MONTHYEARIR 05000320/19800151980-11-24024 November 1980 IE Insp Rept 50-320/80-15 on 800901-1018.No Noncompliance Noted.Major Areas Inspected:Plant Operation,Health Physics & Environ Insp & Review Project stage: Request ML19340D0701980-12-22022 December 1980 Forwards PA Emergency Mgt Agency 801204 Response to FEMA Re Offsite Emergency Planning Contentions for TMI-1 Restart Hearings.List of Documents Initially Submitted to Regional Assistance Committee Encl.Related Correspondence Project stage: Request ML17194A9531981-02-0303 February 1981 Ltr to All Licensees of Operating Plants,Applicants for OLs & Holders of CPs Re Control of Heavy Loads.Forwards Missing Pages to Encl 3 of 801222 Generic Ltr.W/Related Info Project stage: Other ML20005A4731981-06-22022 June 1981 Advises That Review of Controls of Heavy Loads Per NUREG-0612 Scheduled for Completion by 810731 Project stage: Other ML20040B2841982-01-14014 January 1982 Advises of Intention to Submit Partial Response to NRC Re Control of Heavy Loads by 820201 Project stage: Other ML20027C5001982-08-27027 August 1982 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station,Unit 1, Draft Technical Evaluation Rept Project stage: Draft Other ML20067D7071982-12-14014 December 1982 Responds to Concerning Response to Draft Technical Evaluation Rept Re Control of Heavy Loads.Util Reviewing Request to Submit Phase II Rept.Response Will Be Provided 830131 Project stage: Draft Other ML20028F9661983-01-31031 January 1983 Submits Partial Response to NRC Re Control of Heavy Loads.Response Includes Items 2.1.3 Re Load Handling Procedures & 2.1.5 Re Special Lifting Procedures.Remaining Open Items Will Be Answered by 830401 Project stage: Other ML20023B7981983-05-0202 May 1983 Forwards Response to Re Open Items in NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Dynamic Load Effects,Inservice Insp & Exam Frequency Reviewed.Phase II Results Expected by 830601 Project stage: Other ML20079Q1801983-05-0606 May 1983 Forwards Response to Open Item on Safe Load Paths Contained in NRC 820923 Technical Evaluation Rept of Util 820201 Submittal Re Control of Heavy Loads (NUREG-0612) Project stage: Other ML20077L7891983-08-0909 August 1983 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation Rept Project stage: Draft Other ML20083D6381983-12-16016 December 1983 Forwards Response to Section 5.1.1(4) of NUREG-0612, Control of Heavy Loads of Nuclear Power Plants, Consisting of Test Results of Missile Shield Lifting Harness Per DG Eisenhut Project stage: Other ML20097E0961984-09-11011 September 1984 Forwards Insp Table Missile Shield Lifting Harness & Generic Load Path for Heavy Loads Not Covered by Specific Procedures.Info Resolves NUREG-0612,Phase I Items Project stage: Other ML20106A6541984-09-24024 September 1984 Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept Project stage: Other 1982-08-27
[Table View] |
Text
,v -
a Docket No. 50-346 voteoo License No. NPF-3 RCHAHO P. CnousE Serial No. 906 v, p_m kxwe January 31, 1983 Director of Nuc1 car Reactor Regulation At'.en t ion :
Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
This letter is transmitting, per our response of December 14, 1982 (Serial No. 885), a partial submittal of the information requested in your letter of September 23, 1982 (Log No. 1097) concerning " Control of licavy Loads at Nuclear Power Plants (NUREG-0612)" for the Davis-3 esse Nuclear Power Station Unit No. 1.
The letter of September 23, 1982 contained a Technical Evaluation Report (TER) for Davis-Besse with some open items and a partial response is provided below:
ITEM:
2.1.3 - Load Handling Procedures (Guideline 2, NUREG-0612, Section 5.1.l(2)) page 15 (TER)
RESPONSE
The procedures identified in the TER have been updated to comply with NUREG-0612.
ITEM:
2.2.3 - Special review for Heavy Loads over the core (Interin Protection Measure 6, NUREG-0612, Section 5.3(6)) page 26 (TER).
RESPONSE
Toledo Edison has performed the special reviews for the interim protection Measure 6 of NUREG-0612.
ITFM:
2.1.5 - Special Lifting Devices (Guideline 4, NUREG-0612, Section 5.1.l(4)).
Toledo Edison Exception 3 as identified on page 16 of the TER. (ANSI N14.6-1978 Section 5.3.3).
RESPONSE
Toledo Ediscn will perform load testing in accordance with ANSI N14.6-1978 Section 5.3.3 for identified overstressed conditions in accordance with the
[A standard.
7 J
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 B302070250 830131 PDR ADOCK 05000346 p
PDR
(7 F
l Dockst No. 50-346 Lic:nts No. NPF-3
(
Serial No. 906 January 31, 1983 l
Page 2 4
In accordance with our December 14, 1982 letter, a response will be provided on the remaining open items by April 1, 1983.
Toledo Edison plans to submit a Phase II submittal in accordance with NUREG-0612.
We will provide a date for submittal two (2) weeks after the above open items are submitted.
Very truly yours, I
97 CwM RPC: GAB:lah cc:
DB-1 NRC Resident Inspector i
_