ML20028F966

From kanterella
Jump to navigation Jump to search

Submits Partial Response to NRC 820923 Ltr Re Control of Heavy Loads.Response Includes Items 2.1.3 Re Load Handling Procedures & 2.1.5 Re Special Lifting Procedures.Remaining Open Items Will Be Answered by 830401
ML20028F966
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/31/1983
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR 906, TAC-10993, NUDOCS 8302070250
Download: ML20028F966 (2)


Text

,v -

a Docket No. 50-346 voteoo License No. NPF-3 RCHAHO P. CnousE Serial No. 906 v , p_m kxwe January 31, 1983 " * " " " ' '

Director of Nuc1 car Reactor Regulation At'.en t ion : Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stolz:

This letter is transmitting, per our response of December 14, 1982 (Serial No. 885), a partial submittal of the information requested in your letter of September 23, 1982 (Log No. 1097) concerning " Control of licavy Loads at Nuclear Power Plants (NUREG-0612)" for the Davis-3 esse Nuclear Power Station Unit No. 1.

The letter of September 23, 1982 contained a Technical Evaluation Report (TER) for Davis-Besse with some open items and a partial response is provided below:

ITEM: 2.1.3 - Load Handling Procedures (Guideline 2, NUREG-0612, Section 5.1.l(2)) page 15 (TER)

RESPONSE: The procedures identified in the TER have been updated to comply with NUREG-0612.

ITEM: 2.2.3 - Special review for Heavy Loads over the core (Interin Protection Measure 6, NUREG-0612, Section 5.3(6)) page 26 (TER).

RESPONSE: Toledo Edison has performed the special reviews for the interim protection Measure 6 of NUREG-0612.

ITFM: 2.1.5 - Special Lifting Devices (Guideline 4, NUREG-0612, Section 5.1.l(4)). Toledo Edison Exception 3 as identified on page 16 of the TER. (ANSI N14.6-1978 Section 5.3.3).

RESPONSE: Toledo Ediscn will perform load testing in accordance with ANSI N14.6-1978 Section 5.3.3 for identified overstressed conditions in accordance with the standard.

[A J

7 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 B302070250 830131 PDR ADOCK 05000346 p PDR

F (7

l Dockst No. 50-346 Lic:nts No. NPF-3

(

Serial No. 906 January 31, 1983 l Page 2 4

In accordance with our December 14, 1982 letter, a response will be provided on the remaining open items by April 1, 1983.

Toledo Edison plans to submit a Phase II submittal in accordance with NUREG-0612. We will provide a date for submittal two (2) weeks after the above open items are submitted.

I Very truly yours, I 97 CwM RPC: GAB:lah cc: DB-1 NRC Resident Inspector i

_ _