Rept ML20067D7071982-12-14014 December 1982 Responds to Concerning Response to Draft Technical Evaluation Rept Re Control of Heavy Loads.Util Reviewing Request to Submit Phase II Rept.Response Will Be Provided 830131 ML20028F9661983-01-31031 January 1983 Submits Partial Response to NRC Re Control of Heavy Loads.Response Includes Items 2.1.3 Re Load Handling Procedures & 2.1.5 Re Special Lifting Procedures.Remaining Open Items Will Be Answered by 830401 ML20023B7981983-05-0202 May 1983 Forwards Response to Re Open Items in NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Dynamic Load Effects,Inservice Insp & Exam Frequency Reviewed.Phase II Results Expected by 830601 ML20079Q1801983-05-0606 May 1983 Forwards Response to Open Item on Safe Load Paths Contained in NRC 820923 Technical Evaluation Rept of Util 820201 Submittal Re Control of Heavy Loads (NUREG-0612) ML20077L7891983-08-0909 August 1983 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation Rept ML20083D6381983-12-16016 December 1983 Forwards Response to Section 5.1.1(4) of NUREG-0612, Control of Heavy Loads of Nuclear Power Plants, Consisting of Test Results of Missile Shield Lifting Harness Per DG Eisenhut ML20097E0961984-09-11011 September 1984 Forwards Insp Table Missile Shield Lifting Harness & Generic Load Path for Heavy Loads Not Covered by Specific Procedures.Info Resolves NUREG-0612,Phase I Items ML20106A6541984-09-24024 September 1984 Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept 1982-08-27 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:10993&oldid=5496058"