Letter Sequence Other |
|---|
|
|
MONTHYEARML20260D1871977-03-11011 March 1977 Piping Sys Composite:Intake Structure Project stage: Other IR 05000320/19800151980-11-24024 November 1980 IE Insp Rept 50-320/80-15 on 800901-1018.No Noncompliance Noted.Major Areas Inspected:Plant Operation,Health Physics & Environ Insp & Review Project stage: Request ML19340D0701980-12-22022 December 1980 Forwards PA Emergency Mgt Agency 801204 Response to FEMA Re Offsite Emergency Planning Contentions for TMI-1 Restart Hearings.List of Documents Initially Submitted to Regional Assistance Committee Encl.Related Correspondence Project stage: Request ML17194A9531981-02-0303 February 1981 Ltr to All Licensees of Operating Plants,Applicants for OLs & Holders of CPs Re Control of Heavy Loads.Forwards Missing Pages to Encl 3 of 801222 Generic Ltr.W/Related Info Project stage: Other ML20005A4731981-06-22022 June 1981 Advises That Review of Controls of Heavy Loads Per NUREG-0612 Scheduled for Completion by 810731 Project stage: Other ML20040B2841982-01-14014 January 1982 Advises of Intention to Submit Partial Response to NRC Re Control of Heavy Loads by 820201 Project stage: Other ML20027C5001982-08-27027 August 1982 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station,Unit 1, Draft Technical Evaluation Rept Project stage: Draft Other ML20067D7071982-12-14014 December 1982 Responds to Concerning Response to Draft Technical Evaluation Rept Re Control of Heavy Loads.Util Reviewing Request to Submit Phase II Rept.Response Will Be Provided 830131 Project stage: Draft Other ML20028F9661983-01-31031 January 1983 Submits Partial Response to NRC Re Control of Heavy Loads.Response Includes Items 2.1.3 Re Load Handling Procedures & 2.1.5 Re Special Lifting Procedures.Remaining Open Items Will Be Answered by 830401 Project stage: Other ML20023B7981983-05-0202 May 1983 Forwards Response to Re Open Items in NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Dynamic Load Effects,Inservice Insp & Exam Frequency Reviewed.Phase II Results Expected by 830601 Project stage: Other ML20079Q1801983-05-0606 May 1983 Forwards Response to Open Item on Safe Load Paths Contained in NRC 820923 Technical Evaluation Rept of Util 820201 Submittal Re Control of Heavy Loads (NUREG-0612) Project stage: Other ML20077L7891983-08-0909 August 1983 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation Rept Project stage: Draft Other ML20083D6381983-12-16016 December 1983 Forwards Response to Section 5.1.1(4) of NUREG-0612, Control of Heavy Loads of Nuclear Power Plants, Consisting of Test Results of Missile Shield Lifting Harness Per DG Eisenhut Project stage: Other ML20097E0961984-09-11011 September 1984 Forwards Insp Table Missile Shield Lifting Harness & Generic Load Path for Heavy Loads Not Covered by Specific Procedures.Info Resolves NUREG-0612,Phase I Items Project stage: Other ML20106A6541984-09-24024 September 1984 Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept Project stage: Other 1982-08-27
[Table View] |
Text
l l
TOLEDO
-.%se E iISON
,g M'
n.o4Ar<o P. Crn;u O
grdcs)VED 77;r;~~
Docket No. 50-346
~
9 JAH 2 2 N 8 3 3 1.icense No. NPF-3 g g n em e:ccus -
nu:a! GUAI" p
Serial No. 769 9
b
.ianuary 14, 1982 co Director of Nuclear Reactor Regulation Attention:
Mr.. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
Per Toledo Edison's discussion with your staf f, this letter is to inform you of our intention to submit a partial response to Mr.
D. G.
Eisenhut's letter dated December 22, 1980 (Log No. 648) concerning " Control of Ileavy Loads".
Toledo Edison expects to submit the report as requested in Section 2.1 of Enclosure 3 of Mr.
D.
G.
Eisnhut's letter as it pertains to Davis-P> esse Nuclear
)
Powe r Station, Unit No. I by February 1, 1982.
Very truly yours, RPC: CAB: lab cc:
DB-1 NRC Resident inspector joS'3 8201250349 820114 6/g DRADOCK05000g THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO OHIO 43652