Letter Sequence Draft Other |
|---|
|
|
MONTHYEARIR 05000320/19800151980-11-24024 November 1980 IE Insp Rept 50-320/80-15 on 800901-1018.No Noncompliance Noted.Major Areas Inspected:Plant Operation,Health Physics & Environ Insp & Review Project stage: Request ML19340D0701980-12-22022 December 1980 Forwards PA Emergency Mgt Agency 801204 Response to FEMA Re Offsite Emergency Planning Contentions for TMI-1 Restart Hearings.List of Documents Initially Submitted to Regional Assistance Committee Encl.Related Correspondence Project stage: Request ML17194A9531981-02-0303 February 1981 Ltr to All Licensees of Operating Plants,Applicants for OLs & Holders of CPs Re Control of Heavy Loads.Forwards Missing Pages to Encl 3 of 801222 Generic Ltr.W/Related Info Project stage: Other ML20005A4731981-06-22022 June 1981 Advises That Review of Controls of Heavy Loads Per NUREG-0612 Scheduled for Completion by 810731 Project stage: Other ML20040B2841982-01-14014 January 1982 Advises of Intention to Submit Partial Response to NRC Re Control of Heavy Loads by 820201 Project stage: Other ML20027C5001982-08-27027 August 1982 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station,Unit 1, Draft Technical Evaluation Rept Project stage: Draft Other ML20067D7071982-12-14014 December 1982 Responds to Concerning Response to Draft Technical Evaluation Rept Re Control of Heavy Loads.Util Reviewing Request to Submit Phase II Rept.Response Will Be Provided 830131 Project stage: Draft Other ML20028F9661983-01-31031 January 1983 Submits Partial Response to NRC Re Control of Heavy Loads.Response Includes Items 2.1.3 Re Load Handling Procedures & 2.1.5 Re Special Lifting Procedures.Remaining Open Items Will Be Answered by 830401 Project stage: Other ML20023B7981983-05-0202 May 1983 Forwards Response to Re Open Items in NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Dynamic Load Effects,Inservice Insp & Exam Frequency Reviewed.Phase II Results Expected by 830601 Project stage: Other ML20079Q1801983-05-0606 May 1983 Forwards Response to Open Item on Safe Load Paths Contained in NRC 820923 Technical Evaluation Rept of Util 820201 Submittal Re Control of Heavy Loads (NUREG-0612) Project stage: Other ML20077L7891983-08-0909 August 1983 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation Rept Project stage: Draft Other ML20083D6381983-12-16016 December 1983 Forwards Response to Section 5.1.1(4) of NUREG-0612, Control of Heavy Loads of Nuclear Power Plants, Consisting of Test Results of Missile Shield Lifting Harness Per DG Eisenhut Project stage: Other ML20097E0961984-09-11011 September 1984 Forwards Insp Table Missile Shield Lifting Harness & Generic Load Path for Heavy Loads Not Covered by Specific Procedures.Info Resolves NUREG-0612,Phase I Items Project stage: Other ML20106A6541984-09-24024 September 1984 Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept Project stage: Other 1982-08-27
[Table View] |
Text
TOLEDO
%mma EDISON AcHano P. CnouSE v<. mnent Docket No. 50-346
14191 PS9 5221 License No. NPF-3 Serial No. 885 December 14, 1982 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
This is in response to your letter dated November 30, 1982 (Log No. 1147) concerning Toledo Edison's responses to the draft of the Technical Evaluation Report (TER) for Control of Heavy Loads at Nuclear Power Plants (NUREG-0612). Toledo Edison provided a tentative date of January 31, 1983 for response to the TER for Davis-Besse Nuclear Power Station Unit No. 1.
Toledo Edison has reviewed the TER with our consultants to provide the requested information. As a result of this meeting, further effort will be required on several items. Therefore, a staged submittal will be provided by supplying the information completed prior to the end of January and the final responses by April 1, 1983.
Toledo Edison is reviewing your request to submit a Phase II submittal as requested by NUREG-0612 and will provide a response by January 31, 1983.
Very truly yours,
[
RPC:GRG:lah cc: DB-1 NRC Resident Inspector l
8212210092 821214 PDR ADOCK 05000346 p
PDR p
m moo mso~ co_
mso~,_
soo - so~ - -
moo. oso ms,
- -