Advises That Review of Controls of Heavy Loads Per NUREG-0612 Scheduled for Completion by 810731
ML20005A473
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/22/1981
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR 723, TAC-10993, NUDOCS 8106300371
Download: ML20005A473 (1)


Text

TOLEDO EDISON p

",hCm Docket No. 50-346 License No. NPF-3 f_

'[,CJ-.gg7 {

m a m 225 Serial No. 723 3

June 22, 19'81 Y[?:l (h

b Director of Nuclear Reactor Regulation Attention:

Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Stolz:

On December 22, 1980, Mr. Eisenhut sent a letter (Log No. 698) to Toledo Edison concerning " Controls of Heavy Loads at Nuclear Power Plants Resolution of TAP A-36" (NUREG-0612). Toledo Edison is required to review our controls for the handling of heavy loads and identify those changes and modifications in the area of Interim Actions for Control of Heavy Loads and in Section 2.4 of NUREG-0612, which are germane to the Davis-Besse Nuclear Power Station Unit No. 1, by June 1981.

Toledo Edison is currently performing analyses to determine the applic-ability of those actions listed in NUREG-0612. The planned completion date for the analysis is in July. Toledo Edison is now scheduled to submit its response by July 31, 1981.

Very truly yours,