Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20129D82123 February 1996Technical Evaluation Rept of IPE Submittal & RAI Responses for Davis-Besse Nuclear Power StationMission time
Internal Flooding
Probabilistic Risk Assessment
ML20071J39330 June 1994Technical Evaluation Rept,Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001, for Plant
ML20057E59230 September 1993Auxiliary Feedwater System RISK-BASED Inspection Guidance for the DAVIS-BESSE Nuclear Power Plant
ML20086F70731 October 1991Ter,Pump & Valve Inservice Testing Program,Davis-Besse Nuclear Power Station,Unit 1Safe Shutdown
Unanalyzed Condition
Boric Acid
Stroke time
Power Operated Valves
ML20058F86931 October 1990PRESSURE-DEPENDENT Fragilities for Piping Components.Pilot Study on Davis-Besse Nuclear Power StationHydrostatic
Probabilistic Risk Assessment
Earthquake
ML20069N48717 August 1990Station Blackout Evaluation, Final Technical Evaluation ReptSafe Shutdown
ML20083B54913 July 1990Monthly Rept for June 1990 for FIN B-5699, ISLOCA Research ProgramProbabilistic Risk Assessment
ML20083B47316 February 1990Assessment of Potential for ISLOCA at Davis-Besse Nuclear Power Station, Draft Rept
ML20070Q64331 January 1989Nuclear Power Plant Sys Sourcebook,Davis-BesseSafe Shutdown
Boric Acid
Ultimate heat sink
Emergency Lighting
ML20245E92131 August 1988Technical Evaluation Rept TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Davis-Besse Unit 1Loop seal
Anticipated operational occurrence
Earthquake
ML20238A94631 August 1987DAVIS-BESSE Uncertainty StudyLoop seal
ML20214R20630 April 1987Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Davis-Besse, Final Informal ReptSafe Shutdown
ML20212Q08830 November 1986Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1, Informal ReptBoric Acid
Grab sample
Fuel cladding
ML20212M27631 July 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1
ML20210C1667 March 1986Masonry Wall Design,Davis-Besse Unit 1, Technical Evaluation Rept
ML20151L3456 December 1985Suppl to Technical Evaluation Rept of Dcrdr for Davis-Besse Nuclear Power Station
ML20210K12919 November 1985Site Survey of Davis-Besse Maint Program & Practices, Technical Ltr ReptTemporary Modification
Systematic Assessment of Licensee Performance
ML20244D38710 July 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant.
ML20244D43830 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities
ML20132D20730 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Davis-Besse Unit 1
ML20127J59414 June 1985Preimplementation Audit of Dcrdr of Davis-Besse Nuclear Power Station
ML20133P88331 May 1985Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1Boric Acid
Grab sample
Fuel cladding
ML20108F44427 November 1984Masonry Wall Design,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept
ML20106A65424 September 1984Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation ReptSafe Shutdown
Coatings
Nondestructive Examination
Control of Heavy Loads
ML20095H06310 July 1984Draft Control of Heavy Loads - Phase II,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
Fuel cladding
ML20086N24529 February 1984Review of the DAVIS-BESSE Unit No. 1 Auxiliary Feedwater System Reliability AnalysisTime to boil
ML20077L7899 August 1983Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation ReptSafe Shutdown
Coatings
Nondestructive Examination
Control of Heavy Loads
ML20077K84514 March 1983Selected Operating Reactor Issues Program Ii,Rcs Vents, (NUREG-0737,Item II.B.1), Final Technical Evaluation ReptHot Short
ML20077K15024 November 1982ECCS Repts (F-47),TMI Action Plan Requirements, Davis-Besse Nuclear Power Station,Unit 1, Technical Evaluation Rept
ML20071L38431 August 1982Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Davis-Besse Nuclear Power Station, Technical Evaluation Rept
ML20027C50027 August 1982Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station,Unit 1, Draft Technical Evaluation ReptSafe Shutdown
Coatings
Nondestructive Examination
Control of Heavy Loads
ML20065S60523 July 1982Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation ReptBackfit
ML20069C59223 June 1982PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation ReptBoric Acid
Shutdown Margin
ML20064L28210 May 1982Auxiliary Feedwater Sys Automatic Initiation & Flow Indication (F-16,F-17)
ML20027A77530 April 1982Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other ESF Sys, Technical Evaluation Rept
ML20207N4386 April 1982Rev 1 to Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Environ Qualification SERs & TMI Action Plan Installed Equipment, Request for Addl Info
ML20040G15922 December 1981Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment.
ML20052A06831 May 1981Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint.
ML19240C00231 March 1981Inservice Testing Program for Pumps & Valves at Davis-Besse Nuclear Power Station - Unit 1 (Docket 50-346) for Period Nov 1977 Through Nov 1987, Safety EvaluationStroke time
Power Operated Valves
ML19208B87130 July 1979Technical Evaluation Rept Re Alternative to Keylock Control to Bypass Valves.Supports Alternative Procedures
ML19329C46717 July 1970Review of Seismic Design Criteria for Davis-Besse.Tornado Generated Missile
Earthquake
ML19329C48031 October 1969Seismological & Geological Review.Design basis earthquake
Earthquake
ML19329C47028 October 1969Seismic Review.Earthquake